MEGAWORLD CORPORATIONQUALITY CONTROL
MANAGEMENT150 NEWPORT BOULEVARD
Gate system Turnover rate status Unit Status (4th floor, 3rd floor)
RTR Projection - 405
Actual RTR - 339
Slippage - -66
Project : 150 Newport BoulevardCTBS : February 2015 + 8 months
PROGRESS REPORT as of 1-Jun-15
A BRD
MACHINE ROOM 1-Sep-14 10-Sep-14ELEVATOR 23-Sep-14 23-Sep-14ELEVATED WATER TANK 13-Sep-14 13-Sep-14BOOSTER PUMP 15-Sep-14 15-Sep-14Fans and Blowers 12-Sep-14 12-Sep-14
TYPICAL FLOORS10 24-Aug-14 23/23 31-Jul-14 22/229 31-Aug-14 23/23 8-Sep-14 22/228 22-Sep-14 23/23 5-Dec-14 22/227 19-Jan-15 23/23 30-Jan-15 22/226 15-Feb-15 23/23 28-Feb-15 22/225 15-Mar-15 23/23 31-Mar-15 22/224 15-Apr-15 0/23 30-Apr-15 0/223 15-May-15 23/23 30-May-15 1/222 19-Jan-15 23/23 30-Jan-15 22/22
FE 1 Total Units: 207 Total Units: 198FE 2 Total RTR: 184 Total RTR: 155FE 3 Remaining: 23 Remaining: 43FE 4FE 5
2/F Area2/F Deck LandscapePool and Pool DeckChanging Room
G/F Area Tota l Units : 405Main Lobby 9-Sep-14 16-Sep-14 Tota l RTR: 339Arcade / Wa lkway 6-Sep-14 6-Sep-14 Remaining: 66Mai lbox 9-Sep-14 18-Sep-14
EXTERIOR PAINTINGFRONT 30-Sep-14 30-Sep-14
LEFT 30-Sep-14 30-Sep-14RIGHT 30-Sep-14 30-Sep-14BACK 30-Sep-14 30-Sep-14
METER CENTERTVRSWITCHGEAR ROOMEE ROOM 6-Oct-14 6-Oct-14
BASEMENT 1BASEMENT 1 PARKING AREA 9-Nov-14 9-Oct-14LIFT LOBBY 4-Sep-14 18-Sep-14MDF ROOMREFUSE ROOMMDP/ ATS/ MCB/ ECBGENSET AREAAUXILLARY SYSTEMPEF/ PSF/ CFFDAS
CISTERN/ FIRE TANKTRANSFER PUMPPUMP ROOMFIRE PRO SYSTEM 29-Sep-14 29-Sep-14
Legend: Compl etedNot yet readyN/A
Prepared By: VAL/ GLLCMT
15-Sep-14
8-Sep-148-Sep-14
13-Oct-1410-Oct-148-Oct-14
13-Oct-148-Oct-14
1-Sep-1411-Sep-14
15-Sep-14
13-Oct-14
MEPFAux FINISHING
Wing A Wing B
15-Sep-14
8-Oct-14
6-Oct-14
23-Oct-14
7-Sep-14
21-Sep-1425-Sep-144-Sep-14
25-Sep-14
QCM AMW/HSG/RCT/ABM
150 Newport Boulevardas of June 1, 2015
WING A
10TH A B C D E F G H I J K L M N O P Q R S T U V W
9TH A B C D E F G H I J K L M N O P Q R S T U V W
8TH A B C D E F G H I J K L M N O P Q R S T U V W
7TH A B C D E F G H I J K L M N O P Q R S T U V W
6TH A B C D E F G H I J K L M N O P Q R S T U V W
5TH A B C D E F G H I J K L M N O P Q R S T U V W
4TH A B C D E F G H I J K L M N O P Q R S T U V W
3RD A B C D E F G H I J K L M N O P Q R S T U V W
2ND A B C D E F G H I J K L M N O P Q R S T U V W
WING B
10TH A B C D E F G H I J K L M N O P Q R S T U V
9TH A B C D E F G H I J K L M N O P Q R S T U V
8TH A B C D E F G H I J K L M N O P Q R S T U V
7TH A B C D E F G H I J K L M N O P Q R S T U V
6TH A B C D E F G H I J K L M N O P Q R S T U V
5TH A B C D E F G H I J K L M N O P Q R S T U V
4TH
A B C D E F G H I J K L M N O P Q R S T U V
3RD A B C D E F G H I J K L M N O P Q R S T U V
2ND A B C D E F G H I J K L M N O P Q R S T U V
Total F.I. 326 80.49% Signed 227 69.63% Move in 0 0.00%Total Unit 405 Total F.I. 326 Total Unit 405
PLOK 5 100.00% Deemed 59 18.10% Signed/ Deemed 10 76.92%FA 5 Total F.I. 326 AFS 13
Signed/ Deemed 240.00%
Welcome Kit 27796.85%
Welcome Kit 7100.00%
PLOK 5 Signed/ Deemed 286 Returned 7
Status:1.3RD floor :• Wing A- ready to receive.• Electrical and plumbing fixtures tested already.
• Wing B- On going rectification of punchlist.•Lift lobby-not ready for turnover yet.
Hallway
Lift Lobby- Wing A
Living Area Kitchen T&B
Lift Lobby- Wing B
Status:1.4th floor :•On going rectification of painting punchlists.• Incomplete installation of cabinet doors and countertops(target date of delivery June 15 for WING A,)
Hallway
Lift Lobby- Wing A
Living Area Kitchen T&B
Thank youand