APPENDIX - I
(See paragraph - 6)
FORM 1
(D Basic Information:
S.No.
1
2
.J.
A
Item
Name of the project/s:
ffiProposed capacity /area /length/ton nage to be
handled/command area/leasearea/num65565er ofWells to be drilled.
New/Expansion/Modernization
Existing CapacitY Area etc.
Catee.orv of Proiect i.e.' A' or 'B'
I Does it attract the general condition? If yes,
I Please soecifv.I
fDoes it attract the specific condition? If 'yes,
I Please specifu.
-
LLocation
Plot/Survey/Khasra No.
' 1t:a: _-Tehsil
Details
Mahan Open Cast Coal Mine
1(aJ Mining of Mineral
Capacity - 0.3 6 MTY,
Total EC Area- 201.34 Ha
Boreholes - Total 2B BoreholeTotal meterage - 640 MBoreholes density- 14.14 B.H.Per
Sq.Km.Applied as per gadget notification No.
1385 dated - 06.04.2018 to obtain
Elrn4erEl4jqLt[ation 2006. -Existing CapacitY - 0.36 MTY,
Existinq Area - 201 34 HL5.
;o. A
7. No
8. No
t-atituae- N23022'20" to N ZSoZZ'+O;
& Longitude- EB3o0'30" to
!9q00'45_ __Covered in ToPo sheet No. 64M/3 ofs u rvey of in d ia.
Scale- l:50000Kapsa ra
Bhaiyathan
9.
n ic tri.fqfata
Nearest railway station/airport along withDistance in kms.
SurajpurChhatisgarhKaronli 16 KM
10.
General ManaEl'rl'qs.{.fi.qF /E{rq H I
siiiutenatgaon Rto''
Nearest Town, city, District HeadquartersAlong with distance in kms.
Nearest Town - Ambikapur Town,30 kmsDist H/Q - Surajpur, 45KmsDist Collectrate- Surajpur Dist (CGl,
45 Kms
72. Village Panchayats, Zilla Parishad, MunicipalCorporation, Local body (complete postal
Address with telephone nos. to be given)
Panchayat /M unicioa I
Villagc , Contact1Nos.
VillagePanchayat -Kapsara
P ost-bhatgaonTah.-Bhaiyathan,Dist.-Surajpur, Pin497235
KapsaraName ofsarpanch -urwasiapaltGfa
9713448r60
13. Name of the applicant South Eastern Coalfields Limited
1.4. Registered Address Seepat Road Bilaspur, 495006 [CG)
t:t. Address for correspondence:
Name Shri S N Kapri
Designation (0wner/Partner/CEO) General Manager(Bhatgaon area )
Address Offive ofthe General Manager jarh,
tahsil - Pratapur Distt - SurajPur(c.c.)
Pin Code +97235
E-mail gmbhatgaon @gmail.com
Telephone No. 07775-278346
Fax No. 07775-278347
t6. Details ofAlternative Sites examined, ifany.Location of these sites should be shown on a
topo sheet.
Coal Mining is a site specific Activitythe mine is already operational.
,l4as[rq-drqp"T6
"f?s'&li#ig1,s'rCuten"tgaon Ru';
77. Interlinked Projects
-wheth".
s"pa.ate application of interlinkedProject has been submitted?
If yes, date of submission
'--.-'--lf no, reason
IWhether the proposal involves approval /I clearance under: ifyes, Details ofthe samet.I and their status to be glven.
| (ul fn" Forest [ConservationJ Act, 1980?
[bJ The Wildlife (ProtectionJ Act, L972(cl The C.R.Z. Notification, 1991?
Not Applicable
-.
No A pplicable
-Not Rppti.atte
Not Applicable
Yes Forest clearance of Area 15.42
Ha vide No, BC/74/1999-FCW / 11'77
Date 20.05.2003Stage Il FC awarded letter No.
BC/ 014 199-FCw / 18L7 dared -02.09.L999. [Validity 30 Years fromdate of issue of letter.)NoNoNo
18.
79,
20.
n.
22.
;;LJ,
Whether there is any Government 0rder/Policy relevant/ rel4l48l9l!9 J]!g?-eoci-u"a.""t""a o..t^r-] I
Whether there is any litigation pending agarnst
the project and /or land in whichthe project is ProPose to be set uP?
[aJ Name of the Court(b) Case No.
icj oraersTairections ofthe Court, if any and
ltsrelevance with the prpp!!egilgp!!_-
Yes 15.42 Ha Revenue Forest Land
No24.
