Post on 31-Mar-2015
MINING VENTURE IN LATIN AMERICA
PRESENTED BY: FELIX A. NEGRONAMERICAN PRECIOUS METAL RECYCLING LLCWWW.APMRLLC.COMAs of 23 February 2011
40 Mining Projects in 7 Countries
GENERAL INFORMATION5 MILLIONS US PER MINING SITE80% EQUIPMENT AND 20% Administration.40 OR MORE MINING OPERATIONS AVAILABLE.5 YEAR PROJECT. MINING SITES IN ARIZONA, NEVADA, CALIFORNIA,
OREGON, MEXICO, COSTA RICA, COLOMBIA, BRAZIL, PERU AND BOLIVIA.
MINING FOR GOLD, SILVER AND PLATINUM GROUPHEADQUARTERS IN USA. OVER 4 MILLION TROY OUNCES IN GOLD
RESERVES AND 1 MILLION IN PLATINUM GROUP RESERVES.
INVESTMENT58 MILLION TO 150 MILLIONFUNDING OF 30 SITES80% EQUIPMENT AND 20% OPERATIONSINVESTOR WILL PARTICIPATE ON
OPERATIONS.COMPANY INCORPORATION IN NEVADA. REVENUE SHARE7 COUNTRIES AND NEW TECHNOLOGYMILLION OF DOLLARS IN PRECIOUS
METAL RESERVES.
PROJECTSARIZONA, US – 234 ACRES – 10 Mining ClaimsBOLIVIA – Over 200,000 Acres – 4 Mining ClaimsBRAZIL – 2 MINING CLAIMSCOLOMBIA – 284,000 ACRES – OVER 20
PROJECTSCOSTA RICA – 4 MINING CLAIMS HONDURAS – UNDER DEVELOPMENTMEXICO – 4 MINING SITES OVER 300 ACRESPANAMA – UNDER DEVELOPMENTPERU – 2 OPERATIONSAFRICA – 4 COUNTRIES – 200,000 ACRES
EQUIPMENT40 MINING TEAMS – 20 TON PER HOUR
CREWS.20 to 200 TON PER HOUR HELIX CONSTRUCTION SUPPOR EQUIPMENT. PLASMA POWER PLANT – NEW
TECHNOLOGYPRECIOUS METAL LABORATORY WATER PUMP AND SUPPORT VEHICLESMILLING EQUIPMENTOPEN PIT OPERATION AND SEVERAL
UNDERGROUND OPERATIONS.
TIME TABLEMONTH 1 TO 4 ORDERING EQUIPMENT AND
TRAINING THE CREWS. MONTH 2 TO 3 MONTHS SET UP OF LEGAL
ENTITIES IN EACH COUNTRY. 5 TO 7 MONTHS TO DEPLOY THE 20 TON PER
HOUR EQUIPMENT. MOBILE UNITS8 TO 9 MONTHS DEPLOYMENT OF 100 TON
PER HOUR EQUIPMENT. MOBILE UNITS 10 MONTHS FIRST GOLD, SILVER AND
PLATINUM REVENUE.
PHOTOS BOLIVIA
PHOTOS COLOMBIA
PHOTOS COLOMBIA
PHOTOS MEXICO
PHOTOS MEXICO
PHOTOS MEXICO
PHOTOS AFRICA
MINING EQUIPMENT100 TON HOUR
MINING EQUIPMENT
POWER PLANT
POWER PLANT Accepts wide range of feed stock materials Flexibility in terms of waste materials available at various times of the year or with changes in market
conditions - combustion-based systems are restricted to specific materials with certain physical characteristics.
Ability to operate at less than 100% of capacity Can vary operation with availability of waste and energy demand - other systems must operate at
design capacity - less flexibility. No air emissions from the gasifer The Gasifier does not require a "smokestack" as its emissions are the combustible gas used to produce
electrical power. The only emissions are those from the engines, boilers or gas turbines. Environmental permitting is simplified and less costly.
Can be started and stopped as required Better suited for operations where operations are not required for seven days per week and 24 hours
per day. Operates at low pressures and temperatures Reduced original cost. Simplified and longer cost maintenance requirements. Less stringent
requirements for operating permits. Fully Automated Operating System Does not require a full-time operator. Complete system diagnostics built in to computer controlled
operating system. Lower Initial Cost Reduced capital cost due to simplicity of design and effectiveness of gas clean-up system. As much as
1/3 of the size and 1/3 of the cost of competing technologies. Proprietary Technology U.S. and Foreign patents protect the investment in the technology and testify to the unique nature of
the system.
POWER PLANTPrinciples of Gasification Advantages
can use waste products to produce useful energy
help eliminate landfill problems CO2 neutral process choice of energy form produced
POWER PLANT
POWER PLANT