Post on 15-Nov-2021
Storvik & Co AS – Storgata 5, N-9900, Kirkenes, NORWAY
OOO Storvik Consult – Vorovskogo 5/23, 183038, Murmansk, RUSSIA
www.storvik.com
Report
REVIEW OF TENDERS IN NORTHERN SWEDEN
10 September 2014
Storvik Consult 2014 Page 2 of 22
Report title Project no. Date
Review of Tenders in Northern Sweden 80023, KTR 300 10.09.2014
Client Composed by Sign.
Barents Centre Finland Oy Irina Popova
Pavel Zaikov
Number of pages / annexes Approved by Sign.
22 Bjørn Storvik
LIST OF CONTENT
1 SUMMARY ...........................................................................................................................................................4
2 ENGINEERING AND CONSTRUCTION ..........................................................................................................5
2.1 CONSTRUCTION OF WATER PARK AND ROOFED PARKING ETC. IN UMEÅ, COUNTY OF VÄSTERBOTTEN ................5
2.2 CONSTRUCTION OF PEDESTRIAN AND BICYCLE PATH, LANDFILL ALONG SÄVARÅN RIVER, COUNTY OF
VÄSTERBOTTEN ..........................................................................................................................................................5 2.3 CONSTRUCTION OF A BRIDGE IN HÖRNEÅ, COUNTY OF VÄSTERBOTTEN .............................................................6
2.4 LILLJANSBERGET – CONSTRUCTION OF STREETS, UMEÅ, COUNTY OF VÄSTERBOTTEN .......................................7 2.5 CONSTRUCTION OF COOLING TOWER AT SSAB STEEL WORKS IN LULEÅ, COUNTY OF NORRBOTTEN ..................8
2.6 ENGINE HOUSE EXTENSION IN APTAS, KIRUNA, COUNTY OF NORRBOTTEN ........................................................8 2.7 EXTENSION OF A COMMERCIAL BUILDING IN LULEÅ, COUNTY OF NORRBOTTEN ................................................9 2.8 CONSTRUCTION OF HOUSING, ASSISTED LIVING FACILITIES, SPORTS HALL ETC. IN TAVELSJÖ, COUNTY OF
VÄSTERBOTTEN ..........................................................................................................................................................9 2.9 RECONSTRUCTION OF ASSISTED LIVING FACILITY AND FLATS IN GAMMELSTADEN, PHASE 2, LULEÅ, COUNTY OF
NORRBOTTEN ............................................................................................................................................................ 10 2.10 RECONSTRUCTION AND EXTENSION OF STRÖMNÄS SCHOOL IN PITEÅ, COUNTY OF NORRBOTTEN ..................... 10
2.11 RECONSTRUCTION OF ROAD STRYCKFORS-MYRHEDEN, MUNICIPALITY OF SKELLEFTEÅ, COUNTY OF
VÄSTERBOTTEN ........................................................................................................................................................ 11 2.12 RECONSTRUCTION OF ROAD JUNOSUANDO-MASUGNSBYN, MUNICIPALITY OF PAJALA, COUNTY OF
NORRBOTTEN ............................................................................................................................................................ 11
2.13 CONSTRUCTION OF A SCHOOL SPORTS HALL IN SKELLEFTEÅ, COUNTY OF VÄSTERBOTTEN .............................. 12
3 ENERGY ............................................................................................................................................................. 13
3.1 CONSTRUCTION OF A TRANSFORMER STATION IN BODEN, COUNTY OF NORRBOTTEN ....................................... 13 3.2 DISTRICT HEATING, INDOOR INSTALLATIONS, UMEÅ ENERGI AB, COUNTY OF VÄSTERBOTTEN ....................... 13 3.3 TURBINE GRANFORS POWER STATION G2, SKELLEFTEÅ KRAFT AB, COUNTY OF VÄSTERBOTTEN ................... 14
3.4 CONSTRUCTION OF LOW VOLTAGE SUBSTATION IN LULEÅ, COUNTY OF NORRBOTTEN ..................................... 14
4 MINING INDUSTRY ......................................................................................................................................... 16