. Capacity corcesponding to sectoral activity (such as production capacity for
iinufirturirg, mininglease area and production capacity for mineral production'. areo
fii iiruA eiploratfi, leigth for tinea'r transport infrastructure, generation capacity for
power generation etc ,)
(ID Activity
1 , Construction, operation or decommissioning of the Proiect involving.actions'
which will ."r.r"-pt vri."t changes in the locality (topography' land use' changes in
water bodies, etc.)
'l ...---.- .-,{.:'r';"-';'
-:; -i?; li#fft,sEiibiuibuon n"'u
Details thereof (with approximate quantities/rates, wherever possibleJ with source ofinformation data
This is an Opencast Mine the Land use pattern will be changed
Information/ChecklistconfirmationPermanent or temporarychange in land use, land coveror topography includingincrease in intensity of landuse (with respect to localland use planJ
Orhers(speciiv) 12 14(Covr l.ndl
Land use patternr- Core Zone
Land use pattern:- Post Mining
Euil! up Area 0nfrastructu.e, colony,roads,
Land acquired under CBA Act 1957.Copy of notification is enclosed.Stage Il of forest land 15.42 Ha has beengranted by MOEF vide letter No. 8C/0M/99-FCW /7817 dated 02.09.1999. (copy enclosed).
Clearance of existing land,vegetation and buildings?
Total land involved = 2O7.34 Ha.Break up is as follows -Government - 12.14 HaTenancy - 173.78 HaForest - 15.42 Ha
Creation of new land uses?
;;1;i;";i
?01 3,1
A*z
q-d${E11z6
General lanagerq€.{.ff.qd./{drnq q:t
SiCuBlratgaon Anra
This land will undergo changes during miningand at the end of mine life the land usepatterns will be as follows -Infrastructure - 1,49 HaInternal OB Dump - 125.2O Ha
IReclaimed)External OB Dump - 17.05 Ha
IReclaimed)Green Belt - 26.18 HaVoid/water bo dy - 31.42 HaTotal - 201.34 Ha
'l-.4 Pre-constructio n
investigations e.g. bore houses,soil testing?
Yes No.ofBore Holes - 28 No.Total meterege- 640 MBoreholes density- 14.14 B.H.per Sq. Km.
l.) Co nstruction works?
l.o Demolition works? Yes As per final Mine closure plan,
1.7 Temporary sites used forconstructio n works orhousing of constructionworkers?
No Not Applicable
1.8 Above ground buildings,structures orearthworks including linea rstructures, cut and fill orexcavatro ns
Yes Infrastructure & Rehabilitation fExisting) -1.49 HaI n frastru ctu re (P ro p os ed) - NIL
7.9 Underground works includingmining or' tu nneling?
No Not Applicable
1.10 Reclamation works? Yes At the end of mine life Internal OB dump(Reclaimed)- I25.2O HaExternal OB Dump (Reclaimed) - 17.0 5 Ha.
1.1L Dredging? No Not Applicable
r.12 Offshore structu res? No Not Applicable
1.13 Production and manufacturingprocesses?
Yes Coal Production - 0.36 MTPA
1.L4 Facilities for storage of goodsor materials?
Yes Area for storage, Govt land -O.23 Ha, privateland -16.82 Ha. Storage of top soil '5 ha(included in safety zone). Internal OB dump
Ger;eral l/iarage!q€.i.fi.qi./{dr[q $ I
' -, ro,rrtqaOn A.i(,-
725.2O Ha.
1.15 Facilities for treatment ordisposal of solid waste orIiquid effluents?
Yes OB internal dumP - 125.2O Ha'External dumP -17.05 hal.Solid waste :- Over burden being dumped atdesignated site and concurrent reclamation is
being done.2.Mine:- The Mine water is settled in minesump which is reutilized in dust suppressionwork. _The operation workers are residing inBhatgaon colony, shakti nagar colony & urianaqar colony ofSECL in 214 Qtrs. _-
-t.ro Facilities for Iong term housingof operational workers?
Yes
7.17 New road, rail or sea trafficduring constructlon oroperation?
Yes NO
No
Not Applicable
Not Applicable
N"tAppti."bt"
Not Applicable
Oue to Mining activities the aquifer is
.intersected resulting in seepage of water inmine sump. No other abstraction or transfer of
water from glqund qLsq{aqq wj{91 rs dg4e,
The route of an old seasonal water course
which was existing within the mine lease hold
area was diverted to flow outside the mine
workinqs for safety PurPose.
1.18 New road, rail, air waterborneor other tra nspo rtinfrastructure including newor altered routes and stations,ports, airPorts etc?
