OVERVIEW – SUNDANCE WIND PROJECT
PROPOSED $600 MILLION INVESTMENT NEAR TUMBLER & CHETWYND
Ron PercivalAvro Wind Energy Inc.
October, 2014
PRESENTATION OVERVIEW
i. Proposed $600 Million near-term investment in Tumbler Ridge / Chetwynd region
ii. Who Is EDF EN Canada?
iii. Overview Sundance Wind Project
iv. Environmental Assessment Activities
v. Visual Simulation for Sundance Project
||
An expertise in multiple segments
+ Biomass Biogas
+ Sea Energy
+ Concentrated Solar Power
WIND ENERGYonshore & offshore
SOLAR ENERGYpv
Other
EDF EN: A LEADER IN RENEWABLE ENERGY
Integrated skillsPresent on all the renewable value chain
Development Construction GenerationOperations &Maintenance
An international footprint18 countries ~ 3,050 employees
North America Europe Africa / Middle-East /India
Key figures at 31 December 2013MW gross : capacity of power plants in which EDF EN is shareholder* For own account and for third party
A leading position in its business
Generation activity
6,611 MW gross installed
1,986 MW gross under construction*
11,1 TWh of green electricity generated in 2013
Complementary activities
2,310 MW developed, built and sold
9,039 MW in operation and maintenance*
Among the top 10 global players
1,304 MW – Wind PPA
• 774 MW Under Construction• 530 MW Complete & Operating
Operations and Maintenance in Canada:
864MW – Wind
300MW – Solar MW
720 MW of Wind in BC South Peace Region in permitting or shovel ready
More than $3 Billion Investment in Canada
27 MW
23 MW
189.5 MW88 MW
1003 MW
72 MW
400 MW
Wind, Under Development
Wind, Under PPA/Construction
Solar, In Operation
O&M, Under Contract
300 MW
250 MW70 MW
EDF EN CANADAMORE THAN $3 BILLION INVESTED – WITH ANOTHER POSSIBLE $1.8 BILLION FOR BC PEACE
EDF EN Canada contracted Avro Wind Energy to help develop wind projects in BC Peace River Region. Avro has carried interest in the projects.
OVERVIEW – SUNDANCE WIND PROJECT
Generation capacity up to 250 MW
Potential investment of more than $600 Million
Jobs:
Approximately 250 during construction
Approximately 10 – 15 during operations
Build and Permitting Schedule:
Build early as 2016 subject to Power Purchase Agreement with BC Hydro.
EA Certificate expected in 2015
First open house – June 2013
Supportive engagement with Treaty 8 First Nations
Project located on Crown land, approximately 20km north of Tumbler Ridge.
Near D-CAT transmission, proposed Site C dam, and ramping gas electrical load
ON-GOING & UPCOMING ENVIRONMENTAL ASSESSMENT ACTIVITIES
• First Nations, Public & Stakeholder Consultation• BC Environmental Assessment process – submission for
Application review expected in early 2015• Analysis of local features
On-going Activities
• Fall Bat surveys• Reporting on results of field studies, including Archaeological
Resources, Furbearers, Ungulates (including Caribou), Bears, Fish and Fish Habitat, Vegetation and Ecosystems, Amphibians and Reptiles, Bats, Birds, Terrestrial Invertebrates, Community Infrastructure, Visual Resources, Land and Land Use, Communication Systems, Human Health, Terrain Stability, and Hydrology
Some Upcoming Activities
EDF EN Canada and Avro are working closely with First Nations, stakeholders, and local government to ensure EA studies are comprehensive, transparent and sensitive to local and regional concerns
VISUAL SIMULATIONS – SUNDANCE MOOSE LAKE
I October 1 2013
VISUAL SIMULATIONS – SUNDANCE HWY 52
I October 1 2013
VISUAL SIMULATIONS – SUNDANCE GWILLIM LAKE
I October 1 2013
HOW CAN YOU HELP – AND BENEFIT?
Help us deliver message to BC Government and BC Hydro: Tumbler Ridge and Chetwynd are endowed with “world class” wind energy
resource.
Let BC Government and BC Hydro know the world’s leading renewable power developers, owners and operators (like EDF EN Canada) are here already:
Making regional investments near Tumbler Ridge and Chetwynd; and Developing low cost power with social license for the benefit of all British
Columbians
Three Peace Region EDF EN Canada wind projects can build as early as 2016. Potential for near term $1.8 Billion regional investment.
Opportunities for local construction contracts and long term careers in operations and maintenance.
David WarnerEDF EN Canada Inc.416.216.5883David.Warner@EDF-EN.ca
Ron PercivalAvro Wind Energy250.285.2304RPercival@avrowindenery.com