Oak Hill Parkway Water Resources Technical Report
ADDENDUM #2
U.S. Highway 290 (US 290) / State Highway (SH) 71 West from State Loop 1 (Mopac)
to West of Ranch-to-Market (RM) 1826 and US 290 to Silvermine Drive
Travis County, Texas
CSJ # 0113-08-060 and 0700-03-077
November 2019
Water Resources Technical Report Addendum #2 Table of Contents
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 ii 2019
TABLE OF CONTENTS Introduction and Purpose ........................................................................................... 1
2019 Reevaluation #2 ..................................................................................... 1
Methods ....................................................................................................................... 1 Data Review ...................................................................................................... 2 Field Delineation ............................................................................................... 2
Results ......................................................................................................................... 3 Section 404 of the Clean Water Act ................................................................ 4
Summary of Impacts ............................................................................. 7 Floodplains ........................................................................................................ 7 Groundwater and Edwards Aquifer .................................................................. 8
Conclusions ................................................................................................................. 9
References ................................................................................................................ 10 TABLES Table 1: Evaluated Aquatic Features within the Project Area ..................................................... 5 ATTACHMENTS Attachment A Figures Attachment B Project Area Photographs Attachment C Wetland Determination Data Point Attachment D Hydraulic Exhibits FIGURES Figure 1. Project Location (Aerial Base) Figure 2a-b. Water Resources Figure 3a-l. Water Crossings
Water Resources Technical Report Addendum #2 Table of Contents
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 iii 2019
----This page intentionally left blank----
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 1 2019
INTRODUCTION AND PURPOSE In December 2018, the Texas Department of Transportation (TxDOT) approved a Final Environmental Impact Statement (EIS) and Record of Decision (ROD) for mobility improvements to U.S. Highway (US) 290/State Highway (SH) 71 West from State Loop 1 (MoPac) to west of Ranch-to-Market Road (RM) 1826 and from US 290 to Silvermine Drive (Figure 1). The proposed project, known as the Oak Hill Parkway (OHP) Project, is located in Travis County, Texas, and is shown on the USGS 7.5’ quadrangle maps for Bee Cave, Oak Hill, and Signal Hill, Texas.
The proposed OHP Project and previous environmental analyses are described in detail in the Final EIS and ROD, and subsequent May 2019 Reevaluation (Reevaluation 1) (available online at https://www.oakhillparkway.com/environmental/).
2019 Reevaluation #2
As a result of project design changes following the 2018 Final EIS/ROD and Reevalutaion #1, TxDOT is conducting a second documented reevaluation to determine whether the previous environmental decision remains valid under circumstances listed in 43 TAC 2.85 and 23 CFR 771.129. A detailed list of design revisions is included in the Documented Reevaluation Checklist and displayed on the revised schematics (available for review at the TxDOT Austin District Office). This Water Resources Technical Addendum #2 has been prepared to document any change in resource impacts resulting from the 2019 Reevaluation #2 design modifications.
The purpose of this technical report is to identify and describe all water resources located within the proposed project area in order to assist in avoidance of impacts and minimization of effects as a result of the construction of the proposed project. Conclusions contained in this report are the opinion of the professionals conducting the study and are subject to confirmation by the appropriate regulatory agencies. In addition, this report covers regulatory issues related to water resources that are relevant to the requirements for a Documented Reevaluation Checklist for a TxDOT Project.
METHODS This Water Resources Technical Report Addendum #2 includes a summary of waters of the United States (WOUS), including wetlands, delineated within the project area by HDR, Inc. in March 2019, as well as a compilation of published data related to water quality, floodplains, and groundwater.
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 2 2019
Data Review
Qualified wetland ecologists reviewed several published data resources prior to the field visit to identify potentially jurisdictional crossings, floodplains, impaired stream segments, and other sensitive surface and groundwater resources. Sources consulted included U.S. Fish and Wildlife Service National Wetlands Inventory (NWI) maps, the National Hydrography Dataset, the Natural Resources Conservation Service (NRCS) Soil Survey for Travis County, USGS 7.5-minute quadrangle sheets (Oak Hill, Signal Hill, and Bee Cave, Texas), Geologic Atlas of Texas maps (Austin sheet), Federal Emergency Management Agency (FEMA) floodplain maps, and recent and historic aerial photography.
Field Delineation
Qualified wetland ecologists conducted field investigations in March 2019 within the project area. No additional delineation was completed for Reevaluation #2. The routine method of wetland delineation outlined in the Field Guide for Wetland Delineation: 1987 Corps of Engineers Manual (WTI, 1991) and updated in the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Great Plains Region, Version 2.0 (USACE, 2010) was utilized for wetland determinations within the project area. Field activities focused on wetlands and WOUS and description.
The Corps of Engineers Wetlands Delineation Manual (Environmental Laboratory, 1987) defines wetlands based on three criteria: hydrophytic vegetation, hydric soils, and wetland hydrology. In general, all three criteria must be present for an area to qualify as a wetland. Some exceptions can occur in disturbed areas or in newly formed wetlands where one indicator (such as hydric soils) might be lacking. These areas would be dealt with on an individual basis as outlined in the Field Guide for Wetland Delineation (WTI, 1991) and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Great Plains Region, Version 2.0 (USACE, 2010).
