October 28, 2003V.Kekelidze 1 Experiment NA48/2 A Precision Measurement of Charged Kaon Decay...

Post on 13-Jan-2016

217 views 1 download

Transcript of October 28, 2003V.Kekelidze 1 Experiment NA48/2 A Precision Measurement of Charged Kaon Decay...

October 28, 2003V.Kekelidze

1

Experiment NA48/2Experiment NA48/2

A Precision Measurement of Charged Kaon Decay Parameters (CERN/SPSC 2000-003)

Status Report (SPSC-2003-033)

CERN, Chicago, Dubna, Ferrara, Firenze, Mainz, Northwestern, Perugia, Pisa, Saclay, Torino, Vienna

Cambridge, Edinburgh, Siegen

Collaboration:

October 28, 2003V.Kekelidze

2

NA48 Collaboration (Pisa, September, 2003)

October 28, 2003V.Kekelidze

3

Report content

• Goals• New beam line• Set-Up upgrade• Beam detector KABES• Trigger• Data taking in 2003• Asymmetry express analysis:

- observable definition- major systematics estimation

• Ke4 & Rare decay examples• Semileptonics• Conclusions & beam request

October 28, 2003V.Kekelidze

4

Direct CP violation

in K± ± + -, K± ± 0 0

(Ag ) 10 – 4 (limited by statistics)

GoalsGoals

g + - g -

Ag = ———— g+ + g -

Requirements to experiment:

• high statistics (> 2109 decays)• stability in time• set –up symmetry

October 28, 2003V.Kekelidze

5

Ke4 to measure - scattering length ( ) < 1102

required statistics > 106 (430k )

Rare decays to test PT & search for ACP

K , K 0 DE K

e+ e, K + , Ke2

K l l+l

K 0 , K 0 l+l, … etc.

Semileptonic decay Br’s: Ke3, K

3

to improve precision of |Vus|

& check CKM unitarity

Goals Goals (continuation)00a

October 28, 2003V.Kekelidze

6

Simultaneous K+ and K- beam line(schematic vertical section)

not to scale

axes are steered to coincide within 1 mm

October 28, 2003V.Kekelidze

7

-=4.0, mm +=4.1,mm

0

<x->=1.230.01, mm <x+> = -0.08 0.01, mm

K-

K- K+

Beam spots on the DCH1

-50 0 +50x, mm

+50

y,mm

-50 0 +50x, mm

-50

achromat: K+ Down (HD)

K+

K+ K+K-

-50 0 +50x, mm

-50 0 +50x, mm

achromat: K+ Up (HU)

October 28, 2003V.Kekelidze

8

New K12 beam line built for NA48/2

first achromat

second achromat

October 28, 2003V.Kekelidze

9

Set-up Upgrade

• Beam detector KABES (TPC micromegas) 3 double stations + read-out: put in operation

• DCH3: fully instrumented

• DCH1- 4 read-out electronics: re-mapped to be Right –Left (Saleve – Jura) symmetric

• L2 trigger: new processors & interface to neutral part

• Decay vacuum tank: extended (+24 m)magnetic field remeasured

• Beam profile monitor: new pixel detector

October 28, 2003V.Kekelidze

10

Upgraded NA48 Set-Up (schematic top view)

not to scale

October 28, 2003V.Kekelidze

11

KABES-1/2

entrance window

K+

time resolution67 ps

K-

time resolution63 ps

T/2 ns, Station2 – Station3

Beam rate ~20 MHz

P0/P(K) - P0/P(S)

Momentum

resolution 1.1%

P(S) , GeV/c

50 60 70

P

(K),

GeV

/c

-0.2 0 +0.2

5

0 60 7

0

Beam rate ~20 MHz

K+, K-

X,Y space resolution~100 m

-10 0 10T/2 ns, Station2 – Station3

moved out by ~20 cm

October 28, 2003V.Kekelidze

12

Three stage logic for (satisfies Ke4):

• pre-trigger: 2 tracks in Hod & no surrounding anti

• L2 processor (mass-box) 2 vertices (~ 94%)

or 1 vertex (~ 98%)

or “fake track” (excluding ±0 mode) (~99.5%)

• L3 software flags (to simplify splits)

Trigger logic

Logic for K± ± 0 0: • pre-trigger: clusters in LKr Cal (Nx > 2 or Ny > 2) • L2 “fake track”• L3 flags

+ various triggers for: rare decays, semileptonics, efficiency study, random events, ...

K

October 28, 2003V.Kekelidze

13

Stability of trigger efficiencies

day-sample u

1% level

trigger inefficiency trigger inefficiency

0 0

for K+ + + - ( ) & K- - - + ( )

October 28, 2003V.Kekelidze

14

• MNP33 current alternation each day (BU / BD )

• swapping of achromat magnetic fields (HU / HD)

during each MD on Wednesday

(due to long tuning procedure)

• data taking cycle two weeks - a supersample

Running conditions

to compensate variation in time of beam and set-up:

more frequent alternation desirable

(even on the expense of statistics)

as learned from 2003:

October 28, 2003V.Kekelidze

15

Beam availability & supersamples

SS-1August 6- 20

October 28, 2003V.Kekelidze

16

Statistics for asymmetry

Statistics of supersamples in raw K± ± + -

without acceptance cuts (not to scale to the Proposal)

