Post on 22-Jan-2018
Photo Documentation: Risk Management Tool in Construction
Presented by:Sly Barisic CEO and Co-founder
Agenda
2
1. Importance of Risk Management in Construction
2. Safety and Quality Risks and Considerations
3. Photo Documentation in Construction
a. Great Risk Management Tool
b. Operational Challenges
c. Technology Solutions
4. Main takeaways
5. Questions & Answers
Introduction
3
CEO and Founder, FotoIN Mobile
• 4 years working on photo
documentation in business
• Knowledge and experience in:
• Photo and reports
• DB and data, Analytics,
• Mobile and Cloud tech,
• API, Integration,
• User experience, User interface,
• Product Design, Customer Success
Education:
• Longwood University
• BSBA in Finance
• University of GA, MBA
• Finance,
• Real Estate,
• Entrepreneurship and
• Risk Management
• PMP certification in 2008
Professional experience:
• Private Equity Commercial RE Fund
• Executive Investment Director
• Capital One Card, Sr. Business Analyst
• Risk and Loss Management
• Operations
• US Card Customer Experience
Sly Barisic
Risk in Construction – By the Numbers
4
~6.5 million workers 250,000+ construction sites$1 Trillion in 2016
LEED, Green, More sophisticated clients, More complex projects
24,882 injuries / yeardue to falls from stairways and ladders
$27,000 / injury Construction 2x the overall average
>$5 billion / yearto settle construction defect claims
5%+ of the total project costs
for unplanned expenses
Only 30% of projects within 10% of the budget Only 10% of the projects on time for 70%+ companies
Risk Management in Construction
5
Risk cost drivers: Frequency Severity
Stakeholders:
Risk management options:• Eliminate – Don’t do it
• Prevent the risk
• Transfer the risk
• C level
• Management
• Operations
• Legal/Compliance
• Insurance providers
• Service providers
• Vendors
• Government
• Mitigation
• Lessen frequency
• Lessen severity
Photo documentation valuable across project operations and overall business management
6
✓ Documenting As-Built Conditions
✓ Quality Control✓ Safety Management
✓ Reporting Progress to Owners
✓ Daily reporting
✓ RFIs, Punch lists, Change orders
✓ Reducing Warranty and Litigation exposure
✓ Resolving disputes with subs and clients
✓ Audit trail, including OSHA compliance ✓ Insurance✓ Analytics and Planning
Why prioritize photo documentation solution?
7
BRAIN PROCESSES
VISUALS 60,000
X FASTER THAN
TEXT
AVERAGE ORG SPENDS
$20/doc filed IN LABOR PER PWC STUDY
AVERAGE US MANAGER
SPENDS 3 hrs /
week ON
LOOKING FOR DOCS (D&T)
FRAGMENTED CAPTURE MANUAL FILING AND ORGANIZATION
Current photo documentation process is inefficient and provides limited value
LIMITED ACTION
“SAVE AS”
Construction Superintendent Project Manager
8
Operational challenges in solving for Photo Documentation
9
1. Well defined objectives - Why and what needs to be photo documented?
2. People impact - Who will be doing it and how?
3. Organizational support - How will the process be managed and monitored?
4. Picking the right solutions - What Technology will be used and how it will be procured?
Photo documentation benefits for Risk Management in Construction
10
✓ Legal and compliance
• Easier Audits
• Faster dispute resolution
• Faster claims processing
• Reduced penalties
✓ Quality Control
• Faster collaboration on defects and issues from the field
• Eliminating tear downs and re-work
• Avoiding hours and even days of back and forth communication
• Increasing productivity
✓ Safety
• Better control and compliance
• Accountability
• Educational
• Avoiding injuries and medical costs
What about photo documentation technology
11
• Mobile, Cloud
• What photo functionality is needed:
– easily capture photos with individual issues and inspections
– easily annotate on photos
– easily associating photos to the correct project and/or category
– not manually entering all the data for each photo
– ability to easily reference and find the right photos later
– using captured photos easily
– use across systems already in place to manage the project
What to look for:
– Simple and easy photo capture in the field
• mobile and no internet required
• if it is too hard, crew doesn’t use it and you don’t get the photos
• verifiable data captured together with the photos vs. separately
– Efficient vs. laborious
• doesn’t waste time and doesn’t distract from building process
• too many manual steps and data entry points limit adoption
– Manageable
• robust admin and management functions are a must have
• easy keyword search and filtering
– Works well with existing systems and workflows
✓ OTHER PROPRIETARY CONNECTORS, PLUG-INS AND TOOLS:
* * * *
* In development
✓ EASY MOBILE PHOTO AND INFO CAPTURE
FotoIN automates the workflow and makes visuals actionable
✓ ACTIONABLE VISUALS AND DATA
✓ AUTOMATED SYNC AND FILE TO EXISTING SYSTEMS
12
FotoIN success stories in automating photo documentation in Construction
13
ATI Restoration
PRODUCTIVITY,
EFFICIENCY
Walsh&Kelly
DISPUTE RESOLUTION,
PRODUCTIVITY,
EFFICIENCY
AECOM
PRODUCTIVITY,
EFFICIENCY
Key takeaways
14
1. Risk management extremely important in Construction:
▪ Impacts the bottom line directly
▪ Manage it across the organization
▪ Executive leadership is key
▪ Think culture vs. process
1. Photo documentation a great risk management tool:
▪ Improve field to office communication and collaboration
▪ Keep everyone accountable
▪ Have visual evidence to resolve disputes
▪ Reduce legal, compliance and insurance costs
1. Photo documentation strategy:
▪ Has to be holistic-org wide to be successful
▪ Needs to address multiple stakeholders appropriately
▪ Technology has to be user centric – if not easy to do, it wont get done
Easy to capture photos with automated location and project association
16
OPTIONS:Open app straight to report ot camera
modeSnap many photos in a row by skipping
camera photo previewSkip edit after each photo captureImport photos from the device
Easy data capture with the photo: annotate, tag and comment
17
AUTOMATED DATA:
• Naming
• Project
• User
• Address
• GPS
• Date & Time
• Data embedded in file
OPTIONS:
• Configurable tags & annotations
• Tags memorized for next photo
• All labels configurable
• Works with any language
Easy standardization of photo and data capture with template forms
18
CONFIGURABLE:
• Templates
• Chapters
• Questions
• Answer types
• Answer values
OTHER OPTIONS:
• Edit photos from the forms
• Export to PDF
• Upload and file
• Metadata from the form and the photos
• Import many photos
Automated organization and filing to existing systems and folder trees
19
✓ Simple customization of filing paths
* * * *
✓ PROPRIETARY CONNECTORS, PLUG-INS AND TOOLS:
* * * *
* In development
Easy access, search and use of photos, reports, and data
20
OPTIONS:
• Easy keyword search
• Filter by key variables
• Export data to Excel
• Export reports to Word
Customers increase productivity, save time and reduce costs with FotoIN
22
EASY ACTIONABLE OPEN
WHO Field and office users Management, Partners IT
FEATURES
Easy mobile capture tool Automated data, filingFull configurationWeb portal
Web dashboard, reportingData embedded in filesAnalysis and insightsReal time collaboration
Any smart deviceUse with existing systemOpen APICustom integrations
BENEFITSIncreased productivityIncreased efficiencyFaster turnaround
Risk MitigationVerification of field workImproved quality, safety
Control data and filesControl accessAudit readiness
VALUESave 40% of the timeResolve issues faster $7x ROI project $
Reduce dispute, legal costs $Eliminate re-work $Management insights $
Reduce IT costs $FlexibilityAutomate workflows
✓ Photo documentation solution for any field industry