In addition to the jurisdictional wetlands defined above, the Clean Water Act (CWA) regulates impacts to other WOUS. The term “waters of the United States” has broad meaning and incorporates both deepwater aquatic habitats and special aquatic sites, including wetlands, as listed below:
• The territorial seas with respect to the discharge of fill material; • Coastal and inland waters, lakes, rivers, and streams that are navigable WOUS,
including their adjacent wetlands; • Tributaries to navigable WOUS, including adjacent wetlands; • Interstate waters and their tributaries, including adjacent wetlands;
For linear WOUS, the Ordinary High Water Mark (OHWM) was determined by assessing a combination of factors at each site. In accordance with Sec. 328.3(e) of the CWA and
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 3 2019
Regulatory Guidance Letter 05-05 (USACE December 5, 2005), the following factors were considered in determining the jurisdictional boundary:
• Natural line impressed on the bank • Shelving • Changes in the character of soil • Destruction of terrestrial vegetation • Presence of litter and debris • Wracking • Vegetation matted down, bent, or absent • Sediment sorting • Leaf litter disturbed or washed away • Scour • Deposition • Multiple observed flow events • Bed and banks • Water staining • Change in plant community • Other appropriate means that consider the characteristics of the surrounding areas
Following the completion of preliminary data gathering and synthesis, the routine method of wetland determination was used to identify potentially jurisdictional areas within the project area. The crossings are listed in Table 1 below, and photographs of the project area are included in Attachment B of this report.
RESULTS The 2019 Reevaluation #2 proposed design revisions would not result in a change to the findings described in the Final EIS/ROD or Reevaluation #1 for the regulations listed below. Each regulation was addressed in detail during the water resources analysis conducted for the Final EIS/ROD.
• Section 401 of the CWA • Section 402 of the CWA • Section 402: Texas Pollutant Discharge Elimination System • Section 402: Municipal Separate Storm Sewer System • Water Quality Section 303(d) of the CWA • Executive Order 11990, Wetlands • General Bridge Act and Section 9 of the Rivers and Harbors Act • Section 10 of the Rivers and Harbors Act • Texas Coastal Management Program
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 4 2019
• Coastal Barrier Resources Act • Trinity River Corridor Development Certificate • International Boundary and Water Commission • Wild and Scenic Rivers • Water wells with 500 feet of the project area • Executive Order 11988– Floodplain Management
Additionally, the underlying hydrology of the project area has not changed since the environmental clearance of Reevaluation #1.
Section 404 of the Clean Water Act
Wetland ecologists initially conducted field investigations for aquatic features in 2015. The results of that effort were presented in the 2018 Final EIS/ROD. In March 2019, the project team acquired additional right-of-entry agreements, which allowed for additional site visits and delineation of the proposed detention pond locations. Based on the designs of the 2019 Reevaluation #2, five of those aquatic features are no longer in the project area. As a result, a total of 13 aquatic features have been delineated and remain within the project area. Aquatic features identified within the project area include three classifications: intermittent streams, ephemeral streams, and an emergent wetland (Table 1, Figure 2a-b, Figure 3a-l, and Attachment C).
The acreage of impacts of each potentially jurisdictional water body within the existing and proposed right-of-way, along with the total project area acreages, are shown in Table 1 below. Field data sheets are included in Attachment C for the wetland location.
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 5 2019
Table 1– Evaluated Aquatic Features within the OHP Corridor
Aquatic Resource ID Description
Approx. OHWM (feet)
Acreage/Linear Feet within the Project
Area
Acreage/Linear Feet of Potential
Impacts
Potential Permitting Requirements
Wetland 1 Emergent Wetland NA 0.0322/NA 0.0075/NA NWP 14 with a PCN
Wetland 2* Emergent Wetland adjacent to S-11 NA -- -- --
S-1 Ephemeral Stream to Scenic Brook Tributary- Unnamed Tributary 3 0.0026/37 0.0019/28 NWP 14
S-2 Ephemeral Stream – Unnamed Tributary to Wheeler Branch 2 0.0350/760 0.0195/426 NWP 14 with a PCN
S-3 Ephemeral Stream - Wheeler Branch 11 0.4258/1770 0.4258/1770 NWP 14 with a PCN
S-4 Ephemeral Stream - Scenic Brook Tributary to Williamson Creek 19 0.0865/202 0.0820/195 NWP 14
S-5 Intermittent Stream, perennial pools - Headwaters of Williamson Creek at SH 71 bridge 6 0.0389/264 0.0/0.0 --
S-6 Intermittent Stream - Williamson Creek 15 1.6406/4723 0.0244/12 NWP 14
S-7 Ephemeral Stream - Unnamed Tributary to Williamson Creek 5 0.0294/255 0.0123/171 NWP 14
S-8 Ephemeral Stream - Unnamed Tributary to Williamson Creek 4 0.0066/71 0.0/0.0 --
S-9 Ephemeral Stream - Unnamed Tributary to Williamson Creek 4 0.0093/103 0.0/0.0 --
S-10* Ephemeral Stream - Unnamed Tributary to Williamson Creek 2 -- -- --
S-11* Intermittent Stream - Unnamed Tributary to Williamson Creek (SH 71 detention pond) 10 -- -- --
S-12 Ephemeral Stream – Braided channel along Unnamed Tributary to Williamson Creek (Bee Cave detention pond)
8 0.3132/1670 0.0104/75 NWP 14
S-13 Ephemeral Stream - Unnamed Tributary to Williamson Creek (Bee Cave detention pond) 4 0.0245/266 0.0/0.0 --
S-14 Ephemeral Stream – Devil’s Pen Creek 14 0.1935/160 0.0/0.0 --
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 6 2019
Aquatic Resource ID Description
Approx. OHWM (feet)
Acreage/Linear Feet within the Project
Area
Acreage/Linear Feet of Potential
Impacts
Potential Permitting Requirements
Open Water 1*
Excavated Pond on channel of S-11 NA -- -- --
Open Water 2*
Excavated Pond on channel of S-11 NA -- -- --
Total Within the Project Area
2.83/ 10,280 0.58 / 2,677
Project Team, 2019
*These crossings were identified within the survey area in 2019 but have been determined not to lie within the Reevaluation #2 project limits.