4.1 LKAB, PROJECT M15 ROUGHING FACILITY – GRADING SCREENS .................................................................... 16 4.2 LKAB, REPLACEMENT OF MOTORS MVA04KV002 ........................................................................................ 16 4.3 LKAB, RUBBER LINING FOR 06KV001 BALL MILL .......................................................................................... 16 4.4 LKAB, PNEUMATIC WINCH ............................................................................................................................. 17 4.5 LKAB, PIPE LAYING IN CU3-LAPPKYRKAN ..................................................................................................... 17 4.6 LKAB, PROJECT M15 ROUGHING FACILITY – HOPPER FEEDERS (UNDER HOPPERS) .......................................... 17 4.7 LKAB, PROJECT M15 ROUGHING FACILITY – CROSS FEEDERS ........................................................................ 18
Storvik Consult 2014 Page 3 of 22
4.8 LKAB, VITÅFORS CONCENTRATION PLANT, VENTILATION UNITS, PART 2 ........................................................ 18
4.9 LKAB, VITÅFORS CONCENTRATION PLANT, VENTILATION DUCTS, PART 2 ....................................................... 18 4.10 LKAB, PROJECT M15 PELLETS – ROLLING DRUM MK3 .................................................................................. 18 4.11 LKAB, PROJECT M15 PELLETS – DEWATERING PLANT (DRUM FILTER AND VACCUM PUMP ETC.) .................... 19 4.12 LKAB, PROJECT M15 PELLETS – SLURRY PUMPS ............................................................................................ 19 4.13 LKAB, BURNER RAMP KK2 ............................................................................................................................ 19
4.14 COMFORT VENTILATION KK 2/3 ...................................................................................................................... 19 4.15 UPGRADING OF CONTROL SYSTEMS IN KA1 FACILITY ...................................................................................... 20 4.16 MERTAINEN MINE: ROCK EXCAVATION, CONCRETE WORKS, GROUND-BASED INSTALLATION, EARTH WORKS ... 20 4.17 PLANNED DEVELOPMENT OF MINE IN KALLAK, JOKKMOKK MUNICIPALITY, COUNTY OF NORRBOTTEN ............ 20
5 EDUCATION AND RESEARCH ...................................................................................................................... 22
5.1 CHEMICAL ANALYSES, UNIVERSITY OF LULEÅ, COUNTY OF NORRBOTTEN ...................................................... 22
Storvik Consult 2014 Page 4 of 22
1 SUMMARY
The present Report presents the outcome of the review of ongoing tenders as of 10th September
2014 in the Northern Sweden, namely in the Counties of Norrbotten and Västerbotten.
The tender survey covers the following branches:
- Construction and engineering
- Energy
- Mining industry
- Education and research
The Report gives brief information about ongoing tenders and includes a link to detail
information. For most public procurements the detail information can be found in the
Procurement database VismaOpic http://www.opic.com/sv/offentlig-upphandling/ and its
procurement instrument VismaTendSign http://www.opic.com/sv/tendsign/. A potential tenderer
shall be registered in the TendSign system to receive the tender documentation. Detailed
information on several tenders can be obtained from the services E-avrop (www.e-avrope.com)
and www.mercell.se after an easy registration procedure.
In some cases the potential supplier must be registered directly in own procurement system of
the tender publishing organization (a customer), for example LKAB or Trafikverket (Swedish
Transport Authority), to get access to detailed information on the tender or report interest
directly to an organization responsible for procurement.
Besides the tenders, the Report also gives information about some actual planned and coming
projects the tenders under which have not been announced yet.
Storvik Consult 2014 Page 5 of 22
2 ENGINEERING AND CONSTRUCTION
2.1 Construction of water park and roofed parking etc. in Umeå, County of Västerbotten
Project Background
and Objectives
Tenders from flooring, painting, tiling and under ceiling contractors are requested. The contract includes construction of swimming pool and underroof parking, facade refurbishment of the existing sports hall and demolition of the existing heating substation. The building will house several swimming pools with auxiliary rooms, fitness hall with auxiliary rooms and parking. The total are is about 19 700 m2 Spectator stand for about 800 people.
