Reduced Cleveland County Fairgrounds Slideshow

Post on 28-Jan-2018

346 views 0 download

Transcript of Reduced Cleveland County Fairgrounds Slideshow

CLEVELAND COUNTY FAIRGROUNDSMETAL ROOF RESTORATION

BEFORE

BEFORE

RUST

LEAKY/OPEN SEALS

HOLES

DIRTY SKYLIGHTS

INEFFICIENT/HOT

BEFORE

BEFORE

FIRST STAGE - CLEANING ANDPOWER-WASHING

FIRST STAGE - CLEANING ANDPOWER-WASHING

SECOND STAGE - ELASTOMERIC BASE COAT #2

SECOND STAGE - ELASTOMERIC BASE COAT #2

CONKLIN RAPID ROOF III© ACRYLIC “ELASTOMERIC” BASE COAT APPLIED TO ALL HORIZONTAL AND VERTICAL SEAMS

THIS IS THE FIRST STAGE IN THE PROCESS OF SEALING THE ROOF’S SEAMS

THIRD STAGE -- SPUNFLEX©

THIRD STAGE -- SPUNFLEX©

FIRST ELASTOMERIC BASE COAT COVERED BY SPUNFLEX© FABRIC SEAM REINFORCEMENT

SPUNFLEX© EXPANDS AND CONTRACTS, EFFECTIVELY PROTECTING SEAMS FROM LEAKS CAUSED BY WEATHER CHANGES

FOURTH STAGE -- ELASTOMERIC©

BASE COAT #2

FOURTH STAGE -- ELASTOMERIC©

BASE COAT #2

SECOND ACRYLIC “ELASTOMERIC” BASE COAT APPLIED ON TOP OF SPUNFLEX©

THIS COAT CEMENTS THE SPUNFLEX© IN PLACE AND GUARANTEES THE SEALING OF EACH SEAM

FIFTH STAGE -- SEALING OF FASTENERS

FIFTH STAGE -- SEALING OF FASTENERS

ALL EXPOSED FASTENERS ARE SEALED WITH KWIK KAULK© PREMIUM CAULKING

HOLES, CRACKS, AND ANY POTENTIAL LEAKS ARE FILLED AND COVERED

SEALING OF FASTENERS

SEALING OF FASTENERS

FINAL STAGE -- BENCHMARK© TOP COAT

FINAL STAGE -- BENCHMARK© TOP COAT

BENCHMARK© TOP COAT APPLIED TO ENTIRE ROOF

100% ACRYLIC COATING RECOGNIZED BY MOST MAJOR CODE ORGANIZATIONS

ENERGY STAR RATING

85% SOLAR REFLECTIVE VALUE

BENCHMARK© TOP COAT

BENCHMARK© TOP COAT

AFTER

AFTER

RUST REMOVED

SEALS CAULKED AND SEALED

HOLES FILLED AND COVERED

SKYLIGHTS REPLACED

AFTER

AFTER