Note: The impact calculations are based on the schematic design and are not based on actual limits of construction, as this level of detail is not available at this point in project
development. Therefore, the calculations are an estimated value that assume complete loss for waters that occur within or beneath at-grade improvements. The calculations have
not accounted for the removal of waters contained within existing culverts, as this information was not available at the time of report production.
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 7 2019
Summary of Impacts
The project area contains 12 potentially jurisdictional streams and one potentially jurisdictional wetland. Of the delineated streams and wetland, 8 features would be impacted by the proposed project. The impacts to these waters would occur from extending existing culverts, placing fill for concrete aprons and/or rock rip rap at bridges, and placing temporary fills during construction. Exact fill types and amounts would be determined once design is finalized, but impacts are anticipated to be permitted with a Nationwide Permit (NWP) 14 with Pre-construction Notification (PCN) for linear transportation projects from US Army Corps of Engineers. It is likely that a PCN would be required due to impacts associated with the wetland and impacts exceeding 0.1 acres or 300 linear feet at individual crossings. Preliminary design indicates that many of the stream crossings would be bridged, which would minimize or avoid potential fill impacts at these locations.
Floodplains
New rainfall data, referred to as Atlas 14, was released by the National Oceanic and Atmospheric Administration (NOAA) in September 2018. Atlas 14 rainfall data, with increased rainfall values, has been incorporated in to the OHP hydrologic and hydraulic analysis (provided under separate cover). A result of incorporating the Atlas 14 data is the removal of one of the two originally proposed upstream detention ponds, the SH 71 pond, from the project design. The new data has also resulted in changes of elevations of several roadway locations at intersections with creeks.
The SH 71 pond was removed from the project design because, after incorporating the Atlas 14 rainfall data, the pond resulted in additional flooding (compared to existing) along Williamson Creek downstream of the pond and upstream of the SH 71 crossing, through a heavily-developed area of the creek. This additional flooding, not present in the pre-Atlas 14 modeling, is the result of additional peak flows and a change in peak flow timing between the outfalls of the SH 71 pond and an existing nearby City of Austin detention pond. The flows of this existing pond meet the flows of the SH 71 pond approximately 1,000’ downstream of the two ponds pond. The SH 71 pond delayed the peak flows leaving the pond by 6 minutes, compared to the existing conditions. This subtle shift caused the peak flows from the SH 71 pond to coincide with the peak flows form the existing City of Austin pond, resulting in an overall increase in peak flows at the confluence of the two ponds. This increase in peak flows resulted in the additional flooding downstream of the ponds and upstream of the SH 71 crossing.
Multiple options, including outfall and dam reconfiguration to both the SH 71 pond and the existing City of Austin pond, were considered to address the additional flooding in the Atlas-14 modeling. The only option that addressed the additional flooding without causing flood impacts in other areas was the removal of the SH 71 pond. The reductions in peak flows
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 8 2019
(compared to existing) through the project area, while still substantial, are less when the SH 71 pond is removed. Proposed bridges and channels were modified to account for this increase in peak flows without creating impacts to off-site properties. Additionally, a reduction in potential impacts to jurisdictional waters and wetlands (S-11, Wetland 2, and Open Waters 1 and 2) was an added benefit to the removal of the SH 71 pond.
The Atlas 14 modeling indicates two areas of increased 100-year water surface elevations (compared to existing) outside the project right-of-way, which were not addressed in the Final EIS/ROD or Reevaluation #1. These two areas are labeled as “Area of Potential Flood Impact” in Attachment D. There are no other areas of increased 100-year water surface elevations outside the project right-of-way indicated by the modeling of the Atlas 14 data.
Groundwater and Edwards Aquifer
The Safe Drinking Water Act, the Edwards Aquifer Rules (30 TAC 213), and the TxDOT and Texas Commission on Environmental Quality (TCEQ) Memorandum of Understanding (MOU) regulate project activities that have a potential to affect the Edwards Aquifer. The Final EIS/ROD and supporting material provided an in-depth analysis of the OHP project’s effects to groundwater and the Edwards Aquifer. No change to the baseline conditions for these resources have occurred as a result of the 2019 design revisions. A summary of these topics is included below.
The Edwards Aquifer includes three primary zones: the Contributing Zone, the Recharge Zone, and the Transition/Artesian Zone. The OHP Project crosses the Recharge and Contributing Zones. Within the project area, the Contributing Zone is located approximately 800 feet west of the intersection of US 290 and William Cannon Drive and the Recharge Zone is located to the east of the intersection of US 290 and William Cannon Drive (see Figure 3). As required by the TxDOT-TCEQ MOU, TxDOT completed coordination with the TCEQ for the OHP Project in May 2018. The TCEQ did not provide comments on the project or the EIS document. TxDOT has committed to a number of best management practices (BMPs) to protect water quality within the project area and a revised Preliminary Water Quality Analysis & Design Report has been prepared to address the water quality commitments, including TSS reductions resulting from the design modifications (KFA, 2019). Additionally, TxDOT and TCEQ met on July 31, 2019 to discuss permitting the OHP Project (KFA, 2019). At the meeting, it was agreed that a phased permitting approach would be acceptable; due to the fact that the project is located over both the Contributing Zone and the Recharge Zone, different phases will require a different Edwards Aquifer Protection Plans, either a Contributing Zone Plan or Water Pollution Abatement Plan. The revised commitments for obtaining compliance with the Edwards Aquifer Rules are included in the Preliminary Water Quality Analysis & Design Report, which is available for review at the TxDOT Austin District.
