R77 ) ASSESSED CASE (2021)...R77 R78 R79 R80 R81 R82 R83 R84 R85 R86 R87 R94 R95 R96 R96a Oxleas 0...

Post on 24-Feb-2021

9 views 0 download

Transcript of R77 ) ASSESSED CASE (2021)...R77 R78 R79 R80 R81 R82 R83 R84 R85 R86 R87 R94 R95 R96 R96a Oxleas 0...

")

")

")

")")

")")

")

")")

")")

")")

")

R77

R78

R79R80

R81R82

R83R84

R85R86

R87R94

R95R96

R96a

Oxleas

0 350 700 1,050m

1:25,000REPRODUCTION FROM ORDNANCE SURVEY MAPS, BY

PERMISSION OF THE ORDNANCE SURVEY ON BEHALF OFTHE CONTROLLER OF HER MAJESTY'S STATIONERY

OFFICE. © CROWN COPYRIGHT ORDNANCE SURVEY. OSLICENCE NO.100035971/0160

THIS PLAN IS PRODUCED TO ASSIST WITH THE ASSESSMENTOF THE PRELIMINARY ENVIRONMENTAL INFORMATION. IT IS

ISSUED WITHOUT PREJUDICE TO THE SCOPE, CONTENT ANDORDER LAND IN ANY SUBSEQUENT APPLICATION FOR

DEVELOPMENT CONSENT

Coordinate System: British National GridUnits: Metre

THIS DRAWING IS SCALED AT PAPER SIZE A3,THEREFORE ANY PRINTS TAKEN AT SMALLER SIZESWILL AFFECT ACCURACY OF THE MEASUREMENT UNITSAND SHOULD NOT BE SCALED AGAINST

Client

ISSUE DATE COMMENTS DRAWN CHK'D APP'DA 27.08.15 DD TW SP

Title

APPLICATION No. GISA3

DRAWING No.6.5 NSCALE1:25,000ISSUEB

COPYRIGHT NOT TO BE REPRODUCED WITHOUT THE WRITTEN PERMISSION OF TRANSPORT FOR LONDON

Notes

") FUTURE RECEPTORS

") EXISTING RECEPTORS

ASSESSED CASE (2021)MODELLED ROADS

E G

O

F

I JN

®

KEY PLAN

B 30.09.15 DD TW SP

SILVERTOWN TUNNEL:PRELIMINARY ENVIRONMENTAL

INFORMATION REPORTWORST CASE RECEPTORS