PL2000 - planningapplication.s3.eu-west-1.amazonaws.com€¦ · contiguous elevations 01+02 sheet 1...

Post on 25-Aug-2020

3 views 0 download

Transcript of PL2000 - planningapplication.s3.eu-west-1.amazonaws.com€¦ · contiguous elevations 01+02 sheet 1...

+56.350

PARAPET

+56.350

PARAPET

35550

20.40

20.80

20.60

20.00

20.60

1

1

1

2

5

8

9

9

9

9

11

11

11

7

7

7

7

7 7

9

+35.725

LIFT OVERRUN

21.90

30.56

29.82

BLOCK BG4

SCR

BLOCK BG1

+24.975

LEVEL 01

+20.900

LEVEL 00

+31.125

LEVEL 03

+28.050

LEVEL 02

+34.800

PARAPET

3075

3075

3675

4075

13800

+31.725

PARAPET

+24.975

LEVEL 01

+28.050

LEVEL 02

+21.900

LEVEL 00

9825

3075

3075

3675

+40.750

PARAPET

19950

+30.925

LEVEL 03

+27.850

LEVEL 02

+24.775

LEVEL 01

+34.000

LEVEL 04

+37.075

LEVEL 05

+20.800

LEVEL 00

3975

3075

3075

3075

3075

3075

600

+57.050

LIFT OVERRUN

20.625

21.450

Site

b

ou

nd

ary

Site

b

ou

nd

ary

+57.250

PARAPET

36450

3075

+30.925

LEVEL 03

+27.850

LEVEL 02

+24.775

LEVEL 01

+34.000

LEVEL 04

+37.075

LEVEL 05

+20.800

LEVEL 00

+40.150

LEVEL 06

+43.225

LEVEL 07

+46.300

LEVEL 08

+49.375

LEVEL 09

+52.675

LEVEL 10

3975

3450

1125

3075

3075

3075

3075

3075

3075

3075

3300

1

1

2

6

6

11

11

11

9

9

7

7

6

7

Elevation West

28.5928.59

21.4021.36

31.71

BLOCK BG3

SCR

BLOCK BG2

+21.000

LEVEL 00

+72.435

LIFT OVERRUN

50700

3975

3075

3075

3075

3075

3075

3075

3075

3075

3075

3075

3075

3075

3075

3075

+20.600

LEVEL 00

+24.575

LEVEL 01

+27.650

LEVEL 02

+30.725

LEVEL 03

+33.800

LEVEL 04

+36.875

LEVEL 05

+39.950

LEVEL 06

+43.025

LEVEL 07

+46.100

LEVEL 08

+49.175

LEVEL 09

+52.250

LEVEL 10

+55.325

LEVEL 11

+58.400

LEVEL 12

+61.475

LEVEL 13

+64.550

LEVEL 14

+71.300

PARAPET

+67.625

LEVEL 15

3675

+46.700

PARAPET

26100

+72.435

PARAPET

51835

+20.800

LEVEL 00

+24.250

LEVEL 01

+27.325

LEVEL 02

+30.400

LEVEL 03

+33.475

LEVEL 04

+37.150

PARAPET

3450

3075

3075

3075

3675

16350

+38.075

LIFT OVERRUN

Site

b

ou

nd

ary

Site

b

ou

nd

ary

20.60

20.40

20.00

20.625

21.32

+20.600

LEVEL 00

+23.900

LEVEL 01

+26.975

LEVEL 02

3300

3075

10050

+30.650

PARAPET

3675

1

1

1

2

2

2

2

2

3

33

4

8

9

9

9

9

9

9

9

9

9

9

9

10

10

11

11

11

11

11 11

11

11

7

7

7 7 7 7

7

7

7

7 7

7

7

7 7

13

9

7

7

BLOCK

BG3

BLOCK

BG4

BLOCK

BG2

BLOCK

BG1

BLOCK

BG5

950578

APRIL 2020

1:200

Dorota Szafraniec

CONTIGUOUS ELEVATIONS 01+02

SHEET 1 OF 4

Brian Feely

Proposed Strategic

DBTR-SCR1 Fund

Housing Development

PLANNING

Former Bailey Gibson Site

PL2000 A

KEY PLAN (NTS)

ALL DIMENSIONS TO BE CHECKED ON SITE

NO DIMENSIONS TO BE SCALED FROM THIS DRAWING

RELEVANT CONSULTANTS DRAWINGS

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH

NOTE

SCALE:

DRAWING

DRAWN

JOB NUMBER:

DATE

FILE NAME

BLOCK DRAWING NUMBER ZONE

REVISION

CHECKED

@A0

950578-BG PL2000-2004 Continous elevations950578-BG PL2000-2004 Continous elevations

REV DESCRIPTIONDATE DRN

CLIENT

PROJECT

CHKD

Architecture + Interiors

henryjlyons.com

+353 1 888 3333

info@henryjlyons.com

51-54 Pearse Street

Dublin D02 KA66

© Henry J Lyons

MATERIAL LEGEND:

1 RED BRICK CLADDING

2 RED BRICK - TEXTURED COURSING

3 BUFF BRICK CLADDING

4 BUFF BRICK TEXTURED COURSING

5 GREY BRICK CLADDING

6 SELF COLOURED RENDER

7 ALUMINUM FRAMED GLAZING WITH INTEGRATED VENT

8 CURTAIN WALL GLAZING

9 ALUMINUM PANEL/SPANDREL/CAPPING

10 ARCHITECTURAL METAL FRAME WITH S/S MESH

INFILL TO SUPPORT GREEN WALL

11 GLASS BALUSTRADE

12 ALUMINUM LOUVER BAND/SCREEN

13 OBSCURE PRIVACY SCREEN

4

1

2

3

7

8

6

5

1

0

1

2

11

9

SCALE 1:200

Contiguous Elevation 01 BG4-BG1

PL2000

01

SCALE 1:200

Contiguous Elevation 02 BG2-BG3

PL2000

02

A 18/05/2020 ISSUED FOR ABP APPLICATION BF DS