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 9 2019
CONCLUSIONS This Water Resources Technical Addendum #2 has been prepared to document new ecological impacts resulting from the 2019 Reevaluation #2 design changes. The results of the additional analysis are summarized below:
• No additional water features were identified in the 2019 Reevaluation #2. Five water features were determined to no longer lie within the proposed project area.
• It is anticipated that a NWP 14 with PCN would be required for impacts at eight crossings.
No additional water resource commitments would be required in order to achieve NEPA clearance on the 2019 Reevaluation #2.
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 10 2019
REFERENCES Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual, U.S.
Army Engineers Waterways Experiment Station, Vicksburg, MS. NTIS No. AD A176912.
K. Friese & Associates (KFA). 2019. Preliminary Water Quality Analysis & Design Report. Prepared for the Texas Department of Transportation. November 2019.
U.S. Army Corps of Engineers. (USACE). 2010. Regional Supplement to the Corps of Engineers Wetland Delineation Manual: Great Plains Region (Version 2.0), ed. J. S. Wakeley, R. W. Lichvar, and C. V. Noble. ERDC/EL TR-10-20. Vicksburg, MS: U.S. Army Engineer Research and Development Center.
U.S. Fish and Wildlife Service. (USFWS). 2018. National Wetlands Inventory Mapper. Available at: https://www.fws.gov/wetlands/data/mapper.html. Accessed December 2018.
U.S. Geological Survey. (USGS) 2019. USGS National Map Viewer. https://viewer.nationalmap.gov/advanced-viewer/#. Accessed November 18, 2019.
Wetland Training Institute, Inc. (WTI). 1991. Field Guide for Wetland Delineation: 1987 Corps of Engineers Manual. WTI 91-2. 133 pp.
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 2019
Attachment A: Figures
Project BeginProject EndProject End
Detention Pond
Hays Count y
Ernest Ro b lesW
ay
Latta
Republi c
Of Texas Blvd
Tra vis CountyC
ir
Brod
i eLn
SW Parkway
CR 400CR 399
CR 19
18CR 2876
CR 397
CR 1928
CR472
CR 1923
CR 460
CR 1602
CR 443
CR 474
C R402
CR4 04
CR 385
CR47
8
CR 424
CR 16
26
CR 19
86
CR 19
96
CR 40 6
CR48
1
C R2872
CR 1956
CR 1994
CR 1957
CR 1649
CR 1 953
CR 1920
CR428
CR
374
CR 1621
CR4 25
CR2 7 9
CR 1967
CR 1915
CR407
CR 396
CR
405
S Bay
Tule Cv
Myra Ct
Adel C
v
Batak Ln
Via DrEc
l ipse
Ln
Woo d Trl
Ame s Ln
O the l lo Cv
S Oak Blvd
Kenn
anRd
Ax is Dr
Eiger Rd
Nava r r o P l
Neide
r Dr
Nub ia
n Ln
Mc Dade Dr
Nusse
rLn
Blumie St
Headl y Dr
Hero
Dr
Ast o ri aDr
Egan
hill D
r
Holl isterDr
Anchu sa Tr l
Siri ngoPass
Lant
ana W
ay
Sur reyHi l l Dr
LostVa lle y
Rotan Dr
A via
ra Dr
Via VerdeDr
Kiva Dr
Westview Rd
Ad enLn
La n dsman Dr
ClarnoDr
Brush
Cou n
tryRd
Esta na
Ln
Hope landDr
Westc r e e k Dr
Ma e linDr
Esc arpm
e ntB
lvd
Wier H
ills R
d
SB ro ok D r
Ganttcre st
Dr
Pillo
w Rd
Nair n Dr
Oakd a le Dr
DoswellLn
Woo
dcreek Rd
Pa isanoTrl
Parkw oo
d Dr
La Cre s a daD r
FairV all e y Tr
l
Gorha
m Gle n LnE spina Dr
Doe M eadowDr
Colb
ergDr
Bucke
yeTrl
So
terPkwy
Oa
si sD r
Re d m on d
Rd
Tw il i g ht M e sa Dr
Blar
wood
D r
Lone
Oak
Trl
Wag o n Train
RdLove g ras sLn
Harp er s Ferry Ln
Ve ga Av
e
Vi a Corre t o Dr
S
Ba y L n
E ske w Dr
Sta g ge rbrus h Rd
P on c haPa ss
Ma
g e ntaLn
Ale xa nd r iaDr
Trail We s tDr
RedWillow Dr
Cove
red Brid
ge
Dr
Ridge O a k Rd
BackBayLn
Ya upon Va l l e y Rd
Mit r aDr
Copano Dr
Terravis t a Dr
Rial to Blvd
La
Crosse Ave
!#2244
!#1826
Cima Cir
Kali Cv
Easy Dr
Sharl Cv
Kings Row
KayLn
Port Roya l
Ston
e Rd
Crest View Rd
Al len
Weir Dr
Furlo ngDr
Foste
r Ran
ch Rd
Cy pres s
W Pt
Bay Hil l Dr
Hone ycomb Dr
Blue Hill Dr
TaraLn
Le wis M ounta in Rd
Claxton
You ngLn
Gallan t Fox
S a n Diego
R d
Zyle Rd
Bl azyk Dr
Sout hview Rd
Mowink
le Dr
Bar to
n PtCanyo n R im Dr
Gran
ada
Hill s
Dr
Thunderb i rd RdW
hiteM
arsh
Va l ley Wal k
Patt e r son RdScenic Bluff Dr
Circle Dr
E l Do rad o
Creeks Edge
El Re y Blvd
Southw est Pkwy
B arton
Cre ek Bl vd
ST45
ST360
ST71
ST1
£¤290
Hays County
Travis County