Publication Date N/A
Deadline August / September 2014
Budget Estimated total budget SEK 400 million (EURO 43,65 million)
Presenting/preparing
company
Rekab Entreprenad AB
Decision-maker(s) Rekab Entreprenad AB
Recommended approach towards the Swedish/executing side
Rekab Entreprenad AB Box 3096 903 03 UMEÅ Tel: +46 (0) 90-128750 Tore Karlsson Site foreman tore.karlsson@rekabbygg.se Anton Johansson Construction manager anton.johansson@rekab.se +46 (0) 70-3461266 Erik Sandström erik.sandstrom@rekab.se +46 (0) 72-2347781
2.2 Construction of pedestrian and bicycle path, landfill along Sävarån river, County of
Västerbotten
Project Background
and Objectives
Tenders from construction contractors are requested. Construction is estimated to start in October 2014. Construction time is about 9 month. The contract includes all works and materials that are required to deliver a complete and fully operational facility according to published specifications.
Publication Date N/A
Storvik Consult 2014 Page 6 of 22
Deadline 29.09.2014
Budget N/A
Presenting/preparing
company
Umeå kommun Stadsledningskontoret (Municiplity of Umeå, City
management office)
Decision-maker(s) Umeå kommun Stadsledningskontoret (Municiplity of Umeå, City
management office)
Recommended approach towards the Swedish/executing side
Umeå kommun Stadsledningskontoret www.umea.se umea.kommun@umea.se Tel: +46 090-161000 Sune Norman sune.norman@umea.se +46 (0) 70-6936124 Karin Isaksson Representative karin.isaksson@umea.se +46 (0) 70-3322532 Further information and details can be obtained after registration at: http://www.opic.com/upphandling/nybyggnad-gang-och-cykelvag-savaran-(umea-kommun-samhallsbyggnadskontoret-fastighet-u)-aida26435a5a5f4628392c27d9f66b415c7/
2.3 Construction of a bridge in Hörneå, County of Västerbotten
Project Background
and Objectives
The project concerns replacement of a bridge over a pond in Hörneån. Design and build contractors are invited to submit tenders.
Publication Date N/A
Deadline 15.09.2014
Budget N/A
Presenting/preparing
company
Umeå kommun Stadsledningskontoret (Municiplity of Umeå, City
management office)
Decision-maker(s) Umeå kommun Stadsledningskontoret (Municiplity of Umeå, City
management office)
Recommended approach towards the Swedish/executing side
Umeå kommun Stadsledningskontoret www.umea.se umea.kommun@umea.se Tel: +46 (0) 90-161000 Karin Isaksson Representative
Storvik Consult 2014 Page 7 of 22
karin.isaksson@umea.se +46 (0) 70-3322532 Lars Nilsson Project manager lars.nilsson@umea.se +46 (0) 70-6061446 Specifications and additional documents are available after registration at: https://www.e-avrop.com/umea/e-Upphandling/Announcement.aspx?id=23030
2.4 Lilljansberget – Construction of streets, Umeå, County of Västerbotten
Project Background
and Objectives
The assignment concerns construction of streets etc. In the area of Lilljansberget. The main street is to be built from Lilljansvägen Petrus Laestadiusväg. This direction of construction is to ensure that the developer of the first property on the left side counted from Lilljansvägen can get access to the property as soon as possible. As the roads become trafficable the developers along the roads will be allowed to use the roads for construction traffic to the sites. This implies that there will be restrictions imposed on the contractor as to the use of the working site. The contractor shall use the proposed area south of the pedestrian and bicycle bridge over Lilljansvägen. District heating lines along Loklagatan will probably be removed. After the asphalt macadam an inspection is to be conducted. The contractor announces the time. Property developers provide snow ploughing during winter 2014-2015. Pedestrian and bicycle path south of the area cannot be used for any transports.
