S501‐51AANTI‐GRAFFITI COATING
3 LOW BIDDERS 2014 ‐ 2018
ANTI‐GRAFFITI COATING‐ SF Power (ANTI‐GRAFFITI COATING‐ SF)
$0.00
$0.50
$1.00
$1.50
$2.00
0 5,000 10,000 15,000 20,000total cubic inches
S501‐55ALAMINATED ELASTOMERIC BEARINGS GRADE 3 POLYCHLOROPRENE
3 LOW BIDDERS 2014 ‐ 2017
laminated elastomeric Power (laminated elastomeric)
Use cost/cubic inch of pad for estimating, but show as EACH on the Cost Estimate
$0.00
$0.50
$1.00
$1.50
$2.00
0 5,000 10,000 15,000 20,000total cubic inches
S501‐55ALAMINATED ELASTOMERIC BEARINGS GRADE 4 POLYISOPRENE
3 LOW BIDDERS 2014 ‐ 2017
laminated elastomeric Power (laminated elastomeric)
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
0 1,000 2,000 3,000 4,000total cubic inches
S501‐55APLAIN ELASTOMERIC BEARINGS GRADE 3 POLYCHLOROPRENE
3 LOW BIDDERS 2014 ‐ 2017
plain elastomeric Power (plain elastomeric)
$0.00
$0.50
$1.00
$1.50
$2.00
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 16,000 17,000 18,000 19,000 20,000total cubic inches
S501‐55APLAIN ELASTOMERIC BEARINGS GRADE 4 POLYISOPRENE
3 LOW BIDDERS 2014 ‐ 2015
plain elastomeric Power (plain elastomeric)
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
0 100 200 300 400 500kips
S501‐55ASTAINLESS STEEL/PTFE BEARINGS
3 LOW BIDDERS 1992 ‐ 2014
ss‐ptfe Power (ss‐ptfe)
Use cost/kip for estimating, but show as EACH on the Cost Estimate
$0.04
$0.05
$0.06
$0.07
$0.08
$0.09
$0.10
$0.11
$0.12
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
CO
ST/L
F/AR
EA
LENGTH FEET
S501-30A 2017 STD SPECS577-005A 2018 STD SPECS
CASING for INTEGRAL ABUTMENT PILES3 LOW BIDDERS
2012 - 2018
INTEGRAL ABUTMENT CASING Power (INTEGRAL ABUTMENT CASING)
$0.00
$100.00
$200.00
$300.00
$400.00
$500.00
$600.00
$700.00
$800.00
$900.00
$1,000.00
$1,100.00
0 1 2 3 4 5GALLONS
S501‐50A 2017 STD SPECS581‐010A 2018 STD SPECS
CRACK INJECTION3 LOW BIDDERS 2013 ‐ 2017
INJECT Power (INJECT)
Gallons equals cubic inches of crack divided by 231
$0.00
$50.00
$100.00
$150.00
$200.00
$250.00
0 50 100 150 200 250 300 350FEET
S501‐30A 2017 STD SPECS581‐005A 2018 STD SPECS
CRACK PREPARATION3 LOW BIDDERS 2013 ‐ 2017
PREP Power (PREP)
$20
$30
$40
$50
$60
$70
$80
$90
$100
0 100 200 300 400 500 600 700 800 900 1000 1100 1200
GALLONS
S501‐50ADECK SEALER MATERIAL
3 LOW BIDDERS 2014 ‐ 2015
HMWM Power (HMWM)
$0
$1
$2
$3
$4
$5
$6
$7
$8
$9
$10
1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
SQ YARDS
S501‐35ADECK SEALER PREPARATION3 LOW BIDDERS 2014 ‐ 2015
PREP Power (PREP)
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
0 1000 2000 3000SQUARE FEET (BRIDGE PLAN AREA)
S500‐11A 2017 STD SPECS560‐005A 2018 STD SPECS
DEWATER BRIDGE ‐ NO COFFERDAM3 LOW BIDDERS 2013 ‐ 2018
BRIDGE ‐ NO COFFERDAM Power (BRIDGE ‐ NO COFFERDAM)
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
0 1000 2000 3000 4000 5000 6000 7000 8000 9000
