Part 01 Multivendor Case Study Installations

Post on 01-Jun-2018

220 views 0 download

Transcript of Part 01 Multivendor Case Study Installations

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 1/142

Copyright © SEL 2008

Multi-vendor Experiences withIEC 61850 Installation, Testing,

Configuration, Diagnostics, and

Upgrades

David Dolezilek

Schweitzer Engineering Laboratories, Inc.

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 2/142

Practical Uses of IEC 61850 Protocols

and Synchrophasors

GOOSE in a Centralized Remedial Action

Scheme (CRAS)

GOOSE versus hard-wire protective trip RTU I/O collection via GOOSE

Diagnostics tools for GOOSE “virtual wiring”

Recent Global IEC 61850 installations

Improving RAS with synchrophasors

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 3/142

Remedial Action Schemes

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 4/142

Southern California Edison (SCE)

Tested Digital Communications Speed

Strive to mitigate thermal overload andinstability throughout

transmission territory

 Detect Decide Trip

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 5/142

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 6/142

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 7/142

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 8/142

Performance Criteria: Detect, Calculate,

React 50 ms To / From any Location

Test starts when Monitor

detects Contact Input 1

Monitor chooses action to take

Monitor sends monitor alarm

Central Processor receives

monitor alarm

RAS enabled in Central Processor?

Central Processor chooses

action to take

Central Processor sends

decision alarm

Mitigator receives decision alarm

Mitigator chooses action to take

Mitigator closes trip output contact

Monitor detects mitigation trip output

as Monitor Contact Input 2

Scope measures difference

between Contact Input 1 and 2Yes

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 9/142

Initial Testing Verified Time Budget

Using Three IEDs 740 Km Apart

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 10/142

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 11/142

Multiple Devices Demonstrated for

WECC RAS Committee

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 12/142

Within One

Hour, Five

NewDevices

Were

“Digitally”Wired

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 13/142

Typical: GOOSE Trip Tansit 1.50 msec

Central Processing Time 2.083 msec

Monitor is 60 miles distant. Mitigators are local to CP.

Mitigation GOOSE transit, subscription, output - 3 msec or 11 msec

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 14/142

Jim Bridger Power Plant

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 15/142

Simultaneous, Independent Operation

DNP Gateway

IEC Logic

Controller 

I/O

Modules

IEC Logic

Controller 

IEC Logic

Controller 

I/O

Modules

I/O

Modules

DNP Gateway

IEC Logic

Controller 

I/O

Modules

IEC Logic

Controller 

IEC Logic

Controller 

I/O

Modules

I/O

Modules

RAS DRAS C

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 16/142

Three Levels

of Voting

Crosspoints Voting

InputInput Input

Input Voting

Output Voting

Output

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 17/142Jim Bridger Substation

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 18/142

RAS Uses Crosspoint Switch

Crosspoint Switch

t

CBOpens

Tripping

Outputs

Trigger 

Inputs

X

Trip G2

N5

N4

XN3

XN2

N1

Trip G1

Output RemediationContingency

Trip G3

X

Trip G4

X

Bypass

C1

X

Bypass

C2

X

X

X XX

X

Preloaded and Ready to Go

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 19/142

Designed to Handle Multiple, Closely

Timed Events

N-Events

IN1

N=1S1

IN6

N=20S1

IN6

N=6S2

First Event

Example1 Example2

Time (s)