G:\Projects\TXDOT\US290\all_PROD_Figure 1_ProjectLocation_Aerial_20191115.mxd
IProject LocationFigure 1. Project Location (Aerial Base)
Basemap Source: Google (2018)
1 in = 1 mileScale: 1:63,360Date: 11/15/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
ST1
ST45£¤290
§̈¦35
Wells BranchWells Branch
AustinAustin
ProjectArea
Travis County
0 1.5 Kilometers
0 1 Mile
#*#*
#*
#*
#*
#*
!(
!(
!( !(!(
S-10*S-9
S-8S-7
S-6
B arto
n Cr e
ek
Williamson Creek
Lat ta
Beck
ett R
d
Brod
ieLn
Jones Rd
Er n e st Robl e s Way
Brod
ie Ln
Mccarty Ln
Monte rrey Oaks Blvd
TravisCountyCi r
Republic
OfTe
xas Blvd
SW Parkway
WW
ill iamCa nnon Dr
CR 1602
Myra Ct
Bent Oak Cir
Terra
Oak
Cir
E Oa k Blvd
Spiv ey Dr
Faw nRun
Wing Rd
Barton View Dr
Robert Dixon Dr
Kno b Oak Ln
Su nk i st Ln
Cliff
stone
Cv
Woo
dside D r
WOa
k Blvd
VolW
a lke
r Dr
Eiger
Rd
Dry O a k Tr l
Dudle
y Dr
Can a Cv
La ng try Ln
School Rd
Wolf Ru n
V a lia n t Cir
Dry We
l l s Rd
Allegro Lugar
Vai l Va l leyDr
Kiva
Dr
Chuc k Wa g o n Trl
Wes
ternO
a ks B
lv d
SteerTr l
Fenc
eLin
eDr
Se nde r oDrH e ro D r
Honey D ew Ter
Twi ste d
Tre e
Dr
GainesRanchLoop
Boston Ln
OneOa k
Rd
Pono
maTr
l
Concho CreekBnd
Po rsche Ln
Whee le rBran ch Trl
Yellow T a il Cv
Canyonw ood Dr
Smith
Oak T
rl
F oster Ra
nch Rd
Eagl e Fea th e r Dr
Mor n
ing
De
w Dr
Ka yv iew D r
Westview RdReynolds Rd
Brus
h Coun tr
y Rd
Stea
rns Ln
Ye llow Rose Trl
Westc
reek
Dr
Rees
eDr
Oakc
laire
Dr
Oakdale Dr
S ummerse t Trl
Ben Garza Ln
Woodcreek Rd
Park
wood
Dr
Fair Va l l ey Trl
Rialto Blvd
Lone
Oak
Trl
Pillo
w Rd
TrailCrest Cir
W a gon
Train
Rd
L o v egrass L n
Vega
Ave
Ridge Oa k Rd
Staggerbrush Rd
T ra i l WestDr
ST360
ST1
LakeAustin-Town
Lake
WilliamsonCreek-Onion
Creek
£¤290
G:\Projects\TXDOT\US290\Water_PROD2_Figure 2_Water Resources_20191120.mxd
I
Project LocationHUC 12 Watershed BoundaryNHD StreamNHD WaterNWI Wetland100-Year Flood ZoneDesignated Floodway
!( Water Resource#* Water Well within 500 feet
Figure 2a. Water ResourcesData Sources: NHD (2018), NWI (2018),
FEMA NFHL (2018), TWDB (2019), HDR (2019)Aerial Source: Google (2018)
1 in = 2,000 feetScale: 1:24,000Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 600 Meters
0 2,000 Feet
b a
*Resource no longer located within the Project Location
#*
#*
#*
#*
#*
#*
#*#*
!(
!(
!(
!(
!(
!(
!(
!(
!(
!( !(
!(
!(
!(
!( !(!(
Devils Pen Creek
Wheeler Branch
Scenic Brook Tributary
Detention Pond
Wetland 1
Open Water 1*
S-14
S-3
S-4S-9
S-8S-7
S-6
S-5
S-2
S-13
S-12
S-11*
S-1
Wetland 2*Open Water 2*
Williamson Creek
Fletch
er
Silve
rmin
e
WW
i ll ia mCa nnon Dr
S ce nic Brook
Old Bee Caves
CR 19
85
CR19
25
CR 1923
CR 1984
CR6 5
4
CR19
70
CR 2259
CR 1973
CR 19
80CR
1982
CR 1948
CR 22
57
CR 19
49
CR19
67
CR19
81
CR19
50
CR 19
58
CR
1959
CR 2016
CR 1915
Keli CtNandas Trl
Otek
a CvOthe l l o C v
Pi nt o
Path
BlueStem
Trl
Con i fer Cv
Tusm
an Dr
Rac coon
Run
Anchusa Trl
B i g H orn
Cir
Roan Ln
Ga lla tin Dr
C e darElm Trl
Menle r Dr
Grov
eCr e st Dr
Aviar
a Dr
Hanbridge Ln
L a ndsma n Dr
Fenton Dr
Smok
eyHi
llRd
Cal lbr
amLn
Roar
ingS pr i n g s D
r
Oa k
Me adow Dr
Fort B
e nton
Dr
Wier H
ills R
d
S Brook Dr
Chino
ok D
r
LaCo
ncha P ass
C o b bl esto
n eTw i l ight Mesa Dr
Wolfc r eek Pas
s
Jou r n eyvil l e Dr
Ponc ha Pa ss
Red W
illow D
r
Cove
red
B ridge
Dr
Rialto Blvd
Terr a
v ista
Dr
!#1826
Felts
Ln
Cima Cir
Towan
a Cv
Scarle
t Cir
Butler C
v
Kathleen Dr
S Bend
Ross
on D
r
Summ e r Sky Dr
Deer
have
n Rd
San Di e go Rd
Crest View Rd
Grana
daHi
lls Dr
LaFa
una Pa
th
Weir Dr
Espanola Trl
La u ra la n Dr
WVi
ewR d
Brigh
t Star
Dr
Dore l la Ln
Midw
ood
Pkw y
Sam Carte r Dr
Towana Trl
Tara
Ln
Claxton
Cand
elaria
Dr
Murm uring Cre ek
William
son
Cree
k
ElRe y Bl
vd
Southv iew Rd
Pi tte r
Pat L
n
Mowink
le Dr
Thunderbird RdCirc le Dr
ST71Little Barton
Creek-Barton Creek
LakeAustin-Town
Lake
SlaughterCreek-Onion
Creek
WilliamsonCreek-Onion
Creek
£¤290
G:\Projects\TXDOT\US290\Water_PROD2_Figure 2_Water Resources_20191120.mxd
I
Project LocationHUC 12 Watershed BoundaryNHD StreamNHD WaterNWI Wetland100-Year Flood ZoneDesignated Floodway
!( Water Resource#* Water Well within 500 feet