SQUARE FEET (PERIMETER X HEIGHT)
S500‐11A 2017 STD SPECS560‐005A 2018 STD SPECS
DEWATER BRIDGE W/COFFERDAM3 LOW BIDDERS 2012 ‐ 2016
COFFERDAM Power (COFFERDAM)
Use cost/sf of cofferdam form area for estimating, but show as LS on the Cost Estimate.Cofferdam form area is equal to the perimeter of the seal concrete times the difference in elevation of the bottom of the seal concrete and cofferdam vent elevation
$‐
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
0 500 1000 1500 2000 2500 3000 3500 4000SQUARE FEET (CULVERT PLAN AREA)
S500‐11A 2017 STD SPECS560‐005A 2018 STD SPECS
DEWATER CULVERT ‐ NO COFFERDAM3 LOW BIDDERS 2013 ‐ 2018
CULVERT ‐ NO COFFERDAM Power (CULVERT ‐ NO COFFERDAM)
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
$90.00
$100.00
$110.00
$120.00
$130.00
$140.00
0
100
200
300
400
500
600
700
800
900
1,00
0
COST/LF/SQ
. FT OF AR
EA
LENGTH ‐ FT
DRILLED SHAFTS3 LOW BIDDERS 2013 ‐ 2015
DRILLED SHAFTS Power (DRILLED SHAFTS)
Use cross‐section area area of the drilled shaft for preliminay estimating. Final cost is based on multiple bid items.
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
1,00
0
11,000
21,000
31,000
41,000
51,000
61,000
71,000
81,000
91,000
101,000
111,000
121,000
131,000
141,000
151,000
161,000
171,000
181,000
191,000
201,000
211,000
221,000
231,000
241,000
SQUARE FOOT
S501‐51A 2017 STD SPECS553‐005A 2018 STD SPECS
Epoxy Overlay3 LOW BIDDERS 2013 ‐ 2017
Epoxy Overlay ‐ SQ FT Power (Epoxy Overlay ‐ SQ FT)
$20
$25
$30
$35
$40
$45
$50
$55
$60
$65
$70
$75
$80
$85
$90
$95
$100
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
1700
1800
1900
2000
2100
2200
2300
2400
2500
2600
2700
2800
2900
3000
3100
3200
3300
3400
3500
SQUARE FEETheight x length
S501‐51AGRS‐IBS ABUTMENT
3 LOW BIDDERS 2015 ‐ 2016
GRS‐IBS ABUTMENT Power (GRS‐IBS ABUTMENT)
$300
$350
$400
$450
$500
0 50 100 150 200 250
CUBIC FEET
S501‐05A 2017 STD SPECS565‐005A 2018 STD SPECS
Asphaltic Plug Joint3 LOW BIDDERS 2012 ‐ 2017
Asphaltic Plug Joint Power (Asphaltic Plug Joint)
$10
$15
$20
0 50 100 150 200 250 300
COST/LF/INCH
FEET
S501‐06A 2017 STD SPECS566‐005A 2018 STD SPECSCOMPRESSION SEALS = 2"3 LOW BIDDERS 2012 ‐ 2017
COMPRESSION SEALS ONLY=2" Power (COMPRESSION SEALS ONLY=2")
$10
$15
$20
$25
0 50 100 150 200 250 300
COST/LF/INCH
FEET
S501‐06A 2017 STD SPECS566‐005A 2018 STD SPECSCOMPRESSION SEALS > 2"3 LOW BIDDERS 2012 ‐ 2017
COMPRESSION SEALS ONLY >2" Power (COMPRESSION SEALS ONLY >2")
$10
$15
$20
$25
$30
$35
$40
0 50 100 150 200 250 300 350 400 450 500 550 600
COST/LF/INCH
FEET
S501‐06A 2017 STD SPECS566‐005A 2018 STD SPECSCOMPRESSION SEALS < 2"3 LOW BIDDERS 2012 ‐ 2017
COMPRESSION SEALS ONLY <2" Power (COMPRESSION SEALS ONLY <2")
Use cost/lf/inch for estimating, but show as FT on the Cost Estimate.Use uncompressed joint width size to determine cost.