System State

t=5st=0s

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 20/142

PacifiCorp / Idaho Power Remedial Action

Scheme Eliminates Congestion

Stability improvements increase capacity 50%, avoid blackouts

Fastest contro l

system in the

wor ld 

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 21/142

Training / Testing / Playback Simulator 

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 22/142

Test Simulator Plugged Into RAS C

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 23/142

Protection-Class Features

Deterministic, high-speed, peer-to-peerprotocol used between RAS controllers

No backplanes to fail

No auxiliary power supplies

MS Windows® NOT used in RAS controller 

 All controllers embedded Identical logic in all six controllers

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 24/142

Florida’s International

Drive 1999 Project:Distribution Automation

at Transmission Speeds

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 25/142

Switching With a Recloser…

Manual Switching = 1 hour 

Switching w/Recloser = 10 seconds

Recloser + Control Without Communications

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 26/142

…vs. Distribution at Transmission SpeedSEL & S&C for International Drive

SEL-351S + Communications

Smart Switching = 0.1 second

M l i d IEC 618 0

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 27/142

Multivendor IEC 61850

CFE Parque Eolico La Venta

E i ti G t t Wi d F

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 28/142

Existing Generators at Wind Farm

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 29/142

Biggest Wind Farm Project in Mexico

CFE expects to generate close to 3 GW

by 2014 in “La Ventosa”

S b t ti E i N G t

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 30/142

Substation Expansion - New Generators

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 31/142

SEL - MX060018 Project Satisfies

Newest SICLE Design With IEC-61850

SICLE is Spanish Acronym for 

“Integrated System For Substation Local

Control” CFE Specifies SICLE for integration of high

voltage substations, SISCOPROMM for low

voltage

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 32/142

CFE Decided to Build Small but

Meaningful Substation

CFE wanted to prove 61850 was real

Include as many vendors as possible

 Add other redundant IEDs in parallel Demonstrate true functionality on the

network

Prove multi-vendor interoperability

P R li bl

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 33/142

“This is, without any doubt, a great

advancement for the integrat ion of co ntro l

and protect ion sy stems, and for integrat ion

of the IEC 61850 International standard.” 

David Lancha, Project Manager, IBERINCO

Proven. Reliable.

Complete.

World’s First Multisupplier 

IEC 61850 System in Service

Since 2006

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 34/142

Wind Farm Under Construction

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 35/142

50BF

50BF

51PHS

87T

51PHS

51NHS

51NLS

87B

RD

50BF

79

21PP

87L

La Venta II Substation

Protection Requirements

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 36/142

Design #1 Used IEC 61850 Part 5, SEL Methods

in IEDs, IEC 61850 in SCADA Gateway

SEL-451-4

SEL-451

SEL-451-4

SEL-451

SEL-387E

SEL-451-4

SEL-451

SEL-311L

SEL-421

SEL-487B

SEL-3351

SEL-3351

SEL-3332

SEL-3332

230KV Line

LVD93100

230KV

Autotransformer 

LVD92010

230KV Tie

LVD97010

230KV Bus

Diff 

LVDDB9

Redundant

HMI

Redundant

SCADA

Gateway

Information Processor Serves DNP/Conitel as

SCADA Gateway and OPC to HMIs

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 37/142

CFE Requested IEC 61850 in all IEDs

SEL-421 – Distance

SEL-311L – Current Differential

SEL-451 – Distribution

SEL-387E – Transformers

SEL-487B – Buses

SEL-451-4 – Bay Control

SEL-3351 Rugged Computer 

SEL ACSELERATOR Architect –

Substation Configuration Language

(SCL) Engineering SoftwareSEL-710 – Motors

SEL-2411 – Automation

Controller SEL-751A – Feeders

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 38/142

Meet CFE Substation Protection

Requirements Using IEC 61850

Conventional wiring and IEC 61850 GOOSE

Test performance of conventional wiring vs.