Figure 2b. Water ResourcesData Sources: NHD (2018), NWI (2018),
FEMA NFHL (2018), TWDB (2019), HDR (2019)Aerial Source: Google (2018)
1 in = 2,000 feetScale: 1:24,000Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 600 Meters
0 2,000 Feet
b a
*Resource no longer located within the Project Location
0.024 acre
Williamson Creek
Ridge Oak
Rd
Joe
Tann
er L
n
Patto
n Ra
nch
Rd
Mccarty Ln
£¤290
S-10
S-6
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.Water/Wetland Impact
Figure 3a. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
0.024 acre
Williamson Creek
WWi ll i
amCa nnon Dr
£¤290
S-10
S-6
S-6
S-9
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.Water/Wetland Impact
Figure 3b. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
0.012 acre0.012 acre
Williamson Creek
W olfcreek Pass
£¤290
S-6
S-7S-8
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.Water/Wetland Impact
Figure 3c. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
Williamson Creek
Hi l l Oaks Dr
Old Bee Caves
£¤290
S-6
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.
Figure 3d. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
Scenic Brook Tributary
0.082 acre
Williamson Creek
Oak Meadow Dr
ST71
£¤290
S-4
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.Water/Wetland Impact
Figure 3e. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
Wheeler Branch
0.426 acre£¤290
S-3
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.Water/Wetland Impact
Figure 3f. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
Wheeler Branch
0.426 acre
!#1826
Hudson Loop
£¤290 S-3
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.Water/Wetland Impact
Figure 3g. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
0.02 acreCandelaria Dr
Acton Dr
La To
sca D
r
ElRey
Blvd
Ross
on D
r
Phoenix Pa ss
Hudson Loop
£¤290
S-2
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.Water/Wetland Impact
Figure 3h. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
0.002 acre
0.007 acre
Cooper Pass
El Rey
Blvd
Haske ll Dr
Bol ing
Cande l a ria Dr
£¤290
S-1
Wetland 1
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.Delineated WetlandWater/Wetland Impact
Figure 3i. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
Devils Pen Creek
Ta ra Ln
£¤290S-14
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayDelineated Water of the U.S.
Figure 3j. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
Williamson Creek
Old Bee Caves
Chinook Dr
ST71S-5
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191120.mxd
I
Existing Right-of-WayProposed Right-of-WayProposed Driveway LicenseDelineated Water of the U.S.
Figure 3k. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/20/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
Detention Pond
0.010 acre
Mountain Crest Dr
Sunse t Rdg
Old Bee Caves
S-12S-13
G:\Projects\TXDOT\US290\Water_PROD2_Figure 3_Water Crossings_20191122.mxd
I
Proposed Right-of-WayProposed Permanent EasementDelineated Water of the U.S.Water/Wetland Impact
Figure 3l. Water Crossings
Data Sources: HDR (2019)Aerial Source: Google (2018)
1 in = 200 feetScale: 1:2,400Date: 11/22/2019
Prepared for: TxDOT
CSJ: 0113-08-060 and 0700-03-077Oak Hill Parkway: US 290W from Mopac/Loop 1 to westof Circle Drive and SH 71 from US 290W to Silvermine Drive
0 60 Meters
0 200 Feet
lk
e d c b aj i h g f
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 2019
Attachment B: Project Area Photographs
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 1: Commercial land use along SH 71 south of Williamson Creek crossing; facing south.
Photograph 2: Urban land use and commercial properties along US 290; facing east.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 3: Disturbed oak‐juniper vegetation along US 290 (foreground) and residential development
in background; facing southeast.
Photograph 4: Project eastern terminus at Mopac; facing east.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 5: Oak‐juniper woodland and native‐invasive vegetation along US 290; facing west.
