NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

1

Nagpur Metro Rail Corporation Limited

Corporate Office: Metro House, Bungalow No: 28/2, Anand Nagar, C K Naidu Road, Civil Lines, Nagpur-440001

5D BIM & ERP System

Annexure A: System – Solution Architecture

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

2

Contents 1. INTRODUCTION ............................................................................................................................................................ 5

1.1 Introduction to the System .............................................................................................................................. 5

1.2 Introduction to NMRCL.................................................................................................................................... 5

1.3 About this document ......................................................................................................................................... 6

2. 5D BIM & ERP SYSTEM ................................................................................................................................................ 8

2.1 Key Assumptions ............................................................................................................................................. 8

2.2 Design Consideration for the system .............................................................................................................. 9

2.2.3 Distributed Access ...........................................................................................................................................11

2.2.4 Security & Privacy ............................................................................................................................................11

2.2.5 Configurability ................................................................................................................................................11

2.2.6 Data Distribution Service .................................................................................................................................12

2.3 Advantage of the integrated Approach ............................................................................................................12

2.4 Compliance .........................................................................................................................................................12

3. SYSTEM ARCHITECTURE PRINCIPLES .........................................................................................................................13

3.1 Platform Approach ........................................................................................................................................13

3.2 Openness .......................................................................................................................................................13

3.3 No Vendor lock-in and Replace ability ..........................................................................................................13

3.4 Security and Privacy ......................................................................................................................................14

3.5 Scalability ......................................................................................................................................................14

3.6 Manageability and Lights-out Operation ......................................................................................................15

3.7 Reliability .......................................................................................................................................................16

3.8 Availability .....................................................................................................................................................16

3.9 Data Driven Decision Making ........................................................................................................................16

3.10 Reconstruction of truth ....................................................................................................................................17

4. HIGH LEVEL ARCHITECTURE ...................................................................................................................................19

4.1 Architecture Overview ..................................................................................................................................19

5. TECHNICAL ARCHITECTURE .......................................................................................................................................20

5.1 System Design .....................................................................................................................................................20

5.2 Persistence and Data Stores ..........................................................................................................................20

5.3 MIS, Reporting, & Business Intelligence (BI) ....................................................................................................20

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

3

5.4 Web Portal ....................................................................................................................................................23

5.5 Mobile Application ...........................................................................................................................................24

5.6 Integration with Payment Gateways ...................................................................................................................24

5.7 SMS Gateway .....................................................................................................................................................25

5.8 Email service ......................................................................................................................................................25

6. SECURITY ...............................................................................................................................................................26

6.1 Authentication and Authorization ................................................................................................................26

6.2 User and Identity Management ....................................................................................................................27

6.3 Application Security ......................................................................................................................................28

6.4 Data Integrity ....................................................................................................................................................28

6.5 Data Confidentiality .......................................................................................................................................28

7. QUALITY ASSURANCE ................................................................................................................................................29

7.1 Automated Testing ........................................................................................................................................29

7.2 Performance and Load Testing ...........................................................................................................................29

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

4

ACRONYMS

Item Description

API Application Program Interface

BPM Business Process Management

BI Business Intelligence

COTS Commercial Off-the –Shelf

DDS Distributed Data Service

ESB Enterprise Service Bus

ETL Extract Transform and Load

HMAC Hash Message Authentication Code

HSM Hardware Security Module

IPsec Internet Protocol Security

ISO International Standards Organization

LDAP Lightweight Directory Access protocol

MIS Management Information System

MPLS Multiprotocol Label Switching

MSDG Mobile Service Delivery Gateway

OEM Original Equipment Manufacturer

OLAP Online analytical processing

ORM Object-relational mapping

PKI Public Key Infrastructure

RBAC Role based access control

RDBMS Relational Database Management System

REST Representational State Transfer

RFP Request For Proposal

SDLC Software Development Lifecycle

SLA Service Level Agreement

SOP Standard Operating Procedure

SOA Service Oriented Architecture

SSL Secure Socket Layer

TLS Transport Layer Security

UUID Universally Unique identifier

VPN Virtual Private Network

XKMS XML Key Management Specification

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

5

1. INTRODUCTION

1.1 Introduction to the System

The Goods and Services Tax (GST), which will replace the State VAT, Central Excise, Service

Tax and a few other indirect taxes, will be a broad-based, single, comprehensive tax levied

on goods and services. It will be levied at every stage of the production distribution chain by

giving the benefit of Input Tax Credit (ITC) of the tax remitted at previous stages. GST is

based on a destination-based taxation system, where tax is levied on final consumption. It

is expected to broaden the tax base, foster a common market across the country, reduce

compliance costs, and promote exports. The GST demands a well-designed and robust IT

system for realizing its potential in reforming indirect taxation in India. The IT system for

GST would be a unique system, which will integrate the Central and State tax

administrations.

1.2 Introduction to NMRCL

Nagpur Metro Rail Corporation Ltd. (NMRCL), is a Special Purpose Vehicle (SPV) of Govt. of

India and Govt. of Maharashtra registered under the Companies Act, 2013 for construction,

operation and maintenance of Nagpur Metro Rail Project. The project has been sanctioned

by Government of India (GOI) and Government of Maharashtra (GOM) for project

completion cost of Rs. 86,800 Million (Rs. 8,680 Crores). This completion cost includes the

land acquisition, rehabilitation and resettlement and all applicable taxes. The project is

sanctioned in two corridors: Alignment- 1 North South Corridor having length 19.865 Km

and comprising of 17 stations with 15 elevated stations and two at-ground stations. The

Alignment two is of length 18.266 Km. Having 19 stations which are all elevated. Out of total

Length about 4.6 Km of North-South corridor is at-ground and remaining is elevated.

NMRCL has conceptualized the project to deploy a proven integrated ERP (Enterprise

Resource Planning) and 5D-BIM (5 Dimensional Building Information Modeling) solution

to automate its operations and integrate its processes. An Owners Support Office shall be

created which will depend on the mentioned solutions for strategic and operational design,

delivery, execution and subsequent support.

The key outcome of OSO, ERP & 5D-BIM implementation are linked to service delivery,

operational excellence, transparency and compliance

Service delivery to stakeholders

Multi-channel service delivery for optimum and efficient processes to end points via the

best suited technology and user interface that may include thick/thin client, portals and

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

6

mobile devices.

Secure and convenient access to internal and external stakeholders to avail the services

including but not limited to features for direct upload of directives, monitoring KPIs, and

process execution as empowered by NMRCL

Facilitate and enable employees of NMRCL in administration, support and service

delivery

Operational excellence

Integration of processes for all functions like Finance, Procurement, Materials, Project

Management, HR, etc.

Estimation and optimum utilization of resources: Assets, Financial resources and

Intellectual resources for delivering the services

Quick turnaround time for financial transactions, reporting, analysis and feedback

Excellence in the Deployment of facilities and resources, project planning, and exploiting

internal expertise

Transparency and compliance

Proactive and tight adherence to regulation in financial transactions and operations of

NMRCL

Adherence to standard government norms in financial transactions, reconciliation and

reporting as required by regulatory authorities, dashboards, reports and analytics needs

of stakeholders.

Compliance to best practices in project management, customer management, and service

delivery

1.3 About this document

This document focuses on how the system solution architecture should look like. The

contents of the document are logically structured so as to make enhancements to this

document as and when there is opportunity, based on additional learning, to mature it

to the higher level. The document provides the expected technical architecture of the

system.

While designing, building and operating the system, Bidder/Agency for

OSO, 5D BIM & ERP system project needs to comply with the guidelines

contained in this document.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

8

2. 5D BIM & ERP SYSTEM

2.1 Key Assumptions

Following key assumptions needs to be taken care while building the Architecture for the integrated system:

a) The system should look for transformational opportunities

Instead of imitating paper process in electronic form, applications should look to fully embrace mobile adoption, digital signature, online authentication, etc. to transform the processes completely and offer wider choice and no/low touch point for all stakeholders to interact directly. It is critical that project design are aligned to larger trends and designed for the future rather than past.

b) Technology rapidly evolves and requires continuous adoption

Technology evolves way too fast and Government projects with its long procurement cycles do not align naturally to adapt to this trend. Also, making changes to existing implementations require contract changes, new RFP (Request for Proposal), etc. Hence it is very essential that entire system is built by design to integrate not just within itself with components coupled loosely to allow changes in sub-system level without affecting other parts, architected to work completely within a heterogeneous compute, storage, and multi-vendor environment. The system will also integrate and have bidirectional transfer of information from various supplier systems. For this an open standards based approach needs to be adopted so that manual intervention is kept to the minimum possible.

c) Ability to select best product at best rate in as and when required Large applications should be designed to get best cost and performance advantages of natural technology curve (constant increase of speed and decrease of cost) and still aligned to open procurement practices of the Government. For this to happen, architecture should be open, use commodity hardware, have no vendor lock-in, and designed for horizontal scale. This allows buying of commodity compute, storage, etc. only when needed at best price.

d) Multi-channel service delivery With High penetration of mobility and very large percentage of internet usage using mobile devices, it is imperative that the applications provide multiple channels of service delivery to constituents. An important consideration is that the access devices and their screen capabilities (including browser variations) are numerous and constantly evolving. Hence, it is imperative to design the system such that an ecosystem that can adapt and continues to evolve.

e) Data Security: Security and privacy of data within the system will be foundational keeping in view the sensitivity of data and critical nature of the infrastructure proposed to be built.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

9

2.2 Design Consideration for the system

Following are the design considerations that have been considered while conceptualizing the solution.

2.2.1 Integrated Approach

Figure 1: System Architecture

A common system will provide linkage to all stakeholders. It will be a common medium of

information sharing with standardized drawings, forms, formats, project templates, bill of

material, dashboards, etc.

Functions / roles in brief of each kind of stakeholder are detailed below:

Sr. No. Name of stakeholder Major functions performed

1. NMRCL Management Review, approve, monitor, authorize

2. NMRCL Functional staff

Activities will be generic and specific to function: Generic activities:

a. Employee and Manager Self Service b. Travel & Expense Management c. Time & Attendance Management

Specific activities are listed by function in the following rows

3. Technical staff

Create specifications of the requirements Design of the infrastructure’ Review of drawings Bill of material creation, validation Project Plan creation, review and monitoring Execution monitoring

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

10

4. Procurement Review Bill of Material, quantities, rates e-procurement of materials and services Quantity validation and exception handling

5. Finance & Accounts

Accounts Receivables Accounts Payables General Ledger Treasury Management Cash Management Payroll Management Direct and Indirect Tax Management MIS and Budget Management

6. Human Resources Employee Lifecycle Management

7. Legal Contracts Management

8. Operations Staff Review, monitor and control execution of work on site

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

11

2.2.2 Integrated Approach

NMRCL has decided to adopt an integrated approach with a single digital project management

platform comprising 5-Dimensional Building Information Modelling and Enterprise Resource

Planning solution; this shall integrate by design using published vendor APIs and/or Enterprise

Service Bus using Publish and Subscribe methodology with other sub-systems including but not

limited to Geographical Information Systems, Project Management Systems, Human Resource

Systems, Dashboard and Reporting Systems and Workflow and Business Process Management

enabled Document Management System.

Externally the platform shall have bi-directional interface with systems of various agencies like

Engineering Consultants, Design companies, construction companies, civil, electrical, and other

contractors, ticketing and revenue management systems, and finally with its customers who will

be the beneficiaries of the Metro Railway.

Across the cross-section of users, the platform shall provide ability to interact with all user

interfaces and convenience in a friendly way using contemporary responsive UI/UX via

desktop, tablet computers, mobile and other devices like touch screens, kiosks, Ticket

vending machines, etc.

2.2.3 Distributed Access

One of the design considerations is to provide multiple channels/interfaces to respective

users to interact with the system from all types of access mechanisms, i.e. Local Area Network

within the premises of NMRCL, using mobile access cards, Private and Public Wireless

Networks or mobile SIM connected to Laptops or Tablet computers via secure Virtual Private

Network, with no geographical restrictions. The aim is to provide ability to use the system

irrespective of device, time and location for all defined internal roles as well as external third

parties.

2.2.4 Security & Privacy

Security and privacy of data should be fundamental in design of the system without sacrificing

utility and convenience. When creating a platform of this scale, it is imperative that handling

of privacy and security of data are not afterthoughts, but designed into the strategy of the system

from day one.

2.2.5 Configurability

All configurations including policy decisions, business parameters, rules, etc. shall be captured

in a central place within the system. The system shall provide facility to the decision makers to

add new or edit/delete existing policies or make changes with appropriate permission control

and audit trail. Managing these in a central repository ensures only once source of truth is used

across many application servers and reduces issues of inconsistent application behavior.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

12

Decoupling of the business parameters from the rest of the solution architecture and making

them configurable allows for a great deal of flexibility.

2.2.6 Data Distribution Service

The system shall be able to provide data on subscription-publication basis. The organization of

the information exchange between modules is fundamental to publish - subscribe (PS)

systems. The PS model connects anonymous information producers (publishers) with

information consumers (subscribers). The overall distributed application (the PS system) is

composed of processes. The goal of the DDS architecture is to facilitate efficient distribution of

data. Participant using DDS can ‘read’ or ‘write’ data efficiently and naturally with a typed

interface. Underneath, the DDS middleware will distribute the data so that each reading

participant can access the ‘most current’ values.

2.3 Advantage of the integrated Approach

Following are few advantages to taking the integrated approach

i. Choice/Flexibility: Users across the ecosystem (external users) gets the choice and flexibility of using their preferred application and user interface without having to depend on NMRCL systems. This provides them choice of application within their organization for all their work including NMRCL related work. In addition, this provides a choice to end users/ organizations to choose the most appropriate business process, customize workflows, etc. within their system rather than depending on archaic monolithic solutions for all their work.

ii. Innovation: Application ecosystem can innovate in terms of providing all kinds of features

such as offline capabilities, alerting capabilities, mobile/tablet interfaces, and so on as device and user interface technologies evolve.

iii. Agility: When entire system is coupled via components exposing services like PS, it allows

individual partners to change without having to affect the rest of the system. Building the entire system as a monolithic application completely takes away the agility of NMRCL to adapt to the changing industry dynamics.

iv. Data consistency: Providing defined interfaces to access all data models and functionality

ensures data is not duplicated unnecessarily. This offers a single source of truth of data to be managed. In addition, providing centralized data validation, digital signature, etc. ensures data is consistent and accurate across the system.

vii. Security: Data security is paramount to the system. Encapsulating access control, auditing,

confidentiality (via encryption), and integrity (via signatures) is thus possible.

2.4 Compliance

The compliance sub-sections in this document need to be submitted as part of the Bidder/Agency’s technical proposal:

Chapter Description Complies

Chapter 2

Adherence to Design Considerations of the System YES/NO

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

13

3. SYSTEM ARCHITECTURE PRINCIPLES

NMRCL system shall be built on the following core principles:

3.1 Platform Approach

The system will be built as a platform. It is critical that a platform based approach is taken for

any large scale application deployment, to ensure adequate focus and resources on issues

related to scalability, security and data management. Building an application platform across

the application suite provides a mechanism to abstract all necessary common features into a single

layer.

3.2 Openness

The system will need to interface with multiple disparate systems from external partners,

agencies and contractors for bi-directional information flow. Openness comes from use of open

standards and using APIs where available and interfaces for all components.

Whenever options are available, open source frameworks/components shall be used instead of

proprietary frameworks/components. Use of proprietary products/components/frameworks

must be via APIs (if publicly available APIs do not exist, the Bidder/Agency shall be responsible

for creating vendor neutral APIs).

3.3 No Vendor lock-in and Replace ability

a) Use of commodity hardware

Commodity technology refers to hardware technologies that is completely commoditized and

are available from a variety of providers. Applications that are built on such technologies are

built on commodity computing architecture. This is one of the key architecture decisions.

Applications that are architected to use commodity hardware fully benefit from using best

technologies at a cost effective rates and allow applications to not be tied to a proprietary and

vendor specific technology. Such applications also benefit best when technology evolves at a

rapid pace.

The System will be completely built using an open commodity hardware and scaled using

blade/rack servers on x86 platform. Such open scale-out architecture allows NMRCL to

procure latest blade/rack servers from any vendor at the best price whenever required.

Similarly, storage layer also will not depend on any specialized hardware and takes advantage

of heterogeneous storage arrays having from multiple vendors.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

14

3.4 Security and Privacy

The system will ensure privacy and data integrity and must disseminate data to authenticated

and authorized users only (both internal and external users). Security and privacy of data within

the system is foundational and is clearly reflected in NMRCL’s strategy, design and its processes

throughout the system. System must implement various measures to achieve this including

mechanisms to ensure security of data, spanning from strong end-to-end encryption of sensitive

data, use of strong PKI national standards encryption, physical security, access control, network

security, stringent audit mechanism, 24x7 monitoring, and measures such as data partitioning

and data encryption.

It is very important that all data is provided significant protection. It has to be ensured that the

data is handled with the utmost care within its own and Bidder/Agency domains and follows

some of the major principles of data privacy/protection recognized. Internally data must be

protected from all threats and must be kept confidential.

Activities such as anti-spoofing (no one should be able to masquerade for inappropriate access),

anti-sniffing (no one should be able get data and interpret it), anti-tampering (no one should

be able to put/change data which was not meant to be put/changed) should be taken care for

data in transit, as well as data at rest, from internal and external threats.

3.5 Scalability

It is critical that technology choices are kept simple, open, multi-vendor, and standards based.

Following are key considerations that need to be followed at architecture level from the

beginning to ensure technology scale:

a. Loose coupling through open API and messaging

Because the system is conceived as a ‘common platform’ on which many applications will be

interfaced, it is critical that all 3rd party interfaces be fully interoperable without any affinity

to platforms, programming languages, network technologies. Such open interoperability

is an absolute requirement for the system to be widely adopted.

Whenever the logic is long running (taking potentially hours or days), it is critical that it

is broken into small components and wired them through an asynchronous workflow.

Such design allows each component to do its job fast, release resources, and handle

failures at micro level. It also allows each of these components to be run across a cluster

of machines and allow horizontal scaling. The system shall be able to be scaled by adding

additional computer hardware; it shall not have any scalability constraint at application

level.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

15

b. Data partitioning and parallel processing

The system functionality naturally lends itself for massive parallel and distributed

system. For linear scaling, it is essential that entire system is architected to work in

parallel within and across machines with appropriate data and system partitioning.

Considering the fact that the system will need to handle large volumes of engineering and

construction data over the next few years, data partitioning (or sharding) is integral to

ensure as data and volume grow, system can continue to scale without having bottlenecks

at data access level. Choice of appropriate data sources such as RDBMS, Object Oriented

Databases, distributed file systems; etc. must be made to ensure there is absolutely no

“single point of bottleneck” in the entire system including at the database and system level

to scale linearly using commodity hardware.

c. Horizontal scale for compute, Network and storage

The system architecture must be such that all components including compute, network

and storage must scale horizontally to ensure that additional resources (compute,

storage, network etc.) can be added as and when needed to achieve required scale. This

also ensures that capital investments can be made only when required. Given the

significance of the system, it is important that the scalability of the system be measurable

and demonstrable, before GO- Live.

3.6 Manageability and Lights-out Operation

GST system is expected to handle millions of registration leading up to billions of‘returns

submission’ and invoice management. It is inevitable that in such large scale compute

environment, some thing or other fails regularly; be it a hardware failure, network outage, or

software crashes. Assuming otherwise (that nothing fails) is naive and it is essential that the

application architecture handles these failures properly, be resilient to failures and have the

ability to restart, and make human intervention minimal.

For complete lights out operation, all layers of the system such as app, infrastructure must be

managed through automation and proactive alerting rather than using manual effort.

The entire application must be architected in such a way that every component of the system is

monitored in a non-intrusive fashion (without affecting the performance or functionality of that

component) and business metrics are published in a near real-time fashion. This allows data

center operators to be alerted proactively in the event of system issues and highlight these

issues on a Network Operations Centre (NoC) at a granular level. The solution should be

envisaged to utilize various tools and technologies for management and monitoring services.

There should be management and monitoring tools to maintain the SLAs.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

16

There should be dashboard within NoC provided to the administrator to provide virtualization

of the overall platform and IT Infrastructure and be able to produce reports in an automated

fashion showing various performance metrics In addition, the skills and training necessary for

administrators and technical support team be planned well in advance of launch of the system.

3.7 Reliability

The system must have appropriate measures to ensure processing reliability for the data

received or accessed through the solution. It will be necessary that the following issues be taken

care properly.

a. Prevent processing of duplicate incoming files / data

b. Zero loss of data ( data already saved / date at rest should also not be lost)

c. Unauthorized access and alteration to Data uploaded in the system shall be prevented

3.8 Availability

The solution design and deployment architecture will ensure that the application can be deployed in a multi-DC active-active environment offering system High Availability and failover.

The solution should meet the following availability requirements

a) Load Balanced across two or more servers within one data center and across multiple

data centers as required in an active-active fashion avoiding single point of failure b) Deployment of any number of service instances should be possible within and across

data centers to meet the scale c) Ability to deploy application instances in heterogeneous multi-vendor hardware within

the same cluster to ensure newer hardware can be added within same cluster to meet the scale without having to change all machines to uniform configuration

d) Distributed and load balanced implementation of application to ensure that availability of services is not compromised at any failure instance

e) System should provide minimum 99.9 % uptime. f) RPO being zero (no data loss of source of truth data that cannot be constructed) and

availability of data across active-active multi-DC environment as required to ensure services can run from anywhere

An important aspect of ensuring the above mentioned availability criteria would be creation

of Standard Operating Procedure (SOP) for system upgrades, maintenance and other

procedural needs.

3.9 Data Driven Decision Making

All the decisions making in the system shall be driven out of data and not on the basis of

assumptions. Lot more metadata needs to be attached with various data such as invoices etc.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

17

so that the appropriate decision can be taken. System shall have meta-tags so that time taken

by various functions while capturing/entering the data etc. is captured and behavior of

system is verified. This would help to ensure quality is measured systematically and

feedback is given to improve any specific issues that are identified.

A large multi-provider ecosystem created by the system can only be managed efficiently by

measuring process data at a high degree of granularity, creating well defined metrics from

this process data, and creating feedback loop for these insights and learning to be shared

back to the ecosystem for continuous improvement. It is essential that entire system is

measured using data and decisions are made completely based on data.

Thus the objectives for the system are as below, keeping in mind the large ecosystem:

a. Drive decision making based on data analytics: The analytics module within GST

system shall be such that stakeholders can easily include data and insights in their

operations on a regular basis. Processes must be in place to drive a feedback loop to

the overall organization including partner ecosystem to drive continuous

improvement. Every transaction & event including that of the system administrators

should go in BI and accordingly decision can be taken

b. Empower self-improvement: The analytics function shall also help stakeholders to

improve by themselves. Tools, data and platform shall be created to be able to help

stakeholders analyze their own performance and operational metrics themselves.

3.10 Reconstruction of truth

System should NOT allow database/system administrators to make any changes to data. It

should ensure that the data and file (data at rest) that is kept in the systems has tamper

resistance capacity and source of truth (original data of invoices and final returns) could

be used to reconstruct derived data such as ledgers and system generated returns. System

should be able to detect any data tampering through matching of hash value and should

be able to reconstruct the truth.

Compliance

Chapter Clause #

Description

Complies (YES /NO)

Chapter 3 Conformance to Architecture Principles of System

a. Platform approach for integration

c. Vendor lock-in avoidance & replace-ability

d. Use of commodity hardware

e. Scalability of hardware and software

f. Loose coupling through open API and messaging

g. Data partitioning & parallel processing

h. Horizontal scaling for compute and storage

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

18

i. Robust and resilient security and privacy design

j. Manageability and Lights out ops

k. Reliability

l. Availability

m. Data driven decision making

n. Reconstruction of Truth

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

19

4. HIGH LEVEL ARCHITECTURE

4.1 Architecture Overview

The systems architecture consists of the following components:

a. The 5D BIM system technology aspect will involve use of engineering applications that are used

for planning as well as design of the asset. The metro rail to be constructed involves different

engineering disciplines such as rail track, viaducts, station buildings, signaling, geotechnical,

geospatial etc. Each of these disciplines will use discipline specific design applications (with ability

to attach intelligent attributes) to come up with individual 3D intelligent models (and 3D intelligent

master model for review and analysis. All such design applications needs to be interoperable and

able to exchange information seamlessly. The design applications will work in a 3D as well as 2D

environment (for plans production, detailing, measurements, markups etc.). The 3D design

models from the different applications needs to be geo-coordinated so that so that the master

model which is a result of collaboration can exactly fit at the desired location if referenced back on

the map and is an important aspect of the applications to be used.

All such design applications needs to be interoperable and able to exchange information seamlessly.

Each discipline works with a standardized model structure, object structure and layer structure

(part of Standards, Methods and Processes set for the project) to ensure that model information

can be exchanged. At the same time these applications need to tightly integrate with the engineering

collaboration system in order to use their workflow and processes set.

b. The ERP system shall be enabled based on prioritization of modules based on business

requirement. The system tightly integrates with all other components of the overall technology

landscape with bi-directional interfaces as required.

c. Document management is a critical part of any organization in build phase, especially when a trail

of documents need to be managed and speed is of importance. The system providing electronic

storage, tagging, indexing, retrieval, with smart workflows will enable process automation with

time bound and role based escalations to ensure efficiency. Business Process Modelling tools

provide functionality with standards based APIs to integrate with various ERP and other systems.

4.2 System accessibility through Ecosystem

The system shall be accessible across all kinds of networks, LAN, Open and secure WIFI

networks, Mobile networks, and through hotspots; devices including desktops, laptops,

Windows, Android, and IOS tablets and mobile phones.

Compliance

Chapter Clause #

Description Complies (YES /NO)

Chapter 4 Conformance to High Level Architecture

a. GST system availability through eco system

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

20

5. TECHNICAL ARCHITECTURE

5.1 System Design

Suggested NMRCL system design is as below:-

Figure 4: System Solution Architecture

5.2 Persistence and Data Stores

Operational Store (Partitioned Database):

This would contain the operational data of transactions in the ERP and 5D BIM systems. The

data should be horizontally scalable. It is essential that entire system is architected to work in

parallel with appropriate data and system partitioning. Data partitioning (or sharding) is

integral to ensure as data and volume grow, system can continue to scale without having

bottlenecks at data access level. Architecture also must support mechanisms for read only

transactions to be against a replica instance while insert/update transactions on primary

instance.

5.3 MIS, Reporting, & Business Intelligence (BI)

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

21

The BI component is critical to the success of the project as it will enable effective

decision making for all stakeholders.

Over a period of time, data will be accumulated to provide a wealth of information insight

for useful analysis both for compliance as well as to weed out interesting patterns and

exceptions. It is desirable to make use of an appropriate Business Intelligence tool to

analyze and correlate the data and generate reports in various forms which would provide

necessary inputs and enable to derive fruitful information which can have reference to the

procedures.

The BI and analytics platform would comprise of the following components

a. Data-warehousing and analytics

b. Visualization and reporting

Data-warehousing and Analytics component

i. Proposed solution should have capabilities for online analytical processing. ii. All tools in the solution should comply with same security, access, administration

attributes.

iii. The solution should have the capability to provide refresh -only capability to a user

group. The solution should provide a rich set of data mining features that can be

used for classification, regression, clustering, detection of outliers and anomalies,

feature extraction, association analysis etc.

iv. The solution should support information exchange between the data mining

component and the Analytics/Data warehouse component so that inputs for data

mining can be taken from analytics/Data warehouse component tool and vice versa

on a common user platform.

Visualization and Reporting Component

i. The Reporting tool should have robust visualizations such as graphs, charts, and

histograms.

ii. The reporting tool should have slicing and dicing features facilitating ad -hoc

management reporting on the fly.

iii. The reporting tool should have basic statistical modelling properties, to create

clusters, regression analysis, and other modelling techniques dynamically.

iv. The reporting tool should output data in various formats.

v. The Reports generated by the system should be made accessible through API or

an interface to be viewed by the authorized users. The tool should enable different

types of users to perform analysis on data across the Enterprise without the need

to Subset/sample/create multiple views of data. The interface for the authorized

users should be simple with user friendly features such as drop down list, drag

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

22

and drop utilities etc., and should be built with focus on users with elementary

statistical knowledge.

vi. Proposed solution should be capable of seamless integration with leading Office

tools both for import and export of data and reports in multiple formats. The

solution should allow data to be accessed from any industry standard data

source using native connectors. It should also allow data load jobs to be scheduled

to automate the process of loading data into the system for Analysis

vii. Data Visualization tool capable of interactive visualizations. Preference would be

given to tools with auto charting facilities.

viii. The solution should have capability to raise exception alarms (email notification

or SMS). Should provide for exception reporting (ability to set certain thresholds).

ix. The solution should have user friendly GUI to allow easy generation of reports

and exporting capabilities (ability to export resulting data to other applications

such as Excel, Notes, CSV.).

x. The solution should be able to distribute reports and have the ability to save data for

later use or to a local PC/laptop/tablet or for other users to view. It should

support offline viewing and be able to send reports electronically to other users.

xix. The solution should have the ability to schedule reports.

xx. The solution should provide for a browser based interface to view reports.

There can be different types of Analysis. Following are some of the details

a. Statistical Analysis: The system should generate reports comprising of complex

statistical dynamics and multiple parameters from historic data. These reports may be

generated through the UI provided within the solution to authorized Users. It should

also present patterns found in historical and transactional data to identify risks and

opportunities. The proposed tool should be capable of providing viewable descriptive

statistics such as mean, median, max, min etc. and also should be capable of

performing/aiding advanced statistical modelling and analysis including but not limited

to correlation, regression, scoring, ranking, clustering, network plot, decision trees,

scenario analysis, etc.

b. Predictive Analysis and Forecasting: The system should have the capability of

generating predictive statistical models. It should be capable of capturing patterns

and signals in data, analyze them and provide insights into future trends in the form

of graphs and charts, based on certain parameters, statistical modelling and

historical data. These may be used by the Authorized Users to identify trends at

certain location / period and take appropriate decisions. The tool should provide

enhanced forecasting capabilities with Scenario Analysis allowing users to see impact

of variable values on the forecasted trend

c. Anomaly Detection: The system should display alerts / information, based on

certain pre-defined criteria, if there is any deviation from the standard trend /

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

23

output. Access to such information / reports should be restricted to certain

authorized Users / decision makers only. These may be used by users for decision

making purposes or further investigations as required.

d. Statistical Scoring: The solution needs to have capability to score the partners

bases on social and financial performance on a quarterly basis that combines

business rules, anomaly detection and advanced analytic techniques. The solution

needs to have capability to calculate the deviation for each agency and Skill counsel.

The solution should have capability to calculate risk scores based on specific

characteristics of the activity including geographic zones etc.

Platform standardizes on analytics and reporting technology that integrates well with the

rest of the stack and at the same time meets most of the feature needs of applications built

on the Platform. BI architecture consists of the three broad sections of data acquisition, Data

storage and Data distribution platform; all of which can be considered to be part of an over-

arching data warehouse strategy. Data acquisition includes all source systems (enrolment,

authentication, and other application modules) that feed data into the data warehouse. It

is necessary to have the BI system integrated with all the process to ensure consistency of

data across multiple operational data sources.

Data Warehouse (DW) is the repository that contains all data in its granular details. It

is important to note that data storage for reporting and analytics should be separated from

the core transaction data (data that is part of the live production systems). The advantage

of the highly de-normalized analytics data being completely separated is to ensure

scalability and make least impact to production systems.

The BI system should employ highly scalable, distributed, reliable and open standard

technology components to meet the requirements. The BI platform should have a DW

consisting of granular level analytics data and tools to load data from source systems

into ADW (both event publishing via messaging layer as well as offline data extraction via

ETL tools). In addition to DW, BI platform should consist of a “data distribution platform”

that should enable provisioning of data through various datasets and an “analytical delivery

platform” that delivers relevant metrics, dashboards, and portals.

5.4 Web Portal

The portal is an interface to the end-users for all services in the system. Every user needs

to pass through strong authentication before serving him his own personal

‘Dashboard’ as home page, the contents of which are dynamically decided based on the

accesses permitted to the users.

Some of the specifications of the web portal are provided below:

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

24

a. The portal should support the leading browsers such as Internet Explorer, Firefox, and Chrome etc.

b. The portal should be able to expose/publish functional applications seamlessly c. Should provide support for comprehensive audit trail features such as:

i. Daily activities log should be merged into the history log files ii. Unsuccessful attempts to log-in to the system should be recorded

d. Should authenticate users from Active Directory/LDAP, claim based authentication

e. Should support customization of look and feel of the portal f. Should integrate with any other portal products through open standards such as

HTML, XML, RSS, web services, and WSRP. g. Should support encryption and compression features h. Should provide multi-channel output capabilities

5.5 Mobile Application

The system should have the ability to provide a responsive mobile interface for

various activities that will be carried out on the field as well as by employees and

contractors. The application should support all types of mobile platforms (Windows,

Android, IOS) using browsers or applications. Some of the activities are:

1. Approvals for various processes, e.g. purchase orders, payments, documents,

drawings, etc.

2. Exceptions to processes where timelines/budgets have been exceeded

3. Drawings to be used at construction sites; these will be consumed using tablet

computers as required

4. Bill of material, bill of quantity and consumption thereof

5. Progress update from the site (to be GPS enabled on the GIS maps)

6. Employee self-service and manager self-service related to HR processes like leave

application, request for travel, travel expenses submission, and approvals thereof

7. MIS of different types (to be defined during the SRS stage)

5.6 Integration with Payment Gateways

The system is expected to interface with a payment gateway to enable e-procurement

related processes for payment of EMD and other fees that may be levied by NMRCL for

various processes.

Integration with banks is envisaged for electronic payments using EFT and other

mechanisms as offered by banks to beneficiaries including but not limited to suppliers,

employees, contractors, etc. The system will also interface with banks for reconciliation of

accounts. Alerts for the same may be sent to respective users via email or SMS.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

25

5.7 SMS Gateway

SMS services are envisaged to be made available as part of the solution design. SMS services

can be used for tactical alerts to respective individuals and entities. It may also be used

to send OTP authentication and as well as informing the users about their requests for

password reset or other administrative tasks that may be defined.

5.8 Email service

Email services are envisaged to be made available as part of the solution design to send alerts /

intimations / automated messages to registered email ids. This may be through integration to

existing email service used by NMRCL.

Compliance

Chapter / Clause

#

Description

Complies (YES /

NO)

Chapter 5 Conformance to Technical Architecture

a. System design

b. Persistence and Data stores

Operational Store

Planning for Analytics and MIS c. MIS, Reporting & BI

Statistical Analysis

Predictive Analysis and Forecasting

Fraud and Anomaly Detection

Statistical Scoring

e. Messaging: support for enterprise messaging

f. Scalability

g. Web Portal

h. Mobile Applications support / integration

i. Integration with Payment Gateways/bank

j. SMS Gateway

k. Email Gateway

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

26

6. SECURITY

Security is one of the utmost important aspects envisaged in the entire solution design of the

system. All key dimensions both from proactive and reactive security measures including

authentication, authorization, access control, logging and monitoring should be an integral

part of the system architecture. Provision of this section should be read in

conjunction with Annexure C.

6.1 Authentication and Authorization

The system should have digital signature implemented in the system from start of the project.

Integration of e-Sign which is currently being envisaged by Government of India also needs

to be integrated with the system as on when the same become operational.

1. The system should comply with all requirements of security, reliability and non-

repudiation as per the Government of India guidelines. For the Portal there should be a

provision of logging into the system through Internet as well as Intranet. There should

be provision for authentication using digital certificates as per the government of India

guidelines.

a. Once the users enter their login credentials, the user credentials from the user

authentication server database must be verified and then only the access should

be granted. While accessing the portal, the personal ‘Dashboard’ facility should

be available for all the users after successful login as a first interface within the

application. The type of information and content, to be displayed on the personal

‘Dashboard’ of Users should be dynamically controlled through the Access control

module / Admin Module. However, it should be noted that for each user there

should be only one session at a time should be maintained i.e. when one User logs-

in to the application using his/her own credentials, then the same credentials must

not be allowed to be used for logging into the application through same or different

computer.

b. The system should provide single sign-on facility i.e. once any Users credentials

are verified, he/she should be able to navigate through all the modules and

functionalities of the integrated application, to which that User is authorized to

access, based on Role Based Access control (RBAC).

c. Solution should allow a user to access various functions, forms, screens, sub

modules, information, etc. as per the authorization and user role permitted by the

system administrator as per available guidelines and policies.

d. The solution should support multiple authentication methods such as Username

password, two factor authentication, and digital certificate.

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

27

e. The solution should have the functionality to provide authentication based on the

role.

f. The solution should not store authentication credentials on client computers after

a session terminates.

g. Authentication should be done for all valid users. A valid User for this application

should be the one who has been set-up in the application such that he/she can

access the application and perform tasks as per assigned roles and responsibilities

as well we access rights within the system

h. The system should have a configured directory of all authorized Users.

i. User Management should be a management and authentication feature within the

application that should provide administrators with the ability to identify and

control the state of users that should have right to log into the system.

j. There should be a form of User authentication functionality that should allow

various users to access the solution and work as per their defined Roles and

Responsibilities. Access Management should be used for restricting access to

rights-protected content / sections / modules / screens / Fields, etc. to authorized

users only. Rights to all active users should be granted based on their hierarchy

and level in the organization, designation, assigned roles and responsibilities,

location etc. among other parameters. It is also proposed that the new privileges

can be created through the access Management UI interface as well as existing

rights be managed through the same. The access to the section of the application

should be strictly based on “Role Based Access Control” (RBAC) for the

Administrator(s) only as defined in the ACCESS Policy. The details of any change

in the module should be captured in the Audit Trail of the application. Also there

should be facility to assign/modify/deactivate/delete rights globally for the

desired Groups within the system.

6.2 User and Identity Management

i. The solution should be capable of uniquely identifying all users of the system and their activities.

ii. The solution should have the capability of providing user access rights to system and data which will be in line with the defined functional requirements.

iii. The identified solution should support both on premise and cloud implementation, or a hybrid of the two.

iv. The solution should be a directory based solution supporting LDAP. v. The user account management component of the solution should address

requesting, establishing, issuing, suspending, modifying, and closing user accounts and related privileges, with a proper approval process.

vi. The system should be able to perform regular audits and management reviews of all accounts and related privileges.

vii. Should provide Single Sign-On facility. viii. Should support mobility. ix. Should support privilege user management (Super user, Admin accounts).

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

28

6.3 Application Security

i. The system must comply with the Application Security Plan and security

guidelines as applicable

ii. Data output from an application should be validated to ensure that the processing

of stored information is correct and appropriate to the circumstances

iii. Should implement secure error handling practices in the application

6.4 Data Integrity

Data in transit (from external systems or between internal systems) or data at rest must

be protected from tampering. The risk is from both external users and internal users

(such as Database Administrators) who are close to the data at all times.

6.5 Data Confidentiality

To ensure data is secured to access only by required teams and applications, the following

principles are to be adhered:

1. All the databases must be accessed by individual user accounts and user accounts

cannot be shared by multiple persons or as a team based accounts.

2. All the databases/systems must be integrated with the Identity Access Management

system for centralized control. This will also enable disabling of user accounts when a

person leaves the organization.

3. Sensitive data stored in the main RDBMS tables must be encrypted so that

Database administrators do not have direct access to this information for misuse

Compliance

Chapter / Clause #

Description Complies (YES/NO)

Chapter 6

Authentication and Authorization of system

User and Identity management

Application Security aspect

Data integrity

Data confidentiality

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

29

7. QUALITY ASSURANCE

A thorough quality check is an integral part of any system deployment. The systems

and its modules, shall be tested at all levels with well-defined test and use cases.

Bidder/Agency is expected to lay down a robust Quality Assurance program for testing

of the application for functionality, performance and security before putting in

production environment. The program must include an overall plan for testing and

acceptance of system, in which specific methods and steps should be clearly indicated

and approved by NMRCL. Bidder/Agency is required to incorporate all suggestions /

feedback provided after the elaborate testing within a pre-defined, mutually agreed

timeline. Bidder/Agency must undertake the following:

a. Outline the methodology that will be used for testing the system. b. Define the various levels or types of testing that will be performed for system. c. Provide necessary checklist/documentation that will be required for testing the

system. d. Describe any technique that will be used for testing the system. e. Describe how the testing methodology will conform to the requirements of each of the

functionalities and expected outcome. f. Indicate / demonstrate to NMRCL that applications installed in the system have been

tested.

7.1 Automated Testing

Bidder/Agency is expected to perform automated testing with following features:

i. Should allow version control of tests and test assets providing ability to compare

versions and identify changes. ii. Should allow centralized storage and management of tests and test assets including

external resources used by tests. iii. Should provide local system monitoring to test and validate performance issues

including memory leakage, CPU overload and network overload to determine if specific business scenarios exceed desired performance thresholds.

iv. Should provide Auto-documentation while creating of automated tests. v. Should provide facility to parameterize tests to generate/assign test case output values

automatically during runtime.

7.2 Performance and Load Testing

Bidder/Agency is expected to implement performance and load testing with following

features:

i. Testing workload profiles and test scenarios based on the various functional

sNMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

30

requirements should be defined. Application as well as system resource utilization

parameters that need to be monitored and captured for each run also needs to be

defined.

ii. Bidder/Agency should perform the load testing of the applications for multiple

workload profiles, multiple scenarios, and user loads to handle the envisaged

users of the system.

iii. Different activities before load testing i.e. identification of work load profiles,

scenarios, information capturing report formats, creation of testing scripts,

infrastructure detailing and workload profile should be prepared before the start

of actual load testing exercise.

iv. Should eliminate manual data manipulation and enable ease of creating data

driven tests.

vii. Should provide capability to emulate true concurrent transactions.

xiii. Should provide End-to-End system performance analysis based on defined SLAs.

xiv. Should monitor resource utilization including memory leakage, CPU overload and

network overload. Should have the ability to split end-to-end response time for

Network & Server(s) and provide drill-down capability to identify and isolate

bottlenecks.

Compliance

Key Deliverable Chapter / Clause #

Description Complies

(YES /NO)

Chapter 7

Automated functional testing of solution

Performance and Load testing of the solution

Nagpur Metro Railway Corporation Limited Functional Specification Document for ERP

Annexure BThis document contains the functional requirements from the ERP system

Please rename the file to your company name to identify the right response against the bidder

Bidders are required to fill in their responses by putting a cross mark (X) against the requisite rowin the column based on:

The solution supports the functionality out of the box with no change in process

The solution supports the functionality out of the box but with a change in process with a workaround

The solution supports the functionality out of the box but with custom code to be written (Customization)

The solution does not support the functionality and requires additional software to be procured

Additional remarks if any may be put against the row where required for clarifications of the response

Please ensure that you have put in your response to each row where the response is expected

Where sub-text is noted for a row (like this representation), the sub-rows need to be scored

No responses will be deemed as Not Possible

The spreadsheet needs to be uploaded onto the Portal as a spreadsheet and not a scanned document

Sr. No. Functional Requirement Specifications Own

practice

Consortium OEM partner

1 Greenfield Implementation of ERP solution in Railways

2Greenfield Implementation of ERP solution in Metro

Railway

3Digital Project Management Platform as a part of ERP

implementation

4 Turnkey implementation along with Hardware provisioning

5Post implementation support for minimum of 3 years at

same customer

6 ERP implementation along with BIM

7Integration with BIM solutions for Time and Cost

dimensions

8Third party enablement and integration for information

exchange

Annexure B - NMRCL ERP FRS

9 Business Process Design as a part of implementation

10 Data migration from legacy systems

11Third Party Project Management implementation along

with ERP

12Percentage projects completed on time and budget (in the

last 12 months)

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

Pre-Project Stage

1 Ability to define the overall project(s) and the associated

program in the system along with all available project

parameters at this initial stage

2 Ability to conduct and record pre-project planning

3 Ability of system to facilitate definition of pre-

construction activities, establishment of PIUs,

procurement planning at the next stage

4 Ability to create new projects by using standard templates

along with workflow

5 Ability to add/delete/modify project details like project

name, project short name, length of main project, others

6 Ability to add/delete/modify highway details like

highway number, length, highway description, lane, others

7 Ability to assign project code to projects

8 Ability to import / export project details in MS Excel, MS

word

9 Ability to capture intimation to set up a project by the

concerned user

10 Ability to open multiple projects at once

11 Ability to maintain a group of projects in a program and

create cross- project relationships

12 Ability to associate project with respective corridor

13 Ability to add/delete/modify Corridor details like Corridor

short name, corridor name, chainage from, chainage

to, length of corridor

14 Ability for entering different types of projects –

capital, contract, administrative

15 Ability to maintain various project status, such as

Initial Definition, Submitted, Approved, Pending Close,

Closed

Feasibility Relevant details

16 Ability to maintain record of pre-feasibility and feasibility

reports (preliminary project reports), particularly the

recommendations. These reports contain preliminary

design, land acquisition plan, utility relocation plan,

economic and financial analysis etc

17 Ability to maintain record of Detailed Project Report (DPR)

18 Ability to facilitate peer reviews of these reports

online with version control

19 Ability to send these reports to multiple persons or a group

for internal approval through workflows (which can be

configured as per user requirements)

20 Ability to link these reports to a project created

subsequently in the system

21 Ability to separately track in the system, expenditure

on study and project preparation which can be reported

at any point of time

22 Ability to print Reports based on user defined criterion

23 Ability to create master for DPR / Feasibility / proof

consultant/ peer review experts / financial / legal

consultants/ independent engineer

24 Ability to add / delete / modify consultant details

25 Ability to record Consultant details from pre

qualification stage to contract award stage, including

the manpower, key resources and loading of the

manpower in projects

26 Ability to check the status of procurement of Consultant

27 Ability to record work details allocated to Consultant

28 Ability to check the status of reports submitted by

consultant

29 Ability to generate reports related to consultant as per

client requirement

30 Ability to generate alerts based on the various versions

submitted by the consultant to client

31 Ability to generate indent along with the approval through

full workflow at appropriate time periods

32 Ability to approve Payments to be made to Consultants

33 Ability to measure the performance of the consultants

as per the activities assigned to them

34 Ability to track the employability of consultants in terms of

their current engagement, blacklisting etc

Post DPR

35 Ability to record Government sanction and its details

against the project/program

36 Ability to classify projects

37 Ability to define project Work Breakdown Structure/Work

Scheduling (WBS) by breaking down to sub-projects and

activities

38 Ability to create activities as the base unit for analysis of

all information about the project related to costs, progress,

deliverables etc.