No
7.79 Closure or diversion of existingtransport routes orinfrastructure leading tochanges in traffic moveqqn'QL
NO
7.20 New or diverted transmissionlines or pipelines?
No
r.21 lmpoundment, damming,culverting,realignm.ent or other changes
to thehydrology of wate rcourses or
aq u ifers?
No
1.22 Stream crossings? No
7.23 Abstraction or transfers ofwater from ground or surface
waters?
YES
1.24 Changes in water bodies or the
land surface affecting d rainage
or run-offl
YES
I. L) Transport of Perso nnel ormaterials for constructio n,
Yes a) Conveyance facility is provided lor mrne
nersonnel.
General Manager .
aq.{.*t'sT /Fd?n4^Er':. :l ,Phgtgaon Afuq
operationor decommissioning?
bl OB is transported to OB dumping bydumpers.c) Maiority coal is transported to coalhandline plant fCHP) by tiPPers'
L, LO Long-term dismantling ordecommissioning orrestoration works?
Yes It will be dealt in final mine closure plan'
1..27 0ngoing activiry duringdecommissioning which couldhave an impact on theenvironment?
Yes Dealt as per final mine closure plan.
7.28 lnflux of people to an area ineither temporarily orpermanently?
Yes Proiect Manpower - 341Others - 42Total - 383
r.z9 Introduction of alien species? No Not Applicable
1.30 Loss of native species orgenetic diversity?
No Not Applicable
1.31 Any other actions? No Not Applicable
2, Use ofNatural resources for construction or operation of the Proiect (such as
land, water, materials or energy, especially any resources which are non-renewableor in short supply):
S.No. Information/checklist confi rmation Yes/No
Details thereof (with approximatequantities / rates, whereverpossible) with source ofinformation data
2.1 Land especially undeveloPed oragricultural land (ha)
Yes Tenancy - 173.78 Ha
2.2 Water (expected source & competingusers) unit: KLD
Yes "126 KLD Mine water from mine sumP
is utilized for industrial purposeDrinking Water 7.25 KI'
2.3 Minerals IMTJ YES 7.48 MT as per RPR
2.4 Construction material - stone, aggregates,
sand / soil (expected source - MTJ
yes Material Source
1. Stone/aggregate Stone crusher
2. Sand/Soil River
3. Ash BnLks Frum supplicr
Construction material is used in bujldings,retaininB wa lls ct(.
2.5 Forests and timber [source - lv!I) NO
General Manageras.{.fi.q"./lrd'rE st'l
S'ECUBhatgaon Art:a
2.6 Energy including electricity and fuels(source, competing users) Unit: fuel (MTJ,
enersv [MWl
YES 1.7.44 KWH per tonne
3.0 KL / dav2.7 Any other natural resources (use
a p p ropriate standard u n itsJNO NA
S.No. Information /Checklist confirmation Yes/No
Details thereof fwithapproximate quantities /rates,wherever possible) with sourceof information data
J.l Jse of substances or materials, which arerazardous (as per MSIHC rules) to human:realth or the environment (flora, fauna, and,,vater supplies)
YES Quantity of explosive used -
t41622.917 Kg Per Month / 5.55Kgper to n ne.
Quantity ofuse oil - 0.40 KL permontn
3.2 Shanges in occurrence of disease or affectlisease vectors (e.g. insect or water borneliseasesl
No Not Applicable
3.3 Affect the welfare of people e.g. by changingirrin o rn nd itio n c?
No Not Applicable
3.4 y'ulnerable groups of people who could be
rffected by the project e.g. hospital patients,:hildren, the elderly etc.,
No Not Applicable
3,5 Any other causes l\o Not Applicable
about actual or perceived risks to human health.
3. Use, storage, transport, handling or p roduction of substan ces or materials,which could be harmful to human health or the environment or raise concerns about
4. Production of solid wastes during construction oroperation or Decommissioning(MT/month)
S.No. Information/Checklist confi rmation Yes/No
Details thereof (withapproximate quantities/rates, wherever Possible)with source of informationdata
i:s'*Yffi1,#iiJehatgaon erttr
4.1. Spoil, overburden or mine wastes Yes 2.5 M cum
4.2 Municipal waste (domestic and orcommercial wastesl
No Not Applicable (as there is noseparate colony for MahanocMl
4.3 Hazardous wastes (as per Hazardous WasteManagement Rules)
Yes burnt Oil.
4.4 Other industrial process wastes l\o Not Applicable
.t. J Surplus product No Not Applicable
4.6 Sewage sludge or other sludge from effluenttreatment
Yes There is no separate residentialcolony under Mahan OCM. Theemnlovees ere residinq indifferent colonies of SECL.