GOOSE for protection functions

Determine if all relays will interoperate and

perform as desired

IEDs approved by CFE

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 39/142

Design #2 Used IEC 61850 Part 8,9 in the IEDsIEC 61850 From SEL for Every Application in Bays

SEL-451-4

SEL-451

SEL-451-4

SEL-451

SEL-387E

SEL-451-4

SEL-451

SEL-311L

SEL-421

SEL-487B

SEL-3351

SEL-3351

SEL-3332

SEL-3332

230KV Line

LVD93100

230KV

Autotransformer 

LVD92010

230KV Tie

LVD97010

230KV Bus

Diff 

LVDDB9

Redundant

HMI

Redundant

SCADA

Gateway

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 40/142

Next CFE Chose to Demonstrate Multi-

vendor Interoperability

System integrates devices from multiple

vendors

SEL SiemensGE ZIV

RuggedCom Team ARTECHE

Other vendors invited but did not haveIEC 61850 available or not approved by CFE

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 41/142

Two Different Engineering Groups

Working in Parallel to Integrate IEDs

HMI LN reporting and bay levelGOOSE IEC 61850 integration

being done by Iberdrola

SCADA Gateway LN reporting and

station level GOOSE IEC 61850

integration being done by SEL

New Products for CFE : Bay Control SCADA

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 42/142

New Products for CFE : Bay Control, SCADA

Gateway, and IEC 61850

SEL Scope: Panel Design for Parque Eolico

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 43/142

SEL Scope: Panel Design for Parque Eolico

“Wind Farm” and Intertie Substation

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 44/142

P l R d f I t ll ti

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 45/142

Panels Ready for Installation

S t A hit t

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 46/142

System Architecture

Router + Firewall

Remote HMI

RuggedCom

Fiber-Optic

Ring

DNP

Conitel

SW-4

SW-5

SW-3

SW-1

SW-2

GE F650 BC

SEL-451 50BF, 25, 27

SEL-387E

GE T60 87T

GE F60 50, 51HS

GE F35 50, 51TZ

Siemens 7SJ62 50, 51LS

Siemens 7SJ61 50, 51N

SEL-451-4 BC

SEL-451 50BF, 25, 27

ZIV 6MCV BC

SEL-421 21, 67

SEL-279H 79

SEL-451 50BF, 25, 27

GE L90 87L

SEL-311L

SEL-487B 87BGPS

ZIV CPT ZIV HMI ZIV HMI

SEL-3332

SCADA Gateway

SEL Construction Factory Acceptance

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 47/142

SEL Construction, Factory Acceptance

Test (FAT), Training, Commissioning

IEC 61850 SCL Replaces Wired

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 48/142

IEC 61850 SCL Replaces Wired

Connections With Logical Connections

GOOSE M f P t ti

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 49/142

GOOSE Messages for Protection

CFE wanted to see performance

comparison between wired and GOOSE

CFE chose to test breaker failureprotection scheme using GOOSE

Primary protection trip

Breaker failure relay retrip

Breaker failure relay trip

Breaker failure trip reception by busdifferential relay

Trip to all breakers in bus

C t F t A t T t

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 50/142

Customer Factory Acceptance Test

GOOSE Retrip Operation 12 5ms Faster

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 51/142

GOOSE Retrip Operation 12.5ms Faster

Than Parallel Hardwire at La Venta

GOOSE Breaker 21 TRIP A

Wired Contact Breaker 21 TRIP A

12.5 ms Difference

Between Inputs

86FI Operation: GOOSE 8 ms Faster

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 52/142

86FI Operation: GOOSE 8 ms Faster 

CFE Project Res lts

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 53/142

CFE Project Results

Retrip test; GOOSE three-fourths cycle faster  Breaker failure scheme; GOOSE half-cycle