39 Ability to create relationships between activities

40 Ability to view activity relationships

41 Ability to assign constraints to activities

42 Ability to assign roles to activities

43 Ability to assign resources to activities

44 Ability to assign activity code values

45 Ability to view activity notebook topics

46 Ability to administer WBS details-Milestones, Budget

47 Ability for provision of auto-naming of activities as per pre

defined rules which are entered into the system previously

48 Ability to classify activities as milestones which sets the

workdays for the same to zero

49 Ability to sort projects state wise, phase wise, year

wise, mode of funding (including international agencies)

50 Ability to classify projects as per client requirements

for reporting purposes

51 Ability of system to maintain project/activity durations in

such a manner that payments will be blocked by system

against those if payment date is not within the defined

dates for the project/activity

52 Certain combination of expenses and activities can be

restricted by the user in the system

53 System should be user friendly, the field names can be

changed, fields can be moved within the same screen,

unwanted fields can be removed

54 Ability to do activity wise & total project resource planning

for cost, etc. by optimization techniques for various

scenarios

55 Ability to develop a broad level implementation schedule

based on the project intimation

56 Ability to perform Multi-project Scheduling, Leveling,

Applying Actual, Summarizing

57 Ability to establish Project plans by combining sub projects

from different projects

58 Ability to plan project flow in consideration of all deadlines.

Includes the calculation of data for engineering,

delivery dates, construction time, start-up data, and

confirmed data

59 Ability to identify key or critical points in a project,

such as the completion of a group of related activities, a

trigger point for another action such as the completion of a

critical task

60 Ability to link with auto CAD / GIS / other drawing software

documents

61 Ability to allow one to search and retrieve information

related to relevant projects quickly from CAD drawings,

GIS, pictures, documents, excel sheets and

presentations etc.

62 Ability to integrate with Document Management system for

the purpose of relating documents to issues, events,

project Work Breakdown Structure/ Work Scheduling

(WBS) and activities

63 Ability to link work breakdown structure to Resources in

project reporting

64 Ability to have custom fields to capture additional

information related to project activities & resources with

predefined entities being provided for respective custom

fields.

65 Ability to restrict or grant access to Project Data to specific

employees or Team of employees

66 Ability to link two or more projects for reporting purposes.

67 Ability to index and categorize various proposals for new

projects / schemes to keep track of the stage at which a

new proposal is presently or to get a view of all the

proposed projects or any one of the projects or cumulative

status of projects beyond or before a specified stage

68 Ability to scan/image back up documents

69 Ability to integrated project plan with other standard project

management tools like Microsoft Project, Primavera

70 Ability to generate strip plan showing all the status

of the land acquisition, utility shifting with clear

identification of construction line, existing ROW &

proposed ROW

71 Ability to record status of borrowing, loan repaving,

stakeholder amounts

72 Ability to record all details pertaining to admin circular

issued by client

73 Ability to record comments of consultants, PIUs, CMUs,

client HQ

74 Ability to record key personnel involved in the project from

the concessionaire/contractor/ consultant/client and update

records on real time basis

75 Ability to capture the data pertaining to every conceivable

aspect of the project that will contain details like technical

details, financial aspects of the contracts, advance

payments, repayments, work-orders etc

76 Ability to establish a project budget based on the

operational costs and develops the project structure &

schedules in parallel

77 Ability to enter/upload, generate, approve and monitor

the project budgets approved. Budgets can be based

on a number of elements such as work breakdown

structure, period, resources etc

78 Ability to support budgetary control based on project

budget

79 Ability to revise the sanctioned value of budget

Project Estimation

80 Ability to enter estimates for the project – detailed and

abstract

81 Provision for Contingency, Insurance, Tender Premium etc

in the estimate

82 Ability to generate reports on the estimate

83 Ability to sanction estimates online

84 Ability to generate sanction numbers in the user defined

format for the project

85 Provision for maintaining multiple versions of the estimates

86 Ability to record estimated BOQ for the project

Utilities management

87 Ability to update status of utilities shifting from time

to time by stakeholders depending contract type

88 Ability to generate and record the utilization of funds for

utilities shifting when the concerned government

department is undertaking this activity

89 Ability to view the milestone based payment details case of

the concessionaire who is responsible for shifting utilities

90 Ability to record and approve variation orders

91 Ability to generate strip plan showing all the status

of the land acquisition, utility shifting with clear

identification of construction line, existing ROW &

proposed ROW

Clearance procedure

92 Ability to record details related to clearances for different

activities pertaining to civil contract before handling land

over to the civil work contractor for actual start of the work

93 Ability to record clearance details along with the status for

pollution control board clearance, ROB clearance, land

clearance, tree cutting clearance, irrigation department

clearance for CD works, clearance relocation of utilities

94 Ability to record status of clearances

95 Ability to record number of trees cut in the project

96 Ability to record status of application

97 Ability to record finalization of TOR / rejection of

application

Tendering and Award of Contract

98 Ability to maintain contractor details, Ability to extract

Contractor profiles into Word/Excel formats

99 Ability to screen contractors / subcontractors by

reviewing job performance history, financial status, safety

records etc.

100 System should be able to link purchase requirement with

the tender

101 Ability to distinguish the procurement tenders

102 Ability to link the procurement tenders to the financial

modeling of the project.

103 Ability to link the procurement to the associated program,

project, and sub project.

104 All the procurement processes: single, two parts or three

part processes should be able to take into consideration

the parameters of procurement/tender associated

105 The procurement/tender process, should be able to link

all the related activities like:

106 Approvals of a feasibility report

107 Invitation of RFQ after approval of feasibility report and

financial modeling

108 Receipt of RFQ documents

109 Pre-qualification of bidders

110 Invitation of RFP from pre-qualified bidders

111 Receipt of technical and financial bids

112 Stage wise scoring, and evaluation of bids

113 Approval of client board for award of work

114 Award of work (issue of LOA)

115 Signing of consession agreement

116 Ability to provide for storing information of the tender

document in detail such as submission date of

technical offer, commercial offer, EMD amount,

parameters of evaluation etc

117 Ability to set pre qualification criteria for vendors and

subcontractors

118 Facility for recording technical and commercial/Financial

bid for scientific evaluation of the same

119 Facilitate the generation of comparative sheet for analysis

120 Ability to support Limited Tender Enquiry System on

short listed contractors based on their capability

121 Ability to support e-tendering and integrate with e-

tendering platform of client

122 Ability to store, update and retrieve Bill of Quantity (BOQ)

for all types of Projects

123 The system should maintain repository of similar previous

tenders so that details of previous tenders such as

technical specifications can be retrieved and compared

124 Ability to allow the procurement of project services from

qualified and approved sources that offer the most

economical service, taking into consideration quality,

delivery, reliability, and service

125 Ability to generate automatically / manually work order /

Annual Maintenance Contract (AMC) for outside contractor

based on standard list of services or on previous work

contract reference)

126 Ability to facilitate the maintenance of services that can be

contracted out. The unit of measure of the services should

be user definable (hours, Kms, etc.

127 Ability to group together similar services and define service

catalogues / service specifications

128 Ability for creation of category master for contractors /

consultant and subcontractors and details

129 In case of evaluation of Bidder, the module should prompt

the user in case of existing disputes, turnover limitations,

and legal exceptions for the Bidder etc.

130 Ability to generate evaluation reports for the Bidders

131 Ability to generate statements including Bidder rating,

Bidder evaluation reports

132 View & use RFPs / RFQs

133 View earlier Proposals/EOI/LoA and copy/paste any

information

134 Ability to produce a draft proposal/EOI/LoA with

standard, relevant , selected material having technical &

financial parts with standard client terms , General &

special conditions.

135 Ability to take approvals for new tenders’ Internal

Estimates, costing, EMD.

136 Ability to generate draft Model Concession (RFP –

Volume II) and publish on the site

137 Ability to Keep records of externally aided projects (EAPs)

138 Record of minutes of meetings for tenders

139 Ability to record status of expression of interest for

consultant / concessionaire/ contractor if bids are yet

to be received or under evaluation with details

140 Ability to record proposal evaluation details & consultant

/concessionaire/ contractor awarded value along with

status

141 Ability to capture all details for RFP/ RFQ

142 Ability to generate a comparative statement for pre-

qualification of all bidders

143 Ability to generate a comparative statement details both

technically and financially for all types of project

144 Ability to generate a comparative statement for

concessionaire for OMT & BOT contract

145 Ability to assist user to award the contract to consultant

(QCBS) basis

146 Ability to support rate contract system of awarding of

service contracts to contractors

147 Ability to record and monitor all types of insurance as

per contract obligations

148 Ability to record feedback of the supervision / independent

consultant at all stages of the project

149 Ability to record of items- rate wise, year wise, contractor

wise

150 Ability to create different contract packages within project

scope

151 Ability to record variation order (VO)/change of scope

details and generate suitable VO formats/change of scope

formats

152 Ability to record the change of scope cost details,

review/approve from Independent Consultant/client and

monitor the change of scope and cost details

Pre Construction

Land Acquisition

153 Ability to record land acquisition requirement for the

project providing details of government and private land

154 Ability to record land acquisition details such as name of

competent authority, total number of structures, length of

LA, details of land to be acquired, length free from

construction, number of villages, others

155 Ability to record and view month wise land acquisition

status with details, for government, private and consent

basis

156 Ability to record status on three different notifications for

land acquisition i.e. 3(a),3(A), 3D and Award and

Compensation Disburse by client for knowing land status &

payment status

157 Ability to record Land disputes & arbitration details

158 Ability to create Land register as per Land & traffic Control

Act, 2002

159 Ability to record interest generated on pending Land

Acquisition & Competent Authority fund from bank

location wise across client

160 Ability to record additional land to be acquired or to be

purchased due to alternation of alignment of highway or

due to erroneous revenue records or for provision of

additional features

161 Ability to generate strip plan showing all the status of

the land acquisition, utility shifting with clear

identification of construction line, existing ROW &

proposed ROW

162 Ability to generate a line diagram showing

encumbrance free sites available for construction

163 Ability to record month wise details of land mutated in

the name of Government

164 Ability to record details of land acquired & vested with

client

165 Ability to record details of land acquired & entered

(mutated) in the name of Central Government in the

concerned ROR

166 Ability to record details of cases under arbitration

167 Ability to archive notifications

168 Ability to show status of land acquisition in totality

169 Ability to show status of cases

170 Ability to capture the information related to the owners of

the land and related Rights

171 Ability to capture the information on Encumbrances and

restrictions

172 Ability to Integrate with GIS systems to monitor the Land

acquisition process on GIS maps

173 Ability to capture the Survey numbers / Khasra numbers

along with their measurements and usages and

infrastructure characteristics

174 Ability to capture the merger or demerger information

related to the Survey numbers and accordingly adjust their

measurements

175 Ability to capture the official record of change details

176 Ability to capture the various Notice of assessment

177 Ability to create a Land register and assign the Survey

numbers to the register

178 Ability to capture the Public register information like

Contamination, Non -Hazardous waste, Site protection,

Development Plan etc

179 Ability to capture the Purchase / Sale Contracts and Right

of use Contracts and process the contracts during for land

acquisition

180 Ability to integrate with Financial Accounting for all

financial postings during the acquisition process c

181 Ability to calculate the various taxes like TDS, Servcie tax

etc as applicable and post them to separate accounts at

the time of financial postings

General

182 Ability to record clearance details along with the status for

Rehabilitation and relocation of people

183 Ability to record clearance details along with the status for

Clearances from archaeological departments

184 Ability to record clearance details along with the status for

Shifting of religious structures and signs

185 Ability record land details acquired from illegal occupants

and record the payments made to illegal occupants

Capturing Expenditure details

186 Ability to record pre construction expenditure details like

expenditure till previous financial year, cumulative

expenditure in current financial year up to previous month,

expenditure during current month with details like

(advance paid, invoice payment, taxes, land acquisition

cost, others

187 Ability to generate and record the utilization of funds for

utilities shifting when the concerned government

department is undertaking this activity

188 Ability to allocate funds and monitor disbursed funds for

clearances

Construction Project/Contract Management

189 Ability to record the activities related to handing over the

site to the concerned client official

190 Ability to monitor Physical & Financial progress of the

project along with monitoring of performance standards of

all concessionaire, contractor, Independent Engineer,

Safety Consultant

191 Cost and Progress of activity, sub project and

project will be automatically updated. System should be

capable to record & monitor Project cost, Project

expenditure, Revenue status

192 Ability to provide web-enabled access to real time

business critical project data to help client

management, Project Directors and contractors

across client to make timely, informed decisions and

to easily manage, track, and report on their project

activities.

193 Ability to send and receive documents to and from all client

offices for monitoring & follow up

194 Ability to monitor project status at important stages of

project execution

195 Ability to capture monthly/quarterly/annual Physical

Progress details for monitoring purposes

196 Ability to generate list of defaults at the project

implementation stage

197 Ability to generate alerts for LD in case applicable

198 Ability to generate Alerts in situations such as project

delay, budget overrun, others

199 Ability to create project details (initiation, milestones

achieved and completion) report for the publication on the

client website

200 Ability to support electronic feed from contractor Work In

progress (WIP)

201 Ability to configure alerts, wherever generated, to e-

mails / mobile phones (SMS) for projects

202 Ability to create a single repository that records

pertinent project execution details

203 Ability to incorporate any additions to orders awarded to

any contractor for existing project. Ability to record and

approve variation orders

204 Ability to extrapolate effect of variations in schedules on

the total project cost

205 Provision for online collaboration for project-related

deliverables with facilities like document repository with

features like version control and editing control

206 Ability to measure the status of projects by budget as well

as by work completed

207 Ability to analyze project activities by Critical Path

Analysis (PERT), Gantt Charts and pie charts

208 Ability to provide single point of access to information

related to contractor and sub-Bidder pertaining to work

209 Ability to use predefined formula when the unit of

measure of work performed and contract is different

210 Ability to inspect & document work completion & quality

according to checklists

211 Ability to integrate with accounts payables for invoice

verification. The contracts management system should

be integrated with the maintenance / projects module for

updating the work completion / work progress

212 Ability to enter measurements at the site and prepare bill

based on the measurements. This bill should be integrated

with finance eventually for payments

213 Ability to release & monitor the milestone payments as per

the billing schedule and project implementation bar chart.

214 Ability to store/modify/retrieve resource allocation details of

project team

215 Ability to recalculate the cost estimate for the project

after contract award and basic work have taken place and

more detailed information about the project has become

available

216 Ability to record/modify/retrieve contractor plans to set-up

temporary facilities/operations and services and exit the

construction site within a defined schedule or operation

date

217 Ability to record/modify/retrieve quality inspection

results at different stages of the project to ensure

consistent quality throughout the whole project lifecycle

218 Ability to plan, schedule, and monitor site execution

or assembly to achieve the project goals in terms of

quality, costs and schedule and track project costs

incurred in this phase

219 Ability to support inspection of contractor deliverables for

compliance to work plan recording the results of the

inspection and issue of compliance certificate thereof

220 Ability to update activity dates, activity steps, expenses,

etc.

221 Ability to create / view/ update Project risks

222 Ability to email notification about Project Issues

223 Ability to calculate the percentage completion of the

project by using any of techniques such as start finish rule,

milestone technique, others

224 Ability to calculate schedule variances and build

scheduled budget histograms, tables and curves

225 Ability to track key milestones and forward the milestone

details to the relevant personnel for approval

226 Ability to track original & revised budgets and analyze

variances

227 Ability to have provision of commissioning details and

procedures for any activity related to project

228 Ability to record/modify/retrieve the Performance

Guarantee parameters

229 Provision for Exception based project management in

the system: it should be possible to create ‘Project

portals’ where one can set up a links to ‘Project exceptions

that summarize all deviations from the project plan. The

portal should give all information and provide a 'one-

click away' interface to delayed purchase order, activities

and exceeded budgets. Further the system should

provide Performance Portals to monitor the project

based on Cost and Schedule Performance

Indicators.

230 Ability to generate alerts for the preparation of

BOQ/preparation of site data report at least 6 months

before prior to the completion of the construction period

231 Ability to record contractor wise DLP details at all PIUs for

the complete tenure of Defect Liability Period (DLP)

232 Ability to generate automatically / manually work order /

Annual Maintenance Contract (AMC) for outside contractor

based on standard list of services or on previous work

contract reference)

233 Ability to facilitate the maintenance of services that can be

contracted out. The unit of measure of the services should

be user definable (hours, Kms, etc.

234 Ability to group together similar services and define service

catalogues / service specifications

235 Ability to provide for a service entry / joint measurement

document that should be generated after the work is

completed

236 Ability to record correspondences among consultants,

contractors and client and maintaining the linkages among

them

Post Construction

237 Ability to record contract between concessionaire and

O&M contractor

238 Ability to record key personnel involved in the

project from the concessionaire/O&M contractor/

consultant/client

239 Ability to record the vesting certificate to the

concessionaire for the assets being handed over to client

after the concession period is over

240 Ability to capture and maintain an asset register on

completion of concession agreement

241 Ability to monitor performance standards and quality

consideration stated during the O&M phase

242 Ability to record substitution agreement for another

concessionaire in case of termination

243 Ability to generate and monitor indent by the Independent

Consultant

244 Ability to generate inspection reports – pre monsoon

reports, routine, post monsoon amongst others

245 Ability to generate NOCs for the clearances required

for corridor operations

246 Ability to capture details of selection of O & M

contractor/private contractor/OMT concessionaire details

247 Ability to record details of O & M supervision Consultant

from Invitation of RFP/Expression of Interest(EOI) stage to

Consultancy award stage

248 Ability to create details on maintenance plan

249 Ability to record details about post construction work

related expenditure like payment by CMU/ PIU, amount

paid, others

250 Ability to provide reports on the scheduled / un-scheduled

maintenance activities

251 Ability to record relevant documents before the

commencement of the O & M phase

252 Ability to record estimated BOQ for the maintenance of the

project

253 Ability to record & update existing position of the stretch

254 Ability to record work program & methodologies submitted

by contractor

255 Ability to record periodic details on the work carried

out, removal of defects from stretch, Incident

management (Cranes, Ambulance, Patrolling), Property

management, Encroachment movement, unauthorized

holding/ boards, unauthorized access, median

maintenance, avenue plantation, road engineering

improvement, assets management and periodic renewal

work carried out on this stretch

256 Ability to capture details along with the status pertaining to

permissions (Laying of optical fiber cables, Laying of

Pipelines, Access both for private properties & petrol

pump, crossings)

257 Ability to capture details of the land acquired for wayside

amenities

258 Ability to capture details of status of maintenance of

wayside amenities & generate a monthly status report

259 Ability to generate alert Project wise/ contractor wise for

all the CODs Completed/ Pending)

260 Ability to track and monitor all Incident Management

services (like ambulance, route patrol vehicle, tow away

crane etc.) and provide all control unit details of the

specific corridor

261 Ability to define the Periodic Maintenance Plans, Pre-

monsoon activities etc and carry out the maintenance

262 Ability to carry out the maintenance activities and close the

notifications

263 Ability to capture the complete history of maintenance

carried out on a stretch / section or Network

264 Ability to provide reports on the scheduled / un-scheduled

maintenance activities.

265 Ability to record incidents and mobilize the emergency

services

Project Closure

266 Ability to monitor the site-closure phase once the work is

completed as per the contract.

267 Ability to check that the contractor has achieved all client

requirements & to record all client acceptances.

268 Ability to provide for a service entry / joint measurement

document that should be generated after the work is

completed

269 Ability to track the milestone payments made to the vendor

at the time of final milestone of the project is successfully

reached (the successful conclusion of the acceptance

testing).

270 Provision for alert to all concerned if the project is closed

in system or if project is open for a long time even if there

is no activity on the project

271 Project can be kept in ‘soft’ closed mode. Soft Closed

project can be re- opened

272 Ability to process final bill for the contractor

273 Ability to record project closure report in the system

274 Ability to perform Period Closeout for the project if the

project is open

275 Ability to extract historical cost data per activity within the

repository into Word and Excel formats for further

analysis and annual budgeting process

276 Ability to log all relevant project details

277 Ability to schedule history logging (weekly, daily etc )

278 Ability to provide for manual history logging

279 Ability for provision for Graphical display of history

280 Ability to drilldown from graph to history details.

Project Integration with other Modules/ applications

281 Ability to integrate with General Ledger, Asset

Management

282 Ability to integrate with capital Budget

283 Ability to generate capital expenditure report project wise,

etc

284 Ability to integrate with Accounts Payable for project

payments and Accounts receivables for project receipts

285 Ability to drill down to source data while at any hierarchical

level.

286 Ability to consider anticipated costs that arise during

execution of a project

287 Ability to integrate with time entry system for labour cost

booking

288 Ability to track project expenditure details

289 Integration between project and GIS

290 Ability to generate the projected cash flows and cash

utilization reports.

291 Ability to support capital Work in Progress (CWIP)

Accounting

292 Ability to regulate payments in accordance with budgetary

allocation for the project and for the user defined period

293 Ability to identify the aging of projects as per user defined

criteria

294 Ability to arrive at the Total cost of the project.

295 Ability to predict the effect of any variations during

implementation on cost of the project

296 Ability to integrate with cost controlling components for

tracking each activity and project based on Budgeted

Cost, Actual cost, Percentage completed, Cost to

complete, others

297 Integration with Purchasing application for tracking project

commitments

298 Ability to integrate with email system and web-site of client

299 Ability to integrate with disparate business Software

Systems

MIS and Project Reports

300 Ability to generate reports

301 Overall progress including completed length for the

month for each corridor

302 Physical progress of North-South and East-West Corridors

303 Contract Balance For Award Status as on date

304 Contracts for which Letter of Award has been issued,

agreement signing is awaited and contracts which are

terminated

305 Contracts and the length which are terminated, the date of

termination and the name of the contractor before

termination of the project.

306 Contracts Due For Completion upto Reporting Month w.r.t

Original Date of Completion And Yet Not Completed

307 Contracts which are likely to be completed in next 3

Months

308 Contracts under implementation as per the nationality of

The contractors

309 Contracts under implementation as per different cost

ranges

310 O&M Contracts under implementation as on Date

311 Monthly Return on Land Acquisition

312 Contracts likely to be delayed as on Date

313 Penalty/liquidated damages invoked for Projects

314 List of Projects Likely to Completed before Schedule as on

Date

315 List of Civil Works Contracts Awarded to Contractors

316 Details Of Supervision Consultant/Independent

Consultant/ Independent Engineer

317 Contracts Scheduled for Completion as per their

anticipated date of completion during Quarter Ending

318 Contracts Scheduled For completion as per

anticipated date of completion during the financial Year

319 Contracts Summary due for completion during the financial

Year

320 Contracts scheduled for completion during month

321 Penalty/Liquidated Damages invoked and paid for Projects

322 Status of Acquisition of Land

323 Contractor Wise details

324 Supervision Consultant details

325 Project costing reports

326 Utility Shifting Details, Chainage Chart of Corridor Wise

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

Supplier Contracts

1 Ability to record suppliers details as per client

requirements

2 Ability to float RFP for multiple suppliers

3 Ability to receive response from multiple suppliers &

comparison

4 Ability to covert the quotation into contracts or standard

purchase orders

5 Ability to record client Legal Terms & Conditions:

6 Ability to approve contracts and other purchases via

authorized workflow:

7 Ability to maintain suppliers items / services database

8 Ability to evaluate Supplier Performance as per client

criteria.

9 Ability to rate and rank vendors are various parameters

like quality of supply, delivery time, pricing etc.

10 Ability to define and implement workflow for various types

of tenders and also based on the rules of delegation of

powers

11 Ability to associate a vendor with status like preferred,

active, on hold, debarred, black listed.

12 Ability to record details like PAN number, excise control

code, service tax number, VAT number etc of the vendor

and implement TDS, TCS, CENVAT related taxation

activities.

Requisitions/ Indents

13 Ability to support the process of managing requisitions

within the ordering process

14 Ability to create electronic requisitions using authorized

workflow.

15 Ability to create multiple Requisitions.

16 Ability to select tax code with appropriate percentage

17 Ability to copy an existing Requisition to create a new one.

18 Ability to submit a complete requisition for

electronic financial concurrence & approval by

appropriate client authority

19 Ability to view approval status of the Requisition on line

20 Ability to allow requisitioners to attach documents for

forwarding to approvers

21 Differentiate between the service contracts,

capital equipment purchases, material purchases.

22 Ability to define a workflow to approve the requisitions

as per the delegation of rules of client

23 Ability to convert approved requisitions to contracts,

purchase orders seamlessly.

24 Ability to provide the information to the indentor on similar

purchases and contracts made previously.

25 Ability to modify the requisitions, ask for more information

from the indentor, forward the requisition/indent to any

other person to seek more information etc by the persons

in the higher levels of approval hierarchy.

26 Ability to monitor the requisitions/indents with the

budgetary allocations.

Approvals

27 Ability to define Approval Process as per client hierarchy

via authorized workflow

28 Ability to route the electronic Requisition for approval

based on the financial authority of the client

29 Ability to receive and respond to Requisition

approval requests (notifications) via email

30 Ability to convert the requisition created from an electronic

catalogue item into an approved Purchase Order and

email to concerned person

31 Ability to approve purchase orders created by workflow

from approved Requisitions

32 Ability to define multiple approval structures depending on

the type of contracts, tenders, and various categories of

purchases including capital equipment, imports etc.

Purchase Orders

33 Ability to support setting up contract Agreement for every

supplier/ Item dealt with by Requisitioning

34 Ability to create Purchase Orders automatically from

electronically approved Requisitions.

35 Ability to print Purchase Order.

36 Ability to create manually Purchase orders for

electronically approved requisitions.

37 Ability to create Purchase Order in Indian currency

38 Ability to create, amend Purchase Orders for all types of

items

39 Ability to record the tender proceedings with date and time,

observations of tender opening committee and participants

of tender opening process.

40 Ability to generate purchase orders for the capital

equipment which involve erection and commissioning over

a period of time.

Goods Receiving

41 Ability to support the process of receiving goods and

services in client

42 Ability to send email notifications to ask /indentor to

confirm receipt on due date for all items

43 When the goods and equipment are supplied, various

taxes like excise tax, service tax (if services), VAT are

applicable and credit on these taxes can be availed.

System should support taking credit of CENVAT, Vat etc

44 System should have to ability to implement all tax related

issues with respect to goods and services taking credit of

taxes capital goods over two years.

45 Ability to capture the quality parameters and inspection

results on certain items before these items are taken into

inventory

46 Ability to return the goods not meeting the inspection

criteria with reversal of tax credits.

Inventory Management

47 System should be able to track materials on lot basis till

the stage of consumption.

48 Inquiry & Reporting Capability for various Inventory

Transactions (by item-code, item-type, Cost Center, date

of transaction, etc.)

49 Inquiry & Reporting Capability for slow Moving and

obsolete Inventory

50 Capability to track items by Item-Code

51 Facility for Vendor Cross Reference of the items

especially those of original equipment manufacturers.

52 System should make stock requirement predictions based

on re-order level, safety stock etc

53 Ability to receive and record in various units of measure.

54 Ability to define various units of measure with conversion

factors.

55 Ability to adjust or update for differences in

conversions in Unit of Measurement

56 Facility to give various alerts like Shelf Life expiry etc

57 Ability to store Lead Times of procurement in the

Inventory Master File

58 Facility to track with lot number, and record all the

inspection details for the lots.

Supplier Invoices

59 Ability to support the process of entering and managing

Invoices for goods and services online

60 Ability to enter payment terms and choose the

required basis for payment

61 Ability to validate data through Invoice approval

62 Ability to automatically place Invoices on hold, to prevent

payment.

63 Ability to prevent input of duplicate Invoice numbers

64 Ability to adjust Invoices as needed before posting to

General Ledger

65 Ability to record VAT and check calculation. Select

tax code with appropriate percentage

66 Ability to set up basic VAT functions and VAT reporting

67 Ability to set limits for Invoice amounts

68 Ability to view current balances online

69 Ability to process credit Notes from suppliers

70 Ability to cancel Invoices on demand

71 Ability to post transactions to the General Ledger as often

as required.

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

Organization Structure

1 Allows definition of Legal entity, its HQ, Regional office,

other units etc. with automatic GL level consolidation

2 Allows Definition of country, regions, sub-regions to meet

legal requirements such as Central taxes/ duties, state

taxes and local corporation taxes & duties. E.g., Central

sales taxes, local tax, VAT, Octroi or entry tax.

Chart of Accounts - Requirements

3 Ability to support flexible chart of accounts design

for capturing information to meet various reporting and

analysis requirements of client without duplication of data.

4 Ability to view & maintain the chart of accounts online with

the ability to prevent deletion of any data.

5 Ability to support future expansion in client operations for

e.g. location wise, account wise etc.

6 Ability to provide parent, child, sub child and further

relations between various accounts in a chart of accounts

7 Ability to define rules that ensures validity of various

combinations of chart of accounts as per client

requirement.

8 Ability to upload the chart of accounts and its structure

from existing legacy system into the ERP system

9 Ability to download the chart of accounts and its structure

for printing, or in the MS Office supported file format for

review.

10 Ability for end users to add/change/delete business logic

quickly and easily within Chart Of Accounts and report

hierarchies.

11 Ability to drill down on any Ledger A/c in the chart of A/c to

see the details of the Ledger

12 Ability to have more than one chart of accounts

13 Multiple sets of same books of accounts are permitted.

General Ledgers (GL) - Requirements

Global settings

14 Ability to enter the foreign currency exchange rates for

automatic translation of foreign currency balances both

manually and automatically

15 Ability to support various exchange rate type for one

foreign currency

16 Tracking of all foreign currency transaction in both

transaction currencies as well as base currency.

17 Allows grouping of general ledger account for the purpose

of account management

18 Common grouping and coding methodology of Accounts

19 Ability to generate sub ledger for contracts, parties,

employees, fixed deposit , others (user defined) as per

client requirement

20 Ability to define rounding rules for currency at each G/L

level or globally for all ledgers

21 Ability to maintain the holiday calender and define certain

Ledger a/c not to be modified or entered on any holiday

22 Ability to generate financial statements for each

Business Division defined

23 Ability to define different rate of interest along with

the calculation procedure for each G/L account

independently

24 Ability to define different tax rates along with the

calculation base and logic for each G/L account separately

25 Ability to support a revision in tax rates or interest

rates with retrospective effect and trigger corresponding

accounting entries

26 Availability of various document types for various types of

financial transactions with option of manual numbering or

system generated numbering for each of them

27 Option to reset the numbering sequence for all documents

per fiscal year.

28 Allow Accrual based accounting

Accounting Period

29 Ability to have different fiscal reporting calendars

30 Flexibility to define fiscal year including start month and

end month

31 Ability to control the opening/ closing of posting periods

centrally but independently for each account type,

transaction types, and document types

32 Allows to keep multiple periods open across financial

years or within financial year

33 Ability to define 12 periods / month within fiscal year

34 Ability to have at least 4 special periods to facilitate year-

end closing by dividing the last posting period into several

closing periods

35 Ability to control users to access past period for

adjustments (e.g. to re- open a period that has been

closed).

GL Master Data

36 Ability to maintain the following master data records

to store control information on how postings are made

into the General Ledger account:

37 Name of account

38 Short Text

39 Long Text

40 Type of account

41 Account Group

42 Currency (local, foreign)

43 Tax posting and respective rates

44 Reconciliation account in nature

45 Level of transaction details to be maintained within the

GL account

46 Whether to maintain open item processing

47 Alternative account number to store client’s existing GL

a/c

48 Automatic posting to prevent manual posting to account

49 Ability to create GL master data in hierarchy

50 Ability to add / delete / close accounts

51 Ability to copy accounts between entities

52 Ability to automatically renumber account codes

53 Ability to change description of accounts

54 Ability to map the Bank Account numbers for Bank

Ledgers

55 Ability to maintain user defined reason codes for any

account write offs

56 Ability to have mass creation of GL accounts that include

57 Copying entire chart using another chart of accounts as

reference

58 Copying single account

59 Copying multiple accounts

60 Performing data transfer using program for G/L

account master data from existing legacy system of

client

61 Allowing deletion of inactive accounts or accounts with

no outstanding balance

62 Allows creating general ledger accounts in online mode

63 Allows creating general ledger accounts in batch mode

using external interface

64 Ability to assign an activity status to accounts (e.g. active,

inactive)

65 Ability to retrieve an account master record via account

alias

66 Ability to allow immediate electronic notification to relevant

users after creation or change of master data.

67 Ability to provide audit trail to log the creation,

amendments and deletion of each GL account code.

68 Ability to control creations, amendments and deletions

of GL master data by user-defined authorization.

69 Should be able to create the master data for each Bank

Account which will contain essential data which includes

but not limited to:

70 Name of Bank, Bank branch

71 Address of Bank – Location

72 Operating Offic

73 Bank A/c no.

74 Type of A/c

75 A/c opening date

76 List of signatories

77 Daily Credit Limit

GL Transaction Posting

78 Ability to enter journal / cash receipt / cash payment / bank

receipt / bank payment vouchers into an electronic

document on line. The information contained in a journal

should include:

79 Date posted, entered/ created, document date and

value date

80 Source of voucher

81 Voucher text

82 Voucher type

83 G/L account code

84 G/L account name and description

85 Debit/ credit amount

86 Identification of originator such as User ID of the

transaction

87 Allows creation and posting of journal entries online or in

batches

88 Allows to create reversal of journal vouchers with

date definition for reversal

89 Automatic reversal of vouchers based on predefined

criteria

90 Should be able to maintain separate cash accounts for

each cash office

91 Should be able to record accounting entries for business

transactions posted by the cashier

92 Can block / delete general ledger accounts if posting are

to be blocked

93 Ability to search account code, account name or

responsible area during posting documents

94 Voucher entry number must be unique (flexibility to

have system generated number or user defined number)

95 Ability to have real time updation of data from subsidiary/

component ledgers into corresponding G/L a/c

96 Ability to link all voucher generation with account codes,

responsibility codes & budget codes.

97 Ability to generate split invoices for single consignment

(e.g.: 98%+2%).

98 Ability to generate two invoices for a single

consignment with two different paying authorities.

99 Ability to support charge backs to invoices paid short.

100 Ability to enter text comment into the system for an

Invoice.

101 Ability to generate the supplementary invoices for

subsequent price revisions, differential excise duty for

inter branch stock transfer and sales reversal reported.

102 Ability to restrict access to certain accounts by user

defined group

103 Ability to control voucher posting function by user defined

authorization

104 Flexibility to control posting to specific ledger accounts

with specific documents

105 Ability to interface with other systems to capture

accounting entries generated by these systems at regular

intervals during the day both in summary & detail

106 Ability to provide function to reverse documentation

individual and in mass after posting by reference

document number

107 Ability to post to a future and prior period by authorized

users.

108 Ability to post allocation vouchers with user defined rules

109 Ability to validate a voucher upon posting performed

interactively at time of data entry (e.g. valid GL account

code).

110 Ability to suspend and resume, at a later time, entry of

journal that are incomplete or imbalance

111 Ability to prohibit posting to close periods within GL

and other sub systems

112 Ability to prevent posting to control accounts of subsidiary

ledger

113 Ability to store (park) incomplete documents without

carrying out extensive entry checks

114 Ability to specify templates to capture details of recurring

transactions

115 Ability to allow amendment or deletion to recurring

transactions prior to posting

116 Possible to map general ledger account codes to

specific business transaction in other modules

117 Post transaction from other modules to online mode based

on such pre defined criteria.

118 Ability to perform the posting automatically according to

user defined specification

119 Ability to allow multiple account entries (debits and/or

credits) for each transaction type

120 Ability to provide running total of debit/ credit amount

121 Ability to provide running total of transactions

122 Ability to enter statistical information during posting.

123 Ability to handle user defined base currency GL

processing for all accounting entities

124 Ability to handle multicurrency processing

125 Ability to request for authorization of transaction exceeding

maximum or transaction limits by user defined authority

126 Ability to electronically route journal for approval to an

authorized user before posting to the General Ledger. If

rejected, the journal should be automatically routed back

to the originator for correction

127 Ability to post Bank Payment / Bank receipt vouchers

(BPV) in system

128 Should be able to post entries for Cheque receipts and

payments

129 Enables calculation of interest based on value dates

captured in the system

130 Allows the option to use automatic clearing or manual

clearing of open items in any GL account

131 Flexibility to define rules for automatic clearing of such

accounts and clearing of open items based on such

criteria.

Sub ledger General Requirements

132 Allows creation of sub ledgers in the system with

numeric or alphanumeric codes

133 Sub ledger numbers can be manually entered or system

generated

134 Allows to define payment terms in following scenarios:

135 Standard payment term of payment due after specific

no. of days Payment term where discount is offered as

interest component for early payments

136 Payment term which allows retention money

137 Advance payments to vendors

138 Guarantees

139 Security deposits with vendors

140 Bank guarantee, letter of credit to vendors

141 Allows linking of many vendors to capture group

exposure/transaction volume

Sub ledger Transaction Posting

142 Ability to transfer the credit balances within sales orders of

the same party.

143 Ability to set offs receivables against liabilities of the same

party.(in case of Vendor-Customer)

144 Ability to monitor the credit period and related interest

calculations & auto generation of debit notes.

145 Ability to monitor the outstanding within the prescribed

credit limits. (Bank Guarantee)

146 Ability to support automatic credit limit checks and

potential credit order holds at order entry.

147 Allows blocking of specific sub ledgers so that transactions

with such vendors/projects/activities cannot be entered

148 Allow to segregate and track vendor transactions into:

Normal invoices and payments

149 Allows invoice processing With respect to a Goods

Receipt Note (GRN) in the System With respect to capital

job note in case of capital asset receipt With respect to

service entry note in case of a service vendor

150 Expense voucher where vendor is credited without

PO/GRN in the system

151 Supports typical 3 way match (PO, GRN, Vendor invoice)

bill passing process

152 Considers quantitative details from GRN and price details

from PO during the 3 way match

153 Bills are processed based on PO, GRN even if invoice

does not match with value arrived at using these two

documents

154 Ability to prompt/automatically deduct all deductible

charges such as TDS, works contract tax, surcharge on

these taxes at the time of vendor bill processing

155 Ability to automatically account for all these deductions

based on pre-determined criteria

156 Defaults master data information of vendor during invoice

processing

157 Allows defining parameters to determine whether default

master data information can be changed during

processing and changes are allowed only based on this.

The same can be done only based on authorization.

158 Allows to evaluate amount of pending GRN for invoice

processing to arrive at provision figures

159 Triggers commitment and updates budget on issue of

purchase orders for goods/services

160 Ability to track duplicate invoice based on vendor code and

invoice number

161 Should post debit notes and credit notes as well as

print these for sending across to vendors

162 Should calculate overdue interest for vendors based

on individual transaction due dates in following scenario:

163 Interest is accrued at each period end for all

outstanding line items beyond due date

164 Interest is accrued only at the time of payment of

principal. Till then although interest is calculated,

however, not accounted for

Payment to contractors

159 Should process vendor payment in:

160 Manual Payment mode

161 Automatic payment processing based on predefined

parameters

162 Allows payment for following scenarios:

163 Advance payment adhoc

164 Advance payment only against purchase orders

165 Payment against one or multiple invoices - matching

Amount Payment against one or multiple invoices -

partial amount

166 Payment against one or multiple invoices - adhoc

amount

167 Should capture and report capital and revenue advances

separately

168 Should block certain vendors invoices so that they cannot

be paid unless cleared by appropriate authority

169 Allows to process one or more vendor invoices, debit

notes, credit notes and allows to make net payment

170 For the purpose of automatic payment processing system

enables:

171 Allows to run payment program for future date

172 Allows to process multiple payment programs runs for

different dates, same date – different criteria

173 Identification invoices due by a particular date

174 Allows to select/deselect certain invoices for payment

processing

175 Flexibility to process payment of all invoices at one go,

however, strictly on due date basis

176 Based on the process, posts accounting entries in bank

accounts as well as vendor accounts

177 Takes cognizance of TDS requirements and deducts

TDS whenever necessary

178 During payment (automatic or manual) system

automatically calculates discount if any and proposes net

amount for payment processing

179 Ability to generate accounting entry after considering

discount figures and posting of entry based on pre-

determined account mapping

180 Allows maintenance of Cheque stationery and tracking

of Cheque based on available stationery and usage

181 Allows printing of cheques for various banks

182 Option of sending payment details to banks in a soft copy

format so that payment processing can be carried out by a

bank

183 Allows printing of payment advice along with Cheque

which may be sent across to vendors along with their

payment

184 Ensures updating of Cheque register on printing of

Cheque as well as updates the payment voucher with

details of Cheque no.

185 Flexibility to update Cheque register in case cheques

are issued manually, cheques are destroyed, damaged

etc.

Sub ledger Reporting

186 Statement of account for the purpose of sending it across

to vendors for balance and transaction confirmation, with

an option to define format of confirmation letter

187 Due date wise analysis of vendor accounts

188 Ageing analysis of vendor line items

189 Vendor account trial balance

190 Vendor account line item details

191 Vendor account details segregated into: Invoices and

payments

Advances paid to vendors

LCs and bank guarantees to vendors

192 Vendor account balances and transactions per vendor

control account

193 Allows regrouping of vendor balances based on

debit/credit balances

194 Ability to vies/print all the above vendor account and line

item reports per branch, division, location etc.

195 Availability of details of payments made before due date

and corresponding cash discount earned

196 Allows to extract details of purchase orders, GRNs

invoices, accounting documents of individual vendors

197 Allows to segregate imported and indigenous purchases

and expenditure in foreign currency

198 Allows to extract details of capital commitment made by

the company

199 Should provide details of payments segregated into

onetime payment, early payment and delayed payment

200 Should report on total volume of business generated,

discounts earned from vendors

GL Account Enquiry

201 Ability to display GL account balance in multiple views as

follows , but should not be limited to Statutory,

Responsibility, Geographical

202 Ability to hold balances for multiple ledger types such as

Actual, Budget, Statistical, Statistical, Taxation

203 Ability to allow enquiry by

204 Account codes and name

205 Voucher number wise

206 Specific range of period, year, month

207 Ability to display on line at least 20 years of history for

account balances and posted transactions

208 Ability to display account activity includes opening,

movement for the period, closing period and year to date

balance

209 Ability to display breakdown of balances by drilling

down to source document

210 Ability to display GL account master data

211 Ability to store balances for future years.

212 Option to capture due dates for such security deposits and

query/ reports to highlight deposit/ advances which are

due for repayment.

Periodic Processing

213 Ability to perform month-end (soft closing) and year-end

closing

214 Allows definition of recurring transactions and periodicity of

recurrence.

215 Ability to automatically carry out the following, at period

end:

216 Valuate foreign currency balances, calculate and post

unrealized gain/loss on exchange

217 Flexibility to choose rules for posting of such revalued

items at the end of the fiscal year and end of period for

each type of account such as receivable, payable, assets

218 Flexibility options for posting of these differences to meet

all the criteria defined by the Indian Accounting Standards

219 Reclassify credit and debit balances for reporting purposes

220 Ability to automatically initiate a new financial year

221 Ability to automatically update the closing balance of the

previous period and opening balance of the current period

with prior period transaction postings for all ledger

balances. (e.g. actual, budget, statistical)

222 Ability to automatically transfer net profit and all other

relevant revenue statements for the current year to

retained earnings account. (for year end closing)

223 Flexibility to Transfer balances of profit and loss

account to retained earnings account multiple times during

a fiscal year closing process

224 Ability to process the following types of transactions:

225 Current period transactions posted in the current period

226 Prior year transactions for the previous accounting posted

in the current period

227 Future period transactions posted in the current period

228 The system should allow the period end roll over in feeder

systems such as Usage of Funds and Receipt of Funds to

take place in advance, of that of, the General Ledger; i.e.

hold the General Ledger open for a few days after closing

the Usage of Funds and Receipt of Funds.

