Gate system Turnover rate status Unit Status (4th floor, 3rd floor)

RTR Projection - 405

Actual RTR - 339

Slippage - -66

Project : 150 Newport BoulevardCTBS : February 2015 + 8 months

PROGRESS REPORT as of 1-Jun-15

A BRD

MACHINE ROOM 1-Sep-14 10-Sep-14ELEVATOR 23-Sep-14 23-Sep-14ELEVATED WATER TANK 13-Sep-14 13-Sep-14BOOSTER PUMP 15-Sep-14 15-Sep-14Fans and Blowers 12-Sep-14 12-Sep-14

TYPICAL FLOORS10 24-Aug-14 23/23 31-Jul-14 22/229 31-Aug-14 23/23 8-Sep-14 22/228 22-Sep-14 23/23 5-Dec-14 22/227 19-Jan-15 23/23 30-Jan-15 22/226 15-Feb-15 23/23 28-Feb-15 22/225 15-Mar-15 23/23 31-Mar-15 22/224 15-Apr-15 0/23 30-Apr-15 0/223 15-May-15 23/23 30-May-15 1/222 19-Jan-15 23/23 30-Jan-15 22/22

FE 1 Total Units: 207 Total Units: 198FE 2 Total RTR: 184 Total RTR: 155FE 3 Remaining: 23 Remaining: 43FE 4FE 5

2/F Area2/F Deck LandscapePool and Pool DeckChanging Room

G/F Area Tota l Units : 405Main Lobby 9-Sep-14 16-Sep-14 Tota l RTR: 339Arcade / Wa lkway 6-Sep-14 6-Sep-14 Remaining: 66Mai lbox 9-Sep-14 18-Sep-14

EXTERIOR PAINTINGFRONT 30-Sep-14 30-Sep-14

LEFT 30-Sep-14 30-Sep-14RIGHT 30-Sep-14 30-Sep-14BACK 30-Sep-14 30-Sep-14

METER CENTERTVRSWITCHGEAR ROOMEE ROOM 6-Oct-14 6-Oct-14

BASEMENT 1BASEMENT 1 PARKING AREA 9-Nov-14 9-Oct-14LIFT LOBBY 4-Sep-14 18-Sep-14MDF ROOMREFUSE ROOMMDP/ ATS/ MCB/ ECBGENSET AREAAUXILLARY SYSTEMPEF/ PSF/ CFFDAS

CISTERN/ FIRE TANKTRANSFER PUMPPUMP ROOMFIRE PRO SYSTEM 29-Sep-14 29-Sep-14

Legend: Compl etedNot yet readyN/A

Prepared By: VAL/ GLLCMT

15-Sep-14

8-Sep-148-Sep-14

13-Oct-1410-Oct-148-Oct-14

13-Oct-148-Oct-14

1-Sep-1411-Sep-14

15-Sep-14

13-Oct-14

MEPFAux FINISHING

Wing A Wing B

15-Sep-14

8-Oct-14

6-Oct-14

23-Oct-14

7-Sep-14

21-Sep-1425-Sep-144-Sep-14

25-Sep-14

QCM AMW/HSG/RCT/ABM

150 Newport Boulevardas of June 1, 2015

WING A

10TH A B C D E F G H I J K L M N O P Q R S T U V W

9TH A B C D E F G H I J K L M N O P Q R S T U V W

8TH A B C D E F G H I J K L M N O P Q R S T U V W

7TH A B C D E F G H I J K L M N O P Q R S T U V W

6TH A B C D E F G H I J K L M N O P Q R S T U V W

5TH A B C D E F G H I J K L M N O P Q R S T U V W

4TH A B C D E F G H I J K L M N O P Q R S T U V W

3RD A B C D E F G H I J K L M N O P Q R S T U V W

2ND A B C D E F G H I J K L M N O P Q R S T U V W

WING B

10TH A B C D E F G H I J K L M N O P Q R S T U V

9TH A B C D E F G H I J K L M N O P Q R S T U V

8TH A B C D E F G H I J K L M N O P Q R S T U V

7TH A B C D E F G H I J K L M N O P Q R S T U V

6TH A B C D E F G H I J K L M N O P Q R S T U V

5TH A B C D E F G H I J K L M N O P Q R S T U V

4TH

A B C D E F G H I J K L M N O P Q R S T U V

3RD A B C D E F G H I J K L M N O P Q R S T U V

2ND A B C D E F G H I J K L M N O P Q R S T U V

Total F.I. 326 80.49% Signed 227 69.63% Move in 0 0.00%Total Unit 405 Total F.I. 326 Total Unit 405

PLOK 5 100.00% Deemed 59 18.10% Signed/ Deemed 10 76.92%FA 5 Total F.I. 326 AFS 13

Signed/ Deemed 240.00%

Welcome Kit 27796.85%

Welcome Kit 7100.00%

PLOK 5 Signed/ Deemed 286 Returned 7

Status:1.3RD floor :• Wing A- ready to receive.• Electrical and plumbing fixtures tested already.

• Wing B- On going rectification of punchlist.•Lift lobby-not ready for turnover yet.

Hallway

Lift Lobby- Wing A

Living Area Kitchen T&B

Lift Lobby- Wing B

Status:1.4th floor :•On going rectification of painting punchlists.• Incomplete installation of cabinet doors and countertops(target date of delivery June 15 for WING A,)

Hallway

Lift Lobby- Wing A

Living Area Kitchen T&B

Thank youand