PUBLIC SPACES MASTER PLAN UPDATE (POPS)...UFMP & NRMP UPDATES 4 Timeline: • Both plans updated as...

Post on 03-Aug-2020

2 views 0 download

Transcript of PUBLIC SPACES MASTER PLAN UPDATE (POPS)...UFMP & NRMP UPDATES 4 Timeline: • Both plans updated as...

PUBLIC SPACES MASTER PLAN UPDATE (POPS)Urban Forestry Commission September 27, 2018

1

AGENDA

2

POPS Context & Timeline Public Input Final POPS Draft Next Steps

Arlington County

Comprehensive Plan

Urban Forest Master Plan

Public Art Master Plan

Natural Resources

Management Plan

UPDATE

REFERENCE

Related Documents:

CIP

Sector Plans

Area Plans

Park Master Plans

Neighborhood Conservation Plans, etc.

PLANNING CONTEXT

3

UFMP & NRMP UPDATES

4

Timeline: • Both plans updated as one process• Staff already gathering preliminary information • Update process to begin after POPS adoption

Adopted in 2010Adopted in 2004

Win

ter2

015-

16

strategic directions, actions, action steps +

implementation strategy

PUBLIC MEETING SERIES

POPS POPPING UP EVENTS

definitions, strategic direction prioritization

FINAL DRAFTONLINE + OPEN DOOR EVENTS

present final draft plan

present preliminary recommendations

options forclassification+ LOS standards

vision statement + strategic directions

FOCUS

MEETINGS

STATISTICALLY VALID SURVEY

AD

VIS

OR

Y

CO

MM

ITT

EE

EN

GA

GEM

EN

T

AD

VIS

OR

Y

CO

MM

ITT

EE

EN

GA

GEM

EN

T

POPS CHARRETTE

AD

VIS

OR

Y

CO

MM

ITT

EE

EN

GA

GEM

EN

T

land acquisition

strategy

draft plan discussions

draft plan

CO

MM

ISSIO

N

REV

IEW

S

CO

UN

TY

BO

AR

D

AD

OPT

ION

GROUPPUBLIC MEETINGSERIES

Sprin

g/

Sum

mer

201

6

Jul-

Aug

2016

Dec

2016

Feb

2016

Sum

mer

2017

Fall 2

018

present vision, discuss + prioritize strategic directions, ask targeted questions to inform actions

ADDITIONAL PUBLIC ENGAGEMENTS

Dec

2017

Win

ter

2018

/201

9

POPS TIMELINE

WE ARE HERE

5

PUBLIC INPUT (COLLABORATIVE PROCESS)

AdvisoryCommitteeAPSAquaticsBIDs & PartnersBike/PedDog ParksGymnasticsNatural ResourcesUrban ForestrySports

Millennials Seniors TeensGen Xers

Over 90 participants

Public MeetingsFebruary 2016

Stakeholder Interviews

Winter/Spring 2016

Goal: 800Actual: 1,470

Statistically Valid Survey

Winter 2015/2016

POPSPopping UpSummer 2016

Focus GroupsSpring/Summer 2016

CharretteDecember 2016

Public Meetings July 2017

Draft Online

FINAL DRAFT COMING SOON…

Public MeetingsDecember 2018

Land Acquisition Athletic FieldsNatural Resources, Trees & Casual Use Spaces

July-August 2017

6

Work Session W/County Board February 20th 2018

Land Acquisition Athletic FieldsLevel of Service Natural Resources/TreesCasual Use Spaces

POPS AdvisoryCommittee

FEBRUARY 20TH WORK SESSION WITH THE COUNTY BOARD

7

Guidance received on the following:• Land Acquisition • Level of Service • Fields: Synthetic Turf & Lighting • Natural Resources & Trees • Casual Use Spaces

Presentation & Video: County Website

FINAL POPS DRAFT

8

PLAN ORGANIZATION

9

PLAN ORGANIZATION

10

SITE NAME, ADDRESS & ACREAGE

WHAT WILL BE INCLUDED IN THE FINAL DRAFT? INVENTORY OF PUBLIC SPACES BY OWNERSHIP

WHAT WILL BE INCLUDED IN THE FINAL DRAFT? LAND ACQUISITION

Potential acquisition sites- mapped Land Acquisition & Methodology

12

List of potential acquisition mechanisms & funding sources

Inventory of past acquisitions

WHAT WILL BE INCLUDED IN THE FINAL DRAFT? PRIVATELY OWNED PUBLIC SPACES DESIGN GUIDELINES

13

POPS Advisory Committee Meeting, April 2018

WHAT WILL BE INCLUDED IN THE FINAL DRAFT? LEVEL OF SERVICE

14

Population Based

(Dog Parks Example)

Access

2 case studies: community gardens & diamond fields

Conduct a public space needs assessment, including a statistically valid survey and level of service analysis, on a 5-year cycle.

WHAT WILL BE INCLUDED IN THE FINAL DRAFT?CASUAL USE SPACES

15

• Recognize the need- Casual Use Spaces

recommendations & description in SD1

• Draft definition

• Design characteristics

• Refine definition

• Explore completing inventory

• Explore opportunities to develop

standards

Short Term (Include in the POPS document)

Long Term (Implementation item after POPS adoption)

Fort C.F. Smith Park

WHAT WILL BE INCLUDED IN THE FINAL DRAFT?ATHLETIC FIELDS- SYNTHETIC CONVERSION & LIGHTING

Synthetic Conversion Criteria

Ranking of All Fields Tested Against the

Criteria

Synthetic Turf Conversion

Lighting CriteriaRanking of All Fields Tested Against the

Criteria

Field Lighting

16

17

NEXT STEPS

FINAL POPS DRAFT & NEXT STEPS

18

Community Feedback:

Fall: o October through November:

• Final POPS Draft posted online • Public engagements (open door type events)

Fall/Winter: o September & October: Commission reviewso November: LRPCo January 2019: RTAo February 2019: PC & County Board action