Natural Infrastructure Capabilities (NIC) Work Group
Briefing for the Joint Service Environmental Management Conference
13 April 2005
2
Acquisition, Technology and Logistics
Outline
• Background
• Natural Infrastructure Capability Assessment
• Natural Infrastructure Valuation
• Pilot Tests
• Next Steps
3
Acquisition, Technology and Logistics
The NIC Initiative
• Created by the Installations Capabilities Council in Sep 04
• Tasked with analyzing the AF Natural Infrastructure Management and Encroachment Prevention concept for DoD-wide use
• ICC wanted results within 5 months (~ Feb 05)
• Comprised of mainly Environmental reps from OSD and Components, both Secretariat and HQs
• Meet every Monday – on a fast track!
4
Acquisition, Technology and Logistics
Natural Infrastructure Cube
5
Acquisition, Technology and Logistics
NIC Assessment
Quantitative and qualitative
metrics to measure
the capacity andcapability of
air, land and water components
to meet operational requirements
• Airspace
• Surface Land Access
• Air Shed Emissions Availability
• Water Supply
• Water Discharge Availability
• Seaspace Access
WHAT’S BEING MEASURED?
Joint Service Environmental Management Conference
WHAT DATA IS NEEDED?
Joint Service Environmental Management Conference
Accident Potential Zones and Noise Contours
Land Use Constraint Areas – Wetlands, CERCLA/RCRA
Sites, ESQD Arcs, etc.
8
Acquisition, Technology and LogisticsNIC Assessment Process
4. Compare resource requirements with resource availability for each resource category:
• Airspace• Airshed Emissions
Availability• Surface Land Access• Water Supply• Surface Water Areas• Water Discharge
Availability• Sea Space Access
Resource
Logs & Annual Reports
Geospatial Data
Studies and Planning Documents
Emerging and Legacy Data Systems
Required/Available x 100 = %Or
Allotted/Available x 100 = %
1. Determine Operational Requirements
2. Determine Corresponding Resource Requirements
3. Determine Resource Availability
Resource Capability Ratings:*
RO3 = Major Opportunities
RO2 = Significant Opportunities
RO1 = Some Opportunities
RR = Minor Opportunities or
Deficiencies
RD1 = Some Deficiencies
RD2 = Significant Deficiencies
RD3 = Major Deficiencies
*RO = Resource Opportunity
*RR = Resource Ready
*RD = Resource DeficiencyPermits
9
Acquisition, Technology and Logistics
Natural Infrastructure Valuation
• Forests
• Shrubland
• Grassland
• Farmland
• Wetland
• Open Fresh and Marine Water
• Mineral Bearing Strata
• Air shed Emissions Availability
• Water Supply
• Wastewater Discharge Availability
Values provided
by natural infrastructure
assets
10
Acquisition, Technology and Logistics
Natural Infrastructure Valuation Process
Total Natural Infrastructure Asset ValueTotal Natural Infrastructure Asset Value
Resource Characteristics:Acreage or other amount, location,
condition, other attributes (e.g., airspace, sea space, maneuver area)
Resource Characteristics:Acreage or other amount, location,
condition, other attributes (e.g., airspace, sea space, maneuver area)
Goods: Water, Minerals, Crops, Timber, Fish/Game,
Grazing, Habitat, Training
Goods: Water, Minerals, Crops, Timber, Fish/Game,
Grazing, Habitat, Training
Appraise:Comparable Sales, Income Stream, Replacement Cost
Training Value
Appraise:Comparable Sales, Income Stream, Replacement Cost
Training Value
Asset Value(military, community/ecological, market)
Asset Value(military, community/ecological, market)
Step1: Inventory and characterize the assets present
Step 2: Determine the goods represented by the assets
Step 3: Gather relevant data on value of goods
Step 4: Appraise value. Enter the value estimates into a framework that allows aggregation of all factors
Facilitate Informed Decision Making
11
Acquisition, Technology and Logistics
Initial Air Force RCM Applications
• Base Closure Executive Group (BCEG)
– Supported AF beddown scenario development drills
• Barksdale AFB
– Used RCM information to increase base share of oil/gas/timber rights
• Seymour Johnson AFB
– Used RCM to work MTR encroachment
• Cannon AFB
– Used RCM to define aquifer availability
• Beale/Shaw AFBs
– Used RCM to address receiving water body issues
12
Acquisition, Technology and Logistics
DoD Natural Infrastructure Capability
VisionDoD Installations And Ranges Are Available
When And Where Needed, With The Capabilities And Capacities Necessary To Support The Current And Future Warfighter
Mission StatementProvide, Manage, And Sustain, In An Environmentally Sound
And Legally Compliant Manner, Natural Infrastructure At Installations And Ranges
To Support Joint And Service-Specific Readiness And Operations
13
Acquisition, Technology and Logistics
Lessons Learned (so far)• ARMY
• Surface land measures being revised to better capture and portray range and training capabilities and limitations
• NAVY
• Revising surface and sea space measures to account for variety of operational areas/needs at Navy ranges and operational areas
• AIR FORCE
• Revising off-site compatibility measures by attempting to establish degrees of compatibility instead of ‘yes/no’
• ALL
• Updating frequency spectrum measures to better capture the data to assess encroachment issue
14
Acquisition, Technology and Logistics
Next Steps• Pilots
– Finalize AF, Army, and Navy pilots
– Conduct USMC, DLA, Joint-Service, and Overseas Pilots
– Evaluate pilot results
• Develop a consistent NIC framework, including– Common measures, definitions, assumptions
• Develop methodology for aggregating results to support decision making
• Assess financial constructs to support sound investment strategies
• Develop implementation policy and procedures
• Coordinate with DoD Sustainable Ranges IPT, led by ODUSD(R)
15
Acquisition, Technology and Logistics
Questions?