Project first prototype (1)

Post on 07-Jul-2015

92 views 1 download

Tags:

Transcript of Project first prototype (1)

PartName

Part descrip

tionMaterial

Manufacturing

Process

Quantity

Unit Cost

Total Cost

Structures

This part deal with product because structures have an effect on strength in any part of product.

-Wood-Nail

-Drilling-Cutting-Hammering

2 40 80

Chair

This part made from wood and hold by nail . In this part

-Wood-Nail

-Drilling-Cutting-Hammering

1 300 300

PartName

Part descrip

tion

Material

Manufacturing

Process

Quantity

Unit Cost

Total Cost

Table

This part made from wood and hold by nail. In this part you can put a book , Laptop or Tablet and can do work in document type.

-Wood

-Nail

-Drilling-Cutting-Hammering-Dubbing-Painting

1 200 200

Inside of

Total Cost

80+300+200+500 = 1080 Baht

Record the number of hours spent in each

manufacturing process.

-Cutting= 3 hrs.

-Drilling= 2hr.

-Hammering= 1.30 hrs.

-Dubbing= 1.30hrs.

-Painting =2hrs.

Total = 10 hrs.

Provide difficulties and problems encountered during the prototype development.

- It’s hard to move because product didn’t have rollers.

- Material have a high cost.

- Use time to make too much.

Provide the solutions for your second prototype.

- Find rollers and shaft . And assembly it with product (First prototype)

- Find a material that people didn’t use it.

- Manage a time and prepare manufacturing processes that my product use.