229 The system must update accounting balances and perform

a roll forward when a new period (month or quarter) is

opened.

230 The system should allow for re-opening and

rebalancing of control accounts if necessary; subject to

user access controls.

231 The system should provide dry run procedures for

period ends with system reports on closing/opening

balances.

232 System should provide for the approval through the

hierarchy for closing a definite period

233 System shall generate a balance sheet for pre

defined Assets & Liabilities for the closing period

234 System should identify residual funds

235 Allows definition of certain GL accounts in a way that

individual transactions can be tracked based on its open

status. E.g. Security deposits, clearing accounts etc

236 System should carry out processing for open items

237 System should carry forward or restart open commitments

in the next period

238 The system must allow year-end adjustments in the

General Ledger after the Usage & Receipt of funds

Ledgers have been closed for the year.

239 The system must allow users to input to and report

normally on current and future years while still working on

the previous accounting year.

240 The system should allow a year end to be forced at any

point in the financial year, for example, to allow for bodies

that are wound up part way through a year.

General Ledger Integration

241 Ability to integrate with the following modules at on-line

basis, but should not be limited to:

242 Accounts Receivable

243 Accounts Payable

244 Project Management

245 Cash Management

246 Human Resource Management (Payroll)

247 Ability to assess the following for accounting

transaction details, for example:

248 Accounts Payable

249 Accounts Receivable

250 Assets

251 Ability to support e-commerce extended to contractors,

vendors etc.

Reporting

252 Ability to specify the format and layout of reports

253 Ability to summarize and total the information to be

reported

254 Ability to select records to be included in the report

255 Ability to select details from each record to be included

256 Ability to perform arithmetic calculation on the information

selected or totals

257 Ability to add narrative comments to reports

258 Ability to show financial data in thousands, millions etc.

without creating rounding problem

259 Ability to store the report format for later use

260 Ability to produce reports in graphical form for analysis

purposes.

261 Ability to produce the following financial reports in multiple

levels (e.g. whole organization, reporting units such as

PIUs / CMUs) and for a user- defined period (for the

month, year to date), but should not be limited to:

262 Schedules as per requirement for balance sheet

263 Profit and loss account

264 Analysis of Profit and Loss account

265 Analysis of operating expenses

266 Balance sheet

267 Analysis of Balance Sheet

268 Trial Balance

269 Cash flow statement

270 Inter-company report

271 Notes to the financial accounts (account breakdowns)

272 Composite ledger

273 Activity ledger

274 Maintenance ledger

275 Expenditure type ledger

276 Nature of expenditure

277 Subsidiary ledgers such as Contracts, Employees,

Parties, Fixed deposit

278 Consolidated Trial balance

279 Schedule VI format (Part I and II)

280 Other user defined schedules for financial statements

281 Ability to produce all the above reports in multiple formats

282 Allows to define schedule to support annual accounts

283 Ability to produce VAT and Withholding TAX Report

284 Ability to compare actual data to actual data and/ or

budgeted data to actual data in

285 Annually,

286 Semi-annually,

287 Quarterly,

288 Daily

289 Monthly

290 Ability to download reports to standard PC

applications (e.g. Excel spreadsheet)

291 Ability to generate TDS certificates, periodic TDS

summary, balance statements, annual financial

statements, project expenditure statements, OMR

(Consultant wise), Receipt payment advice, Credit / debit

notes

292 Ability to generate expenditure statements such as

schedule of expenditure, schedule of withdrawal of

proceeds, component wise, activity wise, expenditure

type, disbursement category , others (user defined)

293 Ability to generate contracts related reports as per client

requirement

294 Ability to generate error reports in case of rejections or any

errors at the time of data transfer using batch mode.

295 Report on all foreign currency transactions entered during

the period

Assets Accounting – depreciation

296 A computerized database shall be generated for all assets

i.e. properties, vehicles, and equipment owned by each of

the offices

297 Allows to define different types of depreciation methods

such as:

298 Straight Line method (SLM)

299 Written down value method (WDV) Allows multi- shift

depreciation

300 Allows working of different depreciation for same assets

which may be used for different purposes such as:

301 For the purpose of books of accounts

302 For the purpose of income tax act

303 For the purpose of costing/MIS purposes

304 Allows to calculate depreciation on a pro-rata basis

305 Allows defining a threshold value below which assets need

not be defined, and a threshold limit below which assets

should not be depreciated.

306 Allows automatic calculation of depreciation based on pre-

defined criteria

307 Allows calculation and posting of depreciation at monthly

intervals, with an option of posting, posting with reversal

entry

308 Allows both upward and downward revaluation of assets

309 Supports accounting of revaluation of assets

310 Allows depreciation calculation on revalued portion and

charge of revaluation depreciation on revaluation reserve

311 Option of calculation of depreciation with retrospective

effect in case of change of method or rate of depreciation.

312 For retrospective change, calculation of prior period items

posted during current fiscal year.

313 Allows transfer of an asset to other locations, Circles,

divisions or Zones

314 The taking over of the original cost of the asset

along with the accumulated depreciation at the time of

inter location transfer of asset

315 Option of calculation of depreciation with retrospective

effect in case of change of method or rate of depreciation.

316 For retrospective change, calculation of prior period items

posted during current fiscal year.

317 Allows transfer of an asset to other locations, Circles,

divisions or Zones

318 The taking over of the original cost of the asset

along with the accumulated depreciation at the time of

inter location transfer of asset

Asset Sale

319 Supports sale of asset, cost of sale and carries out

profit and loss calculation

320 Posting of capitalization, depreciation, sale of asset is

automatic base on predetermined characters

321 Supports automatic calculation of profit or loss on sale of

assets based on book depreciation

Assets – Reporting

322 Assets register to provide all the details about every asset

in the books of accounts, Some of the critical details

include:

323 Asset no. with part no. and asset depreciation

324 Date of capitalization, original cost, accumulated

depreciation and WDV

325 Additions and deletions from assets over a period

326 Cost center, location of asset

327 Unit of measurement of asset such as meters, feet, kg

etc.

328 Reports on transactions during the year such as:

329 Purchase of new assets

330 Sale of assets

331 Details of sale, transfer and written off

332 Costing of Saleable Assets

333 Capital work in progress computation

334 Location details of assets to be used for physical

verification

335 Assets Registers with grouping

336 Supports sale of asset, cost of sale and carries out

profit and loss calculation

337 Posting of capitalization, depreciation, sale of asset is

automatic base on predetermined characters

338 Supports automatic calculation of profit or loss on sale of

assets based on book depreciation

339 Assets register to provide all the details about every asset

in the books of accounts, Some of the critical details

include:

340 Asset no. with part no. and asset depreciation

341 Date of capitalization, original cost, accumulated

depreciation and WDV

342 Additions and deletions from assets over a period

343 Cost center, location of asset

344 Unit of measurement of asset such as meters, feet, kgs

etc

345 Reports on transactions during the year such as:

346 Purchase of new assets

347 Sale of assets

348 Details of sale, transfer and written off

349 Costing of Saleable Assets

350 Capital work in progress computation

351 Location details of assets to be used for physical

verification

352 Assets Registers with grouping

Cash Management – Requirements

General Function

353 Ability to monitor payment flows and safeguard liquidity

354 Ability to incorporate the Sweep A/c principle wherever it is

on ground

355 Ability to interface with external Bank applications for

online Fund transfer (RTGS)

356 Ability to update the cash position on a real time basis

Bank Reconciliation

357 Ability to enter bank statement details manually &

electronically to match bank transaction information in

system

358 Ability to record bank statement transactions that can

be recorded include, but should not be limited to

359 Bank and other charges

360 Interest received or payment

361 Electronic fund transfers

362 Periodic payments

363 Dishonored cheques (Incoming/Outgoing)

364 Allows defining the criteria for bank reconciliation and

carries out bank reconciliation based on pre-determined

criteria.

365 Ability to automatically generate postings into the General

Ledger for Outgoing Cheques/ Transfers / Cleared

cheque/ bank transfer data delivered by the bank to

generate the clearing entries (i.e. debit Bank Clearing

account, credit Actual Bank account).

366 Ability to print cheque deposit and bank transfer listing

367 Ability to post incoming cheques individually & batch

368 Ability to provide function to overview cheque deposit

processing status on line

369 Ability to record stop payment of cheques

370 Ability to enable the matching of multiple receipts in the

system with a single receipt transaction on the bank

statement

371 Ability to allow for short term planning from sources

affecting the cash position. This includes:

372 Bank balances

373 Notified incoming payments posted to the bank account

374 Incoming payments (e.g. cheques) with a value date

375 Outgoing cheques posted to the bank clearing account

376 Ability to allow update of bank balance by bank accounts

377 Ability to group bank accounts in a logical hierarchy by

type of account

378 Ability to display bank accounts by group and in more

details by bank accounts via drill down

379 Ability to link payment with cheque transfer to stable

cheque accounts as per client rules or Act

Cash Management for Accounts

380 Ability to transfer funds from Head Quarter (HQ) to

required location

381 Ability to select proposed bank transfer amount based

on individual account, multiple accounts or group of

accounts

382 Ability to automatically generate a proposal of

amounts, by bank accounts, that can be transferred

based on user defined rules

383 Ability to edit proposed bank transfer amount by bank

accounts

384 Ability to delete bank transfer proposal

385 Ability to provide information such as planned opening

balance, transfer amount and closing balance by bank

account

386 Ability to create, change and delete payment advice

to sending (i.e. collection) and receiving (i.e. main) bank

account

387 Ability to create bank correspondence

388 Ability to post payment advice to the sending and

receiving bank account

389 Ability to post manually and automatically to the General

Ledger

390 Ability to provide function to allow update of bank

balance by bank accounts

391 Ability to compare actual bank balance against forecast

cash outflow

392 Ability to compute forecast excess or deficit in bank

account

393 If forecast available balance is positive (e.g. excess cash).

Ability to

394 Provide information such as planned opening balance,

closing balance by bank accounts

395 Create, change and delete payment advice to main

bank account

396 Create bank correspondence and/ or print cheque

397 Post payment advice to the main bank account

398 Post manually & automatically to the General Ledger

(e.g. Bank and Deposit account)

399 If forecast available balance is negative (e.g. deficit cash

position. Ability to

400 Provide information such as planned opening balance,

closing balance by bank accounts

401 Create, change and delete payment advice to main

bank account for borrowing or maturity of deposit

402 Create bank correspondence

403 Post payment advice to the main bank account

404 Post manually & automatically to the General Ledger (e.g.

Bank and Deposit or Borrowing account). Interest upon

maturity of deposit should also be posted

405 Ability to forecast cash outflow based on Liabilities

from Accounts Payable and borrowings, payroll due

within a user-specified period & User-defined level.

406 Ability to provide function to create, change and delete

payment advice from sending bank (e.g. main) account to

receiving (e.g. payment) bank accounts

407 Ability to provide function to create bank correspondence

and/ or print cheque

408 Ability to post payment advice to the respective bank

account

409 Ability to post automatically to the respective bank

accounts in General

Ledger

410 Ability to transact thru e-banking.

411 Ability to alert in case of cash payments exceeding defined

limits.

412 Ability to provide analysis for optimization of cash flows.

413 Ability to support automatic cheques reconciliation.

414 Ability to support Investment Management

Cash Flow Forecast and Information Systems

415 Ability to have Electronic bank reconciliation

416 Ability to have Drilldown reporting tool

417 Ability to have Journal/ posting overview (e.g. bank

transfers)

418 Ability to have comparison between actual cash flows with

forecasted cash flows

419 Ability to produce forecast cash flow statement for at least

12 or more months with the following minimum details:

420 Opening balance

421 Cash outflows for Loans / Capital projects / Revenue

expenditure / Tax / Project Expenditure / Others (user

defined)

422 Ability to provide drill down capabilities to view details of

outflows & inflows

423 Ability to allow for medium and long term planning from

sources affecting the liquidity position. This includes:

424 Receivables as expected incoming payments

425 Payables as expected outgoing payments

426 Planned payments of wages and salaries

427 Investments and borrowings

428 Planned tax payment

429 Others (user defined)

430 Ability to forecast these cash outflow and inflows based

on:

431 Fixed deposit and borrowing terms

432 Consolidated forecast of capital projects

expenditure from Project Management

433 Ability to enter forecast cash flow amount manually

434 Ability for the PIUs/ CMUs to enter their cash flow forecast,

which will get tracked with their actual spending on a real

time basis

435 Ability to support Loan accounting (Banks, Financial

Institutions) with reference to cash credit, Equipment

funding etc,

436 Ability to determine net fund requirement and availability.

437 Ability to perform trend analysis.

438 Ability to adjust due dates for statutory payment

based on declared holidays by bank,

439 Ability to alert in case of cash payments exceeding defined

limits.

Vouchers

440 Ability to add / delete / modify / enquire / post Cash receipt

& cash payment vouchers with details like voucher

number, token number, date, summary of funds (project

wise), activity , contracts , cash account details, narration ,

others (user defined)

441 Ability to add / delete / modify / enquire / post Bank receipt

& bank payment vouchers with details like voucher

number, token number, date, summary of funds (project

wise), activity , contracts , bank account details,

narration , instrument number, date, others (user defined)

442 Ability to add / delete / modify / enquire / post journal

vouchers with details like voucher number, token number,

date, party details, debit trial, credit total, others (user

defined)

443 Ability to generate transfer vouchers with details like

voucher number, control account, instrument details, debit

total, credit total , others (user defined)

444 Ability to post all types of vouchers in General Ledger after

approval from concerned client official by workflow

approval

Reports

445 Ability to generate day books for , but should not be

limited to

446 Cash Receipt

447 Cash Payment

448 Cash Book

449 Bank receipt

450 Bank Payment

451 Others (user defined)

452 Allows to view and print cheque deposit statement for a

day.

453 To extract Fund flow and cash flow statement

General Functions

454 Should define cost centers based on internal reporting

requirements

455 Allows grouping of cost centers in a tree structure at least

up to 5 levels

456 Ability to define organization structure in hierarchy at

various level

457 Ability to define main and alternative organization structure

458 Ability to integrate with the following modules on-line in

order to monitor and analyze reporting, but should not

limited to:

459 General Ledger

460 Asset management

461 Project Management

462 Budgeting

463 Payroll

464 Ability to upload data from external system, for

example, Excel spreadsheet, Access, etc. into application

system.

465 Ability to download information to spreadsheet (e.g.

Excel) for user analysis.

Allocations

466 Ability to allocate cost in various levels, for example

Department/ Division

467 Allows transfer of cost from one cost center to another

cost center:

468 On adhoc basis – manual transaction online

Costing & Financial Controlling – Requirements

469 On predefined criteria including specific amount,

percentage or formula

470 In case of formula, flexibility to change formula with an

effective date

471 Ability to allocate actual or budget amount based on Fixed

percentage / Variable percentage / Level of activity

or statistical information / Budgeted value/ quantity

472 Ability to process allocations with ability to amend

details prior to allocations

473 Ability to reverse allocations

474 Ability to simulate allocation method to check the

correctness before update run

475 Ability to run iterative/non-iterative cost allocation

processing in system

476 Ability for mass allocations posted/ reversed

477 Ability to monitor and print allocation report before closing

account

478 Ability to allocate cost and expense between department/

division/ PIU/ CMU / Others

479 Flexibility to transfer cost pertaining to specific expense

head only

480 Flexibility to retain origin information of cost even after

transfer of costs

Analysis

481 Ability to support comprehensive and flexible

information system to analyze costs and expenses within

client / PIU / CMU / Others

482 Ability to analyze costs and expenses on-line, and trace

them right back to the original document

483 Ability to analyze costs and expense separate by

responsibility area in account code level, account group

level

484 Ability to display and call up details of allocation method

via system

Enquiry/Reporting

485 Ability to provide user defined reports for analysis

486 Ability to provide resource analysis

487 Ability to serve user to follow all costs to their origin, even

down to the document level

488 Ability to monitor, analyze and evaluate reports on real

time access

489 Ability to download information to spreadsheet (e.g.

Excel) for user analysis.

490 Ability to transfer data to required application

Project Management – Costing

491 Ability to define the details of the project on-line, but

should not limited to:

492 Project type

493 Project ID, Project name

494 Project responsible person

495 Budget

496 Start date, finish date

497 Resource required for the work that is carried out

internally/ externally in a project

498 Ability to integrate with the following modules on-line in

order to monitor and analyze reporting, but should not

limited to:

499 General Ledger

500 Asset Management

501 Budgeting

502 Payroll

503 Ability to upload data from external system, for example,

Excel, Access into application system

504 Ability to download information to spreadsheet (e.g.

Excel) for user analysis.

505 Ability to trace cost/ expense by project.

506 Ability to automatically link wages/ Overtime/ other benefit

from human resource module to project system module

507 Ability to calculate and post interest from loan to project

508 Ability to settle costs and expenses occurred in project to

fixed asset, WIP or expenses by percentage, pro-rate or

actual amount after closure of project

509 Ability to automatically link to record fixed asset in asset

module

510 Ability to prohibit to post transactions from other module

to this project after closing project

511 Ability to post revenue to project

512 Ability to monitor profit/loss in project

Enquiry/Reporting

513 Ability to provide flexible and comprehensive information

system that assist to monitor and control project easier

514 Ability to monitor, analyze and evaluate various

information:

515 Commercial project reports in hierarchy (single

projects, partial projects or across several projects)

516 One or more projects in details by required element

517 Ability to monitor budget / commitment / actual reports

by monthly, quarterly and yearly on real time basis

518 Ability to monitor cumulative budget/commitment/actual

reports

519 Ability to monitor project progress by viewing completion

%

520 Ability to check history data from system, but not limited

to:

521 Start and Finish date

522 Resources usage

523 User who change budget

524 Project Status

525 User who close project

526 Ability to create own reports to for specific information

needs

527 Ability to view all information in the project immediately

after entering data via other integrated modules and can

run the reports in the background

528 Ability to view on-line reports in graphic and Gantt chart &

other formats as per client requirement

529 Ability to download reports to Excel spreadsheet,

Microsoft word etc for

client user analysis

Payroll Management

530 Ability to create user defined components of Pay like

recurring and

Adhoc Allowances / deductions

531 Ability to allow complex formulas for computing the values

of Earnings and Deductions

532 Ability to support detailed payroll calculations using

conditional logic and references to any HRMS, Payroll or

other module related information

533 Ability to allow one salary element be used to calculate the

value of another

534 Ability to compute the fixed & variable pay elements &

formula based pay elements like (DA as % of Basic)

535 Ability to allow the calculation of pay based on

Compensation Rules like

Years of Service, Location, Others (user Defined)

536 Ability to maintain/configure elements like LTA and

Medical

Payroll – Requirements

537 Ability to allow payment of employees at more than one

rate

538 Ability to allow pay types based on user defined cycles of

pay

539 Ability to allow the user to override the standard rate of pay

for individual employees

540 Ability to allow restriction of administrative functions to

a few select payroll users

541 Ability to allow the display of only selected menu options/

forms based on the role of the user

542 Ability to allow the restriction of data access as view only,

Update and

Correct

543 Ability to have a data upload facility to upload history data

544 Ability to allow the maintenance of slab wise details

for statutory elements like Income Tax, Professional

Tax as well as user defined elements

545 Ability to provide the facility to indicate taxable

earnings, deduction priority, carryover and partial recovery

546 Ability to support full integration with HR module

547 Ability to generate online calculations for one-time

payment

548 Ability to allow payroll users viewing of pay related

information including employer costs and liabilities via

reports and queries

Payroll Processing

549 Ability to allow the calculation of pay elements like Basic/

Leave Encashment/ Retirement / Resignation /

Special Pay/ Allowance/ Personal Pay/ Dearness

Allowance / House Rent Allowance / Children’s

Education Allowance / Washing Allowance / Transport

Allowance / Others (user defined)

550 Ability to perform advance payments like Fixed Value

amounts and Formula-based Amounts

551 Ability to allow GoI deductions like GPF, Festival

Advance, Natural Calamity Advance, Cycle/ Scooter

Advance, Fan Advance, Others(user defined)

552 Ability to allow for loans & Long term advance payments

553 Does the system allow the cap of deductions at user

defined fixed values or as a percentage of some pay

elements

554 Ability to allow calculation of one time payment of

allowance and / or deduction by days

555 Ability to process payroll monthly & on demand (i.e.,

termination, end of deputation period)

556 Ability to calculate recurring payments and / or

deductions using the same criteria as one time payment /

deduction

557 Ability to allow input of start and end date for

recurring payment / deduction

558 Ability to support adhoc basis payment recalculation during

the payroll run while preserving the run’s other results.

559 Ability to allow to monitor regular payroll cycle from data

entry to fully reconciled results

560 Ability to view complete history of payroll results

561 Ability to mark erroneous calculations for retry, while

keeping reconciled calculations intact

562 Ability to automatically detect the changes made in the

past impacting payroll and run retropay for those

employees

563 Ability to support the valuation of inventory as per AS-2

(Sec 145 A of the IT Act)

Online Payroll Calculation

564 Ability to have a tool to online calculate individual’s

payment

565 Ability to allow user to view the results immediately

566 Ability to allow manual payments on as need basis

567 Ability to deal with exceptions online

568 Ability to update balances immediately upon calculation

Payment Methods

569 Ability to support payment types like cheque / Direct

deposit

570 Ability to integrate fully with cash management for cheque

reconciliation purpose

571 Ability to enable different payment distributions based on

different basis

(i.e. separate bank account for bonus)

Tax/ Deduction Calculation

572 Ability to maintain complete taxation rules defined as part

of the pay structures configuration

573 Ability to maintain information pertaining to investments

made by the employee, to avail of tax rebate based on

statutory legislation

574 Ability to support configuring of various tax rules (e.g.

Income tax, Professional taxes) specifying, but not limited

to Basis and method of calculation / Default percentage

rates / General accounts to which tax effects may be

posted / Applicable State

575 Ability to support automatic calculation and deduction of

specific type of tax at the time of Advance payment /

Interim payment / Final payment

576 Ability to support generation of reports / certificates (user

defined format with reference number)

577 Ability to support calculation and deduction of specific type

of Income tax, Professional tax etc., at the time of

payment

578 Ability to ensure support for major statutory reports

579 Ability to calculate tax based on employee perquisites

given

580 Ability to record employees perquisites and other

information relevant in computing their tax liability as tax

components

581 Ability to define tax rules to determine employees tax

liability as per changes by the Central Govt.

582 Ability to complete calculation and deduction of tax

automatically

583 Ability to project the tax liability of an employee for a

tax calendar, providing tax planners to employee

584 Ability to manually adjust taxable earnings (in case of

income from other sources, investments)

585 Ability to handle Exemptions and Rebates as per the

Income Tax Rules

586 Ability to calculate HRA Rebate

587 Ability to handle LTA & Medical exemptions as per I.T.

Rules

588 Ability to support Sec 89 for Arrears Calculation

589 Ability to generates automatically employer / employee

returns in pdf format

590 Ability to support Quarterly Returns (electronic) and Sec

24 Q

591 Ability to provide for online ad-hoc calculation of

employees pay slip amount

592 Ability to perform on-line calculation of pay and benefits for

Deputation employee based upon deputation date

593 Ability to process out-of-sequence checks (pay slip) e.g. in

the cases of transfers in middle of month

594 Ability to evaluate different scenarios for change in pay-roll

structures

595 Ability to run payroll run multiple times before

finalization to ensure accurate pay computation

596 Ability to define unlimited deductions and earnings types

597 Ability to keep a full history of employee payments and

rules

598 Ability to determine which balances are affected

599 Ability to allow user defined element categories and

associated taxation

600 Ability to allow mass changes be made to deduction

amounts

601 Ability to reverse deduction to be included in next salary if

incorrectly withheld

602 Ability to determine deduction amounts by earnings

603 Ability to prioritized deductions prioritized by using

deduction code /

separate priority number

604 Ability to be prompted by system when employee status

changes to leave to determine how deductions will be

paid while on leave take when return lump sum

605 Ability to apply or stop various deductions based on

employee status changes

Statutory Information & Reports

606 Ability to allow to capture the following employee

information PAN No / Residential Status / PF Number /

Superannuation Number / Gratuity Number / Group

Insurance Number / Pension Fund Number / Pin Code

number / other user defined

607 Ability to capture different Employee Categories

608 Ability to capture following client information like Tax, PF,

Professional Tax details

609 Ability to capture Previous Employment Information like

Designation, Annual Salary, PF Number, No of LTC

availed in the previous block, No of LTC availed in the

current block, Leave Encashment amount, Gratuity

Amount, VRS Amount, Gross Earnings for the current tax

year, PF deduction for the current tax year,

Professional tax paid in the current tax year, TDS

deducted for current tax year, Other user defined

610 Ability to capture Nomination Information like

Nominee Details, Percentage, Relationship, Others (user

defined)

611 Ability to handle Gratuity Calculations

612 Ability to handle Provident fund rules like

calculate and deduct contributions according to the

respective Statutory Acts & maintain individual GPF

accounts and generate individual account slip for every

financial year

613 Ability to use employee master data of HRMS for Name of

employee, PF Account No., Name of Father , Date

of birth, Basic Pay, Designation, Date of Joining

service, Nomination details, Name & address of

nominee, Relationship with nominee, Age of Nominee,

Other user defined fields

614 Ability to have the mandatory forms and reports like IT

declaration form, Earnings/other income outside salary,

PF Form 3A, PF Form 6A, Payroll Register, Leave

Register, Form 16, Form 24, Form 12B

615 Ability to have an online Investment Declaration form

616 Ability to have an online salary slip

617 Ability to generate user defined reports

Income Tax computation

618 Ability to calculate tax based on earnings and exemption

for allowances

619 Ability to calculate Education cess, Section 88D

620 Ability to calculate Surcharge, Marginal Relief

Provident Fund Computation

621 Ability to calculate Employee PF contribution, Voluntary

Provident Fund Contribution, Employer PF contribution

622 Ability to calculate Employer Pension contribution

623 Ability to calculate Inspection, Administration charges

624 Ability to integrate with Income Tax

Gratuity Compensation

625 Ability to calculate Gratuity as per PGA 1972

626 Ability to adjust Gratuity Forfeiture

627 Ability to integrate with Income tax

Pay slip

628 Ability to generate salary slip details by pay elements

629 Ability to provide details of earnings, Deductions,

Perquisites, Income

Tax Summary, Leave Details

630 Ability to generate special message printing on salary slips

631 Ability to have Online Self Service salary slip

Payroll Off Cycle Processing

632 Ability to automatically update Payroll database for

changes in employee record without interfering with payroll

processing

633 Ability to automatically update payroll database

when Finance Department makes pay rate changes

634 Ability to make Back dated calculations

635 Ability to reflect payroll adjustments in correct pay period

636 Ability to have a full and Final settlement process in place

637 Ability to capture termination settlement details like Notice

Period Pay, Adjust Notice Period with leave, Leave

Encashment Information, Retrenchment Compensation,

Voluntary Retirement, Commuted Pension, PF

Settlement Details, Loan Recovery, Final Settlement

Report

638 Ability to provide a final settlement report for each

employee

639 Ability to have provision to suspend Payroll runs or

control final settlement processing on a case to case

basis

Payment Processing

640 Ability to provide the capability to handle unlimited pay

account codes and drawing banks

641 Ability to display absence status information on earnings

statement

642 Ability to process Arrear and backdated Payment

calculations

643 Ability to recover advances in subsequent pay periods

with a single transaction

644 Ability to provide for direct deposit of employee

645 Ability to support multiple banks or savings institutions per

employee

646 Ability to provide electronic transmission of direct deposit

647 Ability to maintain data in single central employee

warehouse

648 Ability to allow to centralize data and distribute it across

many locations

649 Ability to allow access across LAN or WAN

650 Ability to ensure appropriate access to employee

information

651 Ability to allow to define menu structures and

customize forms to determine the functional responsibility

of each user

652 Ability to assign multiple access responsibilities according

to the tasks users perform

653 Ability to keep a complete audit log of all changes

654 Ability to view standard reports and inquiries and analyze

the payroll data in spreadsheet, HTML or text format

655 Ability to allow users make their own reports and answer

adhoc queries

Compensation Management

656 Ability to support various salary structures that may

vary based on geographical regions or employee group

657 Ability to support self service interface to enter salary

increases and promotions

658 Ability to define compensation elements

659 Ability to define eligibility of compensation elements to

jobs, positions etc. of client

660 Ability to assign compensation elements to employees

automatically and manually

661 Ability to define security for view and entry of

compensation data.

662 Ability to define approval for salary changes

663 Ability to define Compensation management functions

such as compensation process, compensation budget,

compensation administration, job evaluation

664 Ability to define Compensation component such as job

pricing (fitment into a specific pay scale ),

Budgeting ( for pay allowances & miscellaneous

expenses)

TDS Requirements for Payroll Processing

665 Ability to capture tax , registration details for suppliers &

customers

666 Ability to calculate TDS for payment to contractors /

subcontractors, rent, professional fees, etc.

667 Ability to support transactions like TDS on prepayment,

invoices, work contract tax on pre payment, other TDS

taxes

668 Ability to record multiple level of TDS rates

669 Ability to define tax year for TDS

670 Ability to allow accumulations for Tax deduction at source

671 Ability to support multiple tax line items in one invoice

672 Ability to support calculation alternatives like gross, net ,

etc.

673 Ability to handle TDS adjustments on clearing of down

payments & provisions

674 Ability to record TDS payment due dates by PIUs

675 Ability to integrate Challan update & account clearing

676 Ability to generate & print TDS certificate

677 Ability to calculate provisional Tax TDS surcharge, on

services,

678 Ability to record TDS certificate from contractors

679 Ability to record various annual returns like section 139 ,

etc.

680 Ability to generate monthly & annual TDS reports

681 Ability to facilitate TDS deductions by customers

682 Ability to maintain certificates for concessional rates of

TDS

683 Ability to support tax deduction at source on Prepayments

684 Ability to record adjustments of proportionate TDS on

prepayments while applying prepayment supported

685 Ability to cancel previous TDS invoice automatically on

cancellation of original invoice , if the original TDS advice

was not paid to IT authorities

686 Ability to generate TDS certificate

687 Ability to control multiple copies of printed TDS certificate

688 Ability to generate credit memo for TDS certificate

received from the customer

689 Ability to generate alerts for users in case of due date of

deposit of TDS

based on user defined rules

690 Ability to generate statement of due date, date of actual

deposit, details of penalty/ interest for late payment of TDS

691 Ability to track TDS receivables (integrated with Accounts)

692 Ability to handle query system

693 Ability to support parallel books for maintaining fixed

asset and computation of depreciation as required by tax

laws

694 Ability to record details of payment of loans made by cash,

cheque and drafts

695 Ability to support legal requirements such as VAT,

Education Cess, works contract tax, service Tax and all

other taxes and duties as per the governing regulations.

696 Ability to maintain various components of each tax

types clearly identified by user defined tax codes

697 Flexibility to change the tax rates for various states

698 Ability to record Quarterly return as per section 194C,

194J, 194H, 194I, 192,195,193

Budgeting – General Functions

699 Ability to create the following budget, but not limited to:

700 Revenue budget

701 Capital Expenditure budget

702 Flexible budget based on the activity levels (e.g. No.

of Kms to be completed in different phases)

703 Ability to prepare budget with Bottom-up method

Requirements – Budgeting

704 Ability to import or export budget details from / to

external systems electronically (e.g. Spreadsheet –Excel)

705 Ability to provide Windows-based spreadsheets for budget

preparation

706 Ability to check and balance the detailed-level budget and

the summary level budget.

707 Ability to navigate within the budget hierarchy (e.g. expand

/ collapse structure, drill down for details).

708 Ability to provide a graphical representation of the budget

hierarchy.(bar graph, trend line, others)

709 Ability to calculate and compare budget vs. actual in by

amount variance & percentage variance (activity wise)

710 Ability to provide text facility to document any changes

made and reasons of amendments within each version of

budget

711 Ability to retain user-specified versions of the budgets

upon subsequent reviews.

712 Ability to maintain the original budget version and the

revised budget version

713 Ability to update the original budget by

714 Increasing the budget amounts

715 Reducing the budget amounts

716 Ability to transfer budget amounts.

717 Ability to allow changes to be made to the 5 year forecast

revenue, plan and expenditure items either by manual

entry and electronic upload

718 Ability to control the following activities by account, date of

change and user IDs:

719 Ability to unlock such budgets to reflect budget changes

720 Ability to lock subsidiary budgets and master budget so as

no changes can be made once approved

721 Ability to support multiple currency

722 Ability to carry over unspent budget amount from

previous years to assist in budgeting for next year

723 Assist in budgeting by showing the estimates of the last

year

724 Able to analyze and help in decision making by producing

scenarios

Revenue/ Operating Expenditure budget

725 Ability to define a revenue/ operating expenditure budget

hierarchy for responsibility areas within the organization to

facilitate control and monitoring

726 Ability to classify hierarchical revenue and expenditure

items

727 Ability to provide edit functions to create, insert, copy

& delete a responsible area or revenue / expenditure item

within the hierarchy.

728 Ability to identify revenue and expenditure as

controllable to and uncontrollable for budget control

purposes.

729 Ability to disallow posting into GL account w/o budget

approval

730 Ability to allow posting into a GL account only after

approval of budget

731 Ability to control authorization to create, change, delete,

budget, transfer and post by Budget version

732 Ability to copy budget values into a new budget

version from a reference budget version and by

selecting specific revenue/ expenditure accounts

733 Ability to revalue budget by percentage and by fixed

amount

734 Ability to provide formula (user-defined) planning/

budgeting at the lowest level

735 Ability to update budgets on-line, either individually and in

mass only at specified windows

736 Ability to provide a text editor functions up to the lowest

budget level (i.e. revenue/ expenditure accounts) to

capture supporting workings that derive the budget

amount.

737 Ability to record budgets at all levels of the chart of

accounts (all views of account number up to lowest level of

the accounts and all levels of state wise groupings / phase

wise groupings / bypass / others (user defined)

738 Ability to allow input budget data at detail level with

automatic roll-up to summary level by using aggregation of

account (i.e. revenue and expenditure items) at multiple

levels of consolidation.

739 Ability to allow input budget data at higher level

within the budget hierarchy and perform the following:

740 Manually allocate amounts to detail level based on

user-specified methods

741 Allocate via automatic pro-rate apportionment to user-

specified detail accounts.

742 Allocate budgeted overheads at the same level that actual

expenses was allocated or based on information from

other accounts

743 Ability to incorporate algebraic, mathematical and logical

formulas into cost allocation formulas at the lowest budget

level.

744 Ability to maintain statistical information in the budget

(such as budgeted units of electricity consumed) for

several different activities

745 Ability to provide the option to reflect changes to

amounts in a new budget version or without indicating

budget as a new version (i.e. overwrite original budget).

746 Ability to prepare revise budgets / modified budgets at

least twice in a year

747 Ability to check and highlight missing, incomplete budget

items prior to consolidation

Capital Expenditure Budget

748 Ability to support Projects Capital expenditure budget

749 Ability to define a budget hierarchy for Project ( bridges /

phases/ states / others ) to facilitate control and monitoring

750 Ability to use multiple currency for capital expenditure

budget

751 Ability to disallow posting into a GL account prior to

approval of budget

752 Ability to allow posting into a GL account only after

approval of budget

753 Ability to provide text editor function for budget exceed

754 Ability to determine the budgeting start year and the

number of years in the future for which budgeting is

allowed.

755 Ability to define user-defined budgeting period, e.g. 1 year,

3 years or 5 years

756 Ability to define sub-period budgets, e.g. monthly,

quarterly, semi- annually, or annually

757 Ability to create and maintain at 12 months rolling budget

758 Ability to carry forward budget outstanding from projects to

the following fiscal year

759 Ability to carry forward commitment amount from

projects to the following fiscal year

760 Ability to support multiple budgets by revenue accounts

and expense accounts.

761 Ability to update budgets on-line

762 Ability to provide the option to reflect changes to

amounts in a new budget version or without indicating

budget as a new version (i.e. overwrite original budget).

Budget Control

763 Ability to commit budget, after posting purchase requisition

in purchasing system

764 Ability to transfer budget between Project office ,

according to the authorization level defined by users

765 Ability to provide annual approval budget report

766 Ability to integrate with modules like account payable,

General Ledger, others

767 Ability to generate document number separately when

create/ change budget

768 Ability to perform automatic budget availability checks

during transaction posting.

769 Ability to define tolerance limits either as a percentage or

absolute value, depending on the amount exceed,

automatically perform the following:

770 Trigger warning to user

771 Trigger warning to user and mail to budget owner

772 Ability to classify budget control type, such as

773 Cost/ Expenditure budget–Ability to define trigger warning

to user when budget exceed

774 Capital Expenditure budget (Project)-Ability to define

trigger to user when commitment transaction exceed

budget, but disallow posting when actual transactions

exceed budget

775 Capital Expenditure budget (Non-project)-Ability to define

disallow posting when commitment and actual transaction

exceed budget

Audit

776 Record and tracking of audit objections and corrective

actions taken

777 Ability to track the reopening of posting periods

778 Tracking of user, date and time for each transaction

779 Tracking of changes made to any document

780 Tracking of creation and changes to any master data in

the system

781 Tracking of creation and changes to any set up data in the

system, e.g. TDS codes, excise chapter nos.

782 Tracing of changes to authorization profile/ approval

Reporting

783 Ability to download budget information to spreadsheet

(e.g. Excel) for user analysis

784 Ability to provide facility to present budget data in graphs

or charts within the system

785 Ability to provide the following information in the form of

reports/on-line view at multiple levels within the budget

hierarchy (should not be restricted to):

786 Comparison of actual against budget figures

787 Statistical information such as revenue generated

by various PIUs, CMUs, others (user defined)

788 Analytical information

789 Other forecast information

790 Ability to spread budget over the financial periods based

on user defined

791 Ability to provide the flexibility to inquire budget information

on responsibility area by user- defined parameters (e.g.,

time period, level of detail, activity, etc.).

792 Ability to print variance analysis (Actual/ Budget) reports.

793 Ability to electronically route the reports to allow users to

review reports.

794 Ability to provide exception reports for responsible areas

(e.g. unit, station) that exceeded budget with details such

as:

795 Revenue/ expenditure (according to chart of accounts)

796 Actual to date

797 Budget

798 Variance (i.e. amount in excess of budget)

799 Ability to automatically check and highlight abnormal

data i.e. actual exceed budget more than 10% or less

than 10%

800 Ability to provide over/under budget reports

801 Ability to check fund availability on real-time basis

802 Ability to view source of fund for each project in capital

expenditure budget report

803 Ability to view end use of resources / expenditure

matching

Bank Guarantee details

804 Ability to record details of Bank Guarantee

805 Ability to check the status of bank guarantee with issuing

branch / bank / controlling branch via internet

806 Ability to have provision for bank guarantee extension &

check the confirmation of original BG &

extension/modifications via internet

807 Ability to raise alert for release of performance bank

guarantee & obtaining the concurrence of finance division

at client Headquarters

808 Ability to raise alert for release of retention / advance

payment bank guarantee

809 Ability to raise alert for bank guarantee invoke & release

/ status thereof

810 Ability to have provision for online confirmation for

bankers

Custom Excise Exemption certificate

811 Ability to record details of draft exemption certificate PIU

wise / project wise & processing in different client divisions

by approval workflow

812 Ability to approve exemption by Member (Finance) by

digital signature or equivalent technology

813 Ability to import or export details from / to external systems

electronically

814 Ability to host exemption certificate details on client

website

815 Ability to obtain online confirmation from PIUs

816 Ability to obtain online confirmation from custom excise

department

Fund Management

817 Ability to record allocation vs. expense details

818 Ability to record client head wise balances details

819 System should support different grant heads

820 Provision to handle allotment of certain special funds for

specified temporary causes. Allotment Hierarchy can

be created without requirement projection hierarchy

821 After allotment of funds to every grant head, limited access

should be there to shift funds from one grant head to

another according to user defined rules

822 Users at each level should have flexibility to sub allot funds

for the units below them in the allotment hierarchy

823 Decision making for sub allotment of Funds should

be aided by intelligent tools, which can suggest figures

on basis of pre defined calculation formulas.

MIS

Monthly MIS for Project Expenditure

824 Approved Financing plan

825 Year wise receipt & utilization of funds ( Consolidated)

826 Estimates for funds & expenditures as on date / year

827 Expenditure target vs. Actuals for current year / till date

828 Month wise target vs. Actuals for current year / till date

829 Summary of expenditure on Projects

830 Month wise Project expenditure statement (activity wise /

project wise)

831 Head wise breakup of actual expenditure incurred on

projects during the year

832 Month wise / Year wise expenditure status with percentage

833 Externally Aided Projects (EAP) – Project wise , activity

wise

834 Project Expenditure summary

835 Statement of year wise approved outlay

836 Statement of bonus paid for yearly completion of projects

837 Break up of Project Expenditure

838 Others (user defined)

Requirement - Human Resource Standard Workaround Customization 3rd party Not possible

General Features

1 Ability to capture and maintain comprehensive personnel

data for each employee based on the employment

contract

2 Permanent employee

3 Deputation employee

4 Contract employee

5 Ability to keep job roles by position in database

6 Ability to collect all personnel data in centralized databases

to reduce redundant work and information

7 Ability to provide facility to confirm by authorized user to

update the information that relevant with government's

documentation before update in centralized database

8 Ability to provide authorization to owner unit to call up and

review their personnel data on line directly

9 Ability to keep personnel data in text and graphic

10 Ability to prevent non-authorized person to access

personnel information

11 Ability to change the rights to access personnel

information

12 Ability to record details of Record Retention Schedule for

records of administration division

13 Ability to define Manager Self Service (MSS) & Employee

Self Service (ESS) capability

14 Ability to record details of industrial relations , court cases

15 Ability to record details related to various returns (like

property returns)

16 Ability to provide back up HR information in system

Main Functions

17 Ability to record & capture personnel details, but not

limited:

18 Employee ID

19 Employee Data

20 Addresses: Current / Permanent / e-mail / Contact Nos.

21 Family data

22 Education data

23 Employment Data

24 Employee Benefits

25 Organization Data

26 Training Data

27 Qualification Data

28 Annual Confidential Report (ACR) Data

29 Payroll Data

30 Employee Photo

31 Disciplinary Action

32 Co-curriculum

33 Legal Disputes/Action

34 Health check up details

35 Ability to provide no restriction for the addition of new fields

36 Ability to retain historical data from the day employee

hired and all records should be date sensitive

37 Ability to identify employee by name, part of name,

employee number, Employee ID , job position etc.

38 Ability to generate letter via a word processing application

when any employee event occurs e.g. confirmation,

promotion, transfer, etc.

39 Ability to upload announcement letter or departmental

instruction to system and automatically update employee

status in HR database

40 Ability to have a user-friendly reporting/query tools that can

extract data and produced in various reporting format

41 Ability to allow employees to update their own personal

data

42 Ability to allow employees to check balance & apply leave

43 Ability to allow employees to view their own

master data via intranet/internet. Possible transactions

are:

44 Enroll training courses, view training history and

inquire on training courses available

45 View monthly pay slip

46 Others (user defined)

47 Ability to change master data record by authorized person

e.g. change education data, change department/ division

48 Ability to maintain personnel data in many records (Mass

Change and Fast Entry)

49 Ability to prevent users from viewing or changing

other employees certain information contained in their

own records

50 Ability to internally integrate personnel data e.g. to

accounts

51 Ability to warn and monitor special date e.g.

probation, promotion, resignation, etc.& compilation of

deputation period retirement

52 Ability to send personnel data file to external unit such as

government by authorized client official

53 Should be able to handle NOC Application, NDC

Application, LTC, Advances, PF Advance, PF Withdrawal

Recruitment

54 Ability to record and capture the following applicant details,

but should not limited to:

55 Applicant Data

56 Current address / Permanent address / Contact

number / e-mail address

57 Previous Employment Data

58 Training Data

59 Qualification Data

60 Applicant Photo

61 Resume

62 Examination score and interview score

63 Ability to create a new record for the applicant and all

relevant items shall be automatically updated

64 Ability for application data be electronically captured and

stored for easy retrieval and reporting

65 All documents related to the recruitment and process to be

linked to the document management system for

cataloguing, archiving and storing for easy retrieval and

report generation as and when required

66 Ability to store and view scanned documents in the

system e.g. certification, Identification ID, etc.

67 Ability to generate a list of internal candidates suitable

for a new or existing position based upon qualifications

and job requirements with access control

68 Ability to generate a letter of offer from within the system

or via a word processing application link.