$25
$30
$35
$40
$45
$50
$55
$60
$65
$70
$75
$80
$85
$90
$95
$100
$105
$110
0 50 100 150 200 250 300 350
COST /FT/INCH
FEET
S501‐06A 2017 STD SPECS566‐005A 2018 STD SPECS
COMPRESSION SEALS W/ARMOR ANGLES ‐ ALL SIZES3 LOW BIDDERS 2015 ‐ 2015
COMPRESSION SEALS W/ARMOR ANGLES Power (COMPRESSION SEALS W/ARMOR ANGLES)
$3,000
$4,000
$5,000
$6,000
$7,000
$8,000
$9,000
$10,000
$11,000
$12,000
$13,000
$14,000
$15,000
$16,000
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15CUBIC YARDS
S501‐40A 2017 STD SPECS568‐005A 2018 STD SPECS
Elastomeric Concrete Header3 LOW BIDDERS 2013 ‐ 2018
Elastomeric Concrete Header Power (Elastomeric Concrete Header)
$20
$25
$30
$35
$40
$45
$50
$55
$60
0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000
COST/FT/INCH
FEET
S501‐06A 2017 STD SPECS566‐005A 2018 STD SPECS
JEENE TYPE JOINTS 3 LOW BIDDERS 2012 ‐ 2018
JEENE JOINT (W or J SERIES) Power (JEENE JOINT (W or J SERIES))
$125
$130
$135
$140
$145
$150
$155
$160
$165
$170
$175
$180
$185
$190
$195
$200
0 50 100 150 200
COST/FT/INCH
FEET
S501‐06AMODULAR JOINTS
3 LOW BIDDERS 2011 ‐ 2015
MODULAR JOINTS Power (MODULAR JOINTS)
$20
$25
$30
$35
$40
$45
$50
$55
$60
$65
$70
$75
$80
50 100 150 200 250 300 350 400 450 500 550 600 650FEET
S501‐06A 2017 STD SPECS569‐005A 2018 STD SPECSREMOVE ARMOR JOINTS
3 LOW BIDDERS 2012 ‐ 2017
ARMOR JOINT REMOVAL Power (ARMOR JOINT REMOVAL)
$10
$15
$20
$25
$30
$35
$40
$45
$50
$55
$60
$65
0 50 100 150 200 250 300 350 400 450 500
FEET
S501‐06ASILICONE SEALANT JOINT3 LOW BIDDERS 2012 ‐ 2017
SILICONE SEALANT JOINT Power (SILICONE SEALANT JOINT)
$100
$150
$200
$250
$300
$350
0 50 100 150 200 250
COST/FT
FEET
S501‐06A 2017 STD SPECS567‐005A 2018 STD SPECS
4" STRIP SEALS W/EXTRUSION 3 LOW BIDDERS 2013 ‐ 2018
STRIP SEALS W/EXTRUSIONS Power (STRIP SEALS W/EXTRUSIONS)
Use cost/lf/inch of joint width for estimating, but show as FT on the Cost Estimate.Use total movement range for size to determine cost.
