Astronomy and Astrophysics Astronomy and Astrophysics Advisory CommitteeAdvisory Committee
Oct 11, 2005Oct 11, 2005
Status of Decadal Survey Recommendations
Small Initiatives:
–National Virtual Observatory (NVO) - Framework development funded; discussion with NASA planning long-term support through joint solicitation, currently in legal review; Cyber funds in ’06 and beyond?
Status of Decadal Survey RecommendationsUpdate
Moderate Initiatives:
–Advanced Technology Solar Telescope (ATST)Advanced to “Readiness” at last NSB meeting
–VERITAS -Awaiting outcome of NEPA and NHPA processesConstruction re-start ~December at earliest
Status of Decadal Survey Recommendations
Major Initiatives:–Atacama Large Millimeter Array (ALMA) – update tomorrow
– Giant Segmented Mirror Telescope (GSMT) – joint technology development program proposal funding in process
– Large Synoptic Survey Telescope (LSST) - $14M development award in place.
Status of Quarks to Cosmos recommendationsUpdate
– CMB Research Task Force – Final report today
– Interagency initiative on Physics of the Universe
Physics of the Universe Interagency PlanUpdate
Highest priority, ready
– LSST
– CMB Research Task Force – Final report this afternoon
– Dark Energy Task Force formed under AAAC and HEPAP
Status report tomorrow
GSMT Planning National Optical Astronomy Observatory (NOAO) Science Working National Optical Astronomy Observatory (NOAO) Science Working
Group has formulated a detailed science caseGroup has formulated a detailed science case. . Consortium formed to undertake an extensive technology development Consortium formed to undertake an extensive technology development
and site characterization effort. and site characterization effort. Would result in a public-private partnership with private funds supporting Would result in a public-private partnership with private funds supporting
approximately 50% of the $70M estimated cost; proposal to NSF for the approximately 50% of the $70M estimated cost; proposal to NSF for the remaining 50%. Public funds would support community effort in several remaining 50%. Public funds would support community effort in several major groups.major groups.
Current estimate is that this effort would take five to seven years.Current estimate is that this effort would take five to seven years. Proposal Proposal funding has begun.funding has begun.
NSF has met with consortium and with individual Boards to discuss NSF has met with consortium and with individual Boards to discuss timing and are continuing a constructive dialoguetiming and are continuing a constructive dialogue
Funds in FY2005 appropriation limited; similar for FY2006; Planned Funds in FY2005 appropriation limited; similar for FY2006; Planned growth awaits outcome of Senior Reviewgrowth awaits outcome of Senior Review
LSST Planning
National Optical Astronomy Observatory (NOAO) Science Working National Optical Astronomy Observatory (NOAO) Science Working Group formulated detailed science case.Group formulated detailed science case.
LSST Corporation established. LSST Corporation established. Pan-STARRS underway in Hawaii with DoD funding. No operations Pan-STARRS underway in Hawaii with DoD funding. No operations
money at all and insufficient resources for software.money at all and insufficient resources for software. NSF provided $1.3M in FY03 for detector development for LSST NSF provided $1.3M in FY03 for detector development for LSST
Camera; NOAO has been funding telescope design at roughly Camera; NOAO has been funding telescope design at roughly $1.7M/year. $1.7M/year.
DOE labs have expressed strong interest in participating in the project DOE labs have expressed strong interest in participating in the project through provision of the camera. DOE science budget a problem?through provision of the camera. DOE science budget a problem?
Technology development program ($14M) underway in FY2005, Technology development program ($14M) underway in FY2005, FY2006 (Physics of the Universe)FY2006 (Physics of the Universe)
The ATSTProject
The Advanced Technology Solar Telescope
Improvements over current state of the art:• Resolution – ~7X improvement• Light grasp – 10X improvement (solar physics is actually photon starved in some experiments)
Technical Specifications:• 4-m, off-axis Gregorian (all reflective), alt-az mount.• Integrated adaptive optics.• Hybrid enclosure with thermal control and dust mitigation.• Wavelength sensitivity from 0.3-28 microns (near-UV through thermal infrared).• Field of view: 3 arcminutes (5 arcminute goal).• Angular resolution < 0.03 arcsecond.• Polarization accuracy < 0.01%.
ATST will be the world’s flagship facility for ground-based solar physics observation and the first large US solar telescope constructed in the past 30 years.
The Telescope
Marching toward MREFC• ATST team had planned aggressively for an FY06 start of construction. This will not happen.
• Additional funding will be required to pay marching army and produce final design (note that current MREFC rules preclude funding design from MREFC). AST will fund through FY06 (FY07).
• The next steps:
ATST and AST craft development plan for FY06-7. Site selection complete – environmental impact study underway. Brought to MREFC panel in March 2005; advanced to readiness 9/05 In-depth cost review endorsed costing models completed Attempt to address critical path items – early procurement of primary mirror possible through AFOSR partnership Let contracts for final design to design and engineering firms. Complete Project Execution Plan. Final design review in early 2006. Construction begins in FY2008?