69 Ability to notify relevant department heads or

managers of the new record via workflow and email/

intranet

70 Ability to transfer applicant data to personnel data when

he/she is hired without reentry personnel data

71 Ability to record medical checkup result when he/she

is hired in personnel data

72 Ability to notify relevant personnel in client before

completion of tenure period ( 6 months) for deputation post

73 Ability to generate NOC for outside employee from client

after clearance from vigilance department

Promotion

74 Ability to provide all relevant data for promotion process,

but should not limited to:

75 Employee data

76 Annual Performance Review data

77 Personal development plan

78 Evaluation, current and previous work experience

79 Training and academic achievements

80 Salary

81 Disciplinary Action

82 Ability to set/ update promotion criteria online

83 Ability to generate promotion from within the system

or via a word processing application link

84 Ability to automatically warn and monitor the vacant

position in client with the qualification needs for that

position

85 Ability to match with manpower plan and automatically

generate list of key employees who have the potential

for promotion by department/ division

86 Ability to match the job requirements of the post with

the skills, knowledge, abilities, experience and

qualifications of the employee

87 Ability to trigger training prerequisites (if any) required for

the position highlighted for an automatic link to the

Training module

88 Ability to track and report current position and promotion

position by department/ division

89 Ability to generate a letter of offer from within the system

or via a word processing application link

90 Ability to notify relevant department heads or

managers of the new record via workflow and email/

intranet

Transfer

91 Ability to record and capture all transfers whether it is

management or employee initiated

92 Ability to identify job vacancies or need for the transfer

purposes

93 Ability to capture, record and monitor employee

transfers by Department

94 Ability to track and report current position and

transferability position by department/ PIUs

95 Ability to produce necessary letters e.g. transfer order etc

96 Ability to notify relevant department heads or

managers of the new record via workflow and email/

intranet

Resignation

97 Ability to capture all resignations and perform the

appropriate calculations of benefits to be given to the

employee based on the client resignation policies

98 Ability to automatically generate necessary letters e.g.

resignation acceptance letter, etc. after all the

necessary conditions met like clearance from vigilance

department

99 Ability to notify relevant department heads or

managers of the new record via workflow and email/

intranet

100 Ability to withhold payment of salary depending on the

conditions of resignation e.g. vigilance clearance etc.

101 Ability to prorate the payment of salary and other

allowances given based on the resignation date

102 Ability to capture and monitor the position vacated

103 Ability to maintain all employee historical data for

rehiring or other purposes

Retirement / Termination

104 Ability to generate listing on employee who are going to

retire before 6 months

105 Ability to generate necessary letters or retirement memo

106 Ability to generate necessary forms required

107 Ability to capture all retirement events

108 Ability to record and maintain listed of personal data who

apply for early retirement program

109 Ability to restrict authorization in applying

retirement/ termination receiving form

110 Ability to generate bank transfer report in details

111 Ability to generate termination letters on demand

112 Ability to notify all relevant persons via workflow and email/

intranet

Performance Appraisal / Annual Confidential Report

(ACR)

113 Ability to capture performance appraisal forms / data,

which shall provide the input for employee evaluation and

training, and development needs

114 Provision for On-line appraisal (self appraisal, manager

appraisal) is required or data capture and mandate to

mention manager appraisal for the performance evaluation

115 Ability to generate reminders for those appraisal forms

that have not been returned by the appraiser

116 Ability to generate a listing of outstanding employee

appraisal

117 Ability to integrate with other modules like

training, personnel administration & personnel

development modules

118 Ability to generate necessary reports e.g. performance

listing, evaluation report etc

Organizational Management

119 Ability to produce organization charts (e.g. by HQ,

departments, PIUs, CMUs, BOT type etc.)

120 Ability to produce management organization charts

121 Ability to support flexible reorganization when

organization charts changed

122 Ability to simulate changing organization structure by

"What-if" scenarios

123 Ability to automatically transfer unit to changing

department.

124 Ability to set criteria for manpower planning

125 Ability to forecast requirement of manpower due to

opening of new PIUs or closing of PIUs

126 Ability to record reservation rosters like SC/ST/ OBC/

others (user defined)

127 Ability to record details related to repatriation

128 Ability to define organization unit (PIU,CMU,BOT,HQ) &

relationships between them

129 Ability to define jobs (Finance, HR & Admin ,

Accounts , IT) &

relationships between them

130 Ability to define positions (CGM,GM, DGM, Manager) &

relationships between them

131 Ability to define persons which should include

personnel information, work assignment , basic pay,

address etc. in respect to Mr. X , Mr. Y , Mrs. Z etc.

132 Ability to match an employee with a job position and also

allow for an employee to occupy more than one job

position concurrently

Career Development

133 Ability to maintain staff career path and identify potential

candidates for certain key positions

134 Ability to maintain staff list identified for succession

planning

135 Ability to identify key positions and the availability of

position

136 Ability to perform a needs analysis & manpower forecast

Time Management

137 Ability to capture employee attendance and absence

138 Ability to capture number of days worked

139 Ability to capture number of days sick

140 Ability to capture number of hours of overtime work

141 Ability to capture number of days on EL/HPL/EOL/LND

etc.

142 Ability to capture number of days worked

143 Ability to capture details of leave encashment

144 Ability to have a calendar facility which keep track of all

public holidays and is integrated with work schedule

145 Ability to capture employee attendance information in

period with following events, but should not limited to:

146 Training outside client

147 Seminar/ Meeting/ Workshop at provincial areas or

abroad

148 Ability to analyze employee attendance and absence

149 Ability to produce attendance reports on a daily

basis for every employee

Leave Administration

150 Ability to capture, maintain and monitor all leave

transactions based on user defined leave types

151 Ability to maintain a coded table of all leave types and

leave entitlements for the different categories of

employees

152 Ability to provide a facility for manual and electronic

application and approval of leave

153 Ability to route the electronic leave application to the right

person for approval / cancellation via workflow

154 Ability to record transactions for the different types of

leave, leave accrued and calculate entitlements for the

leave types

155 Ability to provide a facility to add in new types of leave,

amend and delete existing leave types

156 Ability to define unlimited number of leave types

157 Ability to process and update leave record, check for

duplicate leave applications and verify against leave

balance or entitlement for an employee for that type of

leave

158 Ability to automatically warn and display message for

employee's leave balance or entitlement when their leave

balance almost reach

159 Ability to provide for the automatic transfer of leave details

to affect the processing of payroll

160 Ability to automatically identify employees who have

excess of leave balance for the year

161 Ability to facilitate the calculation of leave encashment

162 Ability to allow for leave balance to be carried over

automatically if the entitlements for the year is not

exhausted

163 Ability to carry forward maximum number of balance

leaves

Benefits and Claims

164 Ability to provide the facility to capture, compute, maintain

and monitor employee’s benefits e.g. car loan, house loan,

etc.

165 There should be on-line and batch update facilities for

checking, editing and updating of these benefits

166 Ability to record loan benefits details for client

167 Record/ add/ change loan type, loan data etc.

168 Check historical data/ qualifications and rights of

requested employees

169 Record/ compute the details of each type of loan

170 Check loan status of each requested employee

171 Transfer loan information in text file/ Excel/ Word

processing

172 Compute installment and interest if employee pay partial or

before due date

173 Search loan payment of each employee

174 Link to Payroll module to deduct loan interest amount from

his/her salary in each month

175 Generate or link to Word processing to issue annual loan

interest letter

176 Summarize advance to employee and receivable from

employee loan separate by department / division

177 Generate various reporting format

178 Ability to check refund and balance of management car's

loan on-line and real time

179 For cremation fund, the system shall be able to

180 Compute to pay cremation fund to deformed members or

pass away member

181 Generate on line report at various format

182 Transfer cremation fund information in text file/ Excel/

Word processing

183 For medical benefits, the system shall be able to

184 Check client policies

185 Check employees' rights

186 Manage internal medical benefits that covering client

employees and their family

187 Details of all hospitals where client has tied up for

treatment like contact number, location, address etc.

188 Manage the medical costs claimed by employee

189 Ability to set maximum amount to be claimed

190 Link to Payroll module to deduct amount exceed the

maximum claim allowed.

191 Generate various reporting format

192 Ability to maintain a history of all medical costs incurred for

purposes of statistics and analysis.

193 Ability to track medical benefits in details by employees

group

194 Ability to automatically warn the physical check up period

in each period to all employee

195 Ability to capture medical check up cost

196 Ability to provide the facility to capture claims submitted by

employees for reimbursements to be made

197 Ability to capture official tour related details like travel

request, travel plans, travel approval, travel expense

statement & its reimbursement, LTC, travel administration

& travel calendar for individual employees

198 Ability to have on-line report generation facilities based on

user defined criteria

Training

199 Ability to identify the required training (internal/external) for

selected staff and maintain individual staff training

information and training courses available

200 Ability to store historical training record form the day

employee hired and should be date sensitive

201 Ability to match up the position requirement and employee

qualification. When the gap is occur, system should

automatic list the training course

202 Ability to provide function to check condition in training

course, such as

203 prohibit employee who apply the course that have

already trained

204 prohibit employee who apply 2 or more courses at

same time

205 Ability to generate Training Need Analysis and succession

plan report

206 Ability to link data from performance appraisal, promotion

and transfer to trigger the suitable training course

207 Ability to allow the administration department to view

the historical training record, existing training course and

able to book the training course

208 Ability to inquire on training courses attended by staff

209 Ability to inquire on training courses available for staff

via an online training directory

210 Ability to capture comprehensive data on training courses

attended by staff, but should not limited to:

211 Date

212 Place

213 Instructor

214 Training score

215 Others.

216 Ability to maintain course and instructor feedback from the

participants

217 Ability to scan training documentation, instructor feedback

218 Ability to warn attendance in training course via workflow,

e-mail before training date

219 Ability to create user-defined reports without the need for

technical skills

220 Ability to integrate training module with personnel

development, personnel administration, organizational

management and performance appraisal system

221 Ability to record day to day activities

Self Service (Employee / Manager)

222 Capability to empower employees to enter the

data/view/edit pre- defined data on self

E.g. up dations of personal records like Bank details,

marital status, record/change nomination etc. and leave

balance, leave status (Cannot be modified), Salary

details, liabilities, declare investment for IT returns,

Property returns, Lease data, Medical & Entertainment etc.

223 Capability of providing functionality to the employees of a

bill payment system which would also include

reimbursements. This would have features for

submission, tracking, approval and credit/debit the

account, for receiving of physical proof/bills; there should

be provision.

224 Capability to remind the employee through self service/e-

mail/SMS

regarding modification or requirement of additional data

225 Capability to provide links to the important items hosted in

various in-house websites/intranet e.g. important circulars/

instructions/ policy documents etc.

226 Capability to provide projection features for viewing

projections on

Income Tax liability, terminal benefits etc.

227 Capability to approve leave, bill payments, loans etc for

employees reporting to Superior

228 Capability to apply for or cancel any kind of leave on-line,

submit self appraisal, generate reminders for those

working under him/her who have not submitted the A&L/

Self Appraisal, (also covered under respective heads)

229 Capability of compiling on-line appraisal/ performance

report, review and approve

230 The system should send the employee confirmations after

changes are made online

231 The system should allow the user customize the menus

232 The system should provide immediate updates to the

core HRMS

database when data changes complete the workflow cycle.

233 The system should Provide workflows. Accommodates

multiple levels of review and approval

234 The System should provide the capability to create new

self-service transactions as and when required.

235 The system should allow the manager to Provide

access to staff performance review information (Linked to

point no. 7)

236 The system should allow the manager to conduct

performance appraisals.

237 The system should Enable managers to recommend job

change actions (promotion, demotion, etc.)

238 The system should Provide employee performance

history.

239 The system should Provide appraisal forms, performance

plan templates and employee performance plans.

240 The system should Provide access to staff training

information.

241 The system should Enable managers to review staff

training history.

242 The system should Enable managers to approve training

enrollments.

243 The system should Accommodate multiple levels of review

and approval.

244 The system should Provide immediate updates to the

core HR/payroll database when data changes complete

the workflow cycle.

245 The system should Provide an audit trail.

246 The system should give managers the ability to create and

save their own custom reports?

247 The system should allow managers to view their direct

reports as well as drill down to lower levels under their

area of responsibility?

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

Administration Requirements

1 General Requirements

2 Ability to record details of empanelment of

contractors and their performance assessment

3 Ability to record details of supervision of works of

House Keeping, running & maintenance of office vehicles

4 Ability to record details of procurement of office furniture,

stationeries

5 Ability to record details of empanelment of various service

Agencies

6 Ability to record details of disciplinary cases

7 Ability to record daily details for Vehicle management

for recording expenditure AND MONITORING OF THE

LOGS

8 Special references like VIP

9 Public Grievances

10 Ability to record details related to public grievances

11 Ability to send auto generated acknowledgement to

concerned person by email for public grievances

12 Ability to record details like serial number, date of receipt,

date of reply , date of dispatch , concerned department /

division / section , subject, concerned nodal officer, others

(user defined)

13 Ability to generate reports date wise, week wise,

month wise, nodal officer wise, division wise related to

public grievances

14 Ability to check the status of public grievances references

15 Ability to generate list of outstanding public grievances

16 Ability to notify relevant people in client for public

grievances via workflow and email/ intranet

17 Ability to have a user-friendly reporting/query tools that can

extract data and produced in various reporting format

18 Ability to record details of Telephone, fax, photocopier

19 Ability to record details of dispatch & courier

20 Ability to record details of purchase of Office

furniture, equipment, general stationery, printing, crockery

etc. through proper procedures & placement of orders

21 Ability to record details of AMC of various items e.g.

computers, fax machines, Photostat machine etc.

22 Ability to record Payment details to Vendors

23 Ability to keep proper record of the client assets

24 Ability to record maintenance details of the Office

Premises

25 Ability to record details related to reservations / bookings

of air, train tickets from the approved travel agencies

26 Ability to record monitoring/booking details of hired

vehicles

27 Ability to record maintenance details of client owned

offices

28 Group Insurance

29 Ability to record details related to policy

30 Ability to categorize employee (gazetted, non gazetted)

31 Ability to update details related to insurance matters

32 Ability to integrate with Human resource, payroll,

manpower planning & other modules

33 Ability to generate reports on addition / deletion of

manpower indicating date of birth, place of posting ,

designation, date of joining, date of relieving

34 Ability to generate visitor information report through

integration with visitor management software

35 Ability to record & generate contract employee register

36 Ability to capture the requirement of the staff for getting

the I-cards and visiting cards requirement

37 Ability to capture the details related to security related

expenditure

Legal General Requirements

38 Manage all the relevant constituents and parties involved

in a case.

39 Efficiently manage the process, path and milestones

as the case progresses to outcome

40 Allow multiple channel access to those managing the case

and provide information to those named in the case

41 Manage all types of documentation associated with the

case

42 Manage all types of correspondence associated with the

case

43 Manage all interaction associated with the case including

the Legal Case

History

Advocate Database/ Panel Composition

44 The system should maintain the complete information of

all the lawyers who are empanelled with client in a specific

template in the application including the type of services

rendered by the lawyers.

45 It should create and rank approved lawyer list by Region,

Specialization, and Courts etc.

46 The system should maintain also a list of lawyers who are

blacklisted by

client and ensure that no cases are taken by the

blacklisted lawyers

47 Details of the retainer ship agreements between client and

a Lawyer/ Law Firm should be maintained in the system

for providing all details pertaining to the Fees etc,

including any conditions imposed by the lawyer. For

e.g. minimum number of sittings that a lawyer may ask for

a particular case, travel, boarding and lodging charges etc.

48 The system should maintain a complete data of the lawyer/

law firm’s performance based on the past cases data.

Case Information Management

49 The system must provide a centralized repository of all

cases related information, which is available to users

based on their role in the organization.

50 The centralized repository should allow categorization of

cases (Active/ Inactive) for future references.

51 The solution should provide search capability to search

through structure and unstructured content in the

repository

52 System should have ability to publish most frequent areas

of disputes and possible resolutions. Appropriate approval

flows should be built into publishes such content.

53 The system must allow users to share sensitive

information and allow users to access only those

information based on their role that they need to perform

their tasks

54 The system should provide for a robust capability for

organizations to define, organize, and capture an unlimited

number of custom attributes related to cases using a

Framework.

55 The system should allow user to use the custom attributes

to capture information across all cases or cases of a

specific type as well as be used as criteria when searching

for cases.

56 The system should allow for attachments related to cases

and the same should be available.

57 The system should also provide tools to client allowing

them to access variety of information repositories, and to

outcomes in previous cases to ensure efficient and

consistent case management.

58 The system should provide the facility to generate

automatic notifications for critical milestones in the case

like court hearing etc.

Associated Parties

59 The system should provide a core functionality that

allows users to manage all individuals and organizations

associated with a unique case and identify the role each of

them assumes in the context of a particular case.

60 The above information should be consolidated into a single

view to give agents a powerful tool to instantaneously

ascertain all the parties involved into a particular case,

what role each party assumes, and the contact point of

these parties if applicable

61 An efficient search and create capability for parties

associated to a case. It must enable agents to search for

existing parties in the master data and to quickly create

them if they do not already exist.

62 The ability to define and maintain custom

attributes for parties associated with a case.

63 The ability to view only the active parties associated with a

case and to filter- associated parties by logical groupings.

Case Assignment

64 The system should allow for multiple parties such as client

specialists, and client management reviewers to work on a

case at various points in a case lifecycle.

65 The system should provide configurable business rules to

generate task assignments associated to a given case

to ensure the appropriate people or groups get involved

in the case resolution process.

66 The system should provide automated business process

flows and a notifications framework to ensure all

parties involved in a case participate in the case

management process and are updated in a timely fashion.

Case Workflows

67 The Case Management solution should complement its

case-centric workflows with a party-centric business

process model typical of investigative work methods.

68 The system should allow for Caseworkers to receive

information and conduct ongoing research related to

persons and organizations outside the context of a specific

case.

69 The system should provide business flows that enable

caseworkers to efficiently perform this party-centric,

investigative casework.

Case Reporting

70 The Case Reporting tool must provide the ability to

generate reports in HTML or PDF format using Open

standard based XML Publisher.

71 The system should also provide for an RTF template and a

seeded data definition provided out-of-the-box, enable

users to define reports that meet their business

requirements.

Case Worker User Interface and Flexible Layout

72 An intuitive and easy to use HTML user interface is

provided to support the involved work methods and broad

information requirements of caseworkers.

73 The application should be designed to streamline case

management business processes and to improve the

effectiveness and productivity of caseworkers with a

comprehensive set of information that can be shared

across multiple departments and agencies

74 The solution must provide the flexibility to configure

the application according to the needs of different users,

case processes and agencies.

75 The User Interface should optimize the presentation of

case information

76 The business flow-based design must enable the efficient

management of complex cases.

Case Data Management

77 The system should provide an integrated data quality

management module to ensure data consistency.

78 It must provide users with consistent data and accurate

information thus preventing the creation of duplicate

records. This is required to enhance user’s investigative

effectiveness by enabling “Fuzzy” searches that do not

limit search results to exact matches.

Lawyers Contracts

79 The application should create contracts with lawyers

for services including those services which have payment

terms

80 Incorporate progress payment schedule into the

services agreement/ contract

81 Should be able to maintain a rate agreement with each

individual lawyer and a provision for capturing the scanned

copy of the retainer ship agreement along with the rate

agreement should be available in the application.

82 The application should maintain all the details of the

lawyers including License no, PAN No, address and all the

necessary details to execute retainer ship letters and

payments to the lawyers.

Payment to Lawyers

83 All the payments to lawyers involved with the legal

department would be made through the Accounts

Payable module of the Financials application.

84 The application should ensure that timely payments are

made to the lawyers within their agreed contractual

timeframes and any deviations/ exceptions reports should

be automatically generated for the top management.

85 The application should give details of the payment details

to be made to the lawyer within their agreed

contractual timeframes and any deviations/ exceptions

reports should be automatically generated for the top

management

86 The application should have the ability to apply refresher

charges for complex cases.

Other General Requirements

87 Off The Shelf – client will use Off The Shelf Court Case

Management System which has inbuilt out of the box

integration to other modules like Financials, Purchase,

HRMS etc

88 Flexibility – client will encourage flexible design by

fostering configurability instead of “coding”;

89 Efficiency – client will develop and deploy systems that are

efficient and intuitive to use;

90 Compliance - client will build and deploy business

processes and systems that adhere to the government

guidelines and legislation (security, privacy, archive,

financial safety);

91 Open and Industry Standards – client’s preference is to

build systems utilizing either open or industry standards

that enable integration within our environment;

92 Integrity – all business processes and solutions must

enable the improvement of information integrity.

93 Minimal Application Diversity - Leverage the

current application investments as much as possible.

94 Ability to generate reports as per user defined formats

95 Ability to handle Arbitration Requirement

96 Should be able to define the contracts under various

heads based upon the funding & type of model used for

implementation of the contract

97 Should be able to define various stages of the arbitration

process along with the relevant dates and other details like

Eligibility of Members, date of commencement,

manner of entry on the reference by the Members and

their resignation; obligation of the Members, the Employer

and the Contractor , terms of payment

98 Should be able to forward the case to the users /

committee / concerned parties for review / acceptance /

rejection before a stipulated time period

99 Should be able to create committees like Dispute

Review Board / Dispute Review Expert defining the roles

of the members along with their tenure and other relevant

details

100 Should be able to define the expenses incurred during

various stages of the arbitration process

101 Should be able to create a case number if the arbitration

results in court settlement showing the history of all

processes and case details

102 Should provide notifications based upon the dates on

which the concerned arbitrage activities (like travelling ,

decisions etc) should have been completed by the

concerned parties

103 Should allow to updation / addition / deletion of stay orders

against each case

104 Should be able to handle different type of cases such as

Arbitration, Writ petitions, Land Acquisition cases, Civil

Contract Case, Criminal Cases and Central Administrative

Tribunal (CAT)

105 The application should handle all legal cases & notices for

and against client

106 Current month's cases and should allow the user to view

last month’s calendar also

107 Allow multiple channel access to those managing the case

and provide information to those named in the case

108 The owner on logging should be able to should be able to

watch the unread remarks on home page pertaining to a

case. The remarks should be otherwise visible in the case

document

109 Should allow linking a case to an already existing case for

cases which move from one court to another

110 Should allow assigning IPC acts and section to a case.

111 It should be integrated with emailing setup of client so

that effective email alerts can be sent at each step.

112 The Case Reporting tool must provide the ability to

generate reports in

HTML ,PDF / excel format using Open standard based

XML Publisher

113 It should have options to handle different advises given by

Legal Cell on Contractual matters

114 It should maintain data banks of historical judgments

General Requirements

115 Able to define assets at all levels such as item

category, vendor, employee, Group asset (main and

components), Asset class/subclass (Group asset belongs

to an asset class), Asset type , Asset register, other user

defined

116 Ability to assign an asset to a specific unit/dept./HQ

Asset Master Data Maintenance

117 Able to maintain the following information in the Asset

master, but should not be limited to:

118 Asset Serial number

119 Client number

120 Group asset number

121 General information (e.g. description, make/model,

quantity, acquisition date, owner unit, using unit)

122 Posting information (e.g. asset expiry date)

123 General ledger account assignment by

accumulated depreciation, Depreciation, Gain/ loss on

disposal, Revaluation,

124 Information on the origin of the asset (vendor

information e.g. serial number)

125 Purchasing information (e.g. vendor number, P.O. No.)

126 Physical inventory data – both movable and immovable

items

127 Budget Head (e.g. budget reference number)

128 Insurance data/ warranty

129 Depreciation data – asset useful lives, useful date,

residual value, depreciation method

130 Asset location

131 Asset class/subclass

132 Asset type

133 Remarks

Asset Management system - Requirements

134 Responsible unit (e.g. HQ, PIU, CMU, Department,

division)

135 Usage

136 Quantity

137 Unit of measurement

138 Description/ additional information

139 Acquisition method

140 Ability to create Asset Master both manually &

automatically

141 Ability to automatically post from Asset Database to other

system

142 Ability to make changes in master record

143 Ability to deactivate master record (this should be

automatic upon retirement of asset)

144 Ability to delete master record, provided that there is no

posting was made to it

145 Ability to Block asset (to block further cost posting into

asset)

146 Ability to change location of asset

147 Ability to change in assignment of asset to asset class

148 Ability to change in asset useful lives

149 Ability to do mass changes to depreciation methods

150 Ability to do mass changes in depreciation rates

151 Ability to do mass changes in useful lives

152 Ability to do mass change in asset classification

153 Ability to do mass change in locations/ reporting units

154 Ability to provide audit trail for creation, amendments,

transfer and deletion for all asset group and sub groups.

Addition of Assets

155 Ability to automatically and manually allocate a unique

asset number upon creation of the asset master record.

156 Ability to allow for asset additions including acquisition

costs and dates, maintenance costs and dates, original

and extended useful life, mass additions

157 Ability to capitalize asset via Integration with Purchasing/

Inventory

158 Ability to record asset details upon receipt of asset (with

value), before invoice receipt

159 Ability to record asset details upon receipt of asset &

invoice

160 Ability to record asset details on moving item from

inventory

161 Ability to capitalize an addition or enhancement to an

existing asset in the current fiscal year

162 Ability to process a credit memo, which reduces the

acquisition and production costs of an asset

163 Ability to make subsequent corrections to the acquisition &

costs of a fixed asset.

164 Ability to update the acquisition transactions

automatically to the respective account codes in the

General Ledger

Transfer/ Splitting of Assets

165 Ability to move an asset, resulting in the need to change

asset master data that cannot be otherwise changed (e.g.

the asset class, main asset)

166 Ability to split up an asset or move part of an asset

(transfer between asset groups, sub asset group)

167 Ability to transfer between departments, division, PIU,

CMUs etc

168 Ability to transfer material from the inventory (current

assets) to a asset (for example, for a replacement part).

169 Ability to generate Gate Pass In details ( Gate Pass In

number(automatically), Gate Pass In time, Gate

Pass out time, purpose, vendor details, location,

description

170 Ability to generate Gate Pass Out details ( Gate Pass out

number(automatically), Gate Pass out date, Gate Pass

out time, return status (returnable/ non returnable), vendor

details, location, description

171 Ability to generate Good Received note (GRN) details (

GRN number(automatically), Purchase Order details,

Challan details, Rate , Quantity)

172 Ability to generate Purchase Order with details like

Purchase Order No. (automatically ), Purchase Order

Date, vendor details, payment mode, subject, delivery

details, payment terms & conditions, Tax details, client

Reference No.

173 Ability to generate Material issue slip with details like issue

slip number (automatically ), date, concerned

department/ division/ PIU/ CMU, location, category,

Date of transfer, Previous location, destination

location, Others (user defined)

174 Ability to calculate cost, accumulated depreciation and net

book values transferred

Asset Disposal/ Retirement

175 Ability to produce proposed asset listing based on user-

defined criteria (e.g. asset class, location). The listing

should contain the following information, but should not be

limited to:

176 General master data – location, description, make/

model, acquisition date

177 Asset history

178 Asset values (book value)

179 Ability to electronically route proposed disposal listing to

specific users for approval within the system.

180 Ability to capture disposal information such as:

181 Date of retirement

182 Cost, accumulated depreciation and net book values

written off

183 Gain/ loss on disposal

184 Reasons for retirement

185 Ability to perform the following within the Asset system:

186 Perform complete/ partial retirement

187 Provide simple method of retiring low value assets

188 Perform mass retirement

189 Capture cost of retirement (e.g. removal cost)

190 Ability to automatically calculate the gain or loss on

disposal (from the last calculation date to disposal date)

191 Ability to post automatically and manually to the

respective account codes in the General Ledger

192 Gain or loss on disposal

193 Capitalization cost

194 Accumulated depreciation

195 Depreciation

196 Ability to automatically determine the corresponding

depreciation charge for the partial disposal, based on any

of the following entries:

197 Amount of the acquisition costs being retired

198 Percentage rate

199 Quantity

200 Ability to manually amend the partial disposal amount

calculated by the system and then recalculate the

corresponding depreciation for posting to the General

Ledger

201 Ability to post automatically and manually to issue invoice

in the system

Depreciation of Assets

177 Ability to provide for various methods of depreciating an

asset, such as

Straight-line , others

178 Ability to define the commencement of depreciation

calculation for the automatic posting of depreciation to GL

179 Ability to maintain depreciation schedules for purposes of

accounting, taxation and budgeting and automatically

perform depreciation calculation for accounting and tax

purposes periodically

180 Ability to facilitate adjustment of depreciation of assets

prior and after updates to general ledger

181 Ability to automatically post to the corresponding

accumulated depreciation and depreciation expense

accounts in the General Ledger

182 Ability to provide at least daily basis of calculating

depreciation

183 Ability to comply calculating depreciation with accounting

standard and tax regulation

Revaluation of Assets

184 Ability to capture the following information:

185 Revaluation amount

186 Revaluation date

187 Revaluation method

188 Valuers’ reference

189 Computation of revaluation surplus/ deficit and

diminution

190 Ability to keep the original asset cost details

separated from the revaluated amounts and a history of

revaluation for each asset over time

191 Ability to provide for recalculations of depreciation

expense.

192 Ability to automatically post revaluation transaction to

update relevant accounts in the General Ledger

(allowance for revaluation (surplus/deficit), allowance for

diminution)

Physical inventory of Asset by different head wise

193 Ability to print asset listing for physical count based on

client defined criteria. The following information should be

generate for each asset and verified with physical stock

taking:

194 Client number

195 Serial number

196 Subunit (IT/ HR / Admin/ Engg./ Finance / Others (user

defined) of client

197 Location

198 Asset class / Asset category

199 Date

200 Retirement date with (asset ID, asset Class, asset

description, location, quantity, value)

201 Ability to capture physical count manually and

automatically via data upload (e.g. spreadsheet)

202 Ability to process the results of the inventory manually and

automatically by:

203 Making comparison with information in the database

204 Retiring the asset if asset is confirmed missing

205 Change location if asset has changed location

206 Enter the inventory date in the assets counted and

assets identified as missing

207 Ability to capture the following information for all types of

adjustments such as:

208 Date of adjustment

209 Cost, accumulated depreciation and net book values

adjusted

210 Adjustment reference document (if any) and

authorization

211 Ability to manually and automatically adjust the acquisition

cost and corresponding depreciation for the missing

assets to the General Ledger upon update of Asset

system.

Integration

212 Ability to provide for automatic integration with General

Ledger, Budget, including the following capability:

213 Automatic posting to G/L account

214 Drill-back capability to Invoice, Purchase Order etc

215 Ability to integrate with current legacy system

such as Asset

Management system

Reporting and Enquiry

216 Ability to display asset description at individual asset level,

summarized levels and by particular asset

217 Ability to provide drill-down from asset descriptive details

to:

218 Balances

219 Depreciation

220 GL account code

221 Ability to provide asset information via screen and

print report, but should not be limited to:

222 By date, year

223 By type of transaction

224 By asset location

225 By asset class

226 By vendor wise

227 By floor wise

228 By department wise

229 By client specified rules

230 Ability to produce reports for various reporting, flexible

report writing tools and on-line enquiry facilities for (but

should not limited) to the following:

231 Financial reporting

232 Management reporting

233 Ability to generate standard reports but not be limited

to:

234 Assets at gross separately from accumulated

depreciation – for period and year-to-date

235 Asset master at summary and detail level

236 Asset additions

237 Asset retirements

238 Asset valuation–gross asset values, accumulated

depreciation

239 Assets head wise

240 Assets by acquisition method

241 Depreciation expense

242 Depreciation forecast

243 GL posting summary

244 Assets not found at location

245 Asset found at location other than assigned in asset

record

246 User wise issue slip

247 stock in hand

248 Asset Transaction report

249 List of infrastructure by (IT/ HR / Admin / finance/ Others)

250 Floor wise asset issued in client HQ

251 Division wise

252 Consolidated report

253 Department wise asset report

254 Disposable item report

255 Stock transfer report

256 Gate Pass report

257 Vendor wise report

258 Others (user defined)

259 Ability to provide ad hoc listings (screen and/or printed)

based on user defined specifications such as (but not

limited to):

260 Select and sort by asset category

261 Select and sort by asset class

262 Select or exclude fully depreciated assets

263 Select or exclude retired assets

264 Select by GL account codes

265 Select by client head wise

266 Select by asset status

267 Select by asset location

268 Select by asset life within asset register

269 Ability to provide reports that can analyze asset

information:

270 By HQ/ department wise

271 By time period

272 By client No., Serial No., asset type, department and

location.

273 By movement (such as addition, transfer or disposal) by

account, current month or year-to-date activity.

274 Ability to provide for complete asset history, for example:

275 Depreciation

276 Net book value and residual value for finance and tax

277 Remaining life

278 History transactions with line-item

279 Repair and maintenance tracking

280 Warranty claims and settlements tracking

281 Insurance claims and settlements tracking

282 Acquisition and retirement date.

Linear Asset Management

283 The system should Define group of assets and association

of unlimited user-defined attributes

284 System should keep track of various guarantees, defect

liability details for each class of asset.

285 All Linear assets should be geo-referenced and accessible

under a GIS user interface

286 System should be able to Map linear data such as

Repeated units, Land marks, Start, End, Length, and so

on.

287System should be able to represent and model assets that

extend for several kilometers with changing characteristics

and conditions requires modeling and management tools

to provide the specific functionalities to support and

manage these complex assets.

288 Linear assets will be managed in networks, connecting

assets together end-to-end as opposed to the hierarchical

structuring of assets.

289 System should be able to handle “ Dynamic segmentation”

of the Linear asset

290 The system should maintain the details about Asset

procurement, asset type, department name, quantity, cost,

procurement cost etc.

291 System should allow data capture for Linear Assets and

help in managing maintenance of the same

292 System should allow calculation of capitalization value of

Assets; both Asset Under Construction and Commissioned

Assets

293 The system should allow user to attach reference/ safety

procedure documents like CAD drawings, work documents

among others

294 The system should Assign unique ID to each asset

295 The system should setup the assets in a hierarchical

architecture so as to easily find and group assets

296 System should allow user to map Assets to CPM,

Department, office, contractor etc.

297 The system should have the facility to view the details of

assets across organization

298 System should track the utilization status of an asset

299 The system should support multiple asset locations with

flexibility of moving or transferring an asset to other

organization without losing the integrated attributes or

work history

300 System should be able to calculate depreciation for each

class of asset

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

Workflow - Requirement

1 Approvals workflow management must be an integrated

part of the ERP application.

2 Approvals workflow management must be applicable

across the ERP modules for client

3 The application should allow for devising simple or

complex rules to suite client specific requirements and

the rules should be stored in a central repository and the

same must be shared across all business processes.

4 The rules should work both at transaction header or

detailed line level in the application allowing for a fine level

of granularity on the approval process

5 The approval workflow management should allow for

a consistent method of defining business rules for

approvals across the entire client

6 Zero or bare minimum coding should be required when

defining approval policies.

7 If there is change in the in personnel or approval

authorities, or a change in the client policies, the approval

list should be updated on a real time dynamic basis and

should apply for live transactions, which are within the

approval process.

8 Track status of the document using author, id etc.

9 Audit trail should be available for the workflow approval

management system

10 Comments given by each reviewer to flow along with the

document at each approval stage

11 Ability to utilize workflow capabilities for routing, status,

visible view of workflow, approvals including approval

thresholds.

12 Ability to establish alternate work flows (if the requisition is

pending for five days at a level then it gets re-routed).

BI - Reporting

1 Generate Search Advanced Queries on any of the ERP

database attributes across the ERP database. Options to

choose the attributes to be displayed in the result and

export to excel in report forms. Ability to save search

queries for future.

2 Searching the database for past projects which are similar

in nature based on properties stored for the project in

ERP

3 Searching for properties of a WBS activity or deliverable

made in past for any project.

4 Capture attributes related to Lead, Proposal and Job and

relate ERP data related to Cost, resource and schedule for

generation of MIS reports

5 Should generate customized report by applying

mathematical calculations on the database values.

6 Report for similar items procured during other projects in

the organization, based on the parameters of search.

7 Should prepare overall performance evaluation report for

each project by displaying actual v/s controlled v/s

budgeted values for costs, efforts, schedules, profit and

cash flows

8 Project wise Times Schedule analysis - estimated v/s

actual, reasons for delay, corrective actions taken etc

9 Project wise Manpower Analysis - estimated v/s

consumption figures, reasons for overshoot

10 Project wise Cost Analysis - estimated v/s actual,

reasons for overshoot, corrective actions taken, salient

management recommendations on same

11 Project wise Financial analysis – Profits realized,

Financing charges expended, Forex outflow, cash and

fund flow, unpaid amounts/ bad debts, penalties incurred,

delays in payments

12 Manpower Resource availability v/s commitments –

Current and future projections – Department wise,

division wise, discipline wise, level wise and corporate

wise

13 Option to record key learning records as outcome of BI

analysis of ERP database records (cost reports, close out

reports, client feedback reports and room discussions)

14 Option to create Corporate Business plans (for projected

targets, revenues, orders, success factor)

15 Option to subcategorize Business plans (e.g. by Industry,

country, client and other such parameters)

16 Ability to perform simple filtering by manually selecting the

dimensional items during the course of analysis

17 Ability to perform simple filtering based on mathematical

expressions during the course of analysis

18 Ability to perform complex filtering by defining set

operations (union, intersect, minus) during the course of

analysis

19 Ability to perform complex filtering by defining sub queries

(filtering based on results of another query) during the

course of analysis

20 Ability to perform complex filtering by defining rank

operations (top/ bottom/ count/ percentage)

21 Ability to set up alerts to highlight numbers based on

threshold settings during the course of analysis

22 Ability to perform automatic sorting based on numbers,

alphabets, and dates or manually sort them during the

course of analysis

23 Users to be able to share their reports with individual users

or group of users easily internally within the reporting

environment via shared folders or externally outside of the

reporting environment via email and ftp sites

24 Users to be able to define totals and subtotals as well as

leverage on a library of functions to define additional

calculations during the course of analysis

25 Ability to print the reports and export them to other formats

26 Ability to incorporate changes in the reports through a

refresh

27 Ability to allow users to define information of the report for

other users to understand the report

28 Ability to save the input variables into scenarios to allow

them to compare scenario results

29 Ability to define the stakeholders and organize them into

organization chart, to define objectives and initiatives into

a strategy, to define and assign metrics as KPIs to the

strategies

30 Ability to add new customizable reports to the built in

reports of standard queries

31 Ability to perform pivoting to change the permutation of

any graph or table to view information in various

perspectives during the course of analysis

32 Ability to drill down on any graph or table to view the

detailed breakdown on any value during the course of

analysis

33 Ability to base the drill down path on business hierarchies

that are not necessarily organized in the same manner as

with the physical representation in the database. Users to

be able to select a drill down path of choice

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

CRM Requirements

Complaint Management System

Register Complaints

1 Ability to receive customer complaints online

2 Ability to register Customer Complaints received through

local offices, customer care centres, email, online form

3 Ability to record at least following complaint information:

customer name, date of complaint, type of complaint,

resolution, status

4 Ability to generate unique complaint number

5 Track and Manage Complaints

6 Ability to categorize complaints into pre-defined groups

7 Ability to assign and notify receipt of complaint to

concerned officer through email and SMS

8 Ability to maintain FAQs and support requests database

9 Ability to monitor complaint status

10 Ability to update customer record with the complaint

resolution, if required

11 Ability to receive customer complaints through email and

to notify receipt of complaint to customer through email

and SMS

12 Ability to research customer queries through payment,

billing and usage history

13 Ability to respond to customer information requests

14 Ability to define various types of complaints to be

responded to related complaints

15 Ability to set up a tiered structure for complaints escalation

up to senior levels

16 Ability to generate work order through work order

management module wherever required

17 Ability to perform full and partial search by all available

fields like type, source or status of complaint

18 Ability to capture customer charter related to response

time for complaints and track the same and generate

exception reports

General

Integration

19 Ability to integrate the CRM application to other ERP

Modules

Reporting Requirements

20 Ability to generate customer reports based on various

parameters like customer type, inactive customers, special

customers etc

21 Ability to generate reports from customer master

based on territory or area

22 Ability to generate statistical reports on customers

based on billing history, complaints history, transaction

history and basic customer information

23 Ability to generate customer profiles and segmentation

reports based on various parameters

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

General requirements of the IT Infrastructure

1 The solution should be highly scalable and capable of

delivering high performance as & when transaction

volumes/ users increases without compromising on the

response time

2 All components of the IT Infrastructure should be

based on standards to avoid compatibility issues

3 The IT Infrastructure should have ability to withstand all

single point of failure

4 The IT Infrastructure should support the use of fault

tolerant multiprocessor architecture & cluster processing

5 The IT Infrastructure should support auto-switching to

available server in case of server failure

6 The IT Infrastructure should support centralized

processing

7 The IT Infrastructure should support load balancing

8 It should be possible to configure data replication

synchronously or asynchronously

9 The solution proposed should include servers with latest

CPU architecture offered by the hardware provider

10 The solution should provide for development of mobile

applications for all leading handheld/mobile devices like

Apple Ipad/iphone, Android/Microsoft Phones for all major

modules such as Project Management, Financial

Management , Contract Management , HRM.

11 The IT infrastructure should support, Windows XP,

Windows 7, Windows 8.1, OS X, Mac OS X 10 and Linux

12 The development infrastructure in the proposed solution

will be needed to support ongoing development/upgrade

needs during and post implementation.

13 The Quality Assurance infrastructure in the proposed

solution will be needed for conducting tests and trainings

during and post implementation

14 The database licenses should be provided as full use

licenses to cater to the current requirement of ERP

application and any customization under this contrac

General Requirements of the ERP application

15 The solution should support N-tier architecture

16 The solution should support Thin client

17 The solution shall run on native browser with additional

plug in's that should be freely downloadable and should

support at the minimum MS IE, Firefox Mozilla and Google

Chrome

18 User Interface should require only standards compliant

browsers with standard support for Javascript and HTML.

Full fledged functionality of ERP should be accessible

through standard browser without any additional software

installation.

19 The solution should perform all functions with keyboard

support (mouse is not mandatory)

20 The proposed solution should have the following operating

flexibility;

a) Accommodate multiple levels of Organization structure

b) Multiple financial years processing capabilities

c) To modify and reorganize all menus

d) Multi-user logging in remote location

e) Facility for rearranging labels & fields of screens &

deleting fields, which are not required by users

f) Open work group environment where users can access

same information at the same time

21 The ERP system shall display all reports with only subtitles

in bi-lingual language i.e. Marathi and English. However

the data entry shall happen in English only

Globalization

22 The solution should support multi-location

23 The solution should support multi- time zone

Modularity

24 The solution will initially be required to cover a range of

business process modules as detailed in the RFP, but

it should allow addition of more modules or more users in

any module as and when required. The solution proposed

should be able to integrate with

solutions/products/applications on Open standards

Flexibility

25 The solution should be adaptable to changing

practices of client & in case need arise to customize to

specific needs, it should be possible to do the same in the

form of add-ons and routines that can be

plugged/unplugged from the base product as the situation

arises

Data Model

26 The solution should use a single unified data model hosted

on the database

27 Data redundancy across modules must be minimized to

eliminate real time synchronization needs

Integration & Interfacing

28 The solution shall provide application architecture which

can be integrated with third party/ legacy

applications using a middleware technology (The

Bidders should provide a list of middleware which are

compatible with the proposed solution)

29 The solution should be remote access integration

compatible for remote operation of System

administration, Security Management & Diagnostics/

Fine tuning tools

30 The solution should support traditional integration

a) Bulk load of flat files

b) Application Programming Interface (API) based

integration

c) Message based integration

31 The solution should support modern integration

32 Bulk Load of Flat Files

data is loaded into the package tables

have produced errors and should not load any rows from

the flat file

33 Should support standard transport protocols like http,

https, ftp, ftps, imap and smtp

34 The ERP should include a catalogue/directory of all the

interfaces available for integration

35 Integration based on open standards based platform like

SOA

36 Should support sustainable integrations that survive

upgrades

37 Messaging based integration

38 Should support guaranteed, delivery of messages

39 Should use XML based messages

40 Should support standard transport protocols like http,

https, ftp, ftps, imap and smtp

41 Event based Integration

42 The package should provide event based semaphores

43 setup subscriptions/actions on the semaphores to Launch

other programs in the package, Launch workflows in the

package, Send messages to other applications using

messaging based integration, Launch external processes

using the BPEL and SOA architecture for pan- application

process orchestration

44 The semaphores must provide details of the event for

subscribing processes

45 BPEL based Integration

46 Should support a drag and drop GUI based process

modeler for

47 Should be able to orchestrate process flows that are

external to the integrated packages

48 Should support both synchronous and asynchronous

integration flows

Data Migration

49 The solution should have automatic way of migrating the

data of existing database in case of data structure

change during transfer to new versions

50 The solution should support export and import of data

possible from different legacy systems/ other systems/

databases in different file formats (Text, Excel, MS-Word,

XML) & on specified time intervals

Data Validation

51 It should have the ability to assign validation on specific

fields based on entries in the data validation reference file

Security

52 The application should support SSL & digital certificate

53 The solution should be capable of providing Authorization

by the transaction type, User Name, User Role

54 The solution should be capable of providing One user

multiple roles and vice versa

55 The solution should be capable of providing automatic

timeout for transaction entry

56 The solution should be capable of providing automatic

timeout for user (log out)

57 The solution should be capable of providing Time

restriction on transaction

58 The solution should support password encryption while

passing on wire

59 Ability to allow definition of rules for password composition

and password encryption as per MoRT&H and client's IT

policy

60 System should support configurable password policies

including

a) Password expiry

b) Password complexity

c) Password history and reuse policy

d) Forced password change on first log on

61 Ability to configure the number of permissible log-in

attempts.