$‐
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 60,000
SQ FT
S501‐70APAINT CONCRETE
3 LOW BIDDERS 1990 ‐ 2014
PAINT CONCRETE Power (PAINT CONCRETE)
$130.00
$135.00
$140.00
$145.00
$150.00
$155.00
$160.00
$165.00
$170.00
$175.00
$180.00
$185.00
$190.00
$195.00
$200.00
500 1000 1500 2000 2500 3000 3500feet
S501‐70A 2017 STD SPECS587‐005A 2018 STD SPECS
PAINT PICKET FENCE RAIL IN FIELD3 LOW BIDS 2009 ‐ 2015
PICKET FENCE Power (PICKET FENCE)
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
$90.00
$100.00
$110.00
$120.00
0 500 1000 1500 2000 2500 3000 3500 4000square feet
S501‐70APAINT SHELL PILES
3 LOW BIDDERS 2012 ‐ 2016
PAINT SHELL PILES Power (PAINT SHELL PILES)
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
15000 20000 25000 30000 35000 40000 45000 50000 55000 60000 65000 70000 75000square feet
S501‐70A 2017 STD SPECS587‐005A 2018 STD SPECS
COMPLETE REPAINT STEEL GIRDERS IN FIELD3 LOW BIDS 2003 ‐ 2017
COMPLETE REPAINT IN FIELD Power (COMPLETE REPAINT IN FIELD)
$20.00
$25.00
$30.00
$35.00
$40.00
$45.00
$50.00
0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000square feet
S501‐70A 2017 STD SPECS587‐005A 2018 STD SPECS
PAINT STEEL GIRDER AT EXPANSION JOINTS3 LOW BIDS 2013 ‐ 2017
AT EXP JOINTS Power (AT EXP JOINTS)
$40
$50
$60
$70
$80
$90
$100
$110
$120
$130
$140
$150
$160
$170
$180
$190
$200
0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300
SQUARE FEET
S501‐51A 2017 STD SPECS582‐010A 2018 STD SPECS
PATCH & REPAIR DECK CONCRETE3 LOW BIDDERS 2014 ‐ 2017
DECK Power (DECK)
$100$110$120$130$140$150$160$170$180$190$200$210$220$230$240$250$260$270$280$290$300$310$320$330$340$350
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
105
110
115
120
125
130
135
140
145
150
155
160
165
170
175
180
185
190
195
200
SQUARE FEET
S501‐51A 2017 STD SPECS582‐005A 2018 STD SPECS
PATCH & REPAIR CONCRETE SURFACE3 LOW BIDDERS 2013 ‐ 2017
CONC SURFACE Power (CONC SURFACE)
$0
$1,000
$2,000
$3,000
$4,000
$5,000
$6,000
0 100 200 300 400 500
CUBIC YARD
S501‐40A 2017 STD SPECS551‐010A 2018 STD SPECSPolyester Overlay Material 3 LOW BIDDERS 2014 ‐ 2018
MATERIAL ‐ CY Power (MATERIAL ‐ CY)
Compute the quan ty of material using ⅞" thickness to account for irregulari es.
$0
$10
$20
$30
$40
$50
$60
$70
$80
$90
$100
$110
$120
$130
$140
$150
0
500
1,00
0
1,50
0
2,00
0
2,50
0
3,00
0
3,50
0
4,00
0
4,50
0
5,00
0
5,50
0
6,00
0
6,50
0
7,00
0
7,50
0
8,00
0
8,50
0
9,00
0
9,50
0
10,000
10,500
11,000
11,500
12,000
12,500
13,000
13,500
14,000
14,500
15,000
SQUARE YARD
S501‐35A 2017 STD SPECS551‐005A 2018 STD SPECS
Polyester Overlay Preparation 3 LOW BIDDERS 2014 ‐ 2018
PREPARATION ‐ SY Power (PREPARATION ‐ SY)
$15.00
$20.00
$25.00
$30.00
0 50 100 150 200 250
CO
ST/O
PEN
ING
SF/
LF
Length - ft
S501-25A 2017 STD SPECS578-005A 2018 STD SPECSPRECAST BOX CULVERTS
AVERAGE 3 LOW BIDS2013 - 2018
PRECAST BOX CULVERTS Power (PRECAST BOX CULVERTS)
Use clear span opening times clear height in square feet for estimating, but show as LS on the Cost Estimate.Cost includes barrel and wings.
$10.00
$15.00
$20.00
0 50 100 150 200
CO
ST/O
PEN
ING
SF/
LF
Length - ft
S501-25A 2017 STD SPECS578-005A 2018 STD SPECS
PRECAST STIFFLEG CULVERTSAVERAGE 3 LOW BIDS
2013 - 2017
PC STIFFLEG Power (PC STIFFLEG)
Use clear span opening times clear height in square feet for estimating, but show as LS on the Cost Estimate.Cost includes barrel and wings.