Publication Date 01.09.2014 (last modified)
Deadline 22.09.2014
Budget N/A
Presenting/preparing
company
Municipality of Umeå
Decision-maker(s) Municipality of Umeå
Recommended approach towards the Swedish/executing side
Specifications and additional documents are available after registration at: https://www.e-avrop.com/umea/e-Upphandling/Announcement.aspx?id=22676
Storvik Consult 2014 Page 8 of 22
2.5 Construction of cooling tower at SSAB steel works in Luleå, County of Norrbotten
Project Background
and Objectives
Requests to electrical, ventilation and water and sewage contractors will be sent in Autumn 2014. Earth works and construction contractor for the lower (concrete) part of the tower (20 meters) is engaged. Martinssons is the contractor for the upper part, 21 meters. Construction is estimated to start in September 2014.
Publication Date September – October 2014
Deadline N/A
Budget N/A
Presenting/preparing
company
SSAB EMEA AB
Decision-maker(s) SSAB EMEA AB
Recommended approach towards the Swedish/executing side
SSAB EMEA AB www.ssab.com info@ssab.com Tel: +46 (0) 920-92000 Kent Mörtberg
2.6 Engine house extension in Aptas, Kiruna, County of Norrbotten
Project Background
and Objectives
Request for tenders will be published in Autumn 2014. The project includes earth works, railway construction, electrical, signaling and telecommunication systems.
Publication Date September 2014
Deadline October 2014
Budget Estimated budget SEK 65 million (EURO 7,09 million)
Presenting/preparing
company
Trafikverket Region Nord (Swedish Transport Agency Region North)
Decision-maker(s) Trafikverket Region Nord (Swedish Transport Agency Region North)
Recommended approach towards the Swedish/executing side
Trafikverket Region Nord Box 809 971 25 LULEÅ www.trafikverket.se trafikverket@trafikverket.se Tel: +46 (0) 771-921921 Tomas Tossavainen Project manager tomas.tossavainen@trafikverket.se Inger Lundberg
Storvik Consult 2014 Page 9 of 22
Project coordinator inger.lundberg@trafikverket.se +46 (0) 70-4285462
2.7 Extension of a commercial building in Luleå, County of Norrbotten
Project Background
and Objectives
Specifications are expected to be sent to design and build contractors in the middle of September with about 3 weeks bidding time. Extended area is about 1000 m2. A local construction manager from Luleå will be employed. Estimated construction start in November 2014.
Publication Date Week 37-38 (September 8th – 19th )
Deadline Week 40-41 (September 29th – October 10th )
Budget N/A
Presenting/preparing
company
ICA Fastigheter Sverige AB
Decision-maker(s) ICA Fastigheter Sverige AB
Recommended approach towards the Swedish/executing side
ICA Fastigheter Sverige AB www.ica.se Tel: + 46 (0) 21-193000 Tomas Öst tomas.ost@ica.se
2.8 Construction of housing, assisted living facilities, sports hall etc. in Tavelsjö, County of
Västerbotten
Project Background
and Objectives
Interested developers can contact the Customer. The feasibility study is completed. Design work is ongoing. The project will be divided into several phases. Estimated constructions start in 2015.
Publication Date N/A
Deadline March-September 2014
Budget Estimated budget SEK 65 – 80 million (EURO 7,09 – 8,73 million)
Presenting/preparing
company
Tavelsjö- & Rödåbygdens development company (Tavelsjö- &
Rödåbygdens utveckling ek för)
Decision-maker(s) Tavelsjö- & Rödåbygdens development company (Tavelsjö- &
Rödåbygdens utveckling ek för)
Recommended approach towards the Swedish/executing side
Tavelsjö- & Rödåbygdens utveckling ek för Svedjan 207 922 66 TAVELSJÖ Tel: +46 (0) 70-6465773
Storvik Consult 2014 Page 10 of 22
Göran Sundqvist goran@sundqvist-konsult.se
2.9 Reconstruction of assisted living facility and flats in Gammelstaden, phase 2, Luleå,
County of Norrbotten
Project Background
and Objectives
Tenders from general contractors are requested. Construction starts on October 27th 2014. The contract concerns reconstruction of a high rise building 3 and Row house F. Reconstruction area: about 900 m2. Grounds area under landscaping: ca 7500 m2 Extension area: about 80 m2. New construction area: about 575 m2.