Where in soak pit / septic tanksare made for sewage disposalsystem. The construction ofSTP for these colonies is inproqress.
4.7 Construction or demolition wastes Yes As per final Mine Closure Mine.
4.8 Redundant machinery or equipment Yes Machinery /equipment aresurveyed off as and whenre qu ired.
4.9 Contaminated soils or other materials No Not Applicable
4.10 Agricultural wastes l\o Not Applicable
4.\L Other solid wastes No Not Applicable
5. Release ofpollutants or any hazardous, toxic or noxious substances to air (Kg/hr;
S.No. Information /Checklist confi rmation Yes/
Details thereof (with approximatequantities /rates, whereverDossiblel with source of
.8ffi'{'GEne,ral Manager
qii.'ii.qc.iualq ti '
StCUBhctgaon Artta
No information dataJ.I Emissions from combustion of fossil fuels
from stationary or mobile sourcesYes Emission from stationary source- Nil
Emission from Mobile source- Yes
5.2 Emissions from production processes Yes 5 LMV ,10 HMV 33 & HEMM aredeployed for 0Bp rod uction/d is patch pu rpose.Dust & Gaseous emrssion duringdrillin!, blasting & Loadingoperations. Pollution is controlled bytaking precaution at the site.
J.J Emissions from materials handlingincluding storage or transport
Yes 5 LMV ,10 HMV 33 & HEMM are
deployed for 0Bp ro du ctio n/ dispatch pu rpose.Dust & Gaseous emission duringdrilling, blasting & Loadingoperations. Pollution is controlled bytaking precaut ion at the s ite.
:)..i Emissions from construction activitiesincluding plant and equipment
NO The quantity is insignificant.
5.5 Dust or odours from handling of materialsincluding construction materials, sewageand waste
No Not Applicable
J.O Emissions from incineration of waste No Not Applicable
5.7 Emissions from burning of waste in openair (e.g. slash materials, constructiondebrisl
No Not Applicable
5.8 Emissions from any other sources No Not App)icable
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
S.No. Information/Checklist confirmation
Yes/No Details thereof (withapproximate quantities/rates, wherever possible)with source of informationdata with source ofinformation data
6.1 From operation of equipment e.g.
engines,ventilation plan! crushers
Yes Generation of noise fromoperation of HEMM is kePtbelow permissible limit.
'; ert.ria! )ilJn39"i.qq.{.:'{',i-I.i rlgr'.rd h i
il:cL/e:lci$atn'\ft ':i
10
6.2 From industrial or similar processes Yes Same as above
6.3 From construction or demolition Yes As per final Mine Closure Plan.
6.4 From blasting or piling Yes Ceneration of instantaneousnoise and vibration duringblasting which is maintainedwithin the permissible hmits.
6.5 From construction or oDerational traffic Yes Ceneration of noise Ievel fromoperation of HMV & LMV is
kept below the permissiblelimit.
6.6 From lighting or cooling systems No Not Applicable
6.7 From any other sources No Not Applicable
7. Risks of contamination of land or water from releases of pollutants into theground or into sewers, surface waters, groundwater, coastal waters or the sea:
S.No. Information /Checklist confi rmation Yes/No
Details thereof fwithapproximate quantities/rates, wherever possible)with source of informationdata
7.1 From handling, storage, use or spillage ofhazardous materials
Yes The storage, handling,transportation & disposal ofthe used eye and used batteriesare done with safe manner tothe autho rizes aqe ncies.
7.2 From discharge of sewage or othereffluents to water or the land [expectedmode and place ofdischargel
YES There is no separate colony forMahan OCM. The p resentsystem of soak pit / septictanks will be replaced by STPwhich is already in progress.
By deposition of pollutants emitted to airinto the land or into water
Yes Fug jtive emission into airwhich is ins ign ifica nt.
A*-#lgn"l'gr^l,
11
1i From any other sources No Not Applicable
7.5 Is there a risk of long term build up ofpollutants in the environment from thesesources?
No Not Applicable
S.No. Information/Checklist confi rmation Yes/No
Details thereof (withapproximate quantities/rates, wherever possible)with source of informationdata
8.1 From explosions, spillages, fires etc fromstorage, handling, use or production ofhazardous substances
Yes Emergency Organisation Planis prepared as per DGMS. Mockdrills are conducted at regularinterval.
8.2 From any other ca uses Yes l.0peration of vehicles/HEMM2.BlastingCode of Practice has beenprepa red as per DCMS.
8.3 Could the project be affected by naturaldisasters causing environmental damage
[e.g. floods, earthquakes, ]a ndslides,Cloudburst etcJ?