62 Ability to handle data updation/deletion/creation only

through application layer

63 Session limits must exist for the application. For each

session type, there must be limits on the number of

sessions per user or process ID and the maximum time

length of an idle session

64 The solution must not enable users to circumvent the

intended user interface to access resources in its

supporting infrastructure

65 Ability of system to display an appropriate warning

message upon user logon. The warning message need

not include the following four general elements verbatim

but must convey the same meaning:-

a) Use of application constitutes the user's consent to

monitoring.

b) Use of application is limited to official Login use only.

c) Unauthorized use is subject to prosecution.

d) Notice that this is a Login system

66 Ability to provide automatic time out for entry transaction

67 Should not require opening of any special

protocols for connecting the user client to the web/

application server. All communication should be on HTTP

or HTTPs

68 The database should be certified at EAL4 level for security

69 The database should support role based access

control, user based privileges

70 The database should support password management

mechanism with expirable passwords and password

management.

71 The database should support the resource allocated to the

per user session.

72 The database should support standalone /

integrate with Operating system security.

73 The system should have the option to encrypt data

before transferring over a network.

74 The system should have the option to encrypt the data

stored in the database.

User Access Management

75 The system must have proper security and maintenance

facility which limits access to the system and its various

functions to the users delegated with appropriate authority.

to authorized users.

and time of all transactions with details of creation,

reading, updating, deletion or printing.

program, module, transaction, etc.

attempted access and record in a log with reporting.

module owners, administrator level.

76 The solution should have a business role management

solution integrated with the user management solution

77 The solution should have the ability to integrate with

directory services for authentication and authorization and

support the following features

78 Support of LDAP (Lightweight Directory Access Protocol)

to allow systems access to the directory

79 The system should provide capabilities to receive inputs

from Human resource management system with respect to

user information: In order to get all the user data into the

provisioning tool without manually recreating them, it must

be possible to get the data and then the subsequent

changes from a trusted data source. Most probably such

a store with integrity will be the HRMS solution. Hence

the provisioning tool must have an option to accept a feed

from such systems

80 Ability to support role based access control

81 The system should provide capabilities to define “Time

based Actions” so that enable, disable and delete actions

can be driven by date attributes: In any organization a user

might be need to play a designated role for a specific

known period of time. In such scenarios the tool must

provide capabilities for time based actions so that the

user can be provisioned / de-provisioned based on date

attributes

82 Ability to provide access level security for Entry forms at

Field level - allow, Read only, Hide

83 Ability providing access level security for Entry

forms at

Transaction level - allow / deny

84 Allow providing access level security for reports at Field

level - show / hide

85 Allow providing access level security for reports at

Transaction level - allow / deny

86 Users should not be allowed to access the database

directly

87 Ability to provide authorization by user name

88 Centralized repository of all identification and access

control data

89 The solution should have the ability to support

multi-tier authentication where required

90 The solution should have the ability to assign activities to

roles, and map roles to users

91 The solution should have the ability to provide user and

user group authorization administration tool to assign

security levels to functions and data, and allow the access

by users / by groups with valid security level only

92 The solution should have the ability to restrict users from

unauthorized access by allowing only the authorized users

with valid profile/password to access only the allowed

transaction, as well as be capable of logging off

unauthorized users

93 The solution should have the ability to provide multi-level

access management. The following should be provided:-

a) User identification;

b) Limitation of user rights to perform operations;

c) Data confidentiality provision;

d) User actions audit and protocols.

94 Ability of system to support the following under user

account management

a) Unique user IDs

b) Disabling of inactive user IDs

95 Supplier is expected to provide Single sign on from the

proposed intranet portal of client, so that user once logged

into the intranet portal need not log in to the individual

applications including email again. However the ERP log in

can be separate considering that ERP access will not be

given to all users of other applications.

System Control & Audit

96 The system should be able to define audit trails, audit logs

and transaction logging requirements (what, when, who

has changed)

97 It should enable audit trails on-line, tailor audit

requirements by modules, call audit records to an archive

based on date or other recorded audit details. The system

should allow recovery of data in case of hardware failure

and data corruption. It should be able to perform recovery

to a point of time, to known backup database

98 The system shall ensure that the audit files are stored in

un- editable formats

99 The system should support audit trails at the data level.

The basic audit details like the user name, date and time ,

operation performed (update or insert) for each transaction

should be available easily , without having to run queries

or reports

100 It should be possible to track database superuser

activity in operating system files

101 The solution should be capable of providing Audit Trail:

Audit trail of Time Stamp & User ID stamp for the following

102 All changes to data should be recorded in a separate table

and should be stamped with the identity of the

user/program and the time of the creation/change

103 Views should be available for reporting on data changes

104 It should be possible to audit users at the form level, user

level, application module level and at the organizational

role level

105 The system should provide reports on user activity based

on the role and the application that was used

106 The system should support for auditing to track and

monitor user behavior with details about the level of

detailing stored by the system and ability to reverse

changes

107 Audit system should be centralized, secured and should

provide detail insight in audit data (who did what, to what

data and when)

108 Audit system should enforce separation of duties

between auditors and administrator

109 Auditor's should have direct access to the audit system to

view audit reports and should be able create custom

reports

110 Should capture before / after values from transaction logs

and raise alert on critical and suspicious activity

111 The system should have the ability to identify users that

have exploited access privileges, identify root causes of

conflicts and be capable of interrogating the security log

Network

112 The solution should support TCP/ IP, HTTP & HTTPs

for all traffic between the user screens & the system

113 The solution should support the following network types

a) LAN & WAN

b) Leased Lines

c) ASDL lines

d) Mobile data service network (GPRS, 3G, 4G)

e) MPLS based networks

f) VPNs

Offline Solutions

114 Some of the key functionalities especially input forms

should be available in offline format so that users can

download, fill the data and upload when necessary.

115 These limited functionalities should also be available on

handheld devices where the users should be able to feed

the data and allow the solution to synchronize when the

connectivity returns.

116 User friendly (xl ) formats for upload of information to the

ERP should be available. This will be required to support

the upload of data collected in the offline mode.

117 System should have ability to provide offline forms or

offline applications for handheld devices

118 offline forms or offline applications for handheld devices

should have the ability to work by allowing users to enter

the data when the communication is down

119 Offline forms or offline applications for handheld devices

should have the ability to synchronize data automatically

whenever communication becomes available

120 Offline forms or offline applications for handheld devices

should support selected business and validation logic

121 The Offline forms or offline applications for handheld

should have local data to carry out data validations

122 The offline applications on handheld devices should

support Data Synchronization

123 The Offline Application on handheld devices should

support the following :

a) Local data encryption should be supported on the offline

handheld device

b) Encrypted data synchronization

c) Password changes

d) Remote wipe device data

e) Non-repudiation

f) Security incidents trigger actions e.g. lock device

Help

124 The solution should provide context based help facilities

wherein the users can obtain system specific technical/

functional help online

125 The system should provide online context-based help

facilities at field level and also online help at function,

screen and field level. Interactive tutorial and demo

package should also be provided

User Interface

126 The solution should have unified, easy, flexible and user

friendly interface enabling the following settings

a) Personal User menu

b) Personal User settings

c) Field Placement on screen

d) Field composition on screen

127 The user interfaces should be friendly and GUI/browser

based

128 The application pages should be partially refreshed as

against the entire page when a user performs certain

actions/ changes like search etc.

129 All modules should be homogenous with respect to

keyboard use, screen layout and menu operations with

Graphic User Interface (GUI) support

130 The GUI Form Administration should support the following

without coding effort:

a) Changing fields or tab labels

b) Hiding fields or tabs.

c) Changing the position or size of field or labels

d) Adding restrictions like mandatory or not

e) Setting default value in a field

f) Changing list of value (LOV) contents

131 The solution should have the ability to provide UI

suitable for non-technical business users and IT experts

132 System should allow capability to rearrange screen items

as per user requirements

133 System should allow search based on filters

134 It should be possible to add more fields to the data input

screens for capturing additional business specific

information without having to write any code.

Upgradation

135 The upgrades should not affect the current version

adversely

136 The solution architecture should be with minimum

package modifications so as to preserve the package

upgrade

Source Control

137 The Solution should have built in source code control

program or should support integration with any third

party source code control program

Connectivity

138 The solution should support the connectivity to the

database through ODBC, OLEDB, JDBC or through Native

drivers

Workflow

139 The workflow should be integral part of the solution

140 The solution should have the ability to support

automated workflow designed to address needs of

business users

141 The solution should have the ability to support multiple

workflow paths that are automatically selected based on

request/user attributes, including escalation paths

142 The solution should support standard work flow languages

143 The workflow should allow multi-step approval routing.

Non repudiation of workflow is to be ensured using digital

signature certificates

144 The workflow should have a rules engine that allows rules

to be created to define approval hierarchies

145 The workflow should hold transactions in pending status

and not commit them until all approvals are obtained

146 The workflow should be able to send notifications when

manual intervention is required in a process

147 The workflow should provide a web based end user

interface that can integrate with the portal

148 The workflow should provide a drag and drop GUI based

single/ common design tool to define and alter business

process across all modules of the ERP

149 It should be possible to define the process hierarchies top

down or bottom up to support distributed workflow process

definition

150 There should be no limit on the hierarchy levels that

can be defined

151 A management console should be available to monitor

workflow processes and to control processes that have

errors in them

152 Ability of system to have workflow with the ability to

define business rules without the need for programming,

including alerts and triggers

153 The workflow should interface with email system

supporting SMTP for sending out notifications and IMAP

for receiving the notification responses

154 It should be possible to sign approvals in workflow using

digital certificate for legal purpose. Ability to verify

the signed documents through an evidence store user

interface after the signing process

155 It should be possible to delegate certain notifications to

another user for a certain period, without actually sharing

the password

156 This should also support creation of secondary workflow

by any user in the main workflow, during any stage of

the parent workflow and keep track of the same along

with the parent workflow

Web Portal

157 The solution portal should allow for multiple portlets

to be displayed

158 The solution portal support personalization and role

based access

159 The solution should provide a tool for content

management

160 The solution portal should enable authentication of users

161 The solution should allow Single-sign on to other

components possible through the portal

162 The solution should include automatic indexing and

searching Portal

Archival

163 The system should be able to archive data, based on

user specified parameters (i.e. data range) and restore

archival data for on-line use when required

Development Tools

164 The solution should have built in tools and utilities, which

will enable customer to enhance the ERP for their

requirement and maintain the software on their own

165 All development tools should be GUI based. The tools to

be provided for

a) Creating data entry screens

b) Fixed format reporting

c) User driven ad-hoc reports creation

d) ETL for importing data from external systems

166 Development tools should not use proprietary

languages for writing programs. Development Tools

should be able to use Open standards based

programming languages

Testing Tools A B C

167 The Solution should provide integration with load & stress

testing tool

Reporting Tools

168 The solution should be capable of scheduling a report

for execution / refresh and/or distribution and/or publish

169 The solution should be capable of distributing reports

through email as Body or Attachment

170 The solution should permit viewing of reports through web

171 The solution should permit prioritizing reports during

execution

172 The solution should be capable of publishing reports to a

central store for access by different users

173 The solution should allow user’s to send report to

specified user(s) at scheduled times

174 The solution should have interface to search and filter the

data of the report

175 The solution should provide exception reporting

mechanism

176 The solution should provide Senior Management

Dashboards

177 The solution should be capable of drill down and drill up

with the report tool

178 The solution should be capable of creating ad-hoc queries

and reports for analysis

179 Should not require knowledge of SQL or database to

create self service adhoc reports

180 The solution should support multiple column sorting,

custom sorting

181 The solution should be able to convert reports to MS-

Excel, MS- Word & PDF format directly

182 The solution should provide the following display formats

in the reports

a) Sections

b) Tables

c) Pivots

d) Charts

183 The solution should be capable of archiving reports and

store them in Document Management System

184 The solution should allow reports to be sent directly to

networked Printer

185 The solution should permit display of multiple result sets in

the same document

186 The solution should permit the user to browse through

metadata for detailed information on objects to build adhoc

reports

187 The solution should facilitate the user to create

custom objects/formulas for repeated use in reporting tool

188 The solution should provide graphical interface for

creating custom formulas

189 The solution should have a GUI tool with drag and drop

features to build reports

190 The solution should permit conditional formatting,

based on thresholds or data ranges for any cell in the

report

191 Solution should provide pre-built templates which can be

used for report designing

192 The solution should restrict access to data and report

based on user responsibilities

193 The solution should have the ability to allow users the

following for creating their own views or reports with ease:

a) Select column

b) Apply filters and sort orders

c) Summation

d) Drill down / drill up

e) Averaging

ETL Tool

194 The solution should include an ETL tool that can be

used to extract, transform and load data from disparate

source systems and perform the necessary

transformations to establish a common format

195 The solution should support batch data extraction,

transformation and loading

196 The solution should have an user-friendly GUI for the

users to handle ETL processes, such as:

a) Modify data feeds

b) Change of Business logic used for data ETL

c) Modify ETL parameters

d) Create, edit and execute a large number of

transformation rules

197 The solution should support Import & export

wizard and supporting connections with source and

destination adapters including OLEDB, ADO .Net, Flat

files, and XML formats

198 The solution should include a data mining tool that

provides bottom-up, discovery-driven data analysis

199 The solution should provide data mining algorithms which

help discover patterns and uncover business data to

reveal hidden trends

200 The solution should support analysts by creating analytic

starting pints including graphs, key performance indicators

(KPIs), data grids and advanced visualizations like

Decomposition Tree, Performance Map and Perspective

View.

201 The solution should support What if analysis

202 The solution should support decision trees, Association

rules, sequence clustering, Time series, Neural Networks,

text Mining etc

203 The solution should support data mining tools (including

Wizards, Editors, Query Builders, Lift Chart)

204 The solution should support Data mining Add-ins to

empower end user to perform advanced analysis in MS

Excel & MS Visio

205 The solution should include a Rule based

Data Cleansing/Enhancement tool

206 The solution should have the ability to extract or

refresh information directly from within the MS Office

application (Excel, PowerPoint and Word) without the need

to export from another existing report

207 The solution should have the ability to have

Scheduling capabilities based on events, calendars, or

specific points in time

208 The solution should have the ability to support multiple

Export format support including PDF, MS XL, MS Word,

RTF and HTML

209 The solution should have the ability so that users

define/change any number of charts and tables with

different permutation of the data via a graphical user

interface during the course of analysis

210 The solution should have the ability to enable users to

perform pivoting to change the permutation of any graph

or table to view information in various perspectives during

the course of analysis

211 The solution should have the ability to enable users to

perform drill down on any graph or table to view the detail

breakdown on any value during the course of analysis

212 The solution should have the ability to enable users

perform complex filtering by defining sub queries

(filtering based on results of another query) during the

course of analysis

213 The solution should have the ability to enable users to

perform automatic sorting based on numbers, alphabets

and dates or manually sort them during the course of

analysis

214 The solution should have the ability to perform predictive

analysis against scorecard data and generate predictions

for the KPIs contained in the scorecards

215 The solution should have the ability of system to enable

Users to print the report, export the report to other formats

(excel, pdf) or email the report to other members in the

community during the course of analysis

216 The solution should have the ability to enable users to

setup a schedule to print, export or email the report

automatically

217 The solution should have the ability to enable users to

combine personal data from Microsoft Excel, CSV and txt

files and incorporate data into a single report, which can

then be shared with other users through the platform

218 The System should allow users provided with the capability

to define information about the report so that other

users in the community understands what business

questions the report answers, the meaning of the business

terms used and the link to other related reports

219 The system to provide with the capability to key in notes to

individual respective reports in the form of threaded

messages for the purpose of discussion

220 The system to provide with the capability to map

predefined reports to business processes to build

relationships between people, process and information

221 The solution must allow the users to define the thresholds

for each metric and to define the actions and alerts

required when these thresholds are met

222 The business intelligence platform must be built on a

modern technology based on a services-oriented

architecture for flexibility and extensibility

223 The business intelligence platform must support for

multiple platforms

224 The business intelligence platform must be able to

integrate to our existing web portals easily via portal

services and portlets

225 The tool must have the ability to access a broad range of

technologies to cater for both the current environment and

any new technologies that may be introduce in the future

226 The solution must provide the capability to perform data

profiling, data flow design, data mapping routines and

debugging within the same designer and graphical user

interface

227 Ability of system to allow for any document or report

be previewed before printing

228 Ability of system to provide utilities to automate report

distribution process, so that user is notified after a report is

generated to facilitate easy retrieval

229 Ability of system to provide functionality to users in

generating reports on their own without involving technical

programming

230 The reports should be available for time frames like weekly

/ daily / monthly / yearly

231 The report data must support the feature of being exported

to Excel, ASCII files, PDF, or HTML or third party reporting

tools

232 The system should provide for calculations, filters and

exceptions during reporting

233 The reporting feature should support the reports to be

scheduled to run in batch

234 The schedule to run the reports should be both event-

based or time based

235 Ability of system to support the feature of delivering the

reports to the online users through email, portal, and

report server

236 Ability of system to provide for saving the report

/queries for repetitive execution as and when required by

the users

237 The proposed solution should provide for a role-based

dashboard with graphical reporting capabilities with

executive summary and detailed drill down reports for

business process owners, users, auditors, IT security

238 Ability of system to provide graphics and charting

capabilities

239 Solution should provide the technology to build a business

semantic layer that translates data source technology

terms to business terms to enable business users to

define information requirements without understanding the

data source technology

240 Ability of the business semantic layer to integrate with both

relational database as well as OLAP server data sources

241 Ability of the business semantic layer to be used by

business users to build reports and dashboards via the

web browser

242 Ability of the Business semantic layer security to be

managed within the solution for data restrictions

243 Ability of the business semantic layer to be designed using

a graphical user interface with zero need for SQL

statements or MDX programming

244 Ability to create flexible, highly formatted, pixel perfect and

feature rich operational reports

245 Should have scheduling capabilities based on events,

calenders or specific points in time

246 Should have User, group, object and folder security

247 Should have repository for reusing common report objects

across multiple reports

248 Should have universal integration with other applications

and portals

249 Should have dynamic and cascading prompts feature

250 Should have the ability to authenticate the user before any

transaction to populate the model with data

251 Should provide the administrators the ability to capture

user activities, user log in attempts, report requests and

other activities through reports and dashboards

252 Should allow the administrator to define comprehensive

security requirements easily with the ability to organize

users into groups and inheriting user rights from groups

253 Should support multiple platforms and scalability

254 Should be able to integrate with other web portals via

portal services and portlets

255 Should be able to search and explore the data warehouse

and automatically generate analytical environment

256 Should be able to search the metadata

Handheld/Mobile Applications

257 The solution should provide mobile platform for key

functionalities like Leave approvals, expense reporting,

project monitoring, measurement book etc.

258 The solution should also provide a mobile application

development platform for developing applications for

various handheld devices like iOS, Android, Microsoft etc.

259 These applications should be available in offline mode with

ability to capture data for multiple transactions i.e. local

data should be stored

260 The data stored locally should be encrypted and secure

261 These handheld applications should be available on client

portal for downloading by authorized users

262 The mobile application development platform should also

be used to provide application for consumers/citizens to

lodge complaints/suggestions

263 These consumer applications should be downloadable

from either client portal or respective Apple and

Android/Microsoft stores

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

e-Learning Requirements

1 Ability to define what competencies the learner attains

from successfully completing a course, learning path, or

learning certification.

2 Ability to enrol in learning and on completion of the

learning, automatically update or, optionally, suggest

changes to the learner’s competency profile, thereby

closing the competency cycle.

3 Ability to provide the following learning paths: role-based

paths, performance remediation, and career development.

4 Ability to deliver one or more courses and tests as a

learning certification, which tracks learner progress,

learner test results, completion, and expiry, enabling you

to identify those who are or are not in compliance with your

business and industry requirements.

5 Ability to provide a content player that plays any web-

accessible content, tracks progress by topics, and meets

industry-tracking standards.

6 Ability to support the delivery of synchronous and

asynchronous online and classroom based learning,

through one catalog and a user interface optimized for

learners.

7 Ability to provide administrators a single interface to

determine what learning is available to what people at

what times.

8 Ability to restrict enrolment to only those qualified to

attend, by defining enrolment prerequisites.

9 Ability to use learner groups to define learner access to

categories, courses, offerings and classes.

10 Ability to validate and tailor the material to map more

effectively to the company goals and objectives.

11 Ability to gather feedback from learners on different

training courses and classes.

12 Ability to ensure that learning administrators can always

place the right resources and equipment in the right places

13 Ability to enable the lecturer to record an action or

transaction within the ERP environment and capture the

screens involved to form the basis of a tutorial.

14 Ability to allow the user to launch digital content via a web

browser or other application. Specified World Wide Web

Consortium (W3C) specifications shall be supported,

including being able to use the hypertext transfer protocol

(http) and the hypertext markup language (html).

15 Ability to load, store and make shareable content objects

available to users. Run-time interactions with content

objects should be supported. This includes being able to

load bundled resources (content packages) and unpack

them.

16 Ability to load digital content into a storage area that can

be presented to learners and accessed via the platform

interface.

17 Ability to classify and tag resources.

18 Ability to load and store metadata records and display

information derived from them to the user.

19 Ability to create new resources, integrate them with the

platform and export them.

20 Ability to enable learners to be provided with assessments

and diagnostics to support learning plans.

21 Ability to customise the user interface to adapt to the

learner’s preferences. This should include learner interface

preferences and accessibility requirements. The user shall

be able to change the screen colours, font and font size.

22 Ability to search curriculum information and to navigate to

resources within the platform.

23 Ability to enable anytime anywhere access and to include

all types of users including teachers, pupils etc.

24 The module should be in conformance with current

legislation and the requirements of the Data Protection Act

for personal data

25 Ability to define roles and permissions for users within the

system

26 Ability to allow users to create and maintain portfolios for

sharing content and to support personal development.

27 Ability to provide information about individual and group

usage of the resources.

28 Ability to provide measurement and reporting of

attendance.

29 Ability to allow users to take part in discussion forums by

posting and reading messages.

30 Ability to support audio- and video-conferencing. This

should enable voice or visual communication with peers or

teachers, for example using voice over internet protocol

(VOIP).

31 Ability to facilitate one-one and one-many messaging.

Email, or a system that is like email, should be available to

users for sending and receiving. This should include

sending messages to lists of recipients. Though this is

likely to be the responsibility of the ISP, a platform should

be able to integrate with email.

Knowledge Management

32 Knowledge Management system is required to be

available from the Intranet to share and retrieve

documents/ policies/ case studies/ best practices

33 Provision to configure access for first time users and to

store login credentials for subsequent authentication

34 Ability in the system to configure User Groups and Roles

35 Feature to map every User to one or more User Groups

36 Feature to assign one or more Roles to each User Groups

37 Provision to configure access to content and define

actions for every Role

38 Provision to remove obsolete user accounts and

associated data

39

40 Ability in the system to allow definition of various

categories for organizing information like process

documentation, manuals, HR policies etc.

41 Abitlity in the system to allow design of forms for

accepting knowledge contributions from employees

42 Provision to accept files, URL links and other such

attachments as part of uploads by the employees

Authentication and Authorization

Content Management

43 Provision to enable designated approvals in the

system for specific type of content. Contents requiring

such approval can be configured by the system

administrator/moderator

44 Post due approvals, uploaded content to be made

available for viewing and downloading by employees with

proper authorization

45 Provision in the system to remove outdated or irrelevant

content

46 Provision to schedule regular screening of posted

contents for inappropriate posts/copyright

violations/redundancy etc

47 Ability in the system to integrate with the

Document Management System for proper storage,

retrieval, classification and deletion of uploaded

documents

48 Ability to allow user or user group to configure or modify

their view of the system

49 Provision to allow user to retrieve a list of relevant

posts/documents stored in the KM database based on

specific keyword search

Usage Monitoring and Reporting

50 Ability in the system to provide details of number of users

logging into the system for a particular period of time

51 Ability in the system to track usage details like user

activities, most frequented pages etc and generate

daily/weekly/monthly report if required

Sr. No. Functional Requirement Specifications Standard Workaround Customization 3rd party Not possible

A. DOCUMENT MANAGEMENT SYSTEM

1

The proposed DMS will be a centralized repository for all

Documents, Drawings, Reports, Operational Manuals etc.

across the organization

2

The proposed DMS should be Platform independent and

support open, scalable, Multi-tier architecture with each

tier fully independent with support for clustering.

3

The system shall support separate Document/Image

server for better management of documents and store only

metadata information in database

4

The systems must seamlessly integrate with any or all of

the Core applications and shall support interface with other

open-standard systems.

5

The system should be format agnostic and should allow

storage of any digital data like images, Office Files,

engineering drawings, PDF, PDF/A, photographs, video &

audio files etc.

6System should allow exporting documents from scanner,

email & Microsoft Office documents directly to DMS.

7System should allow creation of custom indexing field/tags

for different documents at Folder & File level

8

The departmental officials should be able to index folders,

files, letters and documents on user-defined indexes like

department, Letter No, file no, year, project Id etc.

9

System should have an integrated Scanning module so

that the scanned documents can be directly exported into

the repository

10

The Scanning Module should allow officers to scan single

document as well as document in bulk with facility of

segregation of scanned images as different document

types like letter, circular, GR, DPR etc.

11

The solution should provide support for automatic

document quality analysis so that any bad quality

document doesn’t get uploaded to the Document

Management System. The solution should audit scanned

documents for resolution, format/ compression, orientation

etc.

12

The solution should have the capability to capture the

document through mobile devices along with indexing.

Using mobile app the users should be able to upload

letters, circulars directly to the document management

system. The mobile app should have built in security so

that the document captured cannot be tampered with, as

well as, compression features to compress the large size

files to a smaller size file.

13

System shall provide the standard file hierarchy structure

of folders and sub‐folders to allow users and groups of

users to manage and organize their documents.

14

System should allow version controlling of the documents

with both minor (1.1, 1.2 etc.) and major version (1, 2 etc.)

.System should show only the latest version of documents

by default. All other version of the document will be visible

to authorized users on need basis.

15

System should allow search based on different parameters

like file name, folder name, project name, index fields, Full

text & Wild card search

16The system should have the capability to save the search

queries or search results.

17

The system should have the capability to perform

annotations such as highlight, sticky note, underline, hide

certain text etc on the documents image with user name,

date and time of putting annotations.

18

The system can be accessed from mobile devices. The

users can search and view the documents in DMS from

mobile devices.

19

System should have facility to set notifications (eg.

Notifying change of version of a file to all stakeholders) &

Alarms (eg. Delay in drawing Approval) by email

20

System should have comprehensive & easy to set access

rights controls at Folders & File level as well as Groups

and users with inheritance

21

The system should allow defining multiple levels of access

rights (Delete/ Edit/ View/ Print/ Copy or Download) to

officers based on their profile.

22

The System should maintain audit-trail of all activities

being done in the system, documents etc. by users as well

as administrators.

B. GOVERNMENT FILE MANAGEMENT &

WORKFLOW SYSTEM

(I) File & Note-Sheet Management

23

The system shall replicate the Present physical file

handling in the same manner as followed and should have

Whitehall view. i.e. electronic files shall give the same look

and feel of Physical file with right hand side of the file

holding the “Correspondence” & left hand side of the file

holding the “Note-Sheets”.

24

The system should be built on a robust Business Process

Management as a platform and should comply with the

Manual of Office Procedure (MOP), published by the

Department of Administrative Reforms and Public

Grievances (DARPG).

25

The system shall have a facility to create/open a new

electronic file as well as a Part File, which can be merged

with the main file at a later stage.

26The system shall have a facility to save the file in the

desired folder in the system as per the user rights.

27

Numbering for the file should be auto-generated as per the

department format and should allow for restarting the

numbering at beginning of every FY.

28The system should mandatorily capture information like

File Subject, Department etc. while creating the file.

29

The system shall generate a Barcode number on

successful creation of a file. This barcode can be pasted

on a physical file for tracking, in case physical file is also

used.

30

The system shall allow adding documents to the electronic-

file directly from the scanner or internal/external drive or

eMail.

31

Any type of documents like Images, PDF files, Office files

like word, Excel, power point presentations, AutoCAD

drawings etc. can be added to the electronic file in the

Correspondence side.

32The documents which are added to the files also can be

individually indexed/ tagged for easy search.

33The system should have a facility to search a file based on

multiple parameters like file number, file subject etc.

34System should allow categorization of files like subject

files, special files, administrative files, project files etc.

35

System shall have an in-built text-editor for entering the

notes. The editor should have basic functionalities such as

highlighting a part of note, underlining, making bold,

creating paragraphs, having bullet numbering, creating

tables etc.

36The note editor should support adding noted in English,

Marathi & Hindi.

37

The system shall have a draft folder to save Office Notes

that are created by officer, which can be

edited/appended/reviewed before making it the final note

in the file.

38

The system shall provide list of “Standard Noting”

templates like “Put up for approval”, which can be used by

officers.

39The system shall provide facility to sign the document

using “Digital Signature” .

40

The system shall allow appending the scanned signature

of officers( for whom digital signature is not available )on

the notes, based on the authentication at the time of

adding the notes to note-sheet.

41

The system shall provide security on notes so that

Noting/comments once written signed and forwarded shall

not be amendable/editable by any user including

originator.

42

The system shall provide facility of securing the notes or

making a noting confidential and allow only selected

authorized officers to view the secured notes.

43

The system shall allow facility of linking a note with a

document in correspondence side or linking note to a

particular page of document in correspondence side or

linking a note to another note.

44

The system shall have the workflow capability to route the

file for approval electronically. The routing can be either

serial or parallel routing.

45The system shall have facility of creating Fixed File Routes

or adhoc routes as the case may be.

46The system will allow to attach other related files in the

workflow for easy reference, while in workflow.

47

The system has facility to “refer” the file to an outside user

who is not a part of Fixed File Route for getting their

inputs.

48The system shall have facility to “Recall” the file from other

users.

49If need be, the system shall allow transferring of file from a

Users Inbox to another user by authorized officers.

50

Once the workflow is initiated, the system will

automatically intimate the respective users by email/SMS

for their action once the file is in their inbox.

51

The system shall allow fixing the timelines for completing

of task by each user. The system will intimate the user by

email/SMS on reaching the threshold time for completing

the task. The system will allow defining escalation actions,

if the task is not completed in time like email, automatically

moving the file to alternate officer etc.

52The system shall allow the officer to keep a file “On-Hold”

by specifying the reason for hold.

53The system shall provide a facility to track the file by

authorized users at any point of time.

54The system shall allow maintaining information & tracking

of Physical Files also, if need be.

55The system shall provide facility to print out the notings for

filing in paper folder as record, if need be.

56The system shall allow various process/file reports

including drill-down reports as needed from time to time.

57

The system shall provide dashboard interface for online

reporting of various processes. The interface shall give a

flexibility to toggle between graphical and tabular view and

tile different windows in the same interface.

58The system shall provide all required reports related as

specified on Manual of Procedures.

(II) Letter/Correspondence Management

59

The Letter/Correspondence Management System shall

have a facility to directly capture the physical/hardcopy

letters received by the department in the system. It should

enable capturing basic information like Date of Receipt,

Subject of letter, who has sent the letter, Date on letter etc

before exporting to the Letter/Correspondence

Management System.

60The system shall have a facility to add emails directly to

the Letter/Correspondence Management System

61

The System shall allow capturing the letter using mobile

device like Smartphone/Tablet and add directly to the

Letter/Correspondence Management System.

62

The system should allow Auto-Numbering of the letters

registered, which can be easily tracked at any point of

time.

63

The system shall have a facility to route the

correspondences (DAKs)/Letter to the user whom it is

addressed to.

64The System shall allow the recipient of the letter to view

the same and do annotations.

65The system shall allow the recipient to take different

actions on the letter like

66 Filing the Letter to an existing/New electronic File.

67 Forwarding the same to other user for action.

68 Forwarding the same to multiple users together for action.

69

The system shall have a facility to prepare responses and

attach with the correspondences (DAKs)/Letter workflow, if

a response is to be given to the letter.

70

The system shall have a facility to create Paper profile of a

Letter at the inward registry, in case the Letter is

confidential. The Paper Profile can be forwarded along

with the hardcopy letter to the recipient. The recipient can

scan and add the same to the Letter Management System.

71The system shall have a facility to track a correspondence

at any point of time.

72

The system shall provide advanced search facility for

searching a correspondence /Letter based on multiple

criteria like dates, subject, pending with, completed by,

pending since etc

73 (III) Committee and Meeting Management.

74The system should have the capability to constitute the

committee with its members and convener details.

75

The system should have the capability to capture various

details of the committee such as term of reference, tenure,

committee members etc.

76The system should have the capability to define the role of

the each committee members.

77

The system should have the capability to define the

committee members from the internal departments as well

as external users along with required details.

78

The system should have the capability to define the

message template for sending the notification to

respective committee members.

79

The system should have the capability to create and

saving the templates for different type of notification

messages.

80The system should have the capability to define the

approval process for committee constituted.

81

The system should have the capability of User Inbox

where committee members/approvers can view the

pending request for approval.

82The system should have the capability to attach the

required documents with various committees constituted.

83

The system should have the capability to circulate the

Office Memoranda with the respective committee

members/stake holders having details about the

committee.

84

The system should have the capability to define the

meeting details such as Agenda, date, time, venue, priority

etc along with the required documents.

85The system should have the capability to link the members

with meeting from the list of pre approved committees.

86The system should have the capability to define the

approval workflow for Meeting scheduled.

87

The system should have the capability to define the

Meeting invitation templates for sending the notifications to

all the committee members.

88

The system should provide the calendar view having

details about the meeting schedule on weekly/monthly

basis.

89The system should provide the capability to submit the

response about their availability for the meeting scheduled.

90

The system should have the capability wherein convener

can define the deadline of submitting the response of

member’s availability.

91The system should have the capability to capture the

Minutes of Meeting.

92

The system should have the capability to assign the

actionable to the respective committee members based on

meeting decisions.

93

The system should provide the capability to define the

deadlines of submitting the response for defined

actionable.

94The system should provide the capability to designing the

template for circulating the Minutes of Meeting (MOM).

95The system should provide the capability to send the MOM

notification through email.

96

The system should provide the capability to track the

actionable assigned to the respective committee

members.

(IV) Assembly/Parliament/Audit Query Management

97

The system shall have the facility to capture the Queries

from Assembly/Parliament/Audit agencies and allow the

personnel to assign selected query to the respective

officers simultaneously for response.

98

The system should have capability to alert the department

officials through email, dashboard alerts, automated SMS

messages with reminders on deadlines for query response

before the due time.

99

Once the response is received from respective officers for

a set of queries, the system will allow generating

consolidated response letter compiling the responses from

each officer in pre-defined format

100The system should have capability to record/update/close

the status of Query.

101The system should have capability to reopen a query

which was inappropriately addressed and closed

102System should be able to generate the reports and data

analytics based on user requirements.

103

The system shall be build on a Business Process

Management (BPM) Framework facilitating creation of own

workflows by users using a modeller for designing the

process flow. The system shall have facility to create

forms for data capture using a designer tool and a rule

engine for creating the workflow routing criteria.

(V) RTI/Grievance Management

104

The System shall provide facility to link cross-related

documents like Application form and Grievance and reply

sent etc. The system should be built using the configurable

Business Process Management and workflow framework.

105

The system should be able to automatically set a deadline

and priority for the resolution of complaints based on the

type of grievance as per the department policy and

provides option for setting deadlines and priority for

exceptional cases.

106

The system should have capability to delegate

responsibilities to an alternate user in the absence of the

assigned user.

107

The system should allow the user who reviews the

complaint to assign the task of redressing the grievance to

another defined user from a list, and optionally also assign

a criticality level.

108

The system should have capability to automatically

escalate the complaint to higher authorities on passing of

the deadline for the RTI request.

109

The system should have the capability to define the

workflow for RTI Application, First Appeal and Second

Appeal etc.

110The system should have the capability to assign the RTI

request to concerned department

111The system should have capability to inform the Citizen by

email that the grievance has been redressed.

112The system should automatically generate call back lists

when complaint has been resolved

113

The system should have the capability to define &

generate the RTI Response/Grievance Response Letter in

a format from the system itself.

114

The system shall provide required reports like number of

RTI queries received, number of RTI queries pending etc.

Also the system should have the facility to generate ad-

hoc reports on need basis by the users.

(VI) Court Case Management

115

Should be able to create Court file including various court

details such as Case no, Case Type, Date of Filing, Case

details, Court Order details, Hearing date, Order date etc.

116 Should be able to Track court dates, hearing dates etc.

117Should be able to provide alerts for the upcoming

hearings.

118Should be able to Cross-reference all dates for one case,

one client, one attorney, a group, or the entire office.

119Should have the capability to generate the Case Diary

having complete details and history of the cases.

120

Should be able to provide a mechanism for analysis of

work flow, case status, and types of cases opened and

closed

121Should be able to maintain an audit trail of entries and

changes.

122Should be able to capture note sheet with the court case

files.

Nagpur Metro Railway Corporation Limited Functional Specification Document for ERP

This document contains the functional requirements from the 5D BIM system

Please rename the file to your company name to identify the right response against the bidder

Bidders are required to fill in their responses by putting a cross mark (X) against the requisite rowin the column based on:

The solution supports the functionality out of the box with no change in process

The solution supports the functionality out of the box but with a change in process with a workaround

The solution supports the functionality out of the box but with custom code to be written (Customization)

The solution does not support the functionality and requires additional software to be procured

Additional remarks if any may be put against the row where required for clarifications of the response

Please ensure that you have put in your response to each row where the response is expected

Where sub-text is noted for a row (like this representation), the sub-rows need to be scored

No responses will be deemed as Not Possible

The spreadsheet needs to be uploaded onto the Portal as a spreadsheet and not a scanned document

Nagpur Metro Railway Corporation Limited Functional Specification Document for ERP

This document contains the functional requirements from the 5D BIM system

Please rename the file to your company name to identify the right response against the bidder

Bidders are required to fill in their responses by putting a cross mark (X) against the requisite rowin the column based on:

The solution supports the functionality out of the box with no change in process

The solution supports the functionality out of the box but with a change in process with a workaround

The solution supports the functionality out of the box but with custom code to be written (Customization)

The solution does not support the functionality and requires additional software to be procured

Additional remarks if any may be put against the row where required for clarifications of the response

Please ensure that you have put in your response to each row where the response is expected

Where sub-text is noted for a row (like this representation), the sub-rows need to be scored

No responses will be deemed as Not Possible

The spreadsheet needs to be uploaded onto the Portal as a spreadsheet and not a scanned document

Annexure B - NMRCL 5D BIM FRS

Sl No. FUNCTIONAL REQUIREMENTS - MODELING, ANALYSIS,

DESIGN AND VISUALIZATION SOLUTION

Standard Workaround Customizatio

n

3rd party Not possible

1 DRAFTING, DRAWING, ANALYSIS AND MODELLING2 Ability to analyze and visualize models based on their geometry or

attributes

3Ability to perform analysis of real-world solar exposure and shading

4Ability to apply real-time display styles to visualize models based on each

object’s height, slope, aspect angle, and other embedded properties

5 Ability to automate common tasks

6 Ability to speed design tasks and related workflows with intelligent

interactive snapping

7Ability to improve productivity or dynamic data entry with heads-up display

8 Ability to customize and group tools and tasks and reduce keystrokes with

keyboard position mapping

9 Ability to quickly customize cursor menus

10 Ability to ensure that only certain individuals can view and/or edit files

within a pre-defined time limit

11Ability to ensure the integrity of your documents using digital signatures

and control the digital rights to view, edit, print, and copy file contents,

including a pre-defined expiration date when the file can be accessed

12Ability to produce realistic movies and simulations from design,

construction, and operational models with the built-in visualization engine

13 Ability to choose from keyframe and time-based animation

14 Ability to get the results you want, faster, using live on-screen animation

previews and distributed network processing

15 Ability to create lifelike visualizations using built-in rendering

16 Ability to use online and delivered libraries of physically correct materials,

lighting, and rich photorealistic content (RPC)

17 Ability to get results faster with distributed network rendering

18 Ability to develop precise drawings using a comprehensive set of drafting

tools to efficiently create 2D geometry

19Ability to rapidly progress your designs from concept to completion using

persistent constraints to maintain your design intent

20 Ability to develop models with a wide range of 3D design tools

21Ability to build and edit curve, surface, mesh, feature, and solids models

22Ability to build functional and parametric components with predefined

variations to simplify managing and finding many similar components

23Ability to present documentation and related design information within the

spatial context of the 3D model to significantly improve their clarity

24Ability to embed links to related Microsoft Office documents and websites

25Ability to easily navigate from content in one file or model to others

26Ability to streamline your workflow and integrate with enterprise systems

using a wide range of available tools to customize the user interface

27 Ability to develop solutions using Microsoft (VBA), .NET, C++, C# as well as

user-defined macros

28Ability to generate consistent, high-quality paper and digital deliverables

such as paper plots, reports, 2D/3D PDFs, and 3D physical models

29Ability to automate and speed annotation, display styles, and reports by

generating them directly from the embedded properties of objects

30 Ability to transform and integrate geospatial information from hundreds of

supported coordinate systems into your designs

31 Ability to access data from OGC Web Map Servers, use real-time GPS data,

and create and reference geospatial PDFs

32 Ability to easily share and consume precise data in key industry formats

such as Autodesk®, RealDWG™, IFC, Esri SHP, and more

33 Ability to aggregate and assemble multiple file formats including PDF, U3D,

3DS, Rhino 3DM, IGES, Parasolid, ACIS SAT, CGM, STEP AP203/AP214, STL,

OBJ, VRMLWorld, SketchUp SKP, and Collada

34 Ability to view and work with design information from others in real time

using live referencing of 2D/3D DGN, DWG, and large image files, refreshed

on demand

35 Ability to natively reference PDF files into your designs

36 Ability to easily incorporate a wide range and scale of point -cloud data into

the design environment

37 Ability to visualize, render, and measure point-cloud data to improve your

understanding of existing conditions, and speed dimensioning and

modeling

38 Ability to easily incorporate raster imagery of all types, including aerial and

satellite imagery and scanned documents. Choose from dozens of

supported file formats including Google Earth KML, CALS, BMP, TIF,

GeoTIFF, JPG and many more

39 Ability to incorporate realistic, photo-textured 3D models or reality meshes

into your designs.

40 Ability to ensure the proper application of organizational and project-

specific standards

41 Ability to apply templates to control geometry and data standards like

styles for dimensions, text, lines, detail symbols, and more

42Availability of automated tools to check drawings for standards compliance

43 Ability to track and easily understand changes made to design files, even at

the component-level, throughout their lifecycle

44 Ability to view, plot, and selectively roll back any individual changes made

throughout the history of a file

45Ability to exchange project models and information using i-models

46Ability to create and exchange digital markups of designs with built-in tools

47 Ability to easily markup models and drawings with redlines and comments

and manage them through a markup dashboard

48 Ability to work in a personalized environment

49 Ability to give personalized recommendations to help you get the most

from your use of the software

50 Ability to automatically set the proper geo-coordinates based on the

geographic location

51 RAIL - MODELING, ANALYSIS AND DESIGN52 Survey Data Import53

Ability to import data from various sources from 2D/3D CAD graphics,

FASCII/text data formats, LandXML files, LiDAR data: ASCII and LAS, USGS

Digital Elevation Model data, Aerial photographs ,Raster files, Contour

maps, Photogrammetric data ,survey data reduction, Feature coding for

custom survey feature connectivity, display, and annotation,

54

Ability to do survey adjustments - Compass, Crandall, Transit, Level, and

Least Squares, Dynamic graphical editing of survey field book data, Change

instrument setup with automatic updating, Add, modify, or delete points

and chains, Change codes and styles, Upload to data collectors

55Ability to integrate mapping/GIS data with engineering data and handle

geographic projection issues offering data interoperability, data analysis,

data browsing, thematic mapping, reporting

56Ability to provide the ability to import/export Horizontal alignment data,

Vertical alignment data, Cant alignment data, Design speed

57 Ability to automatically set the proper geo-coordinates based on the

geographic location

58 Intelligent Feature Based Digital Terrain Modelling 59 Ability to produce Intelligent 3D models

60Ability to Model intelligent civil features: ditches, curbs, trees, culverts, etc.