Planning(Activity Accelerating)
O/IR roadmap team convened by NOAO O/IR roadmap team convened by NOAO has posted reporthas posted report
Radio/mm/sub-mm convened by AUI has Radio/mm/sub-mm convened by AUI has posted reportposted report
CMB Roadmap – this meetingCMB Roadmap – this meeting Dark Energy Task Force – end of 2005Dark Energy Task Force – end of 2005
Building a Sustainable Program Promises to be transformationalPromises to be transformational Built on underpinnings of community involvement in Built on underpinnings of community involvement in
planning, advice, advocacy and “formal” agency recognition planning, advice, advocacy and “formal” agency recognition of those structuresof those structures
Realistic (ambitious is OK, but….)Realistic (ambitious is OK, but….) Supportable by the astronomical communitySupportable by the astronomical community Supported by the astronomical community (over the long Supported by the astronomical community (over the long
haul – now 15 years)haul – now 15 years) Appeals to broader scientific communityAppeals to broader scientific community ““Understands” and meshes with agency processes (helping Understands” and meshes with agency processes (helping
to shape them if possible)to shape them if possible)
Near Term
Intermediate Term
Horizon Facilities
Gemini
GSMT
EVLA I
VLA
GBT LOFAR
EVLA Phase II
LSST
SKA
OWL?
LOI?
CHARA
ALMA
CARMA
VLA
GBT LOFAR
LSST
GSMTNAIC
ATST
NSF and AST Developments New Deputy Director – Dr. Kathie OlsenNew Deputy Director – Dr. Kathie Olsen
NSF program officer, Deputy Div DirNSF program officer, Deputy Div Dir NASA Chief ScientistNASA Chief Scientist OSTP Deputy Director for ScienceOSTP Deputy Director for Science
New Positions in ASTNew Positions in AST Two facilities/large projects managersTwo facilities/large projects managers Additional grants program rotatorAdditional grants program rotator Additional program officer for ESM (upgrade)Additional program officer for ESM (upgrade) Upgraded administrative position – finance and project Upgraded administrative position – finance and project
supportsupport
1990s Decadal Survey - Approx.
0
10
20
30
40
50
FY91 FY92 FY93 FY94 FY95 FY96 FY97 FY98 FY99 FY00 FY01
Fiscal Year
Mill
ions
of D
olla
rs
MMA SOAR Construction WIYN ConstructionCHARA Construction ISI Construction Fly's EyeEVLA I Adaptive Optics CfAO Adaptive Optics ATI
Operating budgets and grant increments to realize the Decadal Survey recommendations
___________________________________________
Astronomy Division Budget - FY2005
Astronomy Division Budget - FY2005
Facilities - $119.1 M
National Optical Astronomy Observatory (NOAO) National Solar Observatory (NSO)
Gemini Observatory
National Radio Astronomy Observatory (NRAO)
National Astronomy & Ionosphere Center (NAIC)
University Radio Observatories
$24.1 M$10.6 M(excludes TSIP, AODP)
$15.5 M
$47.0 M
$10.5 M
$11.3 M
Astronomy Division Budget - FY2005
Astronomy Research & Instrumentation - $75.4 M
Astronomy & Astrophysics Research Grants (AAG)Particle AstrophysicsEducation & Special Programs (ESP)
CAREER, REU, Postdoctoral fellowshipsAdvanced Technologies & Instrumentation (ATI)
Technology Development & Design for future facilitiesElectromagnetic Spectrum Management (ESM)Science & Technology Centers (STC)
Center for Adaptive Optics (CfAO)NSF/MPS Priorities and programs
e.g. Cyberinfrastructure, Math Sciences
AST Budget FY1995-2006
Astronomy Division Budget Growth
Annual budget has grown by 60% since 2000 ($73 M)But with $52M in directed appropriations in FY2001-2004
- $32M to NRAO- $4M to NAIC- $4M to NOAO- $5M to ‘grants’- $7M to instrumentation
Unable to plan for the increase and limited discretion over its use.
Growth has stopped (FY2005 budget down by $2M from FY2004)
Astronomy Division Budget GrowthObservatory budgets FY1990 - 2006
How can we afford it?
Proposals and studies Proposals and studies will sharpen costwill sharpen cost
Planning will provide Planning will provide phasing, decision phasing, decision points, down-selectspoints, down-selects
Overall plan must Overall plan must meet fiscal realitymeet fiscal reality
How?How?
NSF Budget Authority Projection
$4.40
$4.60
$4.80
$5.00
$5.20
$5.40
$5.60
$5.80
$6.00
2002 2003 2004 2005 2006 2007 2008 2009