$1,000.00
$1,500.00
$2,000.00
$2,500.00
$3,000.00
$3,500.00
$4,000.00
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150cubic yards
PRECAST ABUTMENT PILE CAPAVERAGE 3 LOW BIDS
2014 ‐ 2018
PRECAST ABUTMENT PILE CAP Power (PRECAST ABUTMENT PILE CAP)
Cost includes concrete and reinforcement and should be used for preliminary estimating only.
$1,000.00
$1,500.00
$2,000.00
$2,500.00
$3,000.00
0 50 100 150 200 250cubic yards
PRECAST PIER CAPAVERAGE 3 LOW BIDS
2012 ‐ 2015
PRECAST PIER CAP Power (PRECAST PIER CAP)
$500.00
$1,000.00
$1,500.00
$2,000.00
$2,500.00
$3,000.00
30 40 50 60 70 80 90 100cubic yards
PRECAST PIER SHAFTAVERAGE 3 LOW BIDS
2012 ‐ 2014
PRECAST PIER SHAFT Power (PRECAST PIER SHAFT)
$1,000.00
$1,500.00
$2,000.00
$2,500.00
$3,000.00
$3,500.00
$4,000.00
0 5 10 15 20cubic yards
PRECAST WINGSAVERAGE 3 LOW BIDS
2012 ‐ 2018
PRECAST WINGS Power (PRECAST WINGS)
$20
$25
$30
$35
$40
$45
$50
$55
$60
$65
$70
$75
$80
$85
$90
$95
$100
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
CUBIC YARDS
S501‐95AGEOSYNTHETIC REINFORCED ABUTMENT BACKFILL
3 LOW BIDDERS 2014 ‐ 2018
REINFORCED ABUTMENT BACKFILL ‐ CY Power (REINFORCED ABUTMENT BACKFILL ‐ CY)
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
100
600
1,10
0
1,60
0
2,10
0
2,60
0
3,10
0
3,60
0
4,10
0
4,60
0
5,10
0
5,60
0
SQ YARDS
S501‐35A 2017 STD SPECS580‐005A 2018 STD SPECSREMOVE ASPHALT OVERLAY3 LOW BIDDERS 2013 ‐ 2017
Remove Asphalt Overlay ‐ SY Power (Remove Asphalt Overlay ‐ SY)
$30.00
$35.00
$40.00
$45.00
$50.00
$55.00
$60.00
$65.00
$70.00
$75.00
$80.00
0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000square feet
S501‐15AMODULAR BLOCK
3 Low Bids 2005 ‐ 2016
MODULAR BLOCK Power (MODULAR BLOCK)
$80.00
$85.00
$90.00
$95.00
$100.00
$105.00
$110.00
$115.00
$120.00
0 500 1,000 1,500 2,000 2,500 3,000 3,500feet
S501‐18ACOPING FOR MSE WALL3 Low Bids 2013 ‐ 2017
COPING Power (COPING)
$30.00
$35.00
$40.00
$45.00
$50.00
$55.00
$60.00
0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000square feet
S501‐17AMSE WALL
3 Low Bids 2013 ‐ 2017
MSE Power (MSE)
$25.00
$30.00
$35.00
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000square feet
S501‐15ASEGMENTAL BLOCK
3 Low Bids 2012 ‐ 2016
SEGMENTAL BLOCK Power (SEGMENTAL BLOCK)
$55.00
$60.00
$65.00
$70.00
$75.00
5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 16,000 17,000 18,000 19,000 20,000 21,000 22,000 23,000 24,000 25,000square feet
S501‐15ASOIL NAIL
3 Low Bids 2009 ‐ 2015
SOIL NAIL Power (SOIL NAIL)
$50.00
$55.00
$60.00
$65.00
$70.00
$75.00
$80.00
$85.00
$90.00
1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000square feet
S501‐15ASOLDIER PILE
3 Low Bids 2008 ‐ 2015
SOLDIER PILE Power (SOLDIER PILE)