Publication Date N/A
Deadline 22.09.2014
Budget Estimated budget SEK 65 million (EURO 7,09 million)
Presenting/preparing
company
Lulebo AB
Decision-maker(s) Lulebo AB
Recommended approach towards the Swedish/executing side
Lulebo AB Köpmangatan 27 972 33 LULEÅ www.lulebo.se Tel: +46 (0) 920-236700 Tommy Gabrielsson tommy.gabrielsson@lulebo.se
2.10 Reconstruction and extension of Strömnäs school in Piteå, County of Norrbotten
Project Background
and Objectives
Tenders from design and build contractors are requested. The school is to be refurbished and rebuilt to make room for the 6th form from Pitholms school. Construction is expected to start in October 2014.
Publication Date N/A
Deadline 29.09.2014
Budget N/A
Presenting/preparing
company
Municipality of Piteå
Decision-maker(s) Municipality of Piteå
Recommended approach towards the Swedish/executing side
Tender specifications and additional documents are available after registration at: http://www.opic.com/upphandling/stromnasskolan-om-och-tillbyggnad-(pitea-kommun-pitea)-aidac5124048a3e2c62f0e6ec4971515616/
Storvik Consult 2014 Page 11 of 22
2.11 Reconstruction of road Stryckfors-Myrheden, Municipality of Skellefteå, County of
Västerbotten
Project Background
and Objectives
Specifications for design and build contractors are expected to be published in September 2014. The project concerns bearing capacity improvement. About 20 km.
Publication Date September 2014
Deadline December 2014
Budget Estimated budget SEK 40 - 45 million (EURO 4,36 – 4,91 million)
Presenting/preparing
company
Trafikverket Region Nord (Swedish Transport Agency Region North)
Decision-maker(s) Trafikverket Region Nord (Swedish Transport Agency Region North)
Recommended approach towards the Swedish/executing side
Trafikverket Region Nord Box 809 971 25 LULEÅ www.trafikverket.se trafikverket@trafikverket.se Tel: +46 (0) 771-921921 Jonas Hallin Project manager, coordinator +46 (0) 72-2206151 Jörgen Enman Coordinator
2.12 Reconstruction of road Junosuando-Masugnsbyn, Municipality of Pajala, County of
Norrbotten
Project Background
and Objectives
Specifications are expected to be published in September 2014
Publication Date September 2014
Deadline October 2014
Budget Estimated budget SEK 50 - 100 million (EURO 5,46 – 10,91 million)
Presenting/preparing
company
Trafikverket Region Nord (Swedish Transport Agency Region North)
Decision-maker(s) Trafikverket Region Nord (Swedish Transport Agency Region North)
Recommended approach towards the Swedish/executing side
Trafikverket Region Nord Box 809 971 25 LULEÅ www.trafikverket.se trafikverket@trafikverket.se
Storvik Consult 2014 Page 12 of 22
Tel: +46 (0) 771-921921 Kenneth Enbom kenneth.enbom@trafikverket.se +46 (0) 70-3342326 Kenneth Strandh Project coordinator kenneth.strandh@trafikverket.se
2.13 Construction of a school sports hall in Skellefteå, County of Västerbotten
Project Background
and Objectives
Specifications for design and build contractors are expected to be sent in the beginning of September 2014. Construction is expected to start in November 2014. A sports hall with floor ball courts is planned.
Publication Date Expected in September 2014
Deadline N/A
Budget Estimated budget SEK 50 – 60 million (EURO 5,46 – 6,55 million)
Presenting/preparing
company
Municipality of Skellefteå
Decision-maker(s) Municipality of Skellefteå
Recommended approach towards the Swedish/executing side
Municipality of Skellefteå www.skelleftea.se kundtjanst@skelleftea.se Tel: +46 (0) 910-735000 Christer Norberg
Storvik Consult 2014 Page 13 of 22
3 ENERGY
3.1 Construction of a transformer station in Boden, County of Norrbotten
Project Background
and Objectives
Tenders from design and build contractors are requested. Construction is estimated to start in October 2014. The project concerns construction of 130/20 kV transformer station in A8 district in Boden.