Photograph 6: Urban low intensity along US 290 adjacent to roadway and disturbed oak‐juniper
vegetation adjacent to the fenceline; facing east.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 7: Live Oak grove at Circle Drive and US 290; facing northeast
Photograph 8: Woodland vegetation type along US 290; facing north.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 9: Riparian vegetation at SH 71 Williamson Creek crossing (S‐5); facing southeast.
Photograph 10: Riparian vegetation along Williamson Creek (S‐6) at Joe Tanner; facing northwest
towards US 290/SH71.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 11: Riparian vegetation along Williamson Creek (S‐6) at Old Bee Caves Road; facing east.
Photograph 12: Limestone outcrop along US 290; facing west.
Water Resources Technical Report – Addendum
2019
Photograph 13: Urban Low Intensity vegetation and limestone cliff at the start of Recharge Zone along
US290/SH71 at William Cannon; facing east.
Photograph 14: Utility infrastructure within the Bee Cave detention pond; facing west.
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 15: Vegetated woodland within the Bee Cave detention pond; facing west.
Photograph 16: S‐1; facing north.
Water Resources Technical Report – Addendum
2019
Photograph 17: S‐2; facing north.
Photograph 18: Wheeler Branch (S‐3) south of 290; facing north.
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077
Water Resources Technical Report – Addendum
2019
Photograph 19: Wheeler Branch (S‐3) north of US 290; facing south.
Photograph 20: Scenic Brook Tributary (S‐4) from south of SH 71; facing north.
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 21: S‐5 under SH 71 looking west
Photograph 22: S‐5 looking east
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 23: Along Williamson Creek (S‐6) north of US 290/SH 71; facing east.
Photograph 24: Williamson Creek (S‐6) west of low water crossing at Old Bee Caves Road; facing east.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 25: Perennial pool areas along S‐6, Williamson Creek east of William Cannon; viewing east.
Photograph 26: Perennial pool areas along S‐6, Williamson Creek, east of William Cannon; viewing east.
Water Resources Technical Report – Addendum
2019
Photograph 27: Williamson Creek (S‐6) upstream of US 290/SH 71 crossing; facing south.
Photograph 28: Downstream of US 290/SH 71 crossing of Williamson Creek (S‐6); facing south.
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 29: Williamson Creek (S‐6) at William Cannon Road crossing; facing east.
Photograph 30: Unnamed tributary to Williamson Creek (S‐7) south of US 290/SH 71; facing east.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 31: Unnamed tributary to Williamson Creek (S‐8) north of US 290/SH 71; facing south.
Photograph 32: S‐10, dry creek bed (no longer in the project area); facing north.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 33: Unnamed tributary to Williamson Creek (S‐11) (no longer in the project area) within SH
71 detention pond site; facing south.
Photograph 34: Unnamed tributary to Williamson Creek (S‐11) (no longer in the project area) within SH
71 detention pond site; facing north.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 35: Unnamed tributary to Williamson Creek (S‐12) within the Bee Cave detention pond site;
facing northwest.
Photograph 36: Unnamed tributary to Williamson Creek (S‐12) within Bee Cave detention pond site;
facing south.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 37: Devil’s Pen Creek (S‐14) at the US 290 crossing at the western project terminus; facing
north.
Photograph 38: Excavated on‐channel stock pond (Open Water 1) (no longer in the project area) located
within SH 71 detention pond; facing north.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 39: Excavated on‐channel stock pond (Open Water 2) (no longer in the project area) within
SH 71 detention pond; facing southwest.
Photograph 40: Wetland (Wetland 1) near Boling Drive, within the project area; facing south.
Water Resources Technical Report – Addendum
Oak Hill Parkway CSJs: 0113‐08‐060 & 0700‐03‐077 2019
Photograph 41: Wetland (Wetland 2) (no longer in the project area) within the SH 71 detention pond;
facing south.
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 2019
Attachment C: Wetland Determination Point
US Army Corps of Engineers Great Plains – Version 2.0
WETLAND DETERMINATION DATA FORM – Great Plains Region
Project/Site: City/County: Sampling Date:
Applicant/Owner: State: Sampling Point:
Investigator(s): Section, Township, Range:
Landform (hillslope, terrace, etc.): Local relief (concave, convex, none): Slope (%):
Subregion (LRR): Lat: Long: Datum:
Soil Map Unit Name: NWI classification:
Are climatic / hydrologic conditions on the site typical for this time of year? Yes No (If no, explain in Remarks.)
Are Vegetation , Soil , or Hydrology significantly disturbed? Are “Normal Circumstances” present? Yes No
Are Vegetation , Soil , or Hydrology naturally problematic? (If needed, explain any answers in Remarks.)
SUMMARY OF FINDINGS – Attach site map showing sampling point locations, transects, important features, etc.
Hydrophytic Vegetation Present? Yes NoHydric Soil Present? Yes NoWetland Hydrology Present? Yes No
Is the Sampled Area within a Wetland? Yes No
Remarks:
VEGETATION – Use scientific names of plants. Dominance Test worksheet: Number of Dominant Species That Are OBL, FACW, or FAC (excluding FAC ): (A)
Total Number of Dominant Species Across All Strata: (B)
Percent of Dominant Species That Are OBL, FACW, or FAC: (A/B)
Prevalence Index worksheet: Total % Cover of: Multiply by: OBL species x 1 = FACW species x 2 = FAC species x 3 = FACU species x 4 = UPL species x 5 = Column Totals: (A) (B)
Prevalence Index = B/A = Hydrophytic Vegetation Indicators: 1 - Rapid Test for Hydrophytic Vegetation 2 - Dominance Test is >50%
3 - Prevalence Index is 3.01 4 - Morphological Adaptations1 (Provide supporting
data in Remarks or on a separate sheet) Problematic Hydrophytic Vegetation1 (Explain)
1Indicators of hydric soil and wetland hydrology must be present, unless disturbed or problematic.