faster – wiring scheme still has to go through

physical lockout (86) relay, which adds 6 to 8 ms

Configuration and troubleshooting made simpler

with sequential events recorder (SER) and

event reports

Traffic did not affect performance of SEL

devices

P j t E i i R l d

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 54/142

Project Engineering Revealed

Necessary Communication Parameters

Time synch method - chose SNTP

Sacraficed accuracy to use Ethernet

Changed back to IRIG later  Number of client associations – chose 6

Two redundant HMIs

Remote and local engineering workstations

Two redundant SCADA gateways

I t l k d A t ti P j t

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 55/142

Interlock and Automation Projects

Dictated GOOSE Requirements

Number of outgoing GOOSE messages -

eight

Number of incoming GOOSE messages - 16 Number of incoming GOOSE bits

Bay control – 128

Relay –16, 128 depending on application

Parque Eolico La Venta II

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 56/142

Parque Eolico La Venta II

PP&L Modernized

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 57/142

PP&L Modernized

From PLCs to IEDs

Eliminateprogrammable devices

Digital transducers

PLCs

Eliminate othercomponents

24 Vdc supplies

Interface relays

External fault detectors

Streamline Reduce

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 58/142

Streamline, Reduce

Complexity With

IEC 61850 Design

Reduce Hardware Components With

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 59/142

Reduce Hardware Components With

IEC 61850 Design

Design ComputersSubstation

PLCs & Comm.

Processor 

Bay

PLCsRelays

Metering

IEDs

Ethernet

SwitchesSER Total

PLC 3 5 22 24 16 4 1 75

NGS 3 1 0 24 0 2 0 30

Display Redundant Data Sources via HMI

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 60/142

Display Redundant Data Sources via HMI

L2 P disagrees with other IEDs Faulty L2 P manually removed

Using IEC 61850 Methods for RTU

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 61/142

g

Replacement and Distributed Automation

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 62/142

Numerous I/O Configurations Must Fit

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 63/142

Numerous I/O Configurations Must Fit

in Fixed Small Space

DNP3 serial over radio to SCADA Masterchanging to DNP3 / TCP in future

RTU Real-Time Values via Internal and

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 64/142

RTU Real-Time Values via Internal and

External Communications Connections

RTU Replacement Network Could Also

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 65/142

RTU Replacement Network Could Also

Connect I/O of Relays and Meters

Example system database

32 AC analog inputs

2 DC analog inputs

24 digital inputs 16 digital outputs

192.168.0.15 192.168.0.25 192.168.0.30

192.168.0.20SCADAMaster 

DNP3 Serial

Ethernet

SwitchGOOSE Messages

PAC_MASTER

PAC_Slave_A PAC_Slave_B PAC_Slave_C

Data Flow Acts the Same as Distributed

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 66/142

Data Flow Acts the Same as Distributed

RTU I/O Panels But Performs Better 

SCADA Master 

Field Inputs

GOOSE Inputs

DNP3 Response

DNP3 Command

Contact Output

GOOSE Outputs

Multi-vendor Configuration Requires

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 67/142

g q

Stand-Alone Tool Specifically for 61850

Alternate traditional UCA2 method of

proprietary settings makes multi-

vendor systems difficult

Configure IED via International Standard

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 68/142

Configure IED via International Standard

Substation Configuration Language, SCL

Start with IED capabilitydescription, ICD file

Create configured IED

description, CID file Edit only what you

choose

No accidental changes

Minimize verification

testing

Load File in IED, or Send to Colleague Via

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 69/142

g

email to Add Future IED Subscriptions

“Best Practice” Provides Contextual

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 70/142

Names – Generic Names Less Useful

Best practice provides specific names whenever possible

Exceptions include generic logic points, unnamed contact I/O

Generic Specific

Use Unique Name and Revision Control

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 71/142

Use Unique Name and Revision ControlAsk IED Directly to Verify Present Configuration

Solicit identification report from IED

IED name reveals file name and revision ConfigVersion reveals default SCL file that

configuration was developed with

IED GOOSE Reports Are Essential

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 72/142

IED GOOSE Reports Are Essential

Review receive and

transmit configuration

Quickly review network

settings

 Analyze GOOSE statistics

and diagnostics Immediately pinpoint

source of problem

Identification (ID) Reports Provide

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 73/142

( ) p

Source / Destination of “Virtual Wiring”Mismatched Configuration Explains Failure