Publication Date N/A
Deadline 10.10.2014
Budget N/A
Presenting/preparing
authority
Unicon Konsult AB (customer’s representative)
Decision-maker(s) Bodens Energi AB
Recommended approach towards the Swedish/executing side
Unicon Konsult AB Box 715 191 21 SOLLENTUNA www.unicon.se info@unicon.se Tel: +46 (0) 8-6258980 Michael Andersson +46 (0) 70-3910993 Further information and details can be obtained after registration at: http://www.opic.com/upphandling/pt22-alvbrinken-transformatorstation-(bodens-energi-nat-aktiebolag-boden)-aidc09cd60b1ff68e058c6649021fed14d6/
3.2 District heating, indoor installations, Umeå Energi AB, County of Västerbotten
Project Background
and Objectives
The contract includes all works and materials necessary to deliver complete and fully operational facilities in compliance with published specifications.
Publication Date 28.08.2014 (last modified)
Deadline 19.09.2014
Budget N/A
Presenting/preparing
authority
Umeå Energi AB
Decision-maker(s) Umeå Energi AB
Recommended approach towards the Swedish/executing
Further information and details can be obtained after registration at: https://www.e-avrop.com/umeaenergi/e-Upphandling/Announcement.aspx?id=23096
Storvik Consult 2014 Page 14 of 22
side
3.3 Turbine Granfors power station G2, Skellefteå Kraft AB, County of Västerbotten
Project Background
and Objectives
Turbine with all directly associated systems. The contract includes delivery, installation, testing and commissioning of a new turbine with all directly associated systems. Mandatory works for generators. The generator is to be dismantled, refurbished, reassembled, tested and commissioned. The refurbished and reassembled generator must be able to cope with additional load from the new turbine. Generator options and change requests. The total Scope of Work for the generator shall be defined in the inspection summer 2016 and in the test report on disassembled parts to be produced by a chosen workshop in 2017. The Total Scope of Work including options and change requests for the generator will be decided by the Purchaser. The Scope of Work for options and change requests will be handled commercially as Cost Plus Variable Percentage Contract.
Publication Date 02.09.2014 (last modified)
Deadline 14.10.2014
Budget N/A
Presenting/preparing
authority
Skellefteå Kraft AB
Decision-maker(s) Skellefteå Kraft AB
Recommended approach towards the Swedish/executing side
Further information and details can be obtained after registration at: https://www.e-avrop.com/skekraft/e-Upphandling/Announcement.aspx?id=22990
3.4 Construction of low voltage substation in Luleå, County of Norrbotten
Project Background
and Objectives
Tenders from contractors for low voltage substations, including equipment delivery, installation and voltage setting, are requested. Construction is estimated to start in November 2014.
Publication Date N/A
Deadline 26.09.2014
Budget N/A
Presenting/preparing
authority
LKAB concern
Decision-maker(s) LKAB concern
Recommended As described in item 4.
Storvik Consult 2014 Page 15 of 22
approach towards the Swedish/executing side
Procurement number: LF-33929 Contact person: Tore Mettävainio +46 (0) 970-73790 tore.mettavainio@lkab.com
Storvik Consult 2014 Page 16 of 22
4 MINING INDUSTRY
General information concerning LKABs procurements listed under items 4.1- 4.12 below:
The entire procurement documentation can be obtained at LKAB supplier portal:
http://supplier.lkab.com/ under heading “Active procurements”.
The potential supplier shall be registered at the portal to be able to log in. To get access to
detailed tender documentation the potential supplier shall express interest in a specific
procurement.
