PUCT Electric Service Rate Comparison Loads in SCED v. 2 October 27, 2014.

Post on 23-Dec-2015

215 views 1 download

Transcript of PUCT Electric Service Rate Comparison Loads in SCED v. 2 October 27, 2014.

PUCT Electric Service Rate Comparison

Loads in SCED v. 2October 27, 2014

Calculation of G Using PUC Data

• At last Loads in SCED meeting, we discussed using PUC retail rate information to determine G

• Participants at last meeting wanted more information to evaluate options

• Spoke to Grace Godines, who prepares PUC rate information for website

• www.puc.texas.gov/industry/electric/rates/RESbill.aspx

Oncor Electric DeliveryAMBIT ENERGY

Certified Green One-Year$66.08 $109.99 $163.89 $217.79Certified Green Variable$71.08 $134.98 $198.88 $262.78

AMIGO ENERGY100% Renewable$59.64 $97.19 $144.69 $192.19Online Offer, Twelve-Month Commitment$58.14 $94.19 $140.19 $186.19

What Information is Available• Cost information for a small number of rate

plans, by TDU service area and REP• Plans identified by name, which may give some

indication of type of plan• All-in rate, includes delivery charges• Plans appear to be selected to provide cost

comparisons over long periods• Separate table on PUC website provides

unbundled delivery rates• Lag in posting of information

Using PUC Rate Information to Calculate G

• May need broader set of rate plans• Need to refer to other sources for key

plan details (EFL or Terms and Conditions)

• Need to subtract delivery rates calculated from different web page

• Is lag in posting information a concern?

Discussion