ID shows incorrect revision of PAC configuration

Once corrected, GOOSE report shows correct

revision as part of GOOSE reference name

Analyze Contents With Knowledge

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 74/142

Analyze Contents With Knowledge

of Configuration File

Failed GOOSE, Other Alarms Displayed

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 75/142

Failed GOOSE, Other Alarms Displayed

and Sent via Email, Voice, Text Message

Cigre

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 76/142

Multi-

vendor

System

of 12

Vendor

IEDs

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 77/142

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 78/142

Second Generation Modernization

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 79/142

Second Generation Modernization

Began in 2006

Complete modernizationof 30 substations ranging

in voltage level from

13.8 kV to 138 kV

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 80/142

Elektro Network

Includes IEC 61850,

Telnet, FTP, and

SEL Protocols

Substations:

Guarujá 2 – first modernizedsubstation energized June 12

2007 – seven complete

2008 – eight complete Sao Paulo State,

Brazil

Guarujá 2

Guarujá 3

Fiber Optics Replace Copper 

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 81/142

p p pp

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 82/142

KONYA Industrial Park

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 83/142

Chooses SEL and IEC 61850

500 large to mid-size electricity-dependent

tenants: plastics, machinery, pharmaceuticals

Park management responsible for infrastructure:

electricity, gas, water, traffic, security

One 100 MW transformer and three 33 kV

tie lines from National Grid

65 MW maximum demand increasing by 15%

every year 

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 84/142

Control Center

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 85/142

Manages 165

DistributionSubstations

24 km redundant

fiber-optic ring Future distribution

automationadditions

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 86/142

GEESE Migrate to Africa

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 87/142

g

Stations Include IEC 61850 MMS and GOOSE

City Power Pennyville – 19 bays , 2 bus

sections, 3 transformers

City Power Khanyisa – similar to above with

36 bays

City of Cape Town – 2 complete substations

Nelson Mandela Bay Municipality Three new substations in 2008

Each based on IEC 61850

City Power Johannesburg

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 88/142

y g

Harley Street Substation

Control Center IEC 60870-5-101

Fdr 29Fdr 1

SEL

SEL-1102

SEL-2410SEL-2410

Switch Switch

 

Electricity of Vietnam (EVN)

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 89/142

y ( )