4.1 LKAB, Project M15 Roughing facility – Grading screens
Project Background
and Objectives
Grading screens NL09 delivery, installation and putting into operation
Deadline 15.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number: LF-34102 Contact person: Ove Ejemalm ove.ejemalm.ext@lkab.com
4.2 LKAB, Replacement of motors MVA04KV002
Project Background
and Objectives
LKAB invites to submit tenders for designing, manufacturing, delivery and installation of two motors, double hydraulic starters, adjustment and reinforcement of two motor frames (adjustment of axis height), service of one/two grinder motors as well as on-site installation and axes alignment of the whole drive train of two grinding machines, including gear box according to published technical specifications for procurement MVA04KV002
Deadline 25.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number: LF-34200 Contact person: Peter Eriksson +46 97079084 peter.f.eriksson@lkab.com
4.3 LKAB, Rubber lining for 06KV001 ball mill
Project Background
and Objectives
LKAB invites contractors to offer price for a complete set of liners according to the attached drawings. Complete with accessories for lining installation. One complete set of resistant rubber mill lining spare for 06KV001 Ball Mill O 4600 x 6560 mm long, consisting of shell plates, feed
Storvik Consult 2014 Page 17 of 22
end head plates, discharge end plates and lifters in PolyMet with necessary fixing hardware. Feed end and discharge end head plates with steel reinforcement.
Deadline 30.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF-34227 Contact person: Peter Eriksson +46 97079084 peter.f.eriksson@lkab.com
4.4 LKAB, pneumatic winch
Project Background
and Objectives
Delivery of a pneumatic chain winch to Malberget, according to technical specification. Delivery time is to be specified in the offer.
Deadline 16.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF-34224 Contact person: Annika Aspemo +46 97073792 annika.aspemo@lkab.com
4.5 LKAB, pipe laying in CU3-Lappkyrkan
Project Background
and Objectives
Pipe-laying works in a conveyor gallery from CU3 to Lappkyrkan. On-site visit is a requirement before the tenders can be submitted.
Deadline 30.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF-34241 Contact person: Jonas Eriksson +46 79079186 jonas.nils.eriksson@lkab.com
4.6 LKAB, Project M15 Roughing facility – Hopper feeders (under hoppers)
Deadline 15.09.2014.
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34103 Contact person Ove Ejemalm - ove.ejemalm.ext@lkab.com
Storvik Consult 2014 Page 18 of 22
4.7 LKAB, Project M15 Roughing facility – Cross feeders
Deadline 15.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34105 Contact person Ove Ejemalm - ove.ejemalm.ext@lkab.com
4.8 LKAB, Vitåfors concentration plant, ventilation units, part 2
Project Background
and Objectives
Improvement of indoor climate in the concentration plant in Malmberget Vitåfors. LKAB intends to improve ventilation and air treatment system at Vitåfors concentration plant. The present contract is to be performed as a design and build contract concerning ventilation units. The contract includes design, complete installation including construction works, piping, control systems, adjustment, putting into operation and functional testing. A fully operational facility is to be delivered.
Deadline 30.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34187 Contact person Tore Mettävainio +46 (0) 970-73790 tore.mettavainio@lkab.com
4.9 LKAB, Vitåfors concentration plant, ventilation ducts, part 2
Project Background
and Objectives
LKAB intends to upgrade ventilation and air treatment system at Vitåfors concentration plant. The present procurement concerns a new duct system to be connected to the new ventilation units (supplied and installed by another contractor) as well as 3 smaller ventilation units with duct systems belonging to these.
Deadline 30.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34188 Contact person Tore Mettävainio +46 (0) 970-73790 tore.mettavainio@lkab.com
