Post on 11-Oct-2015
1
2
4
/
5
Effectiveness( ) Performance( )Reliability( )
6
()
Safety ( ) ( )
7
www.themegallery.com
(reliability)
(maintenance)
(total productiveMaintenance: TPM)
(preventive Maintenance:
PM)
(breakdownMaintenance : BM)
(correctiveMaintenance : CM)
(maintenancePrevention : MP)
()Time-base maintenance
(OVER HALL)
9
()()
Condition-base maintenance ( )
( )
10
( PM- ) Preventive maintenance
11
()oBreak down Maintenance
oCorrective Maintenance ()
/
12
()
Maintenance Prevention ()
13
()Total Productive Maintenance / TPM
()
14
productive maintenance TPM)
8
1. 1 2. 2
()
3. 3 4. 4 5. 5
6. 6 7. 7 8. 8
16
TPM
Output
P,Q,C,D,S,MInput
5% Operators
20%
ElectronicsInstruments
75%
2 1.
1.1 1.2 1.3
()
2. 2.1 2.2
2.2.1 (closing down cost)2.2.2 (down time
cost)2.2.3 (start up cost)
19
- - - - - - -
3
1. 2. 3.
1.
2.
3.
22
3
1. 2.
3.
1.
2.
3.
24
( Corrective Maintenance ) 4 R=Repair ()O=Overhall ()M=Modified ()C=Combine ()
25
7
7 FITCHLS 1. F=Feel
2. I = Inspect()
26
3. T=Tight()
4. C=Clean()
27
5. A=Adjust ()
6. L=Lubrication()
7. S=Smell()
28
29
30
5
1. ( )
2.
3.
4.
5.
31
32
33
Preventive MaintenanceENV.2-NUT-DW-001 2554ENV.2-NUT-FR-001
2554ENV.2-NUT-FR-002 2554
34
35
Check Point
36
37