61 Ability to pass Survey intelligence through to 3D DTM modelling

62Ability to define Intelligent features for all phases from survey to design

63 Ability to edit Context-sensitive intelligent features

64 Ability to support boundaries, holes, breadlines, inferred breaklines, and

random points

65 Ability to handle large LiDAR datasets

66 Abitlity to Generate contours from data points accounting for breaks,

random points, voids, edges and other criteria

67 Ability to generate Cut and fill delineation

68 Ability to generate controlled density of points on linear features for

optimal surface presentation

69 Ability to display Color-coded triangles, slopes, aspect ratios

70 Ability to view slope vectors

71 Ability to analyze line of site

72Ability to View gridded DTM, View profiled model, View elevation model

73 Ability to Generate grade contour

74 Ability to Interrogate surface

75 Ability to Display isopach

76 Track Geometry Design77 Ability to provide comprehensive tools for 3D track and route alignment

design

78 Ability to provide Horizontal Alignment design tools for Design by IP

method

79 Ability to provide Horizontal Alignment design tools for Design by Element

method

80 Ability to provide Horizontal Alignment design tools for Straights

81 Ability to provide Horizontal Alignment design tools for Curves

82 Ability to provide Horizontal Alignment design tools for Support complex

geometric configurations: SCSCS, SCCS, etc.

83 Ability to provide Horizontal Alignment design tools for Transitions -

Clothoid, Cubic Parabola, Bi-quadratic Parabola, Bloss, Sinusoid, or Cosine,

Simple spirals,

84Ability to provide Horizontal Alignment design tools for Compound spirals

Horizontal discontinuities, straight to straight connection

85Ability to provide Vertical Alignment design tools for Design by IP method

86 Ability to provide Vertical Alignment design tools for Design by Element

method

87 Ability to provide Vertical Alignment design tools for Grades

88 Ability to provide Vertical Alignment design tools for Vertical curves,

parabolic and circular

89 Ability to provide Vertical Alignment design tools for Vertical

discontinuities, grade to grade connection

90 Ability to provide Cant Alignment design tools for:-

91 Ability to provide Cant Alignment design tools for Cant application formulae

related to transition type, may be non linear

92 Ability to provide Cant Alignment design tools for Design based on

horizontal geometry

93 Ability to provide Cant Alignment design tools for User definable speeds by

element or change of speed within an element

94 Ability to provide Cant Alignment design tools for Definition of cant change

at locations other than horizontal tangent points

95 Ability to provide Cant Alignment design tools for Interactive design

process giving immediate feedback to the user for Theoretical Cant,

Applied Cant, Cant Deficiency,Rate of change of cant on cant transition,

Rate of change of cant deficiency on cant transition Analysis of cant for

multiple operational speeds

96 Ability to set nominal gauge for running edge

97 Ability to set centre to centre distance for rails for cant calculation

98 Ability to set cant application method; lift outside rail, rotate rails about

axis, lower inside rail.

99 Ability to create station equations in an alignment

100 Ability to follow the workflow of Horizontal Alignment design, then Cant

Alignment design, then Vertical Alignment design.

101 Yard Layout Design102 Ability to provide ability to create turnout templates: tangential, non-

intersecting and intersecting as per the Indian rules and support industry

standard bending methods and best practices

103 Ability to be possible to create turnout templates using geometry or

stroked alignments

104Ability to be possible to flex turnout templates to match mainline radius

105Ability to be possible to place turnouts interactively into alignments

106 Ability to be possible to connect turnout to incoming or outgoing

alignments on the turnout track

107Ability to be possible to apply vertical alignment and cant to turnouts

108 Ability to be possible to automatically adjust the turnout diverging angle for

gradient and cant

109 Rail Generation110

Ability to be possible to create rails in 2D, with rails spaced at gauge in plan

111 Ability to be possible to create rails in 3D, with rails spaced at gauge in rail

table on canted sections

112 Ability to be possible to create rail running edges with cant values applied

across rail centre to rail centre

113Ability to be possible to create rails in 3D through transitions using the

appropriate cant application formula. Note this is not necessarily linear.

114 Regression Analysis115 Ability to assemble regression points from multiple data sources quickly

and easily including versine data

116 Ability to perform multiple element (Straights or Curves) regression analysis

based on constrained/obligatory points

117 Ability to perform single element (Straight or curve)regression based on

controlled slews

118 Ability to create Horizontal and Vertical alignment geometry from

regression analysis

119 Ability to calculate Horizontal and Vertical slews

120 Template design & Earthworks121

Ability to provide tools to create typical sections for rails and components

for earthwork design without additional programming by the user and

changes can be made graphically (visually)

122 Abiltity to apply constraints to components (free, partially or fully

constrained)

123 Ability to apply different type of constraints such as horizontal, vertical,

sloped, projected, vectors, offsets, elevations, minimum/maximum values,

etc.

124 End conditions may trace existing surfaces or project intersections through

surfaces such as rock

125 Vertices of components and end conditions carry naming conventions for

point controls and symbology for drafting

126 Ability to Define parametric components graphically — no programming

necessary

127 Ability to Drag-and-drop assembly of components and end conditions into

typical sections or templates

128 Ability to Perform graphical tests to verify behaviour of assembled

sections before application

129 Ability to store all objects in a template library

130 Ability to provide 3D model of proposed model as per civil engineering principles and standards

131Ability to Merge horizontal and vertical geometry with 3D topography for

application of design standards and typical sections

132 Ability to Display right-of-way, existing ground and other road centerlines

to enhance dynamic interaction

133 Ability to provide provides heads-up dynamic, interactive parametric

design, with instantaneous feedback

134 Ability to Model dynamically, in steps or batch process

135 Ability to Manage one or multiple corridors for plans, visualization, cross

sections and reporting

136 Construction documentation: Cross Section; Plan & Profile Creation;

Reports137

Ability to create plan drawings with relevant setting out information

138Abilit to create long section drawings showing chainage, existing levels,

proposed levels, horizontal geometry and vertical geometry

139 Ability to create cross section drawings showing existing and proposed

outline and levels and track Ability to provide tools for producing cross

sections and plan & profile sheets and text /XML based reports and

include the following functionalities:

140         Drawings to include vertical alignments and existing and

proposed surfaces

141         Drawings to include objects from intelligent DTM by selection

sets or ranges

142         I Drawings to include drainage structures and utilities

143         Drawings to include User-defined annotation of points and

segments

144         Drawings to include Controllable display of multiple surfaces

and offsets

145        Ability to Cut cross section at any angle relative to linear path

146         Ability to Create custom cross sections along user defined

paths

147         Automate project delivery process with drafting and plan

preparation tools

148         Extract sections, drawings, and reports directly from

completed 3D model

149         Automated sheet generation for plans, profiles, and cross

sections

150         Easy to modify default reports in any text or XML editor

151        Provide standard reports for bridges, superelevation/cant,

clearances, data collection, geometry, sections, geometry, DTM,

legal descriptions, design, visibility, and more

152         Compute volumes by model to model (triangulated surface

comparison), triangle by station, gridded, and end-area sectional

volumes

153         End area volume options for separate materials, unsuitable

materials, as-builts

154 Site Design155 Ability to meet needs for designing sites and site grading plans for non-linear (site) projects

156 Ability to include the following functionalities:

157         Grading tools for comprehensive site design for industrial or

environmental site remediation

158         Project longitudinal slopes with automated benching and slope

intercepts

159         Transverse design tools for smoothing slopes and fine tuning

designs

160         Building pad design wizard

161         Dynamically place, rotate, and move pads

162         Dynamic contouring and triangulation

163         Create Pond Wizard

164         Project plane intercepts

165         Set slope along objects

166         Set elevations

167         Generate sloped surfaces

168         Hydrologic analysis for trickle, flow delineation, and pond

volumes

169         Set slope along feature

170         Create channel from objects

171 Swept Envelope Analysis172 Ability to have facility to create swept envelopes for rail vehicles

173 Light Rail Manufacturing 174 Ability to have tools with which engineers can design light rail track systems and its manufacturing

175 Visualization176 Ability to offer tools for walk through models interactively for design

checking and clash detection and offer photo realistic rendering for public

presentation

177 Drainage Model creation, Design Analysis and pond routing 178 Ability to create 3D drainage model relative to site topography and road geometry

179 Ability to include the following functionalities:

180         Place multiple drainage structures along alignments by spacing

and offsets

181        Support interconnected network of pipes, curved pipes,

channels, culverts, manholes, pumps, catch basins, and inlets

182         Physical model is fully associative and dynamic

183         Create storm, sanitary, or combined networks

184         Build drainage models directly from survey data

185        Apply any material and coefficient of roughness to network

186         Identify 2D graphics as utilities and drape relative to terrain

model

187        Display all network and utility objects in sections and profiles

188         Label all attributions in any view or include in user-defined

reports

189         Draw 3D models of drainage structures to full 3D shapes for

easy clash detection

190        Analyze model using industry-standard theorems such as

Mannings, Colebrook-White, Bernouli, and continuity equations

191         Analysis based upon HEC22, FHWA, HDS 5, 10, 13, modified

rational method, as well as regression equations

192         Compute drainage flows from areas using Modified Rational

Method or SCS Unit Hydrograph Method

193        Compute Tc via FAA, Kirpich, overland flow or LADOT methods

194         Compute Tc from 3D model or specify

195        Use demand and demographic tables for sewer computations

196         Supports infiltration, population, and peaking factors as well as

land usage

197         Computation reports are generated from design and analysis

for inclusion in project notebook

198         Generate drainage queries and reports

199         Color code based upon queries or set-up styles for special

symbology by type and size

200        Calculate pond volumes from surfaces or specified dimensions

201         Create input and output hydrographs

202         Design inlet and outlet control structures

203         Rational method

204         SCS Method

205 Publishing Design Information206 Ability to publish the data for archival and to communicate with other vendor formats including the following:

207         Support industry standards, such as LandXML

208         Export alignments, surfaces and other pertinent design

information to other systems via XML

209         Create PDF and 3D PDF

210         Automated Plotting

211         Export to Google Earth KMZ

212 Machine Control213 Ability to output alignments in track maintenance machine readable

formats for Plasser & Theurer’s ALC and WinALC formats

214 SIGNALLING215 Ability to place relayes that have properties to show their contacts in

energized or de-energized state

216 Ability to automatically assign pin numbers and track it throughout the

design.

217 Availiblity of drawing modes to keep track of devices that are represented

in different disciplines

218 Ability to import pre-existing Bills of materials and create your layout

drawings before creating any schematics.

219

Ability to create your own report template for project documentation

220

Availibility of options to create report templates includes Bill of Materials,

Asset Lists, and Job Costing reports as well as connection information

regarding Cables Schedules, panel wiring and terminal reports

221

Ability go generate reports in variety of formats such as CSV, XLS, TXT and

PDF as well as directly to the projects as text on the drawing

222 Ability to move from page to page of your project by simply pointing the

cursor and clicking on a cross reference, device ID, part number, relay

contact, or rack layout.

223 Ability to create links from the drawing elements to other document types

like PDF, HTML for cut sheets, maintenance records, Web pages, and other

documents.

224 Ability to automatically create index sheets listing the pages within your

design

225

Availibility of comprehensive symbols library and parts catalog database

226 Ability to create own symbol library

227 Ability to share the graphical information and asset data in a itelligent pdf

publication

228

Ability to establish relationships with panel layouts and schematic circuits

229 Ability to create 3D models and 2D symbols for the same objects

230 Ability to postion objects along a selected track utilizing the track alignment

data with an offset, at a user specified chainage

231 Availibility of hook points/lines to postion objects, connet cables and design

trenches

232 Ability to design cable trenches and “connect” objects, which will provide a

“network” of cable routes.

233

Ability to connect 2D symbols (and/or 3D models) with cables, which will

contain cable ID’s, part number(s) and connectivity (to-/from information).

234

Availibility of tools that in in a few clicks reference project data such as

track layouts, catenary designs, maps, existing conditions etc.

235 Ability to automatically set the proper geo-coordinates based on the

geographic location

236 VIADUCTS - MODELING, ANALYSIS AND DESIGN237

Ability of 3D parametric modelling for bridge super and substructure

238Availiblity of Library of fully prepared parametric bridge cross-sections.

239 Availiblity of CAD tools for cross section definition.

240 Ability of Laying out of Alignment in plan and elevation

241 Ability ofImport of Land XML file (roadway design exchange format) to

define the alignment, profile and cross-section

242Ability ofexchange of the model with CAD standard formats (DGN, DWG)

243 Ability ofAutomeshing of cross-sections

244 Very Well supports analysis, design and construction of all types of bridges

(reinforced, prestressed, concrete, steel, composite, cable stayed,

suspension).

245 Very Well supports different types of erection methods (span-by-span,

advanced shoring, incremental launching, balanced cantilever, pre-cast

segmental).

246 Very well handles linear as well as non-linear advanced static and dynamic

analysis.

247 Very Well handles non-linear problems such as Cable sagging, 3rd

order

large displacements, and non-linear time history.

248 No limitations on geometry, boundary conditions, applied loadings, load

combinations and construction stages.

249 Availiblity of Wizards for typical bridges

250 Ability of modelling the bridge using GUI as well as text input file which can

be reused for other similar bridges.

251 Supports International as well as Indian Bridge Standards

252Performs Working Stress as well as Limit State method of design and checks

253 Performs automatic Camber calculation - The module should create an

Excel sheet with the required camber values. The camber line can then be

presented numerically or graphically like any other displacement

distribution.

254 Capable of Automatic Plan production

255 Ability ofgenerating Automated output report in various formats,word,

excel, pdf, graphical, stress diagrams etc.

256 Ability ofEvaluating fiber stresses, principal stresses, shear stresses,

equivalent stresses

257Ability ofcalculating prestressing cable losses due to creep, shrinkage,

relaxation, elastic shortening, anchorage and slip losses

258 Ability to perform full response spectrum analysis for any number of eigen

values

259 Ability to carry out stability calculation – Linear Buckling

260 Ability ofHybrid FEM modeling with Shell, Plate, Shear Wall, Volume

elements

261 Ability ofComputational Fluid Dynamic calculations

262 Ability ofManaging short line match casting for segmental box girder bridge

construction

263 Ability to performin 4D time-dependent analysis

264 Ability to generate detailed calculations along with formulas and references

from standards

265 BUILDING- MODELING, ANALYSIS AND DESIGN266 Multi-Classification System supported

267 Interdisciplinary modelling environment including architectural, structural,

mechanical, plumbing and electrical

268 Design File format must be available openable by other applications

without data conversion

269 Backward compatibility with previous versions

270 Company, Project and Local level configurations support

271 Design changes must be saved automatically during modelling

272 Full CAD capabilities embedded with the product

273 No Geometrical restrictions for BIM Design

274Bi-directional i-model and IFC support with ability to read business data.

275 Ability to model in true geographical locations

276 Ability to use Company Standard Schedule Templates

277 Ability to generate Thematic Maps

278 Space area creation from Excel data

279 Native Space Planning & Space Navigation tools

280 Ability to embed the non-CAD documentation inside the project

281 Point Cloud support

282 Solar Studies and Shadow Analysis

283 Generative design supporting BIM Elements

284 Generate BOQ by rooms

285 Work in plan, elevation, isometric, or perspective view at the same time

with the same tools

286 Populate, validate an export a valid IFC and Cobie data

287 Create high detail visualisation renderings

288 Provide the instant connection between the 3D geometry and the detailed

drawings of a specific element or system

289 Federate different BIM Models from the relevant design/construction team

members including i-models and IFC

290 Author information to a specified in the LOD Element Table

291Explore the objects by type and analyze its properties in a schedule

292 Asign/change the predefined object type and properties to an existing 3D

geometry

293 Manage the live link to a set/group of properties that can be asigned to a

3D geometry

294 Include/import 3D components into the native objects catalog.

295 Measure and dimension the objects in a 3D view.

296 Model assembled multilayer components (i.e. Walls)

297 Create multy-category schedules for the objects catalogs

298 Natively link dynamically the spreadsheet schedule into the model and

present in on a sheet.

299 Manage the graphical representation of components and handle

resymbolisation

300 Handle a customized structural section catalogs

301Create a non-editable properties to the user for the catalog components

302Create rules to manage the automatic resymbolyzation of the elements

303 Create the floor plans, sections and elevations at the appropriate scale,

dynamically from the 3D model

304 Use the same floor levels across the whole project without the need of the

additional coordination

305 Support the creation of the floor sub-levels

306 Link solids and surfaces to the drawings, specifications, images, videos and

documents

307 Centerline symbology

308 Create the curved beams, columns and walls using the native BIM tools

(including spline)

309Create and schedule the parametric penetrations in slabs and walls

310 Divide and Join structural members

311 Produce plans, sections, elevations and schedules for any architectural

component

312 Create truly curved and double-curved surfaces, solids, and architectural

assemblies

313 Model steel, concrete, timber structures including walls, foundations,

columns, and other structural components

314 Produce plans, framing layouts, sections and elevations, and volume and

weight analyses

315 Integrate with detailing applications

316 Employ point clouds of virtually any scale natively within the modeling

environment as context for designs

317 Support common formats including Bentley i-models, DGN, RealDWG™,

IFC, , DXF, SketchUp SKP, PDF, U3D, 3DS, Rhino 3DM, IGES, Parasolid, ACIS

SAT, CGM, STEP AP203/, AP214, STL, OBJ, VRMLWorld, Google Earth KML,

COLLADA, Esri SHP

318 Integrate geospatial information and ensure proper display within the

proper context

319 Integration with Structural Analysis solutions

320 Export Concrete Structural elements with Analytical information to Analysis

programs

321 Round tripping inside a complete solution including Design, Analysis and

Detailing

322 Ability to create structural objects in any form

323Ability to promote 2D CAD elements to complete structural elements

324 Create tapered structural members with the provided library

325 Create spreadsheet reports bi-directionally allowing the user to modify the

graphics from an excel file

326 Apply Slope to Designed ventilation or Plumbing systems

327 Automatic hook-up between different mechanical systems

328 Ability to promote 2D CAD elements to electrical components

329 Integration with the most-used lighting analysis solutions

330 Integration with power analysis applications

331 Filter the imported data by provenience and attributes

332 Measure distances, areas, angles, and volumes with complete engineering

precision

333 Simulate and resolve clashes before construction starts to avoid costly

errors on-site

334 Simulate schedules to eliminate the need for guesswork during project

planning

335 Group and classify items to build more intelligence into the model by

adding attributes that greatly improve the quality of the information on

screen

336 Create relationship sets to categorize items, enhance project insight, and

make more informed decisions

337

Mark up and enhance the model with new geometry to quickly assess the

impact of change without modifying the original engineering data

338 Register and preserve comments using a structured approach, and

interpret comment status through a complete audit trail

339 Produce models in PDF format with business data

340 Simulate construction sequences through animation

341 Free viewer tool for desktop and tablets able to measure, analyze and

segregate data

342 View large image files and multi page PDFs

343 View, reference, and geo-coordinate models

344 View and manipulate point cloud data

345 Walk, fly, pan, and rotate to move around the model naturally

346 View the model up close with zoom-in/out capability

347 Speed productivity with keyboard position mapping

348 Save and recall pre-defined view attributes

349 Slice, section and filter 3D models

350 Attach large image files as reference files

351 Search for elements based on key attributes

352 Look for various materials, PDF references, and simple geometry

353 Isolate key components with customizable search capability

354 Accurately measure distances and angles

355 Estimate areas and volumes with complete reliability

356 Determine clearance constraints for effective planning

357

Detect clashes on native content from many sources without translation

358

Create and apply powerful suppression rules to reduce false results

359 Manage and resolve clash results effectively

360 Import project schedule information to simulate project planning

361 Review multiple schedule scenarios simultaneously

362 Animate objects based on schedule tasks or construction status

363 Automate linking of schedule data

364 Batch import for item sets

365 Group and categorize data to alter the display view

366 Assign attributes to items and classify geometry

367

Color code the model and group objects according to construction status

368 Organize elements by discipline or specific contractor

369 Review and mark up designs with redline comments

370 Manage markups and review workflows with markup dialog

371

Assign unique attributes and comment history to individual markups

372 Register and preserve comments against items

373 Near real-time photo realistic rendering

374 Generate paper prints of models and markups to scale

375 Publish PDF report of markups

376 Google Earth integration

377 Create and reference geospatial PDFs

378 Ability to automatically set the proper geo-coordinates based on the

geographic location

379 BUILDING - MECHANICAL DESIGNER 380 Ability to work in 2D as well 3D environment

381Availability of 3D visualization tools with rotate and zoom functionality

382 Ability to visualize input errors

383 Ability to develop one common model for all load calculations

384 Availability of localized calculation modules

385 Ability to calculate with the appropriate method

386 Ability to compare efficient building design options

387 Ability to assess summer design conditions with no cooling

388 Ability to assess simple passive design solutions quickly

389 Ability to compare data from a common model to country specific building

codes

390 Availability of comprehensive material list as well as a built in module for

calculating thermal properties

391 Ability to define quick building using standard constructions or user-defined

constructions from base materials

392 Ability to define all structures around design building

393 Ability to assess beneficial shading and corresponding cooling load

calculations

394Ability to add predefined and user defined fins/louvers to windows

395Ability to assess Fin/louver designs when considering cooling loads

396 Availability of graphical interface for easy definition

397 Ability to lay out systems in x,y,z plane and between floors

398 Availability of system types include heating, chilled water, ductwork, gas,

Hot water and cold water services

399 Ability to produce schedules and balance pressures for all sizes of ducts and

pipes

400 Ability to calculate fan and pump duties

401 Availability of pump database to select pumps for design

402 Ability to automatically produce schedules

403 Control Valve Selection

404 Availability of Control valves database

405 Addition of Notes

406 Ability to add automatically add notes to the drawings

407 Ability to create simple schematic drawing in a dgn/dxf format

408

409Availbility of state-of-the-art graphical environment that uses well-

established standard MS Windows functionality and familiar layouts,

enhanced with clear modes and pages to simplify the engineering

workflow Concurrent engineering-based user environment for model

development, analysis, design, visualization, and verification

410 Ability to perform full range of structural analysis including static, P-delta,

response spectrum, time history, cable, buckling and steel, and concrete

design

411

Ability to model analyze and design Beams (Standard linear, curved and

physical beams, compression/tension, with databases of sections.), Plates 3

or 4-noded 2D plates and surface objects with holes), Solids (Solid 3D bricks

from 4 to 8-noded), Supports (Foundation and Multi-linear springs)

412 Ability to perform Elastic Analysis - Traditional first-order including iterative

one-way analysis

413 Ability to perform P-Delta Analysis - Both large and small P-Delta including

stress stiffening effects

414 Ability to perform Cable Analysis - Account for the changing stiffness of

cables due to loading

415 Ability to perform Imperfection Analysis - Account for imperfections in

structural geometry

416 Ability to perform Dynamic Analysis - Modal analysis including stress-

stiffening Eigen solution and steady-state options, Time History and

Response Spectrums. Ability ofcreation of response spectrum files from

Time History data and vive-versa

417 Ability to perform Buckling Analysis - Identify the buckling

factor(Multimodal buckling factor as optional capability)

418 Availiblity of basic and advanced solvers

419 Ability to support international as well local Indian Design codes such as

IS456, IS800 etc.

420

Ability to design basic types of foundations (Isolated, Combined, Pile Cap)

along with design calculations and engineering drawings of GA, details and

reinforcement schedule without requiring any additional module.

421

Availiblity of graphical tools, so that models can be created quickly and

accurately using structural grids, tooltips to highlight data, frame

generators and a structure wizard for standard structural frames

422 Availiblity of visualization tools to visualize simple wire frames for speed,

accuracy and ease of use to fully rendered 3D -models for clear mass

distribution and presentation

423

Availiblity of editor - A color-coded tool to check and organize the data,

label with comments and organize to model stage construction

424

Availbility of meshing tools - Triangular or quadrilateral meshes created

from zones within defined models or imported from DXF files

425

Avaiibility of Load generators - Seismic UBC, IBC, ASME wind and snow.

426

Availibility of customizable interface with VBA tools. Create windows and

tables to our own specifications. SQL- query builder

427 Availiblity of customizable reports

428 Ability of Graphic review of analytical results

429 Ability to retrieve data using SQL query

430Availiblity of bi-directional links to 3-D modeler of structural systems, 3-D

building modeler, Foundation design software, RC and PT slab designer,

Connection design software, Pipe stress analysis software

431 Ability to design isolated, combined, Octagonal, Pile Cap and Mat

foundation in a single file.

432 Ability to design foundations for Vibrating Machines, Pressure vessels, Heat

exchangers, API 650 tanks and should have capabilities to design laterally

loaded piles

433 Ability to design rigid foundations, fleixble foundations and equipement

foundations

434 Interoperable through xml formats

435 Ability to design both vertical and horizontal vessels of isolated, combined

or octagonal types on soil or on pile

436 Indian wind and seismic codes should be supported

437 Ring wall foundation design capability as per API 650 and PIP STE03020

should be incorporated

438

Ability to perform Nonlinear geometric analysis for laterally loaded piles

439 Ability to design Piles considering multiple layers of soil, multiple pile

section and multiple loads

440 Ability to generate p-y graphs

441 Ability to analyze and design rafts of any shape, with/without hole and

control regions with On Soil and On Pile option

442 Ability ofAutomatically generating Pile Cap arrangement in addition to Pile

Cap arrangement through manual input

443 REINFORCED CONCRETE DETAILING AND SCHEDULING444 Ability of Parametric concrete detailing and modeling

445 Ability to produce amd modify details in 3D as well as 2D

446 Ability of Fast modifications by direct update in 3D/2D

447 Ability to perform clash detection

448 Ability of Dynamic & intellgent bar labeling, dimensioning, reinforcement

equations and reinforcement prompts

449 Availibility of International rebar libraries with preference series

450 Availibility of Rebar modification tools – template styles

451 Availibility of Special shapes with database connections

452 Availiblity of user-defined object library for standard details

453 Availiblity of user-definable bar code data

454 Abiltity of Automatic shape detection, bar mark numbering, and schedule

lengths

455 Ability of Bar mark numbering methods – per drawing, member,

layer,diameter, shape, or any combination

456 Ability to revise and audit bars

457 Ability to calculate total bar mass summaries

458 Availibility of user-definable bar shape standards

459 Availiblity of user-definable bar chart templates

460 Ability to create bar shape diagrams and dimensions

461

Ability to export Bar chart to ASCII, CSV/Excel, and manufacturing formats.

462 Abitlity to create part lists from the 3D model

463 Ability to create output of part lists in many file formats such as PDF, RTF,

HTML

464

Ability to automatically generate 2D drawings for costing and production

465 Ability to automatically generate bar bending schedule

466

Abitlity to automatically update the bar bending schedule based on revision

467

Ability to produce single sheet output or multiple details per sheet

468 Availibility of project drawing manager

469 Ability to do programming - customization

470 Ability to support International as well local Indian Standards

471 STRUCTURAL STEEL DETAILING AND FABRICATION472 Ability to produce amd modify details in 3D as well as 2D

473 Ability to create and modify structural steel objects that includes Staircase

towers, Handrails, Circular staircaise, Ladders, Bracing, portal frames, Wall

claddings, Purlin systems, Truss/Lattice girders, Platforms round and

rectangular, walkways

474

Ability to create and modify structural steel connections that includes End

plate, Base plate, Web angle, Shear plate, Splice joint,

Haunch, Stiffener, Purlin connection, Drill holes, Bolt, Notch, Polycut,

Diagonal cut

475 Ability to exchange data with various solutions that includes STAAD, RAM,

SDNF 2/SDNF 3, CIS/2 (CIMSTEEL), SCIA ESA-PT, Dlubal RSTAB, KISS, PXF,

PS3 (ProSteel 3D), DSTV-NC, DSTV-PPS, Product interface, Steel (DSTV),

AutoPIPE® V8i

476 Ability to support International as well local Indian Standards

477

Ability to automatically generate drawings that includes Workshop

drawings views, erection drawings, parts lists or NC-data

478 Ability to Interface with ERP-Systems, machine controls

479

Ability to create output in many File Formats such as PDF, RTF, HTML etc

480 Ability to do programming - customization

481 GEOTECHNICAL AND GEOENVIRONMENTAL DATA MANAGEMENT AND REPORTING SOFTWARE482 Ability to provide centralized data management and reporting for

subsurface projects of all types including environmental, geophysical and

more.

483 Ability to Support Microsoft Access/Microsoft SQL database

484 Availiblity of in-built CAD based drawing application

485 Ability to support Google Earth

486 Support graphical and excel based data entry

487 Ability to export data in excel, database, DGN, DXF, BMP, JPG, PNG, PPM,

TGA, AGS, CSV, EVS PGF and Wincore

488 Ability to export data as contours

489

Ability to export data using filters for zones, site layout and other criteria

490 Ability to import data from excel, database, log plot, BMP, JPG, PCX, PNG,

PPM, TGA,TIF, AGS, CSV

491

Ability to import data from Alignments, TIN surfaces, and site maps

492 Ability to Store Geotecnical Lab test Reports

493 Availiblity of data query tools (using SQL)

494 Ability to comapre different databases

495

Ability to create Site maps for viewing, modifying, and creating boreholes

496 Availibility of Geo-coordinate conversion tools

497 Ability to automatrically generate reports including graphics, graphs,

histograms, summary tables, site maps, images and logos

498 Availiblity of extensive ediatble symbol library

499 Ability to generate repors inpdf formats

500 GIS AND MAPPING SOFTWARE501 Ability to execute efficient data compilation and editing

502

Ability to have administration tool to define rules for intelligent features

503 Ability to handle both CAD and GIS data for geometric level accuracy and

handle CAD data natively.

504 Ability to read the legacy dgn based data without any loss of information

and also should be able to save to any versions of dgn so as to work with

legacy applications.

505 Ability to assign any project coordinate systems and also should have

facility for user defined projection systems.

506 Ability to have facility to create small to very large terrain model from any

type elevation inputs including geotiff images.

507

Ability to have the ability to create user specified smooth contours from

the terrain model created from various different sources.

508 Ability to write the contours with elevation details to ascii format easily and

quickly with very easy to use interface to input to army specific

applications.

509 Ability to generate Scalable terrain model from various sources.

510 Ability to support Integration for all types of spatial data formats

511 Ability to create any GIS schema and be able to store the schema in XML

format where it can be edited in any common xml editor.

512

Ability to have high level of flexibility to create very complex GIS schema to

support Features, Properties, Domain lists, default values, Property based

symbology, Property based annotation, multiple types of attributes.

513 Ability to be easy to implement without programming.

514 Ability to have support for Projection transformations

515 Ability to integrate source data in multiple projections

516 Ability to include custom made VBA routines into the XML based

definitions.

517 Ability to support the legacy mdl based custom applications that were

developed long back.

518 Ability to do automatic and semi automatic digitization on maps or scanned

maps.

519 Ability to have georeferencing tools.

520 Ability to support image processing capabilities like contrast stretch,

density slice, Histogram, Mosaic, clip, etc .

521

Ability to take lidar data and be able to edit or reclassify the lidar data.

522

Ability to be able to process the lidar data and extract grahics from that

523 Ability to connect, Query, retrieve, edit and post Oracle spatial data

without needing any additional connectors etc

524 Ability to have 3D storage capability in Oracle spatial

525 Ability to have 3D smart editing tools

526 Ability to have support for multi-user access via feature locking

527

Ability to adhere to native Oracle Spatial feature and topology models

528 Ability to be able to maintains defined topological relationships

529 Ability to provide application specific editing tools for accurate feature

placement and editing and bulk Oracle Spatial loading

530

Ability to have support for the Oracle 10g,11g and 12c topology model

531 Ability to have topological cleaning options like Split/Merge polygon

command, Line Cleaning tools, Find Dangles, Gaps, Duplicates from

“Spaghetti” Line Work

532 Ability to have warping tools to fit data to existing control

533 Ability to easily adopt imported or legacy data through Dynamic Feature

Scoring

534 Availility of comprehensive Spatial Analysis tools for creating buffers

around selected features, Spatial Query, Overlay feature classes, Results

symbolization and reporting both in 3D and 3D

535 Ability to be able to do 3D intersection analysis.

536

Ability to have Map Generation and Print Preparation tools for Grid and

graticule generation, Marginalia, Legends, North arrow, Scalebar, Neatlines.

537

Ability to have tools to define separate symbology for printing nad

publishing purpose without affecting the original data and be able do (What

You See is What You Get) for display of cartographic maps.

538 Ability to Plot high fidelity output, Publish to intelligent PDF, 3D PDF ,

Bookmarks, Web links

539 Ability to Direct reference geospatial formats like MapInfo (TAB, MID/MIF),

Shapefiles, Oracle Spatial, CAD files etc

540

Ability to reference and transform file according to defined projection

541 Ability to work with the native format - identify, overlay, and more without

any special licensing

542 Subject Matter Experts should be able to customize applications without

much support from programmers.

543 Developers should be able to further customize via: C expressions, XSLT,

VBScript, VBA, MDL, .NET API

544 Ability to automatically set the proper geo-coordinates based on the

geographic location

545 IMAGERY PROCESSING546

Ability to process Point clouds that includes - Point-cloud visualization ,

Drape and snap elements, Classification editing, Visual Explorer, Batch tile

export, Pointools, POD, LAS, and XYZ file export, Primitive fitting (extraction

of planar and cylindrical elements), Linear feature extraction, presentation

style manager, Class management for any type of presentation styles,

Definition of custom classes, Clip and section manager, Support of

geographic coordinate systems, Support of geographic coordinate

systems,Support of geographic coordinate systems Scalable Terrain

Modeling, Creation of scalable terrain models (STMs), High-performance

display of very large digital terrain models (DTMs), Flexible display modes:

smooth shading, smooth shading with shadows, aspect angle, elevation,

slope, contours, High-resolution image draping on STM, STM update and

synchronization with , civil DTMs, pointcloud data, and XYZ files ,

Calculation of view shed from a point or path

547 Ability to produce high fidelity imaging that includes - Dynamic

transparency, standard tools for tools for move, scale, and rotate, Display

priority settings, On-the-fly projection, Coordinate system and projection

system control, Transformation of vector and raster data, Georeferenced

file format support, Georeferenced “sister files”and User-defined

projections

548

Ability to clean up the document, editing, enhancement and Image

Maniputaltion that includes - Clean-up tools, Clean-up mask, Pixel-grid at

high-zoom levels, Vector stamping, Drafting, Rubber sheeting

549 Ability to perform Image Enhancement that includes - Translate, scale, and

rotateSet translucency/transparency, Use WYSIWYG enhancement tools,

Crop non-rectangular shapes, Perform selection set operations, Perform

contrast stretch

550

Ability of Registration that includes - Precision warping with register,

WYSIWYG display of vectors and control points over raster, Batch

resampling, Multiple warping methods, Align tool, Batch processing

551Ability to create Image Mosaics that includes Automatic seaming and

feathering Unlimited number of imagesAutomatic color balancing, Corridor

cropping to DGN elements, Mosaics processed as a single image, High-

performance image display, 1- to 24-bit color support, 16-bit/channel

support (64-bit), Look-up-table (LUT) support, Fast file open and save

552 Ability to produce output in standard formats that includes ECW

(unlimited), PDF, IMG, JPEG 2000, BIL, DOQ, FLI, SPOT CAP, and Digital

Image Map ,TIFF (1- to 32-bit), GEOTIFF, iTIFF, COT, CIT, RLE, CALS, PCX,

IMG, BUM, TG4, INT, RGB, TGA, JPEG, RLC, RS, HMR, BMP, and IKONOS 3

(Red), and 4 (NIR) bands from GeoEye, Compression schemes: Deflate,

PackBits, CCITT3, CCITT4, and JPEG 2000, Wavelet compression schemes:

ECW and MrSID

553

Ability to create Visualization that includes Image draping on DTM or 3D

objects, Real-life textures, Lighting effects, Elevation, Perspective,

Creation of fly-throughs and animations, Creation of 3D PDFs,

Interpretation and conversion, Semi-automatic and interactive modes,

Intelligent conversion, Topologically ready linework, Point, stream, and arc

modes, Gap jumping, Generalization, RasterSnap, Contour conversion,

Rasters erased while vectorizing, Optical character recognition (OCR)

554 SUBSURFACE UTILITY MODELING

555

Ability to automatically create 3D model of existing as well as proposed

underground utilties such as pipes, conduits, ducts, cables, and structures

(manholes, inlets, valves, wetwells, and more from survey information,

CAD artifacts, GIS data, Excel spreadsheets, Oracle databases, and other

industry-standard sources of information.

556 Ability to create and maintain topology of network

557 Ability to automatically model connectors (tees, wyes, etc.) between

adjacent utility lines

558

Ability to customize Structure libraries as per agencies /or vendors.

559 Ability o create, share and expand standard design libraries describing the

component details for a variety of storm, sanitary, water, gas, and

communications

560

Ability to build associations and relationships between civil elements

561 Ability to store Information about the object (how it was created, from

where it was created, by what method it was created)

562 Ability to store relationships between elements ensuring that relationships

are maintained

563

Ability to synchronize civil and GIS data with a two-way information

exchange between the design and geospatial database in order to

automatically create 3D models and are featurized

564 Ability to detect clashes among utiliies and other 3D elements

565 Ability to report, query and edit found clashes

566 Ability to visualize appropriate details of clash features using feature

definition

567 Availibility of tools to import information of project from road design

software used on the project

568 Ability to create 3D models based on feature defintions

569 Availiblity of material libraries to provide realistic rendering

570 Availiblity of Generic catalogs

571 Ability to easily integrate agency- and vendor-specific catalogs

572 Ability to Layout utitlities in plan, profile and cross-sections

573 Availibility of automated tools for extracting from a variety of data sources

targeting design features and finished grades to render corresponding 3D

utility models

574 Ability to rule utility nodes and conduits to surfaces, terrain models, and

other 3D elements so that surface elevation changes are automatically

reflected in utilities

575 Ability for design time visualization - meaning visualize at the same time

while designing

576 Availibility of Powerful, dynamic 3D modeler with built-in visualization

tools

577 Ability to automatically set the proper geo-coordinates based on the

geographic location

578 REALITY MODELING579 Ability to use 2D Photographs as input data and perform automatic

Aerotriangulation and Calibration

580 Ability to generate true 3D reconstruction (3D TIN) from aerotriangulated

model

581 Ability to have geo-referencing

582 Ability to use Ground Control Points (GCPs) if available

583 Ability to generate True Orthophoto/Digital Surface Model (GeoTIFF, JPG,

etc.)

584 Ability to generate dense point clouds ( POD, LAS)

585

Ability to have CAD Interoperability (3MX, OBJ, FBX, Collada, STL…)

586 3D GIS Interoperability (CityPlanner, Virtual Geo, Blaze Terra, TerraBuilder,

SpacEyes3D Builder, SuperMap, …)587 Ability to have Area/Volume measurement

588 Ability to export 3D mesh with texture and level-of-detail to GoogleEarth

KML.

589 Ability to Export orthophoto to KML super-overlay

590

Ability to display models in a free viewer or publish onto a web interface

591 Ability to do unlimited tiling for large models

592 Ability to queue tasks or allow background processing

593

Ability to be suited for ultra-large projects and use of grid computing

594 STORM WATER DESIGN AND MODELING595 Ability to create Unlimited scenarios and alternatives

596 Ability to perform comprehensive scenario management

597 Availibility of activating or deactivating network elements

598 Ability to do Scenario comparison

599 Availibilty of customizable engineering libraries

600 Ability to do Dynamic (query based) and static selection sets

601 Availibilty of Drawing review tools for connectivity consistency

602 Ability to do Automatic topology review

603 Availibility of Drawing navigator

604 Ability to generate orphaned node and dead-end pipe queries

605 Ability to Hyperlink network elements

606 Ability to create custom data fields (with user-assigned or formula based

values)

607Availibility of tool to display surface water flow direction across any terrain

608 Ability to do unlimited undo/redo of layout and editing

609 Ability to do Element morphing, splitting, and reconnection

610 Availiblity of tool to merge the nodes in close proximity

611 Ability to do automatic element labeling

612 Ability to do scaled, schematic, and hybrid environments

613 Ability to do scaled catchment and gutter elements

614 Ability to generate element prototypes

615 Ability to do Aerial view and dynamic zooming

616 Ability to support Image, CAD, and GIS

617 Interoperability and Model Building

618 Ability to maintain associations between records in source file (GIS bsaed

property ID) and elements in model

619 Ability to import and export LandXML data

620 Ability to support Oracle spatial

621Ability to do Polyline-to-pipe connections from DXF and DWG files

622 Ability to build model from Spreadsheet, database, Shapefile, and ODBC

connections

623Ability to automatically assign elevation data to manhole elements

624 Ability to do Steady-state simulations

625Ability to do Flow profile methods: capacity and backwater analysis

626 Ability to do Headloss methods -HEC-22 (2nd and 3rd editions), standard,

absolute, generic, and headloss-flow curve

627 Ability to do Diversion simulation

628 Ability to do Automatic constraint-based design

629 Availibilty of option to choose different friction loss methods: Manning,

Kutter, Darcy-Weisbach, Curb, grate, ditch, slot, generic, combination, and

user-defined capture curve inlet types

630 Ability to do open channel and closed conduit hydraulics

631 Ability to support V-shaped and parabolic gutters

632 Ability to support pressure elements (including pumps)

633 Ability to do pond outlet structure calculations

634 Ability to do culvert inlet control calculations

635 Ability to support culvert headwalls and endwalls hydrology and Load

Allocation

636Availibilty of option to choose Rational Method for hydraulic calculation

637 Ability to do Rainfall data input: user-defined Intensity-Duration-Frequency

(IDF) table, Hydro-35, IDF table equation, IDF curve equation, IDF

polynomial log equation,

638 AvAbility of option to choose different Time of concentration methods:

User-defined, Carter, Eagleson, Espey/Winslow, Federal Aviation Agency,

Kerby/Hathaway, Kirpich (PA and TN), Length and Velocity, SCS Lag, TR-55

Sheet Flow, TR-55 , Channel Flow, Kinematic Wave, Friend, Bransby-

Williams

639 Ability to do present results in the form of Thematic mapping

640Ability to do dynamic, multi-parameter, and multi-scenario graphing

641 Ability to do Advanced tabular reporting with FlexTables®

642Ability to publish i-models in 2D or 3D, including to mobile applications

643 Ability to do Property-based color coding and symbology

644 Ability to do Property-based annotation

645 Ability to do Contouring with Shapefile and DXF export

Sl No.FUNCTIONAL REQUIREMENTS - ENGINEERING REVIEW,

COLLABORATION, MARKUP AND ANALYSIS Standard Workaround

Customizatio

n3rd party Not possible

1 Ability to open and review models, 2D drawings and documentation of all

sorts

2 Ability to access project information on the device of your choice with

support for PCs, tablets and other hybrid devices running Windows, iOS,

and Android operating systems

3Ability to enjoy a touch interface on devices like tablets and other large

screen touch devices to use the application and interact with models.

4 Ability to employ common gestures to rotate, zoom, and pan

5 Ability to intuitively navigate and interact with 3D models

6 Ability to perform virtual walkthroughs and immersively explore and

investigate the models and their embedded property data

7 Ability to create thematic displays of your models through queries of

embedded properties. Visualize and better understand models and their

associated project information

8 Ability to search and filter models based on property data or geometric

criteria

9 Ability to locate model elements and their embedded properties and linked

information

10Ability to ensure you have the latest shared version of project information

by securely accessing models and related files through integration with

engineering information collaboration system

11Ability to speed the reliable resolution of issues discovered by project team

members by using forms, cloud services, and automated workflows

12Ability to use the same applications whether in the field, in the office, or on-

site, and synchronize whenever you have time with the ability to work on

models and associated documents without network connectivity

13 Ability to open i-models, native files, and overlay DGN files with one

software product

14 Ability to aggregate 2D/3D multi-discipline models

15 Ability to view large image files and multi-page PDFs

16Ability to view and reference complete geo-coordination capabilities

17Ability to navigate models intuitively with enhanced viewing capabilities

18Ability to walk, fly, pan, and rotate to move around the model naturally

19 Ability to view the model close up with zoom-in/out capability

20 Simplified and customizable interface to group tools and tasks

21 Ability to snap intelligently and interactively

22 Ability to customize the display and filter geometry from view

23 Ability to save and recall pre-defined view attributes

24Ability to slice and filter 3D models to improve interactive visualization

25 Ability to section models using dynamic view capabilities

26 Ability to attach large image files as reference files

27Ability to set and change view perspectives with enhanced camera settings

28Ability to display and navigate business information behind the geometry

29 Ability to search for elements based on key attributes

30 Ability to locate information contained in i-models

31 Ability to find and access element information quickly

32Ability to look for various materials, PDF references, and simple geometry

33Ability to isolate key components with customizable search capability

34 Ability to estimate areas and volumes with complete reliability

35 Ability to compare two pieces of geometry with complete engineering

precision

36 Ability to determine clearance constraints for effective planning

37 Ability to detect clashes on native content from many sources without

translation

38 Ability to create and apply powerful suppression rules to reduce false

results

39 Ability to manage and resolve clash results effectively

40Ability to import project schedule information to simulate project planning

41 Ability to review multiple schedule scenarios simultaneously

42Ability to animate objects based on schedule task or construction status

43Ability to create item relationships to build more intelligence in the model

44 Ability to group and categorize data to alter the display view

45 Ability to assign attributes to items and classify geometry

46Ability to color code the model and group according to construction status

47 Ability to organize elements by discipline or specific contractor

48 Ability to review and mark up designs with redline comments

49Ability to manage markups and review workflows with markup dialog

50 Ability to register and preserve comments against items

51 Ability to assign unique attributes and comment history to individual

markups

52 Ability to add simple graphics to enhance "what if" scenarios and assess

impact

53 Ability to export Clash Detection information to Excel

54 Ability to create and use custom templates for Markups

55 Ability to create near real-time photo-realistic Luxology rendering

56 Ability to generate paper prints of models and markups to scale

57 Ability to create and support 2D/3D multi-page PDF files

58 Ability to Google Earth integration

59 Ability to create and reference geospatial PDF’s

60 Abitlity to take off quantities of the engineering model

Sl No. FUNCTIONAL REQUIREMENTS - WEB GEOGRAPHICAL

INFORMATION SYSTEMStandard Workaround

Customizatio

n3rd party Not possible

1 Ability to do Web-optimized vector publishing / pre-publishing to a web-

optimized format

2 Caching options allows administrators to cache whole layers with pre-

publishing tools, so that streaming of Graphic / Attribute data will be very

quick.