State-owned utility established 1995

Generation, transmission, and distributionfor whole country

4 transmission

companies 79,800 km of

distribution lines

Growing Electricity Demand

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 90/142

g y

Forecasted growth 17% per annum until 2025

0

100

200

300

400

500

600

1995 2000 2005 2010 2015 2020 2025

Production

Sales

   T

  e  r  a  w  a   t   t  -   H  o  u  r  s

First Phase – Substation Modernization

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 91/142

Began in 1999

First computerized 220 kV substation

commissioned in Ho Chi Minh City

This success resulted in digitizing moresubstations through 2003

Early Substation Modernization

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 92/142

Conventional protection and control using

DNP3 serial and hardwired connections

Problems with incompatibilities between

multiple manufacturers’ IEDs

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 93/142

220 kV Thu Duc Substation

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 94/142

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 95/142

Third Phase – IEC 61850

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 96/142

IEC 61850 Part 10 approved Oct. 2005

EVN standardized for future projects –

new and retrofit

 All 500 kVbackbone

substations

upgraded by

2010

New System Requirements

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 97/142

Dual redundant fiber-optic LAN with no

single point of failure

IEC 61850 for all substation communication

IEC 60870-5-101 for SCADA

Standard System Hardware Architecture

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 98/142

Host 1 Host 2Engineering

(Bridge to SCADA)HIS Server Router to WAN

Backup

IED

Backup

IED

Main

IED

Main

IED

Bay

Devices

Bay

Devices

Main

NIM

Backup

NIM

Bay CubicleBay Cubicle

Bay Cubicle

Option 2

Option 1

LAN 1

LAN 2

GPS Clock

Backup

IED

Main

IED

Bay

Devices

Fiber-Optic

Ethernet

100 Mbps

Computerized Control and Monitoring

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 99/142

Local HMI,

engineering console,

and historian

Redundant system

servers running on

Windows® 2000 or Linux®

Old Protection Panels Replaced

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 100/142

Microprocessor-based relays perform

protection, control, and monitoring

Outdoor Cubicles Reduce Cabling

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 101/142

Existing Copper Cabling

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 102/142

Binh Long Substation

Copper

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 103/142

Cabling

Reduced

@STATION System Overview

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 104/142

HMI1 HMI2ENG

HISGW

LAN / WAN

Primary Equipment

Meter 

Hardware

Connections

Relays / BCUs

IEC 61850

Legacy Device GatewayR d C i Pl f

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 105/142

Rugged Computing Platform

SCADA Gateway

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 106/142

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 107/142

Test Results

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 108/142

User Interface FeatureRequired by

EVNTested

Display Response Time < 1 s < 1 s

Data Entry Response Time < 1 s < 1 s

Display Update Rate < 2 s < 2 s

Update Completion Rate < 1 s < 1 s

Test Results

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 109/142

User Interface FeatureRequired by

EVNTested

 Alarm/Event

Response Time< 1 s < 1 s

 Alarm Acknowledge/

Delete Time < 2 s < 2 s

Report and Logbook

Response Time< 0.5 min < 0.5 min

Display Color Printout

Response Time < 0.5 min < 0.5 min

Test Results

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 110/142

User Interface FeatureRequired by

EVNTested

Console Inhibit Time for

Display Hardcopy< 2 s < 1 s

 Analog Data

Collection Rate  – < 2 s

Status Indication

Collection Rate – < 1 s

Failover Time Between

Main 1 and Main 2  – 0 s

GOOSE Exchange Time < 10 ms < 8 ms

Benefits of IEC 61850 SAS

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 111/142

Faster system integration with IED

interoperability Reduction of copper cabling and

hardwiring

GOOSE for peer-to-peer data exchange Outdoor cubicles adjacent to feeder or bay

System malfunctions reduced by nearly

50%

What is a Synchrophasor?

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 112/142

Time Waveform

d Ph R t ti

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 113/142

v(t)

0

A

 

t2

A

Reference

and Phasor Representation

Absolute Time Synchronization Has

F d t ll Ch d th W ld

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 114/142

Fundamentally Changed the World

GPS RCVR

PMU 1

 A B

Satellite

GPS RCVR

PMU 2

IRIG-B IRIG-B

Mag/Ang Mag/Ang

Direct State Measurement

SYNCHROPHASORS

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 115/142

SYNCHROPHASORS

GPS provides common time reference

Measure state vector 

Measure currents, too Synchronously!

Every second

Every cycle

Synchrophasors Provide a “Snapshot”

f th P S t

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 116/142

of the Power System

P= |V1| |V2|sinФ / X Ф= sin-1(PX / |V1| |V2|)

V1∠0 V2∠ФP→

Increase Stable

Power Transfer 

Relays Are Right for Synchrophasors

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 117/142

Phasor measurement and control unit

(PMCU) ≥ PMU

Minimal incremental cost

Reduced current and voltage connections High-accuracy measurements

High reliability and availability

Future control applications

Relays are everywhere

What Operators Did Not See Aug. 14th

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 118/142

64 Minutes

Utilities Are Operating Closer to the Edge

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 119/142

MarginMargin

1.0 1.3 1.5 1.7PU Nominal Load

1.0

0.5

0.0

Operating

Point

Bifurcation

Point

 

Long Island: Monitor Angles BetweenTransmission Distribution Buses to

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 120/142

Transmission Distribution Buses to

Detect & Prevent Voltage Collapse

X)θcos(2

V)θsin(1S

2

2

smax

 Z L  =  R  +  j X V S   0

 V r 

 S  =  P  +  j Q

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 121/142

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 122/142

Impro ved View: 

Synchroscopeand Freq Plot

make it easier

for operators

“The MRI of Power Systems”