HD BU

HD BD

HU BU

HU BD

154 166 38 358 150 58 76 284

127 162 50 339 130 142 60 332

1 2 3 total

total 561 528 224 1313

~ 450 mln K± ± + - events of SS-1 reprocessed for the express analysis

in 106

~ 50 millionsof K± ± 0 0

October 28, 2003V.Kekelidze

17

Reconstructed K± ± + -

PK, GeV/c40 50 60 70 80

K-

0

PGeV/c

K+

0

M(3)+ GeV/c2

K+ K-

M(3)- GeV/c2

~120 mln~220 mln

SS-1: 1 - 12 day-samples

1 - 6 samples

1 - 3 - HD

4 - 6 - HU

October 28, 2003V.Kekelidze

18

Dalitz for accepted

u = (2MK/m2)(MK/3 - E*)

M(u,v)2 1 + gu + hu2 + kv2

v = (2MK/m2)E*2

Square of matrix element

u

vrun 15323

K

October 28, 2003V.Kekelidze

19

N+(u) a+(u) (1 + g+u)

N- (u) a- (u) (1 + g-u) Ag = —————

if a+(u) = a-(u) - acceptance cancel

R(u) = N+(u) / N- (u) ~ 1 + gu

g = (g+- g-) 2gAg

R(0) = 1 - normalizationg – 0.2

- 1.170 < u < 1.267

Definitions for asymmetry

u = (2MK/m2)(MK/3 - ) u = (m22 -M2

K/3) / m2 - 1

g+ - g-

g+ + g-

slope

K

October 28, 2003V.Kekelidze

20

u- spectra & their Ratios

N+(u) N- (u)

R(u) (not normalized)

statistics of SS-1 (each plot - one momentum bin)

beam pipe cut

October 28, 2003V.Kekelidze

21

Observable: AS & AJ - slopes of R(u)

BU N+(u)

if aS(u) & aJ(u) are stable in time

t ~ 1 day

AS = AJ g

A = 0.5 (AS + AJ) g

if Ra(u) = aS(u)/aJ(u) is stable in time

BU N-(u)

BD N+(u)

BD N-(u)

aS(u)

-acceptanceaS(u)

AS

aJ(u)

aJ(u)

AJ

October 28, 2003V.Kekelidze

22

BU N+(u)

BU N-(u)

BD N+(u)

BD N-(u)

Systematic checks

A+

t = 1 day

A-

AU

AD

Ra(u) = aS(u)/aJ(u): Sa - slope AU g + Sa; AD g - Sa

if Sa is stable in time

A+ + Sa; A- - Sa; (A+ + A-)/2 0

-Sa +Sa

+Sa

-Sa

(AU + AD)/2 g

October 28, 2003V.Kekelidze

23

Selection criteria

• radial cuts around the beam centres (in DCH1,4)

to symmetrize acceptances

• day-by-day definition of the beam COG’s in each momentum bin

to reduce acceptance variations in time

Conservative cuts:

R(DCH1) > 11.5 cm

R(DCH4) > 13.5 cm

leave 60% of raw statistics( beam stability dependent )

October 28, 2003V.Kekelidze

24

Spectrometer alignment

MK – MPDG, KeV/c2

~ 35 KeV/c2

~4 m / dayx DCH4

day-sample

BUK+ & BDK- (to Jura)

BDK+ & BUK- (to Saleve)

surprising effect

time variation term was compensated

(after fine tuning of B)

October 28, 2003V.Kekelidze

25

Acceptance cancellation check

< A± > = (A+ + A-)/2 = (1.2 2.3)10-4

October 28, 2003V.Kekelidze

26

Beam geometry effects

A± for different achromat polarities

HD HU

> 0

< 0

October 28, 2003V.Kekelidze

27

Time stability of acceptancesin momentum bins

October 28, 2003V.Kekelidze

28

A stability with momentum

October 28, 2003V.Kekelidze

29

Time stability of acceptances

HD HD HUHU

different achromats different achromats

October 28, 2003V.Kekelidze

30

Time stability of A

HD HU

October 28, 2003V.Kekelidze

31

Systematics summary• Major systematics related to

- acceptance asymmetry- time variation effects

are under control

• Other possible systematics:

- residual (+ Earth) magnetic fields

- trigger efficiencies

- DCH’s efficiencies

- accidentals

- …..

are found to be less significant

October 28, 2003V.Kekelidze

32

First look on K± + - e±

15807 events in SS-1 BR = (3.87 ± 0.20)10-5

(PDG: (4.08 ± 0.09)10-5)

7105 expected K± + - e±

in 2003

Background

~1% of Ke4

from K± +- ±

~1% of Ke4

from K± ± 0D

M(3) GeV/c2

PK, GeV/c

K mass

October 28, 2003V.Kekelidze

33

Rare decayRare decay K K e+ e-

0.40 0.44 0.48 0.52 0.56 0.60

500

400

300

200

100

0

1400 events in 1 month of data taking ~ 3500 events expected in 2003 run

Me + e -GeV/c2

Even

ts /

2

MeV

/c2

October 28, 2003V.Kekelidze

34

Semileptonics study

In addition, all major modes:• leptonic & semi..

Ke2, K

e3, K2, K

3

• hadronic K2, K

3

are accumulated with min. bias trigger

strong constraint for Br’s0

(missing mass)2, (GeV/c2)2

0

70 example of K eselected from ~1700 burts

October 28, 2003V.Kekelidze

35

Conclusion

• NA48/2 experiment has been prepared:beam line, detector and trigger

are put in operation & tuned• the major systematics are under control

& do not exceed statistical precision• to reach the proposal goals

quoted statistics are neededcan profit from more

Beam Request for 2004

• as much proton time as possible

(400 GeV protons ~1·1012 ppp on T10)• as few beam interruptions as necessary