3 Ability to manage prepublishing updates behind the scenes so that fresh

information is available as needed for end users.

4

Ability to have a high performance Image Server that supports tiling,

overview, and streaming functionality for better Raster Performance

5

Ability to be a medium to eliminate duplicate or counterproductive work

scenarios due to poor information exchange

6 Ability to Support interoperability standards in the GIS domain, including

standards defined by the Open Geospatial Consortium (OGC), allow us to

bring together many types of information for integrated display, analysis,

and reporting. These include DGN, DWG, SHP, MapInfo TAB, any

information in Oracle Spatial and other spatial data stores, multiple

relational databases,

7

Ability to support minimum of 30+ industry-standard raster formats, raster

mosaics, multimedia, and hyperlinks to other sites or information

8

Ability to also allow us to publish spatial information from Oracle and

oracle spatial directly without having any connecting software.

9 It should also support Oracle Spatial geometry types including lines,

polygons, point cells, and point text.

10 Ability to support the WMS 1.1.1 Server, meaning that it can publish

information to any WMS compliant client.

11 Ability to also serve as a WMS client. This means that it can integrate

information from any WMS compliant server. WMS makes it possible for

our users to take advantage of the wealth of information publicly available

through WMS servers and ensures interoperability with other vendor

solutions.

12 Ability to also act as a WFS server and client.

13 Ability to allow us to view 3D Panorama Publishing

14 The Ability to have Multiple analysis tools including:

15 Thematic mapping (unique values, equal range, intervals)

16

Pie charts defined from one property (proportional circle) or from many

17 Ability to also allow Reverse Proxy Support

18 Ability to be capable of Publishing Maps in Multiple Coordinate Systems -

To publish maps in multiple coordinate systems; typical map in projected

local coordinate system as well as latitude-longitude for mash-ups

workflows

19 The Ability to allow us to re-project the data on the fly for layers which are

displayed dynamically; for pre published layers, data is re-projected at pre-

publishing time.

20 The Ability to have facility to publish raster files stored in Oracle Spatial

databases called GeoRaster

21 The Ability to have Silverlight® WMS - Silverlight client by Microsoft

available as a development tool. It consumes WMS maps, includes

navigation tools and is supported by Web Services.

22 The Ability to have Oracle, Support of Time Component to allow

administrators to add a time constraint when defining an Oracle Spatial

graphical source.

23 The Ability to have Editing spatial layers of data

24 Simple point features or Oracle Spatial points-lines-polygons can be added

or modified along with their properties

25

The Ability to have Authorization/Authentication for Administrators to

specify which data is visible to specific users. The authorization works at

the layer level, and in this context, the layer encompasses each and every

object that is tied to it; so if a layer is not visible to a user, he will obviously

not see the layer itself from the display object, the searches, the reports

from the info object; the themes from the thematic mapping object, and

others.

26 The Ability to have Commenting

27 Mark-up files can be overlaid on top of maps, printed, saved, loaded and

sent to Department People

28 The Ability to have Editing and updating properties

29 Properties can be destined from the report section with free text or pick

lists

30 The Ability to have tools for Advanced Print to allow end users to generate

cartographic quality prints from the Map Viewer.

31 The Ability to have tools to create and configure web pages for display of

Map, Attributes, and Queries etc on the browser.

32 Must support building and configuring web mapping applications without

requiring programming experience It should come with tools for

administrators that allow a fully functional Web GIS to be rapidly

constructed

33 Must provide web application developer framework for Microsoft .NET

development

34 Finally the Ability to provide a Real-time access to accurate geospatial data

will promote better governmental decision making and a more informed

public

35

Support Microsoft Windows Server 2008 R2 64 bit Operating System

36 Support for Microsoft Internet Information Server natively for running all

web-based services

37 Support Microsoft SQL Server 2008 R2

38 Support a virtualized server environment (for licensing and technical

support)

Sl No. FUNCTIONAL REQUIREMENTS - ENGINEERING

COLLABORATION SYSTEMStandard Workaround

Customizatio

n3rd party Not possible

1

Ability to host the system on the physical premises as well on the cloud

2 System needs to be scalable meaning additional modules based on the

requirement can be added on top of the basic modules

3 Ability to support SQL as well Oracle database

4

Ability to tightly integrate engineering modeling, analysis and design

applications and office document such as MS Word, Excel, Powerpoint etc,

Adobe PDF, Microstation, AUTOCAD etc. (Integration allows files to be

quickly accessed, checked out for use, and checked in directly from the

application, ensuring that the managed environment becomes an essential

addition to your existing workflows.

5 Ability to support native file types such as dwg, dgns and also exchange

formats such as i.dgn's, ifc's etc.

6

Ability to enforce file naming standards on all engineering documents (2D

drawings, 3D CAD models -dgn/dwg, office documents , pdfs etc.) created

based on a number of user-configurable factors such as project, type,

discipline, orientation, cateogry etc.

7 Ability to cache workspaces locally for distributed teams

8 Ability to create and manage file versions and revisions

9 Ability to define workflows and states which matches with the stages

though which an engineering document passes in the project (to track

documents progress and to send notifications)

10 Ability to assign user and group access priveleges based on the state of the

engineering document

11

Ability to send automatic notification when action occurs on documents

12 Ability to automatically generate and distribute document rendition at

milestone (e.g if project is 50% complete then document rendition takes

place)

13 Ability to setup Individual and group access rights

14 Ability to set access rights at Document, Folder and Project Level which can

be inherited following top down approach.

15 Ability to set security at State/Workflow Level.

16 Ability to creatre and extract Users and Groups from Windows Active

Directory

17 Ability to set security at the user login level

18 Ability to support Windows single sign-on (SSO) with Microsoft active

directory integration and user synchronzation

19 Ability to create their own project specific attribute (metadata) forms with

availibilty of standard attribute forms

20

Ability to pick up meta data from the document (or attributes of the

document/Project) and use it to fill placeholders in AutoCAD, Microstation,

MS Excel and MS Word documents - called as Titleblock Integration

21 Ability to bi-directionally exchange data between the system and

documents

22

Ability to allow seeing only the relevanyt fields/attirbutes to the user

23 Ability to create thir own views

24

Ability to offer an unique way of handling document which helps in keeping

the references intact even when a file is moved or renamed

25 Ability to manage all reference file and XRef relationships

26 Ability to resolve broken reference file relationships caused by moved or

renamed files

27 Ability to query all references attached to a DGN/DWG directly from

system

28 Ability to all files that reference any given DGN or DWG file

29 Ability to automatically access all attached reference files when the master

CAD file is checked out

30

Ability to log all actions on document and folders, including deletion

31 Ability to view roll ups of actions by folder of projects

32 Ability to prompt users for comments

33 Ability to filter reports by user, action, date or time

34 Ability to view changes between versions of design data graphically,

including dgn, dwg, and dpr files.

35 Ability to perform full text search which allows users to search for a text

within the document (2D drawings, 3D CAD models -dgn/dwg, office

documents , pdfs etc.)

36 Ability to create form and custom search builder interfaces

37 Ability to save searches which are performed over and over again (e.g. list

of all documents awaiting approval) as user sepcific searches or global

searches

38 Ability to do Google-type searches are also possible on all fields

39 Ability to automate indexing of components

40 Ability to centrally view properties of indexed components

41 Ability to list all documents associated with a component

42 Ability to Two way navigation between component index and related files

with components

43 Two way navigation between component index and related files with

components

44 Ability to maintain single central index of documents

45 Ability to store files on local servers to save bandwidth

46

Ability to provide web based access to engineering documents (2D

drawings, 3D CAD models -dgn/dwg, office documents , pdfs etc.)

47

Ability to view the dependencies that already exist among the documents

in your datasource, such as References, Link Sets and Sets

48

Ability to display a dependency map showing the relationship between the

master document (DGN or DWG) and all its references

49 Ability to filter the view in any dependency map to show as many or as few

levels of links between documents as you want.

50 Ability to automatically create pdf rendtions depending on the state of the

document (.e.g document changes to "Good for Construction" state pdf

will be published)

51 Ability to automate the production plotting process either to ummutable

electronic format (PDF) or to the paper

52 Availbility of inbuilt email messenger (for sending messages and

notifications)

53

Ability to checkin, checkout, export, copy out engineering documents

54 Ability to capture and store emails ,memos and associate an approval and

distribution matrix

55 Ability to create emails, letters, notes, memos etc and assign an approval

matrix befoe it release to recipient.

56 Abiltity to create transmittals and vendors to do submittals with the

regeired numbering system

57 Abiltity to create automated cover letter based on the templates utlized by

the project

58 Ability to create a response template on the document

59 Ability to create reports on the outgoing transmittalls and incomming

submittals

60 Ability to redlining and markups independent of originating softwares

(especially over the web)

61 Ability to view the engineering document (dgn,s dwg.s pdfs. Office etc.)

without opening the document

62 Ability to support collaboration and CAD standards such as BS1192,

PAS1192, COBIE etc.

63 Ability to create progress reports (on the engineering documents)

64 Ability to cache the file and delta file transfer (only change to be reflected

to the system)

65 Ability to spatially navigate the engineering documents (map based

interface - if users clicks on a particular stretch of the project he/she can

get an access to the set of engineering documents in relation wti that

stretch)

66 Ability to create project performance dashboards that includes monitor

document status , monitor project team activity, analyse key performance

indicators , evaluate subcontractor performance

67 Ability to create user dashboards that includes personal dashboard, project

page, project application usage

68 Ability to cater for disaster management

69 Ability to drag and drop the engineering documents from windows into the

system

70 Ability to populate attributes in regards to the document while being

dragged and dropped

71 Ability to extract thumbnails from engineering documents (2D drawings, 3D

CAD models -dgn/dwg, office documents , pdfs etc.)

72 Ability to extract file properties

73 Ability to manage project related common data that includes toppographic

maps, aerial maps , drawing libraries, seed files etc.

74

Ability to manage large point-cloud and raster reference files, and their

distribution, to disperse teams in a controlled and secure manner

75 Ability to compose plot sets from DGN and DWG files, as well as a variety of

raster format files

76

Ability to access the data in the central repository via mobile appilcations

77 Ability to upload information (may be from construction site) such as

photos, forms via mobile applications

78 Ability to synchronize the engineering data in real time (from the field,

between same & different teams, different disciplines, same & different

offices)

79 Ability to provide dynamic feedback and realtime feedback (for quicker

decisions)

80 Ability to print versions of documents that can be marked up using a digital

pen

81 Ability to instantly synchronize markups with original design file in the

system

82 Ability to utilize their own applications and file formats in their own

locations

83 Ability to do CAD standard Quality Assurance check (line wigths, levels,

level names, colours, line type etc.)

84

Availbility of business process template for BS1192 (preconfigured set of

rules that encapsulate best-practices for BS1192 work processes)

85 Ability to do geospatial management that includes support of geocoded

images, point clouds metadata and display of

documents thumbnails on a background map

86 Ability to provide support for ArcMAP iDesktop integration and MXD, MXT,

SHP, BIL, and BIP file formats

Sl No. FUNCTIONAL SPECIFICATION - DIGITAL CONTENT

MANAGEMENT SYSTEMStandard Workaround

Customizatio

n3rd party Not possible

1 Searching and Query

2 The system shall support a Quick Search type search enabling users to find

information objects by Name or Number

3 Abiilty to present list of search results, using paging as appropriate to

manage server resources.

4 Ability for a user to search for objects by querying the meta-data

(attributes, class etc) of those objects

5 Ablity for a user to search for objects by querying the relationships

between objects

6 Ablity for a user to perform a Full Text Retrieval (FTR) on content of files

associated with document records

7 Ability to be able to perform complex queries of the data in the system

using an online wizard to build query strings.

8 The system shall support boolean type searches.

9 It shall be possible for the user to select a search result and navigate to the

object found using a hyperlink.

10 Each object in the system must show links to related objects

11 The system shall allow search queries to be saved for reuse by a user or to

be published for a group of users

12 Ability to define parameters of a save report for supporting variations of

the original query

13 Ability to export to csv/excel results of searches/queries

14

The system shall allow wildcards to be used in searches (e.g. * or %)

15 Document Management / Document Control

16

The system must provide an easy user interface to configure Document

classification/taxonomy with supporting meta data for each document class

17 The system should have the ability to provide a process for Users to

request Document Number/placeholders in batch.

18 The system should have the ability to identify and structure Project

Deliverables per work package/scope of work to provide effective

deliverables tracking

19

The system should provide the ability to configure simple or complex

document numbering masks based on various data/attribute sets

20 The system should keep track the next available document sequence

number for each type (or class) of document

21

The system shall provide a configurable document creation form for each

document class with pre-defined attributes including pick lists

22 The system must be able to retain revision history and version history of

both document objects and file objects

23 Ability for check out/check-in and lock document once checked out

displaying which user is working on the document

24

The system must be able to support the ability to relate documents to

other information objects as with specific named relationships. These

named relationships must be configurable to suit the business needs.

25 When creating document records the ability to create a placeholder record

that does not (yet) have any files associated with it to assist with project

deliverable management.

26 The system must support a complete document life-cycle approach with

pre-defined document status.

27 The system must have the ability to relate a workflow to promote the life

cycle of a document by document class

28 The system must have the ability for users to subscribe to documents and

receive notifications when certain events or actions are triggered e.g.

approval; revision

29 The system must be able to hold Cross Reference/Alias numbers against

document records

30 The system shall allow for none, one or many electronic files to be

associated with a single Document

31 The system shall provide the functionality to create PDF renditions of one

or many selected documents

32 Transmittal/Submittal Management

33 The system must have functionality to support distribution process i.e.

transmittals and submittals

34 The system shall keep track and assign the next Transmittal number based

on a re-defined numbering mask

35 The system must have the ability to define a Distribution List

36 It shall be possible to edit the distribution list in the system

37 The system must provide the ability to see all Transmittals issued from the

document object

38 Ability to issue documents via transmittal to internal and/or external

people

39 The system shall provide the ability to send a package of documents

included in a Transmittal to an external party

40

The system shall track the receipt acknowledgement of a transmittal

41 Mark up, Redline & Review

42 Ability to integrate with a mark up solution to support simple graphical and

textual markups

43 Ability to route a document through a workflow process of review and

mark up

44 Ability to retain each reviwers redline and markup as markup layer and

retained for history purposes

45 Ability for a user with appropriate rights to consolidate the mark up from

multiple reviewers into a single mark up

46 Ability to add additional files (e.g. scanned mark ups) to an existing

document record during the review process

47 Ability to record comments from individual reviewers

48 Ability to report on progress of the review process

49 The system shall be able to determine the correct review workflow from

the meta data of the object.

50 It shall be possible for a user to record comments and notes against any

record

51 The ability to define a return date for a workflow review process.

52 RFI/Technical Queries

53 System must be able to support RFI / Technical Queries

54 The sytem shall provide a utility to configure custom request forms. There

could be one form per type of request

55 System must be able to link supporting information objects to the RFI/TQ,

e.g. Documents

56

System must be able to track the status of each RFI/TQ to response stage

57 The system shall provide a configurable workflow for each type of RFI. A

RFI workflow is triggered by someone submitting an RFI.

58 The system shall support the ability to define user access/group/role

security model for RFI

59 Tag and Asset Management

60 Ability to define different classes of Tags (e.g. electrical, instrumentation,

track, signal etc)

61 Ability, for each class of Tag, to define the attributes of the Tag to record

the design & opeartional requirements

62

Ability of the solution to manage multiple revisions of a document, tag and

other objects and retain a history of those revisisons

63

The system should provide the ability to configure simple or complex Tag

numbering masks based on various data/attribute sets

64 The system should have the ability to provide a process for Users to

request Tag numbers in batch

65 The system should keep track of the next available tag sequence number

based on the tag numbering mask

66

Ability to support the best practice separation between asset information

and the functional requirements defined on the associated tag

67 The system shall provide functionality to define Parent to Child

relationships between tags

68 The ability to manage multiple versions of a Tag to track its history

69 Ability for Tags to be related to an 3D Model and/or any other supporting

document

70

Ability to support the best practice separation between asset requirements

(represented by a Tag object) and the Equipment fulfilling the requirement

71 Ability to manage the Physical Assets

72 Maintain a Master Equipment List including Manfacturer, Make & Model to

avoid duplication

73 Ability to record Equipment/Material compliance i.e process for type

approvals ensuring equipment selected for procurement/construction

meets the design expectations.

74 Ability to manage Serial instances of equipment where appropriate and

record where installed (fitted in Tag)

75 Ability to structure Physical assets as a hierarchy of components

76 Ability to record the specific configuration of an asset or part of asset both

hardware and software/firmware

77 Ability to publish Master Equipment list to Maintenance Management

(ERP) solution

78 Configuration Management and Change Management (MOC)

79

The ability to support an ISO 10007 process of Configuration Management

80

The ability to record a baseline of a set of objects at a point in time to

maintain a consistent history, e.g. at the end of project phase.

81 The ability to identify the make up of assets/asset hierarchy

82 Ability to maintain version control of assets/hardware/software

83 Ability to configure different types of change request objects to support

business needs

84 The system should provide the ability to configure additional metadata

fields per change request type

85

Change Request objects should have a defined lifecycle and have status to

support decisions e.g. draft, proposed, approved, rejected, cancelled etc.

86

It shall be possible to mark certain information objects as being subject to

change control to manage a more formal revision/version history

87

Where subject to change control all change controlled information objects

must be associated with an approved change request object before

allowing newer revisions/versions to be created.

88 The change control object shall record the description and reason for the

change and track the approval process of the change.

89 The change control object shall track the development of the change and

implementation status of the change

90 System must display change status on information objects associated with

a change

91

System must record and retain the change history for each revision/version

92 The ability for a user to be notified of changes to a document object in the

solution

93 Graphical & Visual Navigation

94 Ability for a user to display an iModel of an asset.

95

Ability for a user to click on object in the iModel and see information about

that object (Tag) and other objects related to that object.

96

Ability for a user to display 3D and 2D (e.g. P&ID) types of documents

97

Ability for a user to navigate, zoom, pan etc. within the graphical display

98 Ability for the system to integrate with 3rd party viewing technology, such

as Brava

99 Conracts Administration

100

Ability to identify, configure and track various contractual communications

and route them through business approval processes

101 Ability to record and track Claims/Compensation Events to manage

Contract and Scope variations

102

Ability to relate contractual communications to document & drawings to

give context to issues arising during contract administration

103 Ability to record and track Early Warning/Risks and Actions arising

104 Ability to record Payment Applications and Payment Certificates per

contract/scope of work

105 Workflow & Task Management

106 The ability to define workflows in the system consisting of tasks orientated

steps for users to undertake.

107 The ability to assign tasks to individuals or pools of individuals with specific

skills

108 The ability to define serial paths in a workflow

109 The ability to define parallel paths in a workflow

110 The ability to define conditional paths in a workflow

111 The ability to define rework paths in a workflow

112 The ability for a User to delegate, accept, complete, rework tasks in a

workflow

113

The ability to associate a document or other information object to a

workflow. Association can be the "subject" of the workflow (i.e. being

routed through the process), or may be supporting information

114 The ability to define standard time durations on each task.

115

The system shall provide the ability to send automatic E-mail notifications

to Outlook when work tasks are assigned to individuals/groups

116 Records Management

117 The ability to define a file plan for document objects

118

The ability to define the retention policy for different types of file plan

119 The ability to define move and disposition rules and assign these to

sections of the file plan

120 The ability to notify a user of a pending record management action, e.g.

destruction

121 The ability to place a hold on an object, e.g. for legal reasons, to prevent

future records management actions.

122 Information Modelling / Information Object Types

123

To ability of the system to support a configurable information model

124 Ability for the system to manage document records

125 Ability for the system to manage Tags

126 Ability for the system to manage People (people may or may not be users

of the system)

127 Ablity for the system to manage Organisations

128 Ablity for the system to manage change to information objects in a

controlled way

129 Ability for the system to manage a review process for both documents and

tags.

130 Ability for the system to manage requirements that must be complied with

131 Ability for the system to manage events on a project or related to a

document, tag or asset.

132 Ability to manage multiple dispersed assets in a single solution.

133 Ability to define hierachical classifications of different types of information

objects in thesystem. Each "class" of object may have different attributes

134 The ability to define configurable attributes for information objects i.e.

character,memo, pick list, date, numeric etc.

135 The ability to specify a unit of measure for a numeric attribute

136 The ability to define an attribute as 'mandatory'

137 Ability to provide Quicklink URL's for information objects which can be used

in other line of business applications

138 Projects Information Management

139 The system shall be able to create a Project as an information object with

its respective metadata

140

The system shall have a built-in project naming convention and allow

manual key in. The Project Name (or Number) must be unique

141 The ability to relate, track and manage all information objects that relate to

a specific project

142

The ability to define the members of a project, e.g. people or organisations

143

The ability to track a work breakdown structure on a project and relate

associated objects and deliverables in the system to nodes on the WBS

144

The ability to report on the status of events related to a project or other

object in the system to ensure they are all resolved by a specific timeline.

145 The ability to track events on a Project such as

146 RFI/Technical Queries

147 Issues

148 Risks

148 Snagging/Punch Lists

149 Userability

150 Ability for a user to manage their own area of "favourite" objects.

150 Where appropriate the system will provide hierarchical navigators to

enable users to find information quickly and conveniently

151

The system shall be able to manage multiple hierarchies for navigation

152 The ability for a user to define their own hierarchy

152 The system shall provide the ability to allow users to set their preferences

and reset to system defaults

153 Extract, Transform & Load (ETL) & Bulk Loading

154 The system shall be able to integrate with ETL tools such as SSIS.

154 The system shall support a ETL (3 steps) approach to business information

objects in bulk. The validated data will be transformed into a load file for

the target solution

155 The system shall have a rule-based validation engine that can be configured

for each type of object (i.e. a document object will have a different rule

than a tag object

156 The system shall perform a data validation by batch (i.e. object metadata

and/or object relationships) and report any errors

156 The system shall provide the utility to transform the validated data into a

format recognized by the bulk loader

157 The system shall provide a bulk loading interface for running and

monitoring a batch, report any errors encountered, continue to load the

remaining and show the final successful bulk load results

158 For Document objects, the bulk loader shall have the ability to update the

Document Master, Document Revisions, and Document Revisions with the

same metadata.

158 Reporting

159 The system should have a configurable reporting module and provide a

simple to use interface

160 Reports shall be able to be saved for reuse by a user

160 Reports shall be able to be shared by multiple users

161 Reports shall respect the permissions of the person that is running the

report

162 The system shall support the report output formats in Excel/CSV

162 Ability to integrate with 3rd party reporitng tools where required.

163 Audit trail

164 The ability of the system to record an audit trail of changes to information

objects including the date, time and username of the person making the

change

164 The ability of the system to configure extended audit to retain deltas of

changes made to information properties and metadata

165 File Storage/Repository

166 The system shall store files in a managed secure repository

166 The system shall prohibit direct update of files contained within the

repository (digital signature)

167 The system shall be able to automatically render to PDF typical CAD and

office file formats

168 The system shall be able to reference physical files (or media) so that

printed documentation can be tracked and managed.

168 The system must be able to store all File types (including CAD, 2D & 3D

models)

169 Access and Security Management

170

The system shall be accessible via web over internal and external networks.

170 The system shall provide a simple system administration interface to

manage user accounts

171 The ability to specify security settings on individual information objects in

the system

172 The ability to define security/permission roles in the system

172 The ability to assign people to roles

173 The ability to assign roles to objects to manage the permissions on

individual information objects

174 The ability to modify the security of an object as it moves through a

lifecycle or workflow process.

174 The system shall provide the ability to protect sensitive information objects

from general users.

175

The system shall provide the ability to define information object access

privileges for users (View, Create, Modify, Delete,Approve) according to

object types, business specifications, roles, groups, activates, etc

176 When creating new objects a user shall have the aiblity to select from a

template to minimise the chance of error and to standardise on object

creation

176 The ability for a user to see all previous versions/revisions of asset &

document objects in the system

177 Integrations

178 The ability for the system to integrate with other solutions using a publish

and subscribe process.

178

The system shall integrate with design management tools to support the

automatic publishing of finished engineering information into the system

179 System must be able to integrated with Active Directory to easy User

creation

180 What design management tools can you integrate with?

180 The system shall have a published and supported API (Application

Programming Interface) toolkit for functional development

181 GIS Integration

182 Ability to integrate with a GIS solution to show assets on a map

182 Ability to select assets from a map and navigate to the information about

those assets

183 Mobility

184 Ability to access information in the system using a mobile device.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

1

Request for Proposal (RFP)

Selection of Agency for creation Of Digital Project Management

Platform comprising OSO, Supply, Implementation and Support of 5D-

BIM & ERP

Volume - 1

OSO, 5D BIM, & ERP Ref: No.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

2

Disclaimer

1. This Request for Proposal ("RFP") is issued by Nagpur Metro Railway Corporation

Limited (NMRCL)

2. The information contained in this RFP or subsequently provided to bidders, whether

verbally or in documentary or any other form by or on behalf of NMRCL or any of

its employees or advisers, is provided to bidders on the terms and conditions set out

in this RFP and all other terms and conditions subject to which such information

is provided.

3. This RFP is not a contract and is neither an offer nor invitation by NMRCL to

the prospective bidders or any other person. Whilst the information in this RFP

has been prepared in good faith, it is not and does not purport to be comprehensive

or to have been independently verified. Neither NMRCL, nor any of its officers or

employees, nor any of their advisers nor consultants accept any liability or

responsibility for the accuracy, reasonableness or completeness of, or for any errors,

omissions or misstatements in the information or makes any representation or

warranty, express or implied, with respect to the information contained in this RFP

or on which this RFP is based or with respect to any written or oral information made

or to be made available to any of the recipients or their professional advisers and, so

far as permitted by law and liability therefore is hereby expressly disclaimed.

4. The purpose of this RFP is to provide the bidder(s) with information that may be

useful to them in the formulation of their proposals in pursuant to this RFP. The

information contained in this RFP is selective and is subject to updating, expansion,

revision and amendment at the sole discretion of NMRCL. This RFP document is

not exhaustive and does not purport to contain all the information that a bidder

may require for the purpose of making a decision for participation in this

bidding process. Neither NMRCL nor any of its officers, employees nor any of its

advisors nor consultants undertakes to provide any party with access to any

additional information or to update the information in this RFP or to correct any

inaccuracies therein which may become apparent. Each bidder should conduct its

own analysis of the information contained in this RFP, to correct any inaccuracies

therein and is advised to carry out its own investigations in the project, the

regulatory regime which applies thereto and by and all matters pertinent to NMRCL

and to seek its own professional advice on the legal, financial and regulatory

consequences of entering into an agreement or arrangement relating to the project.

5. NMRCL accepts no liability of any nature whether resulting from negligence or

otherwise however caused arising from reliance of any bidder upon the statements

contained in this RFP.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

3

Contents Important Dates ....................................................................................................................................................... 6

Letter of Invitation for Proposal ............................................................................................................................... 7

1 Introduction ........................................................................................................................................................ 9

1.1 Background .................................................................................................................................................. 9

1.2 Underlying strategy ...................................................................................................................................10

1.3 RFP Format .............................................................................................................................................14

1.4 Fact Sheet ...............................................................................................................................................14

2 Instruction to bidders .....................................................................................................................................17

2.1 General ...................................................................................................................................................17

2.2 Eligible bidders .......................................................................................................................................17

2.3 Sub-contracting ......................................................................................................................................17

2.4 Bidder to inform .........................................................................................................................................17

2.5 Compliant proposals/Completeness of response ......................................................................................18

2.6 Proposal preparation costs .........................................................................................................................18

2.7 Pre-bid meeting and clarifications..........................................................................................................18

2.8 RFP document fee ......................................................................................................................................19

2.9 Earnest Money Deposit (EMD) ...................................................................................................................20

2.10 Bid validity period .......................................................................................................................................20

2.11 Contents of bid ..........................................................................................................................................20

2.12 Bid format ..................................................................................................................................................21

2.13 Commercial Bid ..........................................................................................................................................24

2.14 Language ....................................................................................................................................................24

2.15 Authentication of bids................................................................................................................................24

2.16 Amendment of request for proposal .........................................................................................................24

2.17 Deviations and Exclusions ..........................................................................................................................25

2.18 Total Responsibility ....................................................................................................................................25

2.19 Late bids .....................................................................................................................................................25

2.20 Right to terminate the process ...................................................................................................................25

2.21 Non-Conforming Proposals ........................................................................................................................25

2.22 Acceptance/Rejection of bids .....................................................................................................................25

2.23 Confidentiality ............................................................................................................................................26

2.24 Disqualification ...........................................................................................................................................26

2.25 Key personnel .............................................................................................................................................27

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

4

2.26 Conflict of Interest ......................................................................................................................................29

3 Selection Process for bidder ..............................................................................................................................31

3.1 Opening of Bids ..........................................................................................................................................31

3.2 Preliminary Examination of Bids .................................................................................................................31

3.3 Clarification on bids ................................................................................................................................31

3.4 Evaluation process ......................................................................................................................................31

3.5 Technical evaluation framework ................................................................................................................34

4 Award of Contract ..........................................................................................................................................46

4.1 Notification of Award .............................................................................................................................46

4.2 Signing of Contract .....................................................................................................................................46

4.3 Performance Bank Guarantee (PBG) ..........................................................................................................46

4.4 Failure to agree with the Terms & Conditions of the RFP ..........................................................................47

5 Annexure 1 – Template for Pre-Bid Queries ...................................................................................................49

6 Annexure 2 – Formats for Submission of the Pre- Qualification Bid ..............................................................50

6.1 No Deviation Certificate .............................................................................................................................50

6.2 Total Responsibility ....................................................................................................................................51

7 Annexure 3 – Formats for Submission of the Technical ....................................................................................52

7.1 Technical Bid Covering Letter .................................................................................................................52

7.2 Bidder’s General Information .................................................................................................................53

7.3 Bidder’s Experience - Client Citations .....................................................................................................54

7.4 Resource Deployment Plan ....................................................................................................................55

7.5 Curriculum Vitae (CV) of Key Personnel .................................................................................................57

7.6 Project Plan ............................................................................................................................................59

7.7 Bill of Material (BOM) for the Solution ..................................................................................................60

7.8 Manufacturers'/Producers’ Authorization Form....................................................................................63

8 Annexure 4 –Formats for Submission of the Commercial Bid .............................................................................67

8.1 Commercial Bid Covering Letter ................................................................................................................67

8.2 Summary of Cost Components ...................................................................................................................69

8.3 Calculation of Net Present Value ................................................................................................................70

8.4 Capital Investments – Schedule A ................................................................................................................71

8.5 Operations and Maintenance Costs (OPEX) – Schedule B ...........................................................................72

8.6 Hardware Costs – Schedule D .....................................................................................................................73

8.7 COTS Software and other Tools and licenses – Schedule E ....................................................................74

9 Annexure 5 – Template for PBG ........................................................................................................................75

9.1 Performance Bank Guarantee ...................................................................................................................75

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

5

9.2 Bank Guarantee for Earnest Money Deposit ..............................................................................................77

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

6

Important Dates

Sr. No.

Activity Date

1 Release of RFP November 17, 2015

2

Last date for receipt of pre-bid

queries on RFP December 7, 2015

4 Pre-bid Conference/Meeting December 8, 2015 (11:00 AM)

5 Last Date for submission of Bids January 5, 2016 (4:00 PM)

6 Date of Opening January 8, 2016 (4:00 PM)

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

7

Letter of Invitation for Proposal

Date: 22/10/2015

Nagpur Metro Rail Corporation Ltd. (NMRCL), is a Special Purpose Vehicle (SPV) of Govt.

of India and Govt. of Maharashtra registered under the Companies Act, 2013 for

construction, operation and maintenance of Nagpur Metro Rail Project. The project has

been sanctioned by Government of India (GOI) and Government of Maharashtra (GOM) for

project completion cost of Rs. 86,800 Million (Rs. 8,680 Crores). This completion cost

includes the land acquisition, rehabilitation and resettlement and all applicable taxes. The

project is sanctioned in two corridors: Alignment- 1 North South Corridor having length

19.865 Km and comprising of 17 stations with 15 elevated stations and two at-ground

stations. The Alignment two is of length 18.266 Km. Having 19 stations which are all

elevated. Out of total Length about 4.6 Km of North-South corridor is at-ground and

remaining is elevated.

NMRCL invites responses (“Proposals”/“Bids”) to this Request for Proposal (RFP) from

eligible Bidders for selection of Bidder/Agency for creation of Digital Project Management

Platform comprising OSO, Supply, Implementation and Support of 5D-BIM & ERP

Interested bidders are advised to study this RFP document carefully before submitting their

proposals in response to the RFP document. Submission of a proposal in response to this

RFP shall be deemed to have been done after careful study and examination of this

document with full understanding of its terms, conditions, and implications.

The Document, e payment procedure, submission and other details are available on

NMRCL tender portal under section new tenders: "https://nmrclmaharashtra.etenders.in".

Interested Agencies may view this notice on NMRCL website "www.metrorailnagpur.com"

also. The interested bidders would be informed of any subsequent

corrigenda/clarifications through the website URL mentioned in the Fact Sheet.

The time, date and venue details related to the pre-bid conference and proposal submission

are mentioned in the Fact Sheet. Proposals that are received after the deadline WILL NOT

be considered in this procurement process.

Bidder/Agency will be selected under Quality and Cost Based Selection System (QCBS)

and procedures described in this RFP.

To obtain first-hand information on the assignment, bidders are encouraged to attend the

pre-bid meeting. However, attending the pre-bid meeting is optional.

8

8

Section 1:

Introduction

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

1 Introduction

1.1 Background

NMRCL has conceptualized the project to deploy a proven integrated ERP (Enterprise

Resource Planning) and 5D-BIM (5 Dimensional Building Information Modeling) solution

to automate its operations and integrate its processes. An Owners Support Office shall be

created which will depend on the mentioned solutions for strategic and operational design,

delivery, execution and subsequent support.

The key outcome of OSO, ERP & 5D-BIM implementation are linked to service delivery,

operational excellence, transparency and compliance

Service delivery to stakeholders

Multi-channel service delivery for optimum and efficient processes to end points via

the best suited technology and user interface that may include thick/thin client,

portals and mobile devices.

Secure and convenient access to internal and external stakeholders to avail the

services including but not limited to features for direct upload of directives,

monitoring KPIs, and process execution as empowered by NMRCL

Facilitate and enable employees of NMRCL in administration, support and service

delivery

Operational excellence

Integration of processes for all functions like Finance, Procurement, Materials,

Project Management, HR, etc.

Estimation and optimum utilization of resources: Assets, Financial resources and

Intellectual resources for delivering the services

Quick turnaround time for financial transactions, reporting, analysis and feedback

Excellence in the Deployment of facilities and resources, project planning, and

exploiting internal expertise

Transparency and compliance

Proactive and tight adherence to regulation in financial transactions and operations

of NMRCL

Adherence to standard government norms in financial transactions, reconciliation

and reporting as required by regulatory authorities, dashboards, reports and

analytics needs of stakeholders.

Compliance to best practices in project management, customer management, and

service delivery

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

1.2 Underlying strategy

There are many dimensions to the strategy of OSO, ERP and 5D-BIM deployment at

NMRCL, and they are formulated around the possibilities offered by these solutions.

Digital Project Delivery Services and the OSO

a. The Bidder/Agency shall assess, design and implement a Digital Project Strategy and

Project Execution Plan as well as the Project Organization

b. Develop long-term strategy around information needs of stakeholders

c. Develop the Digital Strategy in line with project execution strategy, including

contracting strategy and capital plan

d. Align and integrate project management processes and tools

e. Assess and design data flow between systems to improve integration and efficiency

f. Identify interfaces with corporate functions

g. Develop execution plan, setup and run a Digital Project

h. Define strategic project delivery options and develop strategic framework

i. Define and design the project governance, organization and process aligned to digital

project delivery

j. Define policies, roles and responsibilities, decision making, escalation, standards,

contracts and procurement strategy

k. Setting up a performance measurement and monitoring model fully integrated into the

project delivery environment

l. Designing the contract and sourcing strategies, and contract management in line with

digital project delivery

m. Aligning the procurement and supply chain strategy, so that it will satisfy the

requirements of digital project delivery

n. Undertake Information Management and Digital Ecosystem Management

o. Define and design an integrated system to manage all project functions such as:

Supplier & Contractor Management

Building and Design Information Management

Document Management including Engineering Design Authorisation

Contract Management and Construction Planning

Procurement Management

Estimation & Schedule of Rates,

Cost Control & Cash Flow,

Reporting

Scheduling

Quality Control and Site Management

Human Resources

Non-fare box revenue optimisation

Accounting and Financial Management

Any other function required to successfully deliver this project

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

As a part of Owner Support Office services, the Bidder/Agency will provide oversight

during the project implementation and undertake the following:

a. Communication and Stakeholder Management

b. Advise on Investment Safe-guarding Options

c. Design and Monitor Project Execution Strategy

d. Define, Design and Monitor Reporting System and Metrics

e. Design and Monitor Project Gateway Approval Process

f. Undertake Independent Project Review

g. Design Project Organisation Structure

h. Design Project Governance Model

The Bidder/Agency will define, design and monitor overall project procedures and process

such as:

a. HSE / Quality Management System

b. Financial Management System

c. Procurement and Contract Management

d. Scope and Change Control

e. Issue and Risk Management

f. Schedule Management

g. Engineering & Design Management

The Bidder/Agency will define, design and monitor overall Human Capital Management

Processes, Procedures and Structures such as:

a. Organisational Structure

b. On-Boarding and Knowledge Transfer

c. Skills Review

d. Resource Management (including recruitment and performance management)

e. Training and Development

f. Roles and Responsibilities Matrix

The Bidder/Agency will define, design and monitor overall Project Management Tools and

Systems such as:

a. Document Management

b. Project Management Tool

c. Scheduling

d. Data Management

e. Workflow Management

f. Building Information Management

Support NMRCL by establishing, setting up and review of tender processes to ensure

maturity of the tender documents. Design and develop procurement and supply chain

strategy that results in the selection of a partner which meets the need of the project and

reflects timescales involved.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

1. Standardization – standardization of processes, records, terminology, information

exchange mechanisms

2. Proven solutions - With the scale and criticality of its activities in mind, NMRCL has

clearly identified that a strong foundation of technology is essential towards creating

the best possible outcomes. Thus it is envisaged that all activities will be carried out

with help of the best of technology solutions.

3. 5D-BIM which has the become the best practice for the creation of large infrastructure

projects globally, with techniques that have been extended beyond conventional 2D &

3D modeling, the added dimensions of time and cost have been beneficial and have

resulted in on-time and within budget execution. The 5D-BIM solution would address

the following in near real-time where technically feasible:

a. Focus on design beyond 2D drafting and 3D modeling

b. Early visualization by NMRCL – faster approval cycles.

c. Ease of coordination between construction documents.

d. Spatial Coordination between disciplines

e. Clash detection and conflict resolution limiting issues on-site and during

construction.

f. Extraction of intelligent data and automated schedules.

g. Ability to take-off materials and quantities.

h. Models + Projects Schedules and Construction Sequencing.

i. Projecting future construction sequence conflicts.

j. Tracking and identifying location of material and pieces on-site in a simulated

environment.

k. Transparent and realistic picture of the actual activities in the Project.

l. Visualization of construction-sites for contractors, subs and clients on-site.

m. Integration of BIM with mobile-devices for managing construction and

commissioning / hand-over.

n. View the current cost and compare it to the estimated total target cost of their

project as well as interim costs against design during design phases

o. Effective strategic and operational setup right from the beginning of the Project

p. Implementation of an effective Operational Excellence in Initialization & Execution

q. True and fair view on financials, reliable forecast and what-if-scenarios. Cost and

Time optimized Program Management with early warning system in place for on-

time management action

4. A platform to address the evolving needs – The operational characteristics of NMRCL

would evolve over a period of time, as the project moves from construction stage to

operations of Metro. Keeping in line with this change the requirements of NMRCL from

the IT system would also change. The ERP solution is expected to act as a platform with

which the multiple requirements could be addressed effectively. The ERP solution would

address the following:

a. Integration of business processes across departments onto a single enterprise-wide

information systems

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

b. Automation and integration of the core business operations

c. Requirements of asset management and maintenance management

d. Increased operating efficiency

e. Reduced operating and inventory costs

f. Better day-to-day management

g. Support for strategic management

h. Global best practices and processes in functions like project management, financial

management, procurement, materials management, Government file management

and documentation, etc.

i. Integration with ticketing operations

5. The objective of NMRCL in investing in 5D-BIM & ERP based applications is to:

a. Achieve world class quality of service, achieve efficiency and practice better control

over the financial transactions and project activities

b. Establish uniform standards for excellence in operations, project management,

human resource management, financial management and performance reporting

c. Create and empower Owner Support Office with technology to achieve the most

optimum results possible.

d. Adopt the global best practices in different spheres of, procurement, materials

management, human resource management, quality management, customer service,

financial management and accounting, and performance management.

6. Expected outcomes of the project

a. Adopting best practices offered by ERP solutions in the key processes like finance

and accounts, control, audit, asset management, materials management, human

resources management, as applicable to the operations of a Metro Rail project, will

lead to efficiency, transparency and informed decision making

b. The ERP Solution will facilitate embedding best business practices and processes

into all its operations, doing away with non-value adding/redundant processes in

various functions of the corporation to make them efficient, transparent and

compliant to regulations.

c. The 5D-BIM solution is expected to ensure that project execution stays within the

defined timelines and budgets with the best of quality resulting from world-class

practices on scheduling, estimation and engineering.

d. For Owner Support Office ability to apply proven best practices to create robust

insight into overall project performance across the entire project lifecycle

Purpose of this RFP

The purpose of this RFP is to select a Bidder/Agency for creation of Digital

Project Management Platform comprising OSO, Supply, Implementation and

Support of 5D-BIM & ERP for a period of six years after the Go-Live date. The

requirements and the scope of work of the bidder are mentioned in RFP Vol. 2.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

1.3 RFP Format

The Request for Proposal (RFP) consists of three volumes viz.

RFP Volume 1: Structure of Proposal & Bid Process Specifications

Volume 1 details the instructions with respect to the bid process management, technical

evaluation framework, and the technical and financial forms.

RFP Volume 2: Scope of work including Functional & Technical

Specifications

Volume 2 of the RFP provides information regarding the scope of work including

business requirements, software and services to be covered and corresponding related

documentation, infrastructure requirements, scope of work for the selected bidder,

Service Level Agreements (SLAs) and functional requirements.

RFP Volume 3: Legal Specifications

Volume 3 contains the contractual, legal terms & conditions applicable for the proposed

engagement.

1.4 Fact Sheet

Item Description

Method of selection The method of selection is Quality and Cost Base Selection

(QCBS).

The weights given to the Technical and Commercial Bids

are:

Technical = 80% and

Commercial = 20%

Availability of RFP

Documents The Document, e payment procedure, submission and other

details are available on NMRCL tender portal under section

new tenders: "https://nmrclmaharashtra.etenders.in".

Date of RFP issuance November 17, 2015

RFP document fee (Non- refundable and Not exempted)

INR 50,000 (INR Fifty thousand only) to be paid online

Bid security/Earnest

Money Deposit (EMD)

INR 1,00,00,000 (INR One Crores only) through DD / FDR / Bankers Cheque in favour of “Nagpur Metro Railway Corporation, payable at Nagpur or by Bank

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

Guarantee (as per format attached in Section 9.2) from

scheduled commercial bank

Last date for submission

of pre-bid queries

December 4, 2015 until 5:00 PM

All the queries should be received on or before the

prescribed date and time, through email only with

subject line as follows:

“Pre-Bid queries -<Bidder’s Name>”. The queries should be submitted in an excel file as per the

format prescribed in Section 5.