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 123/142

NERC press release onFlorida outage Feb. 26,

2008:

Synchrophasors are “Likethe MRI of bulk power

systems” 

SCE Uses C37.118 FromRelays and PMU

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 124/142

y

SCADA

Master 

DNP3

IEEE C37.118

InformationProcessor 

Harris 5000/6000,

IEC 60870-103,

Modbus, SEL Fast

Message, Telegyr8979, Conitel 2020,

CoDeSys, OPC, …

Distributed Generation CreatesIslanding Problems

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 125/142

Islanding Problems

TransmissionNetwork

DG

SEL-3378

Synchrophasors Detect and Correct

Islanding Problems

Defensive Strategies Working Group

New York State Reliability Council

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 126/142

New York State Reliability Council

NYSRC asked SEL to propose solutions

Mitigate impact of major disturbances on the

New York electric system

Blackout mitigation and prevention

Separate into “islands” using transmission

system fault protection relays

SEL Synchrophasor Total

Potential Worldwide!

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 127/142

 

Canada

 

Potential Worldwide!

North America

142,085 units

South America

15,903 units

Europe / Asia

4,115 units

Africa / Middle East

5,085 units

Asia

Pacific

45,793 units

Real-World Example – Line Repair

Error Detection

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 128/142

Error Detection

Synchrophasors Make

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 129/142

Relay-to-RelaySynchrophasors for

Generator Shedding

y p

CFE’s Grid Smarter 

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 130/142

Detect and Control Adaptive Islanding

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 131/142

TransmissionNetwork

SEL-451

Relay / PMU

SEL-3378 SVP

Unintentional

Islanding

Distribution

Network

SEL-451

Relay / PMU

Over Angle Protection Holds System

Together

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 132/142

Together 

 Area 1

Heavy

Load

 Area2

Link 1

Link 2

 Area 3

Light

LoadTrip

Generation

SEL-421 SEL-421Synchrophasors

(Chicoasen –   Angostura) > 5°   Trip Generation

Today: Most Processing Is at the Master 

Fi d t l

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 133/142

Finds topology

Purges bad data

Estimates stateMaster 

RTU RTU

 Asynchronous

Scan

~5 seconds per scan

. . . can have partial

information from

two or more

 physical systems –

due to faults, switching,

swinging, tap changes.

One Utility’s View of Several Data

Streams

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 134/142

StreamsBus Voltage

Line

MVA

Frequency

Instantaneous

Phase Angles

Trended

Phase Angles

PMU ID

Local Calculation of Line Temperature

Improves Power Transfer Reliability

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 135/142

Improves Power Transfer Reliability

+ +

Line Temperature = f (Ambient Temp, Current, Line Orientation, Season)

IEEE Synchrophasors Compatible

With IEC 61850 Networks

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 136/142

With IEC 61850 NetworksPossible Future GOOSE or 9-2 Extension

IEEE C37.118,

Telnet, tunneled

serial

Verify CT wiring,phase rotation,

settings

Determining the State of a Power System

VV

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 137/142

4

3

2

1

34

232

231

12

V

VV

V

I

II

I

Y

I12   I34

I231

I232

V1   V4V3V2

State Vector 

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 138/142

SVP RAS Clearing Time ¾ Cycle Faster 

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 139/142

Improving RAS with Synchrophasors

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 140/142

Direct state measurement is now practicalbecause of the widespread availability of

Synchrophasors

The SVP performs local direct statemeasurement and control

Wide area RAS schemes are improved

because synchrophasors reduce the amount

of information communicated to the master

station

What Does a Future “Worst-Case

Scenario” Look Like?

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 141/142

Scenario Look Like?

Detect potential unstable operating conditions Control islanding

Detect system oscillation before criticality

Minimize problems automatically

Synchrophasors Empower the Future

8/9/2019 Part 01 Multivendor Case Study Installations

http://slidepdf.com/reader/full/part-01-multivendor-case-study-installations 142/142