PROPOSED LEVEE ALIGNMENT

Post on 22-Jan-2022

6 views 0 download

Transcript of PROPOSED LEVEE ALIGNMENT

PHASE 1PHASE 1PHASE 1PHASE 2

PHASE 2PHASE 2

Proposed Construction Right of Wayfor Tacoma Water 2nd Supply Pipeline

Proposed Construction Right of Wayfor Tacoma Water 2nd Supply Pipeline

Tacoma Water SupplyPipeline No. 5 Right of Way

Tacoma Water Supply Pipeline No. 5 Right of Way

BPARight of WayBPARight of Way

Brannan ParkBrannan Park

Brannan ParkStormwater

Pump Station

Brannan ParkStormwater

Pump Station

30th Street NE30th Street NE

26th Street NE26th Street NE

37th Street NE37th Street NE

AuburnMunicipal

Airport

AuburnMunicipal

Airport

Isaac EvansPark

Isaac EvansPark

Auburn RegionalGolf Course

Auburn RegionalGolf Course

Auburn 40 DevelopmentAuburn 40 Development

Labr

ador

Prop

erty

Labr

ador

Prop

erty

River Mobile EstatesRiver Mobile Estates

City of Auburn Property(former Crista Property)City of Auburn Property(former Crista Property)

Riverpointe DevelopmentRiverpointe Development

Riverpark Estates DevelopmentRiverpark Estates Development

Trail Run DevelopmentTrail Run Development

Port of SeattleWetland Mitigation

Site

Port of SeattleWetland Mitigation

Site

Gre

enRi

ver R

oad

SE

Gre

en R

iver R

oad

SE

Gre

enR

iver

Roa

dS

EG

reen

Riv

er R

oad

SE

RM 29.5RM 29.5RM 29.5RM 29.5

RM 28.5RM 28.5RM 28.5RM 28.5

RM 28.0RM 28.0RM 28.0RM 28.0

RM 27.5RM 27.5RM 27.5RM 27.5

RM 29.0RM 29.0RM 29.0RM 29.0

Green R

iverG

reenR

iverG

reenR

iverG

reen River

Green River

Green River

Green River

Green River

Green River

Green River

Green River

Green River

MS

treet

NE

M S

treet

NE

CS

treet

NE

C S

treet

NE

Aub

run

Way

N.

Aub

run

Way

N.

AubrunW

ay N.

Aubrun Way N.

EXISTINGLEVEE

PROPOSEDLEVEE

ALIGNMENTPROPOSED LEVEE

LeveeFootprint

Levee Crest

500’500’ 0

Legend

Minor Contours - 2 foot

River Mile Marker and Number

Parcel Boundaries

Utility Easements

Railroad

Major Contours - 10 foot

5.1MR

Edge of Pavement

Structures

Edge of Water

MaintenanceAccess Road

135-12539-10001-06/Fig3-1_FINA

L_BaseM

apandProposedA

lignment.ai

Reddington Levee Setback and Extension Feasibility Report1420 Fifth Avenue, Suite 600Seattle, Washington 98101Tel 206.883.9300 Fax 206.883-9301

Figure 3-1.UPDATED BASE MAP AND PROPOSED LEVEE ALIGNMENT