Yes Although the project is notfalling under seismically activezone or land slide prone zone,however mine is well equippedto deal with the emergencies asper CMR 1957 and relatedDCMS C ircu lars.
8. Risk ofaccidents during construction or operation ofthe Proiect, which couldaffect human health or the environment
9. Factors which should be considered {such as consequential development) whichcould lead to environmental effects or the potential for cumulative impacts withother existing or planned activities in the locality
S. No, Information /Checklist confirmation Yes/No
Details thereof (withapproximate quantities/rates, wherever possible)with source of informationdata
9.7 Lead to development of supporting,. Yes The resion is industrial resion
..1{:r t -. 'rrancial l.i'il?9e!
fi.!,t '' I'i;qe.'it cuieln- lg'"t A"t ,,
Iities, ancillary development ordevelopmentstimulated by the project which could haveimpact on the environment e.g.:
. Supporting infrastructure [roads, powersupply, waste or waste water treatment,etc.)
. housing development
. extractiveindustries
. supply industries
. other
with coal mines activities. Thishas lead to overall econonllcgrowth of near by areas tosupplement the population ofarea and creation of socialinfrastructures as school,hospital, road etc, which help rneconomic development in thereglon.AIong with leading to semiurban development ininfrastructure of near by areasand supporting mining andother industries.
9.2 Lead to after-use of the site, which couldhave an imoact on the environment
Yes The Biologically reclaimed landwill improve the green cover inthe area and water body to bedeveloped will act as a waterrecharge structu re
9.3 Set a precedent for later developments Yes Economic development in theentire region leading to overall socio-economic growth
9.4 Have cumulative effects due to proximityto other existing or planned projects withsimilar effects
Yes Existing Coal mine and otherindustries in the regionenhanced the econom icdevelopment of the locality.
(IlD EnvironmentalSensitivity
S.No. Areas Name/ldentity
Aerial distance (within 15km.) Proposed proiectlocation boundary
1 Areas protected under internationalconventions, national or local legislationfor their ecological, landscape, cultural orother related value
No Not Applicable
z Areas which are important or sensitive forecnlnpica| reasons - Wetla nds,watercourses or other water bodies,
No Not Applicable
IJ
coastal zone, biospheres, mou ntains,
fo rests3 Areas used by protected, important or
sensitive species of flora or fauna forbreeding, nesting, foraging, resting, over
wintering, migration
No Not Applicable
+ lnland, coastal, marine or undergroundwaters
No Not Applicable
5 State, National boundaries No Not Applicable
6 Routes or facilities used by the public forAccess to recreation or other tourist, pilgrim
Areas.
Defence installations
Yes Ambikapur Varanasi NH andpublic road connecting toBhaiyathan remain as it is forpublic access to recreation or
other to u r ist, pilgrim a reas.
7 No Not Applicable
B Yes Mining, commercial & I
residential establishment oflmines of SECL are situat^dwithin lOKm I
Areas occupied by sensitive man-made
land uses (hospitals, schools, places ofwo rship, communitY facilities)
Areas containing important, high quality
or scarce resources(ground water resources, surJace
re sou r ces, fore stry, ag ri cul tu re, fish e rie s,
tourism, minerals)
Yes Primary School - 49Middle School - 15
Secondary - 3
Primary Health Center - 2
H ospital - 1
Dispensary - 4Temple - 15
Stadium - 2
Auditorium
10 Yes Except for coal reserves no
other high qualitY reserves
e ncou ntered.
11 Areas already subjected to pollution orenvironmental damage. (those where
existing leg al environmental standardsore exceeded)
No Not Applicable
Not Applicable
NA
'1.2 Areas susceptible to natural hazard which
could cause the Project to Presentenvironmental Problems(e arth quakes, sub si dence, I a ndsl i de s,
erosion, floodingor extreme or adverse cl!!49!!9 lgncliLionll-
No
14
0V) Proposed Terms ofReference for EIA studies
I here by given undertaking. that the data and information given in the application and
enclosure are true to the best of my knowlddge and belief and I am aware that if any part of the data
and information submitted.is found to be false or misleading at any stage, the project will be reiected
and clearance give, if any to the project will be revoked at our risk and cost.
Date:Place:
(Project proponent / Authorised SignatoryS.N. Kapri
General Manager,Bhatgaon Area
. Post- BhatgaonThana- BhatgaonDistt - Surajpur.State- C.G.497235
trarqtrfiGeneral Managel
Kr.{'S.cF /rrdttselagECUBhaEsonArea
Signature of thd applicantWith Name and Full Address
15