Absolute Dominant Indicator Tree Stratum (Plot size: ) % Cover Species? Status 1. 2.3.4.
= Total Cover Sapling/Shrub Stratum (Plot size: ) 1. 2. 3. 4. 5.
= Total Cover Herb Stratum (Plot size: ) 1. 2. 3. 4. 5.6.7.8.9.10.
= Total Cover Woody Vine Stratum (Plot size: ) 1. 2.
= Total Cover % Bare Ground in Herb Stratum
Hydrophytic Vegetation Present? Yes No
Remarks:
290/71 Oakhill Parkway Travis 7/20/2015
TxDOT Tx W-1
C. Magers, S. Moren N/A
- concave 5
I (Southwest Plateaus) 30.231008 -97.899092 NAD 83
Brackett-Rock outcrop complex, 1 to 12 percent slopes n/a
✔
✔
✔
✔ ✔✔
Appears to be a dry pond that was dug in uplands during construction of roadway with a cut into anexisting stream.
30'
none4
7
-15'
Baccharis halimifolia 5 yes57%
FACSalix nigra 5 yes FACWSapium sebiferum 5 yes FACJuniperus ashei 5 yes NIMelia azedarach 5 yes FACU
255'
OBL30Polygonum hydropiperoides yesMuhlenbergia reverchonii 15 no FACTypha latifolia 5 no OBLYucca rupicola 5 no NI
✔
5530'
Lonicera japonica FACU20 yes
2045
✔
US Army Corps of Engineers Great Plains – Version 2.0
SOIL Sampling Point:
Profile Description: (Describe to the depth needed to document the indicator or confirm the absence of indicators.) Depth Matrix Redox Features (inches) Color (moist) % Color (moist) % Type1 Loc2 Texture Remarks
1Type: C=Concentration, D=Depletion, RM=Reduced Matrix, CS=Covered or Coated Sand Grains. 2Location: PL=Pore Lining, M=Matrix. Hydric Soil Indicators: (Applicable to all LRRs, unless otherwise noted.) Indicators for Problematic Hydric Soils3:
Histosol (A1) Sandy Gleyed Matrix (S4) 1 cm Muck (A9) (LRR I, J) Histic Epipedon (A2) Sandy Redox (S5) Coast Prairie Redox (A16) (LRR F, G, H) Black Histic (A3) Stripped Matrix (S6) Dark Surface (S7) (LRR G) Hydrogen Sulfide (A4) Loamy Mucky Mineral (F1) High Plains Depressions (F16) Stratified Layers (A5) (LRR F) Loamy Gleyed Matrix (F2) (LRR H outside of MLRA 72 & 73) 1 cm Muck (A9) (LRR F, G, H) Depleted Matrix (F3) Reduced Vertic (F18) Depleted Below Dark Surface (A11) Redox Dark Surface (F6) Red Parent Material (TF2) Thick Dark Surface (A12) Depleted Dark Surface (F7) Very Shallow Dark Surface (TF12) Sandy Mucky Mineral (S1) Redox Depressions (F8) Other (Explain in Remarks) 2.5 cm Mucky Peat or Peat (S2) (LRR G, H) High Plains Depressions (F16) 3Indicators of hydrophytic vegetation and 5 cm Mucky Peat or Peat (S3) (LRR F) (MLRA 72 & 73 of LRR H) wetland hydrology must be present,
unless disturbed or problematic. Restrictive Layer (if present): Type: Depth (inches): Hydric Soil Present? Yes No Remarks:
HYDROLOGY Wetland Hydrology Indicators: Primary Indicators (minimum of one required; check all that apply) Secondary Indicators (minimum of two required)
Surface Water (A1) Salt Crust (B11) Surface Soil Cracks (B6) High Water Table (A2) Aquatic Invertebrates (B13) Sparsely Vegetated Concave Surface (B8) Saturation (A3) Hydrogen Sulfide Odor (C1) Drainage Patterns (B10) Water Marks (B1) Dry-Season Water Table (C2) Oxidized Rhizospheres on Living Roots (C3)
Sediment Deposits (B2) Oxidized Rhizospheres on Living Roots (C3) (where tilled) Drift Deposits (B3) (where not tilled) Crayfish Burrows (C8) Algal Mat or Crust (B4) Presence of Reduced Iron (C4) Saturation Visible on Aerial Imagery (C9) Iron Deposits (B5) Thin Muck Surface (C7) Geomorphic Position (D2) Inundation Visible on Aerial Imagery (B7) Other (Explain in Remarks) FAC-Neutral Test (D5) Water-Stained Leaves (B9) Frost-Heave Hummocks (D7) (LRR F)
Field Observations: Surface Water Present? Yes No Depth (inches):Water Table Present? Yes No Depth (inches):Saturation Present? Yes No Depth (inches):(includes capillary fringe)
Wetland Hydrology Present? Yes No
Describe Recorded Data (stream gauge, monitoring well, aerial photos, previous inspections), if available: Remarks:
W-1
0-2 10 YR 6/2 gravel
2
gravel✔
Soil appears to be greatly affected by adjacent roadway. Gravel was found at surface level and restricted diggingbelow 2 inches.
✔
✔✔
✔
✔
✔
✔ ✔
Google Earth aerial photograph
Water Resources Technical Report Addendum #2
Oak Hill Parkway CSJs: 0113-08-060 & 0700-03-077 2019
Attachment D: Hydraulic Exhibits