Prototyping and study of Glass Spark Chamber detectors

Post on 05-Jan-2016

40 views 8 download

description

Prototyping and study of Glass Spark Chamber detectors. B.Satyanarayana TIFR, Mumbai. Materials for the chamber fabrication. Glass Modi float glass 2mm thick Measured Mean 2.017 & RMS 0.013 Resistivity ~10 12 W -cm Surface preparation. Materials for the chamber fabrication. - PowerPoint PPT Presentation

Transcript of Prototyping and study of Glass Spark Chamber detectors

Prototyping and study ofGlass Spark Chamber detectors

B.SatyanarayanaTIFR, Mumbai

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

2

Materials for the chamber fabrication

Glass Modi float glass 2mm thick Measured Mean 2.017 & RMS 0.013 Resistivity ~1012-cm Surface preparation

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

3

Materials for the chamber fabrication

Carbon powder Special high grade Kolloidgraphite

40019 Nikunj Eximp Enterprises (P) Ltd Fixed carbon 94/96%, Mesh size –800/1000

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

4

Materials for the chamber fabrication

Coating Mixed with thinner and lacquer Applied with spray gun Various proportions tried

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

5

Graphite resistance

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

6

Materials for the chamber fabrication

Argon 44%

Isobutane 4%

Freon-R22 52%

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

7

Spacers for glass plates

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

8

Acrylic frame for the chamber

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

9

Exploded view of the chamber

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

10

Model of an assembled chamber

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

11

Typical signal from the chamber

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

12

Cosmic Ray Test setup

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

13

Counting rate of the chamber

January 9, 2003 Prototyping and study of Glass Spark Chamber detectors

14

Present status

Detector efficiency is the main problem

Gas mixture, carbon coating Procuring various gases and mixer Need to improve timing