$50.00
$55.00
$60.00
$65.00
$70.00
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 16,000 17,000 18,000square feet
S501‐15AWELDED WIRE WALL W/CONC FACING
3 Low Bids 2012 ‐ 2014
WELDED WIRE W/CONC FACING Power (WELDED WIRE W/CONC FACING)
$25.00
$30.00
$35.00
$40.00
$45.00
$50.00
$55.00
500 1,000 1,500 2,000square feet
S501‐15AWELDED WIRE WALL3 Low Bids 2013 ‐ 2018
WELDED WIRE Power (WELDED WIRE)
$20
$30
$40
$50
$60
$70
$80
$90
$100
$110
0 100 200 300 400 500 600 700 800 900 1000
SQ YARDS
S501‐35AROCK SLOPE PROTECTION3 LOW BIDDERS 2010 ‐ 2018
ROCK SLOPE PROTECTION Power (ROCK SLOPE PROTECTION)
$0
$5
$10
$15
$20
$25
1,00
0
2,00
0
3,00
0
4,00
0
5,00
0
6,00
0
7,00
0
8,00
0
9,00
0
10,000
11,000
12,000
13,000
14,000
15,000
16,000
17,000
18,000
19,000
20,000
21,000
22,000
23,000
24,000
25,000
SQ FT AREA OF BRIDGE
S501‐90A 2017 STD SPECS584‐005a 2018 STD SPECS
TEMPORARY SHORING FOR BRIDGES3 LOW BIDDERS 2013 ‐ 2018
TEMPORARY SHORING Power (TEMPORARY SHORING)
Use cost/sf of new bridge plan area for estimating, but show as LS on the Cost Eestimate.
$0
$5
$10
$15
$20
$25
$30
$35
$40
0
500
1,00
0
1,50
0
2,00
0
2,50
0
3,00
0
SQ FT PLAN AREA OF CULVERT
S501‐90A 2017 STD SPECS584‐005A 2018 STD SPECS
TEMPORARY SHORING FOR CULVERTS3 LOW BIDDERS 2013 ‐ 2018
TEMPORARY SHORING Power (TEMPORARY SHORING)
Use cost/sf of new culvert plan area for estimating, but show as LS on the Cost Estimate.
$20
$30
$40
$50
$60
$70
$80
$90
$100
$110
$120
$130
$140
0 100 200 300 400 500 600 700 800 900 1000
SQ YARDS
S501‐60A 2017 STD SPECS575‐005A 2018 STD SPECS
TEXTURED CONCRETE SURFACE3 LOW BIDDERS 2013 ‐ 2018
TEXTURED CONCRETE SURFACE Power (TEXTURED CONCRETE SURFACE)
$0
$5
$10
$15
$20
0
1,00
0
2,00
0
3,00
0
4,00
0
5,00
0
6,00
0
7,00
0
8,00
0
9,00
0
10,000
SQ FT AREA (PERIMETER X DEPTH)
S501‐51ATEMPORARY TURBIDITY CURTAIN
3 LOW BIDDERS 2014 ‐ 2017
TEMPORARY TURBIDITY CURTAIN Power (TEMPORARY TURBIDITY CURTAIN)
$5.00
$10.00
$15.00
$20.00
50 100 150 200 250 300 350 400 450 500feet of conduit
S501‐30A 2017 STD SOECS586‐005A 2018 STD SPECS
UTILITY CONDUIT ‐ Complete Installation with No Hangars3 low bids2013 ‐ 2018
Complete WITH NO HANGARS Power (Complete WITH NO HANGARS)
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000feet of conduit
S501‐30A 2017 STD SOECS586‐005A 2018 STD SPECS
UTILITY CONDUIT ‐ Complete Installation with Hangars3 low bids2013 ‐ 2018
Complete WITH DECK HANGARS Power (Complete WITH DECK HANGARS)
$5.00
$6.00
$7.00
$8.00
$9.00
$10.00
$11.00
$12.00
$13.00
$14.00
$15.00
0 500 1000 1500 2000 2500 3000 3500 4000total length ‐ feet
S501‐30A 2017 STD SPECS586‐005A 2018 STD SPECS
UTILITY CONDUIT ‐ Partial Installation3 low bids2012 ‐ 2018