4.10 LKAB, Project M15 Pellets – Rolling drum MK3
Deadline 15.09.2014
Recommended Procurement number : LF- 34082
Storvik Consult 2014 Page 19 of 22
approach towards the
Swedish/executing
side
Contact person Ove Ejemalm - ove.ejemalm.ext@lkab.com
4.11 LKAB, Project M15 Pellets – Dewatering plant (Drum filter and vaccum pump etc.)
Deadline 15.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34081 Contact person Ove Ejemalm - ove.ejemalm.ext@lkab.com
4.12 LKAB, Project M15 Pellets – slurry pumps
Deadline 15.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34086 Contact person Ove Ejemalm - ove.ejemalm.ext@lkab.com
4.13 LKAB, Burner ramp KK2
Project Background
and Objectives
Design, manufacturing and construction of a burner ramp KK2
Deadline 17.09.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34026 Contact person Nils-Håkan Ek +46 980 715 61 nils.ek@lkab.com
4.14 Comfort ventilation KK 2/3
Project Background
and Objectives
LKAB invites to submit tenders for integration of control systems for office ventilation systems in KK2 and KK3 facilities. The request concerns mostly integration of control systems but also some cable laying works as well as development of drawings for the whole integrated system. The work is expected to start in Autumn 2014. The contractor is expected to prepare a time schedule.
Deadline 14.09.2014
Storvik Consult 2014 Page 20 of 22
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34164 Contact person Peter Isaksson +46 (0) 980-53226 peter.isaksson@lkab.com
4.15 Upgrading of control systems in KA1 facility
Project Background
and Objectives
The control system of higher order 800xA in KA1 facility has a 5.0 version. It is to be upgraded to a newer version. LKAB is looking for a supplier and installer of both hard- and software for the upgrading.
Deadline 05.10.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 34190 Contact person Peter Isaksson +46 (0) 980-53226 peter.isaksson@lkab.com
4.16 Mertainen mine: Rock excavation, concrete works, ground-based installation, earth works
Project Background
and Objectives
Tenders are requested from concreting and earth works contractors. The contract works are to be started in spring/summer 2015.
Deadline 10.10.2014
Recommended
approach towards the
Swedish/executing
side
Procurement number : LF- 33130 Contact person Tore Mettävainio +46 (0) 970-73790 tore.mettavainio@lkab.com
4.17 Planned development of mine in Kallak, Jokkmokk municipality, County of Norrbotten
Project Background
and Objectives
Test production is on-going. Further information will be provided soon. Estimated start in 2015. The mine is expected to be put in operation in 2016/2017. The Customer is Beowulf Mining located at the address Richmond House Broad Street Ely Cambridgeshire CB7 4AH England.
Publication Date N/A
Deadline N/A
Budget Estimated budget SEK 1-2 billion (EURO 109,12 – 218,25 million)
Presenting/preparing
authority
Jokkmokk Iron Mines AB
Decision-maker(s) Beowulf Mining
Storvik Consult 2014 Page 21 of 22
Recommended
approach towards the
Swedish/executing
side
Jokkmokk Iron Mines AB Råsundavägen 1 8tr 169 67 SOLNA Tel: +46 (0) 950-34852 Fred Boman
Storvik Consult 2014 Page 22 of 22
5 EDUCATION AND RESEARCH
5.1 Chemical analyses, University of Luleå, County of Norrbotten
Project Background
and Objectives
Research groups within Asphalt technology, Applied geology and water and sewage technology at the Technical University of Luleå (LTU) consider that chemical analyses to determine concentrations of basic elements, organic compounds and nutrient salts are very important research instruments. The university also uses analyses of stable metal isotopes and other basic elements. There must be a possibility to perform analysis on samples with low concentrations as well as on samples with high concentrations with complex matrixes. The different types of analysis are performed on a number of different sample types such as natural water samples with low concentrations, polluted water, rock materials, minerals, natural earth, sediment, polluted earth, biologic materials and household and industrial waste such as ash, sludge, mining waste, slag and slime. Cooperation in the are of analyses development and method improvement between researches at LTU and the company that performs analysis is important for the development of research. The present procurement contains three parts: chemical analysis, operation and maintenance of MC-ICP-MS instrument Neptune and Neptune Plus as well as R&D-cooperation.
Publication Date 08.09.2014
Deadline 19.10.2014
Budget N/A
Presenting/preparing
authority
University of Luleå
Decision-maker(s) University of Luleå
Recommended approach towards the Swedish/executing side
Contact person: Susanne Liminga susanne.liminga@ltu.se Detailed information and specifications are available at: https://upphandling.ltu.se/avantra/customer/atc_ltu/ modules/purchase/published/Selected.aspx?pid=1148
Storvik Consult
Murmansk, 10.09.2014