The Pre-Bid queries to be sent to the following Email Ids:

Email ID 1: md.nmrcl.tenders@gmail.com

Pre-bid conference

time, date and venue

Date and Time: December 8, 2015 at 11:30 AM

Venue:

Posting of responses to

Queries by NMRCL (on

website)

December 11, 2015

Last date and time for

bid/proposal submission

(on or before)

December 24, 2015 4:00 PM IST

Date and time for

Opening of bids

December 29, 2015 12 noon IST

Language Proposals should be submitted in English only.

Bid validity Proposals must remain valid up to 180 (One Hundred &

Eighty) days from the last date of submission of the Bid.

Currency INR only

Submission of proposal Bidders must submit all documents online only

Contact for clarifications

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

13

Section 2:

Instruction to Bidders

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

17

2 Instruction to bidders

2.1 General

a) While every effort has been made to provide comprehensive and accurate

background information and requirements and specifications, bidders must form

their own conclusions about the solution needed to meet the requirements. Bidders

and recipients of this RFP may wish to consult their own legal advisers in relation to

this RFP.

b) All information supplied by the successful bidder may be treated as contractually

binding on the bidder after successful award of the assignment is made on the basis

of this RFP.

c) No commitment of any kind, contractual or otherwise shall exist unless and until a

formal written contract has been executed by or on behalf of NMRCL. Any

notification of preferred bidder status by NMRCL shall not give rise to any

enforceable rights by the bidder. NMRCL may cancel this public procurement at any

time prior to a formal written agreement being executed by or on behalf of NMRCL.

d) This RFP supersedes and replaces any previous public documentation and

communications, and bidders should place no reliance on such communications.

2.2 Eligible bidders

This closed RFP is being issued to pre-qualified bidders based on the criteria that was set

in the Invitation for Expression of Interest (EOI) for “Selection, Supply,

Installation, Implementation of and Support for Enterprise Resource Planning (ERP) &

5-Dimension Building Information Modeling (5D-BIM) Solutions and provide services to

setup and ramp-up Owners Support Office (OSO) in NMRCL” released on August 26,

2015. The RFP is not open to other interested parties. If they do bid for the RFP, their

responses shall not be considered for evaluation and shall forfeit any monies paid in the

process of procurement or submission of RFP.

2.3 Sub-contracting

Bidder will be responsible for performance of its nominated sub-contractor(s). Bidder needs

to mention details of any sub-contracting proposed in the bid along with name of sub-

contractor and activity assigned. Any change in sub-contractor(s) at later date will be

allowed only after approval of NMRCL.

2.4 Bidder to inform

The bidder shall be deemed to have carefully examined the Terms and Conditions, Scope of

work, Service levels, Specifications, and Schedules of this RFP. If bidder shall have any

doubt as to the meaning of any portion of these conditions or of the specifications he shall,

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

18

before the last date for submission of pre-bid queries, set forth the particulars thereof, and

submit them to NMRCL in writing in order that such doubt may be removed.

2.5 Compliant proposals/Completeness of response

a) Bidders are advised to study all instructions, forms, terms, requirements and other

information in the RFP documents carefully. Submission of the bid shall be deemed

to have been done after careful study and examination of the RFP document with full

understanding of its implications.

b) Failure to comply with the requirements of this paragraph may render the proposal

non-compliant and the proposal may be rejected. Bidders must:

i. Include all documentation specified in this RFP;

ii. Follow the format of this RFP and respond to each element in the order as set

out in this RFP

iii. Serially number all the pages being submitted and provide the total number of

pages in the cover note

iv. Comply with all requirements as set out within this RFP.

c) Bidder should not propose multiple options for any system software; for the

infrastructure, additionally option of cloud based hosting may be submitted.

d) For all the components, wherever applicable, bidder needs to provide the data

sheets of the product along with the compliance table of such products. Bidder

needs to mark in the data sheet the sections where the product compliances as

mentioned in the RFP are printed.

2.6 Proposal preparation costs

The bidder shall be responsible for all costs incurred in connection with participation in the

RFP process, including, but not limited t0o, costs incurred in conduct of informative

and other diligence activities, participation in meetings/discussions/presentations,

preparation of proposal, in providing any additional information required by NMRCL to

facilitate the evaluation process and in negotiating a definitive contract or all such activities

related to the bid process.

NMRCL will in no case be responsible or liable for those costs, regardless of the conduct or

outcome of the bidding process.

2.7 Pre-bid meeting and clarifications

2.7.1 Bidders queries

a. Any clarification regarding the RFP document and any other item related to

this project can be submitted to NMRCL as per the submission mode and

timelines mentioned in the fact sheet.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

19

b. NMRCL shall not be responsible for ensuring that the bidders’ queries have

been received by NMRCL. Any requests for clarifications post the indicated date

and time shall not be entertained by NMRCL. Further NMRCL will reserve the

right to issue clarifications.

c. The queries of only those bidders would be considered who have purchased the

RFP document. A copy of RFP purchase receipt should be enclosed along with the

pre-bid queries.

d. It is necessary that the pre-bid queries must be submitted in excel sheet format,

along with name and details of the organization submitting the queries as

mentioned in Section 5.

2.7.2 Pre-bid conference

NMRCL shall hold a pre-bid conference/meeting with the prospective bidders on December 8, 2015, at ___________________.

2.7.3 Responses to Pre-bid queries and issue of corrigendum

a. NMRCL will formally respond to the pre-bid queries after the pre-bid conference.

b. NMRCL will endeavor to provide timely response to all queries. However,

NMRCL makes no representation or warranty as to the completeness or accuracy

of any response made in good faith, nor does NMRCL undertake to answer all the

queries that have been posed by the bidders.

c. At any time prior to the last date for receipt of bids, NMRCL may, for any reason,

whether at its own initiative or in response to a clarification requested by a

prospective bidder, modify the RFP document by a corrigendum.

d. Any such corrigendum shall be deemed to be incorporated into this RFP.

e. In order to provide prospective bidders reasonable time for taking the

corrigendum into account, NMRCL may, at its discretion, extend the last date for

receipt of the proposals.

f. Any corrigendum/notification issued by NMRCL, subsequent to issue of RFP,

shall only be available from NMRCL office. The website of NMRCL will be

updated to communicate to the bidders that a corrigendum is available.

2.8 RFP document fee

a. RFP can only be purchased online

b. The RFP document fee is non-refundable and not exempted.

c. The details and form of the RFP document fee are mentioned in the Fact Sheet.

d. The bidder has to submit a copy of RFP purchase receipt along with their

proposal.

e. Proposals received without proof of procurement of RFP document fee shall be

rejected.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

20

2.9 Earnest Money Deposit (EMD)

a. Bidders shall submit, along with their bids, Bid Security/EMD as per the details

mentioned in the Fact Sheet. Bid security in any other form will not be entertained.

b. The bid security of all unsuccessful bidders would be refunded by NMRCL after

submission of Performance Bank Guarantee by the successful bidder. The bid security

of the successful bidder would be returned upon submission of Performance Bank

Guarantee, as per format provided in Section 9.1, by the successful bidder. The bid

security of technically disqualified bidders would be refunded by NMRCL after

completion of technical evaluation.

c. The EMD amount is interest free and will be refundable without any accrued interest.

d. In case bid is submitted without the EMD then NMRCL will reject the bid without

providing opportunity for any further correspondence to the bidder concerned.

e. The EMD may be forfeited:

If a bidder withdraws its bid during the period of bid validity. Bidder fails to provide required information during the evaluation process or is

found to be non-responsive. If the successful bidder fails to provide the Performance Bank Guarantee as

required at the time of signing of the Agreement.

If the successful bidder fails to sign the Agreement in accordance with this RFP within 21 days from the issue of Letter of Intent (LOI) by NMRCL.

2.10 Bid validity period

Bid shall remain valid for the time mentioned in the Fact Sheet. Bid validity may be

extended by the bidder by submitting a letter to NMRCL in writing on receipt of

request from NMRCL.

2.11 Contents of bid

a. The bidder shall submit the following documents online:

Number Marked As Content of File folder

One

Proof of payment of

RFP Document fee & Bid

Security/Earnest Money

Deposit (EMD)

a) RFP Document Fee

b) Bid Security/Earnest Money Deposit (EMD)

c) Signed RFP Document

d) Signed RFP corrigendum/Corrigenda, if any

Two

Technical

bid/proposal

a) Technical bid/proposal (As per Section 7)

b) Masked Commercial bid (except price all other

details should be provided including

make/model, quantity etc.)

Three Commercial Bid/proposal Commercial bid/proposal

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

21

b. All the pages of the bid must be sequentially numbered and must contain the list of

contents with page numbers. Any deficiency in the documentation may result in the

rejection of the bid.

c. The proposal/bid shall not contain any corrections interlineations or overwriting,

except as necessary to correct errors made by the bidder itself. Any such corrections

must be initialed by the person (or persons) who sign(s) the proposals.

d. All pages of the bid, shall be initialed and stamped by the person or persons who sign

the bid.

g. Failure to submit bid on time would result in rejection of the proposal.

h. NMRCL will not accept delivery of bid in physical form, fax or e-mail.

2.12 Bid format

Bidder shall submit their bids in the format mentioned in the following sub-sections. Bids

not in the prescribed formats will be liable for rejection.

2.12.1 Technical bid format

Section No.

Section Heading

Details

Section 1

Technical Bid Covering Letter As per format provided in Section 7.1

Section 2

Bidder’s Experience

Bidder’s General Information as per format

provided in Section 7.2

Experience in OSO

o Citations as per format provided in Section 7.3 with documentary proofs

Experience in 5D BIM o Citations as per format provided in Section 7.3 with documentary proofs

Experience in ERP o Citations as per format provided in Section 7.3 with documentary proofs

Section 3

Understanding of Scope of Work

Bidder needs to elaborate on its understanding

of the background and scope of work of the

assignment.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

Section 4

Proposed Solution for

NMRCL & Solution / Product

Experience

- Solution/Product experience - Overall solution and deployment architecture - Security architecture - Database architecture - Documentary proofs - Bill of Material as per format provided in

Section 7.7

(Bidder can include more sub-sections as seems relevant/fit)

Section 5

Exit Management plan

- Comprehensiveness - Level of detail - Phase wise exit management plan - Knowledge transition

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

23

Section No.

Section Heading

Details

Section 6

Approach and Methodology

- Methodology adopted - Project implementation approach - Integration approach - Approach for ensuring SLA compliance - Project Plan as per format provided in Section

7.6

(Bidder can include more sub-sections as seems

relevant/fit)

Section 7

Resource Planning

- Governance structure - Resource Deployment Plan as per format

provided in Section 7.4

- CVs as per format provided in Section 7.5

Annexure II

Power of Attorney

Power of attorney for authorized signatory

Annexure III Masked Commercial Bid Masked Commercial Bid as per formats provided

in Section and its sub sections

Note:

a. Pre-existing work of the Bidder/Agency: In accordance with terms of

Volume 3 of the RFP, in the technical proposal the bidder should identify and

provide the details of any relevant pre-existing work of the Bidder and that of its

partners, subcontractors, agents, representatives that the bidder wishes to use in

provision of services under this RFP. The bidder shall also provide sufficient

documentary proof to establish that such work belongs solely to Bidder (or its

subcontractors, agents, representatives). The bidder shall also certify that the

bidder (or its subcontractors, agents, representatives) has all necessary

documents like source code, object code, user manuals, SRS, FRS etc. for such

pre-existing works.

b. COTS: In accordance with terms of Volume III of the RFP, the bidder

shall submit documents evidencing that the proposed COTS

products/software etc. have been implemented for at least 5

Organizations worldwide.

2.12.3 Commercial Bid Format

Section No.

Section Heading

Details

Section 1

Commercial Bid Covering Letter

As per format provided in Section 8.1

Section 2

Cost details

As per formats provided in Section 8

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

24

2.13 Commercial Bid

i. The bidder must submit the Commercial Bid is the formats specified in Section 8.

ii. Bidders shall give the required details of all applicable taxes, duties, other levies and

charges etc. in respect of direct transactions between NMRCL and the bidder.

iii. Bidders shall quote for the entire scope of contract on an “overall responsibility” basis

such that the total bid price covers all the bidder’s obligations mentioned in or to be

reasonably inferred from the bidding documents in respect of providing the product

or services.

iv. Prices quoted by the bidder shall remain firm during the entire contract period and

not subject to variation on any account. A bid submitted with an adjustable price

quotation will be treated as non-responsive and rejected.

2.14 Language

The proposal should be filled by the bidders in English language only. If any

supporting documents submitted are in any language other than English, translation

of the same in English language is to be duly attested by the bidders. For purposes of

interpretation of the documents, the English translation shall govern.

2.15 Authentication of bids

a. An authorized representative of the bidder shall initial all pages of the Technical and

Commercial bids.

b. Bid should be accompanied by an authorization in the name of the signatory of the

bid. The authorization shall be in the form of a written power of attorney

accompanying the bid or in any other form demonstrating that the representative has

been duly authorized to sign.

2.16 Amendment of request for proposal

a. At any time prior to the deadline for submission of proposals, NMRCL, for any

reason, may modify the RFP by amendment notified in writing or by fax or email to

all bidders who have received this RFP and such amendment shall be binding on

them. NMRCL, at its discretion may extend the deadline for the submission of

proposals

b. NMRCL reserves the right to change the scope before opening of the Commercial

bids. In this case, NMRCL will release a corrigendum/clarification and ask the

bidders to resubmit their commercial bids.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

25

2.17 Deviations and Exclusions

Bids shall be submitted strictly in accordance with the requirements and terms &

conditions of the RFP. The bidder shall submit a No Deviation Certificate as per the

format mentioned in Section6.3. The bids with deviation(s) are liable for rejection.

2.18 Total Responsibility

Bidder should issue a statement undertaking total responsibility for the defect free

operation of the proposed solution as per the format mentioned in Section 6.4.

2.19 Late bids

a. Bids received after the due date and the specified time (including the extended period if any) for any reason whatsoever, shall not be entertained.

b. Bids submitted in physical form, fax/e-mail etc. shall not be considered. No correspondence will be entertained on this matter.

c. NMRCL reserves the right to modify and amend any of the above-stipulated condition/criterion depending upon project priorities vis-à-vis urgent commitments.

2.20 Right to terminate the process

a. NMRCL may terminate the RFP process at any time and without assigning any reason. NMRCL makes no commitments, express or implied, that this process will result in a business transaction with anyone.

b. This RFP does not constitute an offer by NMRCL. The bidder's participation in this process may result in NMRCL selecting the bidder to engage towards execution of the contract.

2.21 Non-Conforming Proposals

A proposal may be construed as a non-conforming proposal and ineligible for consideration:

a) If it does not comply with the requirements of this RFP.

b) If a proposal appears to be “canned” presentations of promotional materials that do

not follow the format requested in this RFP or do not appear to address the particular

requirements of the solution, any such bidders may also be disqualified.

2.22 Acceptance/Rejection of bids

NMRCL reserves the right to reject in full or part, any or all bids without assigning any

reason thereof. NMRCL reserves the right to assess the bidder’s capability and capacity. The

decision of NMRCL shall be final and binding. All erasures, correction or addition must be

clearly written both in words and figures and attested. Offers not submitted in prescribed

manner or submitted after due date and time are liable to rejection.

In the event of any assumptions, presumptions, key points of discussion, recommendation

or any points of similar nature submitted along with the bid, NMRCL reserves the right

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

26

to reject the bid and forfeit the EMD.

If there is any discrepancy in the commercial bid it will be dealt as per the following:

a) If, in the price structure quoted for the required goods/services/works, there is

discrepancy between the unit price and total price (which is obtained by multiplying

the unit price by the quantity) the unit price shall prevail and the total price corrected

accordingly.

b) If there is an error in a total corresponding to the addition or subtraction of subtotals,

the subtotals shall prevail and the total shall be corrected.

c) If there is a discrepancy between words and figures, the amount in words shall

prevail.

d) If there is such discrepancy in an offer, the same shall be conveyed to the bidder with

target date up to which the bidder has to send his acceptance on the above lines and

if the bidder does not agree to the decision of NMRCL, the bid is liable to be rejected.

2.23 Confidentiality

All the material/information sent to the bidder shall be treated as confidential and

should not be disclosed in any manner to any unauthorized person under any

circumstances. The employees of the successful bidder who will be deployed on the

project will have to furnish a Non-Disclosure Agreement (NDA) as per RFP Vol 3

(Clause 16).

2.24 Disqualification

The proposal is liable to be disqualified in the following cases or in case bidder fails to meet

the bidding requirements as indicated in this RFP:

a) Proposal not submitted in accordance with the procedure and formats prescribed

in this document or treated as non-conforming proposal.

b) During validity of the proposal, or its extended period, if any, the bidder increases

its quoted prices.

c) The bidder’s proposal is conditional and has deviations from the terms and

conditions of RFP.

d) Proposal is received in incomplete form.

e) Proposal is received after due date and time.

f) Proposal is not accompanied by all the requisite documents.

g) Information submitted in technical bid is found to be misrepresented, incorrect or

false, accidentally, unwittingly or otherwise, at any time during the processing of

the contract (no matter at what stage) or during the tenure of the contract including

the extension period if any.

h) Financial bid is provided in the technical bid

i) Bidder tries to influence the proposal evaluation process by unlawful / corrupt /

fraudulent means at any point of time during the bid process.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

27

j) In case any one party submits multiple proposals, the bidder is likely to be

disqualified, unless additional proposals/ are withdrawn upon notice immediately.

2.25 Key personnel

NMRCL has identified certain key positions and minimum qualifications for each

of these positions that should be part of project team of the bidder (hereby referred to

as “key personnel”).

These resources would be dedicated resources on-site (at NMRCL) for the project till

at least 6 months after Go-Live. After 6 months of Go-Live, Bidder/Agency can

propose an updated governance structure to NMRCL for review and approval.

The Bidder/Agency shall deploy key personnel as part of the project team as per the

scope of work for this RFP. The following key personnel will operate from NMRCL

premises. Their deployment will be as per the deployment plan proposed by the bidder

and agreed by NMRCL and everyone is not required to be present through the project

timelines:

Sr. No. Role Pre Go Live Post Go Live

1 Engagement Director Yes Yes

2 Program Manager Yes Yes

3 Project Manager – Software Yes Yes

4 Project Manager - Infrastructure & Networks

Yes Yes

5 Team lead – Testing Yes Yes

6 5D BIM Expert Yes Yes

7 Solution Architect Yes On demand

8 Database Architect Yes Yes

9 Analytics Expert Yes Yes

10 Team Lead – Materials Management Yes Yes

11 Team Lead – Procurement Yes Yes

12 Team Lead – 2D & 3D drawings Yes Yes

13 Database Administrator Yes Yes

14 Team Lead – MIS Yes Yes

15 Operations Manager Yes

16 Business Analyst 1 Yes Yes

17 Business Analyst 2 Yes

18 Security Architect Yes

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

28

19 Training Expert Yes

20 Quality Analyst Yes Yes

NMRCL will provision space for 20 personnel in its premises (at Nagpur in India). The

profiles for the above roles are provided in section 3.5.4. If the Bidder/Agency believes that

the team required will be larger, adequate justification along with profile and timelines

should be submitted along with the RFP response.

The bidder is free to deploy its development, technical, and operational teams at its own

offices. The bidder has to ensure that the Service Levels are met at all times. The bidder has

to provide the detailed CV’s of the personnel deployed by them for the project. The cost of

the deployed personnel shall be part of the overall cost quoted for this RFP. Any cost on

account of project team/resources deployed shall not be attributable to NMRCL.

It is recommended that the proposed team as defined above and in addition as determined by

the bidder be present during the technical presentations/demonstrations, if the bidder

qualifies for technical evaluation.

2.25.1 Obligation

Bidder shall not make any changes to the composition of the Key Personnel and not require

or request any member of the Key Personnel to cease or reduce his or her involvement in

the provision of the services during the term:

i. unless that person resigns, is terminated for cause, dies, is long-term

disabled, is on permitted mandatory leave under Applicable Law or retires; or

ii. without NMRCL's prior written consent

2.25.2 Replacement

In case any key personnel have resigned then the bidder has to inform NMRCL within one

week of such resignation. Bidder shall promptly initiate a search for a replacement to ensure

that the role of any member of the key personnel is not vacant at any point in time during

the contract period, subject to reasonable extensions requested by bidder and approved by

NMRCL.

Before assigning any replacement member of the key personnel to the provision of the

services, bidder shall provide NMRCL with:

i. A resume, curriculum vitae and any other information about the candidate that is

reasonably requested by NMRCL; and

ii. An opportunity to interview the candidate.

The bidder has to provide replacement resource of equal or better qualification and

experience. If NMRCL objects to the appointment, bidder shall not assign the individual to

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

29

that position and shall seek an alternative candidate in accordance with this Section.

The bidder has to ensure at least four weeks of overlap period in such replacements.

NMRCL will not be responsible for any knowledge transition to the replacement resource

and any impact/escalation of cost because of replacement – this cost has to be incurred by

the Bidder/Agency only.

The team of the bidder deployed for the project (Key personnel and others) will be allowed

a total of 22 days leaves in a financial year (pro-rata allowed every quarter). Bidder/Agency

has to ensure suitable replacement for personnel deployed for critical tasks during their

leaves. For any leaves more than 22 days, NMRCL reserves the right to deduct appropriate

amounts based on the blended man month costs quoted by the bidder from the due

payments. In any case the Service Level Agreements have to be met at all times.

The calendar of Government of India will be applicable for administrative purposes.

2.25.3 High attrition

If in the first six month period from the Agreement effective date or in any rolling 12 months

period during the term, 20 percent or more of the members of the Key Personnel cease or

reduce their involvement in the services for any reason other than with NMRCL's prior

written consent, bidder shall:

i. Provide NMRCL with a reasonably detailed explanation as to the reasons for

such change, including, where applicable and permitted, notes from any exit

interviews conducted by bidder with any departing member of the Key Personnel;

and

ii. If such change to Key Personnel has or is likely to have any material adverse impact

on the provision of the Services or any substantial part thereof, undertake, at its own

costs, such remediation acts as are reasonably necessary in order to improve the

retention of the Key Personnel including making reasonable changes to the human

resources policies and procedures applicable to the Key Personnel (including those

related to compensation, benefits and other conditions so that they are competitive

with the market) as may be necessary to ensure that such policies and procedures

comply with good industry practice.

2.26 Conflict of Interest

NMRCL requires that the Bidder/Agency shall act as trusted advisers to NMRCL and shall

provide professional, objective, and impartial services and at all times hold NMRCL’s

interest paramount, avoid conflicts with other assignments or its own corporate interests.

The Bidder/Agency represents that it is not engaged and/or shall not engage in any

assignment or professional activities that would be in conflict with its current

obligations or that may place it in a position of not being able to carry out the assignment

in the best interests of NMRCL.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

30

31

Section 3:

Selection Process for Bidder

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

31

3 Selection Process for bidder

3.1 Opening of Bids

The Proposals will be opened by NMRCL as per the procedures and guidelines laid down

by the Government of Maharashtra for opening of e-tenders.

3.2 Preliminary Examination of Bids

NMRCL will examine the bids to determine whether they are complete, whether the

documents have been properly signed, and whether the bids are generally in order. Any bids

found to be non-responsive for any reason or not meeting any criteria specified in the RFP,

will be rejected by NMRCL and shall not be included for further consideration.

Initial Bid scrutiny will be held and bids will be treated as non-responsive, if bids are:

Not submitted in format as specified in the RFP document

Received without the Letter of Authorization (Power of Attorney)

Found with suppression of details

With incomplete information, subjective, conditional offers, and partial offers

submitted

Submitted without the documents requested

Non-compliant to any of the clauses mentioned in the RFP

With lesser validity period 3.3 Clarification on bids

During bid evaluation NMRCL may at its discretion, ask the bidder for a clarification

of its bid. The request for clarification and the response shall be in writing, and no

change in the price or substance of the bid shall be sought, offered, or permitted.

3.4 Evaluation process

NMRCL will constitute a Proposal Evaluation Committee (PEC) to evaluate the

responses of the bidders. The PEC shall evaluate the responses to the RFP and all

supporting documents/documentary evidence.

The decision of PEC in the evaluation of proposals shall be final. No correspondence

will be entertained outside the process of evaluation with the Committee. PEC may

ask for meetings with the bidders to seek clarifications or conformations on their

proposals.

The PEC reserves the right to reject any or all proposals. Each of the responses shall

be evaluated as per the criteria and requirements specified in this RFP.

The steps for evaluation are as follows:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

32

3.4.1 Stage 1: Technical evaluation

1. NMRCL will review the technical bids of the bidders to determine whether the

technical bids are substantially responsive. Bids that are not substantially responsive

are liable to be disqualified at NMRCL’s discretion.

3. The bidders' technical solutions proposed in the bid document will be evaluated as per

the requirements specified in the RFP and technical evaluation framework as

mentioned in Section 3.5.

4. Each Technical bid will be assigned a technical score out of a maximum of 1000 marks.

Only the bidders who get a technical score of 70 percent or more in each section

and 75 percent or more overall will qualify for commercial evaluation stage. Failing

to secure minimum marks shall lead to technical rejection of the bid.

5. The final normalized technical score of the bidder shall be calculated as follows:

Normalized Technical Score of a bidder = {Technical Score of that bidder /

Score of the bidder with the highest technical score} X 1000 (adjusted to 2

decimals)

Example:

Bidders

Technical

Score

Calculation

Normalized Technical

Score

Bidder-1 880 (880/950)*1000 926.3

Bidder-2

900

(900/950)*1000

947.3

Bidder-3

800

(800/950)*1000

842.1

Bidder-4

950

(950/950)*1000

1000

3.4.2 Stage 2: Commercial Evaluation

1. The commercial bids for the technically qualified bidders will opened and reviewed

to determine whether the commercial bids are substantially responsive. Bids that are

not substantially responsive are liable to be disqualified at NMRCL’s discretion.

3. Commercial bids that are not meeting the condition mentioned in Section 2.13 shall be

liable for rejection.

4. The normalized commercial score of the technically qualified bidders will be

calculated, while considering the commercial quote given by each of the bidders in the

commercial bid as follows:

Normalized Commercial Score of a bidder = {lowest discounted quote/

bidders discounted quote} X 1000 (adjusted to 2 decimals)

The discounted quote is the net present value (NPV) of total cash outflow for NMRCL for

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

33

five years discounted at 9%.

Example:

Bidders

Discounted Commercial

quote given by bidders

(In lakhs)

Calculation

Normalized

Commercial Score

Bidder-1 110 (110/110)*1000 1000

Bidder-2 140 (110/140)*1000 785.7

Bidder-3 160 (110/160)*1000 687.5

Bidder-4 130 (110/130)*1000 846.1

5. The bid price will include all taxes and levies and shall be in Indian Rupees and

mentioned separately.

6. Any conditional bid would be rejected

7. Errors and rectification: Arithmetical errors will be rectified on the following basis:

a. “If there is a discrepancy between the unit price and the total price that is

obtained by multiplying the unit price and quantity, the unit price shall prevail

and the total price shall be corrected.

b. If there is a discrepancy between words and figures, the amount in words will

prevail.”

3.4.3 Stage 3: Final score calculation through QCBS

1. The final score will be calculated through Quality and Cost selection method based with

the following weight-age:

Technical: 80% and Commercial: 20%

Final Score = (0.80*Normalized Technical Score) + (0.20* Normalized Commercial

Score)

Example:

Bidders Normalized technical

Score

Normalized

commercial score

Final Score

(80:20)

Bidder-1 926.3 1000 941.04

Bidder-2 947.3 785.7 914.98

Bidder-3 842.1 687.5 811.18

Bidder-4 1000 846.1 969.22

2. The bidder with the highest final score shall be treated as the successful bidder.

In the above example, bidder-4 will be treated as successful bidder. 3. In the event the final scores are ‘tied’, the bidder securing the highest technical score

will be adjudicated as the Best Value bidder for award of the project.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

3.5 Technical evaluation framework

The bidder's technical solution proposed in the technical evaluation bid document will be

evaluated as per the evaluation criteria mentioned in the table below:

# Evaluation Criteria Total

Marks

Minimum

Qualifying Marks

(Cut-off)

1 Bidder’s/Consortium Experience 250 >=162 (65%)

2 Proposed Solution 350 >=228 (65%)

3 Approach & Methodology 125 >=81 (65%)

4 Resource Planning, Project Governance &

Key personnel proposed

175 >=114 (65%)

5 Technical Presentation 100 >=65 (65%)

Total 1000 >= 700 (70%)

NMRCL (or a nominated party) reserves the right to check/validate the authenticity of the

information provided in the pre-qualification and Technical evaluation criteria and

requisite support must be provided by the bidder.

The following sections explain how the bidders will be evaluated on each of the evaluation

criteria.

3.5.1 Bidder’s experience

#

Citation

Citation Details

Documentary Evidence

Marks Allotted

1.

Experience in conceptualizing, process design, working with client to create and support the Owner Support Office

Experience in conceptualizing and creating an OSO for customers which have been able to leverage best in class processes as well as technology solutions of comparable scope and magnitude during the last seven (7) years from the date of submission of bid. Value of at least one project to be equal or greater than INR 5 crores.

3 citations (atleast 1 should be successfully completed) = 90,

Copy of work order + Completion Certificates/current status in case work is still in progress or not completed from the client

110

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

2 citations (atleast 1 should be successfully completed) =60,

1 citation (successfully completed) = 30

10 additional marks if one of the above citations is in Railways

10 additional marks if two of the above citations are in Metro

2.

Experience in System Integration projects – to include ERP, and infrastructure procurement, deployment & maintenance, (d) operations management, (e) Helpdesk Support

Experience in System Integration projects during the last seven (7) years from the date of submission of bid. Value of individual project to be at least of value INR 5 crores

5 citations (at least 3 should be successfully completed) = 50, 4 citations (at least 2 should be successfully completed) = 40, 3 citations (at least 1 should be successfully completed) = 30, 2 citations (at least 1 should be successfully completed) = 20, 1 citation (successfully completed) = 10

Copy of work order + Completion Certificates/current status in case work is still in progress or not completed from the client;

50

3.

Experience in 5D BIM deployment, implementation and support

Experience in 5D BIM during the last seven (7) years from the date of submission of bid. Value of project to be at least of value INR 5 crores

4 citations (at least 2 should be successfully completed) = 40, 3 citations (at least 1 should be successfully completed) = 30, 2 citations (at least 1 should be successfully completed) = 20 1 citation (successfully completed) = 10

20 additional marks if done by

primary bidder and not consortium

20 additional marks if integration

with specified ERP has been done

10 additional marks if work done for Railways

Copy of work order + Completion Certificates/current status in case work is still in progress or not completed from the client;

90

TOTAL 250

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

3.5.2 Proposed Solution

# Citation Areas to be Demonstrated Documentary Evidence

Marks

Allotted

1 Solution / Product

Experience

Whether the proposed Solution (technologies as proposed in this bid) is deployed and operational in an existing project (50)

Bidders will be evaluated as per their prior experience of deploying and maintaining of technologies proposed for this project (40)

In case consortium is bidding, if they have worked on similar project together (30)

Copy of work order +

Completion Certificates

from the client or current

status in case work is still

in progress or not

completed

120

2 Overall Solution & Deployment

Architecture

Functional, Application, and Integration architecture, Infrastructure deployment proposed covering at minimum the below key aspects: Modularity of the systems Integration by design with

seamless information flow

Scalability to handle future load by

adding additional compute and no

constraints on the application

Suitability of Tools & Technologies

proposed including capacity to

handle the volumes envisaged with

no degradation in performance

Risk and mitigation Plan

Plan to handle multiple stakeholders

Mobile enabled consumption

Proposal and presentation citing references where similar solution has been deployed citing customer references. If the solution is work in progress, client certificate on current status is to be submitted The architecture should include deployment strategies including tools that will be used for integration and monitoring.

100

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

37

3 Security

Architecture

Presentation including:

Access & Identity Management

Application Security

Database security

including ensuring non

repudiation of data and

reconstruction of truth

Governance framework to cover the threat landscape

Solution to ensure

foolproof security of the

system from various

threats including hacking

attempts, internal threats,

etc.

Privilege management

Compliance to Regulations

(IT Act, and other

government guidelines )

Proposal and presentation 80

4 Database architecture

Database integration and security for data change

Proposal and presentation 50

TOTAL 350

3.5.3 Approach & Methodology

#

Criteria Criteria Details Marks

Allotted

1. Understanding of

Business and Scope of

work and all aspect of

the Project

Demonstrated level of understanding of Railway business processes, project purpose and scope of work. Average (20), Good (30), Very Good (40), and

Excellent (50)

50

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

38

2. Approach for

Implementation of the

project including Tools,

Technologies used for

project control and

execution (e.g.

Configuration mgmt.,

Project monitoring and

reporting, etc.)

Approach for project implementation and bidder's

plan for performing the required services as detailed

in scope of work in the RFP and to meet the desired

SLAs

Average 25

Good 30

Very Good 35

Excellent 40

40

3. Exit Management plan Detailed Transition and Exit Management plan. To

include:

Comprehensiveness of scope of work

Level of detail

Phase wise Exit Management plan

Knowledge sharing

35

TOTAL 125

3.5.4 Resource Deployment Plan and Team Composition

For a project of such a large scale and complexity, it is imperative that the

Bidder/Agency should deploy best in class professionals to ensure successful

execution. The Bidder/Agency will in its proposal include the names and detailed

curriculum vitae of their key personnel who will be working full time on this project.

NMRCL will provision space for 20 personnel in its premises (at Nagpur in India).

For the key personnel working out of NMRCL’s office, NMRCL will provide them

with basic office infrastructure like seating space, internet connection, and a common

telephone line. The Bidder/Agency team is expected to bring their own laptops and

data cards (as required). The proposed list of identified key roles and their onsite

deployment requirement is as given below:

# Criteria Criteria Details Marks

Allotted

1. Resource Deployment Plan & Governance structure

Bidder would be evaluated for Resource

Deployment Plan & Governance Structure Average (40), Good (50), Very Good (60), and Excellent (75)

( 40 marks for resource deployment plan

and 35 marks for governance structure)

75

2. Program Manager Should fulfill basic minimum qualification as 20

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

39

3. OSO Domain and Metro rail expert

mentioned in RFP in terms of

Qualification & Certification

Total experience

Experience in similar assignments

30

4. 5D BIM expert 10

5. Solution Architect 5

6. Procurement Expert 5

7. Integration Expert 5

8. Database Architect 5

9. Security Expert 5

10. Other – Key Personnel 15

TOTAL 175

Following table specifies the minimum qualification required for Key Positions

identified for this project.

# Position Minimum Qualifications

1.

Program Manager

Education: Full Time MBA/M. Tech & B. Tech/B.E. from a reputed institute

Total Experience: Should possess at least 20 years of

experience in IT/Consulting.

Should have more than 10 years of experience of handling

such large projects as a project/program manager (system

user base of more than 500/project value more than INR 5

crores)

Should possess Project Management certification like PMP or

Prince2.

Should have led team of more than 50 direct/indirect

people.

Should have led at least one such project end to end i.e. from

Design to deployment to O&M phase (system user base of

more than 500/project value more than INR 50 crores)

Excellent writing, MIS, communication, time management

and multi-tasking skills

Previous experience of handling large Railway/Government

projects would be an added advantage

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

40

2.

Project Manager –

Software

Should have a minimum educational qualification of BE/B.

Tech (in Computer Science/IT/EC) or MCA.

Should have an overall experience of 15 years or above in

Software project implementation of which exclusively, at

least the last 5 years should have been spent while working

as Manager Application Development/Application

Maintenance.

The person should be preferably PMP or Prince 2 certified.

Experience in prevalent project methodologies e.g. Agile.

Should have managed a team of 10+ software developers.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

41

# Position Minimum Qualifications

3.

Project Manager -

Infrastructure &

Networks

Education: Full time M. Tech/B. Tech/B.E. from a

reputed institute

Total Experience: 15 years or above in IT infrastructure

Should have experience of leading at least three such large

scale projects (system user base of more than 500/project

value more than INR 5 crores)

At least 7 years of experience as Manager IT Infrastructure for

at least 4 relevant projects involving Data Center and DR

center

Should have managed a team of 10+ resources

Experience in setting up an IT ecosystem from scratch would

be an added advantage

4.

Team Lead –Testing

Education: B.E/MCA

Total experience: 15 years or above in Testing (load, unit, user

acceptance, performance, etc.)

At least 7 years of experience as a Lead Manager for Testing in large projects. (system user base of more than 500 project value more than INR 5 crores) Good knowledge of applicable test tools and test environment

Must possess testing, strong analytical & troubleshooting

skills.

Must have good aptitude for Quality Assurance

The person should preferably be CSQA or ISTQB Certified.

5.

5D BIM Expert

Education: Full time M. Tech/B. Tech/B.E. from a

reputed institute

Total Experience: More than 15 years with at least 10 years in the field of Building and Modeling using computers

Preference is given for person having work experience both in

the Government and Private sector.

Should have experience of executing more than 3 large

projects with BIM and at least one with 5D BIM is desirable

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

42

6.

Solution Architect

Education: Full time M. Tech/B. Tech/B.E. from a

reputed institute

Total Experience: At least 15 years in IT domain

Should have experience of more than 7 years as Solution

Architect in large projects of similar nature

Should have architected at least three such large scale projects

(system user base of more than 500/project value more than

INR 5 crores)

Should possess Industry standard certifications like TOGAF.

# Position Minimum Qualifications

7.

Database Expert

Education: Full time MCA/M. Tech/B. Tech/B.E./Certified

DBA

Total Experience: At least 12 years in IT domain

Should have experience of more than 7 years in Database

architecting/design in large projects of similar nature (system

user base of more than 500/project value more than INR 5

crores)

Experienced in database activities like instance tuning,

schema management, space management, backup &

recovery, disaster recovery, data replication, database refresh

etc.

Person needs to mandatorily have experience in Databases

that are proposed for the solution

8.

Analytics Expert

Education: Full time MCA/M. Tech/B. Tech/BE

Total Experience: At least 12 years in IT

Should have experience of more than 7 years in Data Analytics

Experienced in designing data warehouses/marts as required

9.

Team Leads

Education: Full time MCA/M. Tech/B. Tech/BE

Total experience: At least 12 years in Information Technology

Should have experience of at least 7 years in the areas for

which they are proposed as Team Leads

Working in Metro/Railway projects will be an advantage

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

43

10.

Operations

Manager

Education: Full time MCA/M. Tech/B. Tech/BE or equivalent

with preferably MBA degree

Should have an overall experience of more than 15 years or

above in maintenance and operations of large IT setups

Should have experience of at least 7 years working in a

managerial role in the maintenance phase of at least one IT

implementation project involving 30 members or more.

Certified in ITIL, knowledge of ISO 20000, 27001 standards.

11.

Business

Analyst(s)

Education: Full time MCA/M. Tech/B. Tech/BE or equivalent

with preferably MBA degree

Total experience: Should have an overall experience of 10

years or above in the field of IT & ICT project implementation

in Railway/Metro/Construction industries.

Should have expert knowledge in Requirements Analysis,

business process workflow preparations, domain, use case

creation, etc.

# Position Minimum Qualifications

12.

Security Architect

Education: Full time M. Tech/B. Tech/BE or equivalent.

Total experience: Should have an overall experience of 12

years or above in the field of Information Technology.

Should have experience of at least 7 years in designing and

maintaining security systems in large projects.

Should have OEM/Industry Standard certification like CISM,

CISSP, ISO 27001 etc.

13.

Training Expert

Education: Should have a minimum educational qualification

of Masters/MBA in Human Resources

Should have an overall experience of more than 8 years or

above in conducting Organization Training and Human

Resource Management.

Excellent communication skills with fluency in Hindi and

English. Fluency in Marathi is desirable.

Experienced in leading teams for designing and preparing

training content and material

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

44

14.

Quality Analyst

Education: Should have minimum educational qualification

of BE/B. Tech (in Computer Science) or MCA

Total Experience: Should have an overall experience of 8

years or above in software testing and quality assurance

processes

At least 4 years’ of experience exclusively in lead roles for

software quality assurance projects while leading a team of 4

members or above

Should be certified in Industry standard certifications like

CSQA

3.5.5 Demonstration and presentation

# Criteria Criteria Details Marks

Allotted

1. Presentation (90 minutes presentation + 30 minutes Q&A)

Answer queries

Quality of presentation

SLA management

Completeness of solution

Governance framework

Quality Assurance & Framework

100

TOTAL 100

Note: The presentation is to be delivered by the bidder’s nominated Program Manager.

Bidder needs to commit 100 percent time availability of key personnel proposed from the

day 1 of the project. In case the team is not committed to the project the bid may be

rejected by NMRCL. The project sponsor from the bidder’s organization should be

present during the presentation.

Wherever there is problem in providing name or cost of project due to Non-disclosure

agreements with the clients, the bidder can provide a certificate from an independent

auditor or Company Secretary. The bidder has to provide an undertaking that to this

effect.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

45

5

Section 4:

Award of Contract

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

46

4 Award of Contract

4.1 Notification of Award

Prior to the expiration of the validity period, NMRCL will notify the successful

bidder in writing or by fax or email, that its proposal has been accepted. In case the

tendering process has not been completed within the stipulated period, NMRCL

may like to request the bidders to extend the validity period of the bid.

The notification of award will constitute the formation of the contract. Upon the

successful bidder's furnishing of Performance Bank Guarantee, NMRCL will notify

each unsuccessful bidder and return their EMD.

4.2 Signing of Contract

After the notification of award, NMRCL will issue Purchase Order (PO)/Letter of

Intent (LOI). The bidder shall sign and return back to NMRCL duplicate copy of the

PO/LOI as an acceptance of the PO/LOI within 7 working days from the date of

issuance of PO/LOI.

On receipt of the Performance Bank Guarantee, NMRCL shall enter into a contract.

The Master Service Agreement is provided in RFP Vol 3. The contract has to be

signed within one month from date of issuance of PO/LOI.

4.3 Performance Bank Guarantee (PBG)

The successful bidder shall at his own expense deposit with NMRCL, within fifteen

(15) working days from the date of issuance of PO, an unconditional and irrevocable

Performance Bank Guarantee (PBG) from a scheduled commercial bank, in the format

prescribed in Section 9.1, payable on demand, for the due performance and fulfilment

of the contract by the bidder.

This Performance Bank Guarantee will be for an amount equivalent to 10 percent of

total contract value. It is the intent of NMRCL that the PBG equivalent to 5 percent

of total contract value is returned to the bidder after six months of Project Go-Live.

Thus, the bidder needs to submit two PBG’s, each equal to 5 percent of value of

contract. The validity of the PBGs will be up to 6 months after the contract end date.

One PBG will be returned to the bidder six months after project Go-Live.

PBG shall be invoked by NMRCL in the event the Bidder/Agency:

i. Fails to meet the overall liquidated damages condition as mentioned in RFP Vol

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

47

2 or any changes agreed between the parties,

ii. Fails to perform the responsibilities and obligations as set out in the RFP to the

complete satisfaction of NMRCL including failure to comply with exit

management responsibilities.

iii. Misrepresentations of facts/information submitted to NMRCL.

The PBG shall be valid till satisfactory completion of Post Implementation Support.

The PBG may be discharged/returned by NMRCL upon being satisfied that there has

been due performance of the obligations of the bidder under the contract. However,

no interest shall be payable on the performance bank guarantee.

In the event of the bidder being unable to service the contract for whatever reason,

NMRCL would invoke the PBG. Notwithstanding and without prejudice to any

rights whatsoever of NMRCL under the contract in the matter, the proceeds of the

PBG shall be payable to NMRCL as compensation for any loss resulting from the

bidder’s failure to perform/comply its obligations under the contract. NMRCL shall

notify the bidder in writing of the exercise of its right to receive such compensation

within 40 days, indicating the contractual obligation(s) for which the bidder is in

default.

NMRCL shall also be entitled to make recoveries from the bidder’s bills, performance

bank guarantee, or from any other amount due to him, an equivalent value of any

payment made to him due to inadvertence, error, collusion, misconstruction or

misstatement.

In case the project is delayed beyond the project schedule as mentioned in RFP Vol 2,

the performance bank guarantee shall be accordingly extended by the bidder till

completion of scope of work as mentioned in RFP Vol 2.

On satisfactory performance and completion of the order in all respects and duly

certified to this effect by the Project Coordinator, Contract Completion Certificate will

be issued and the PBG will be returned to the bidder.

4.4 Failure to agree with the Terms & Conditions of the RFP

Failure of the successful bidder to agree with the Terms & Conditions of the RFP shall

constitute sufficient grounds for the annulment of the award, in which event NMRCL

may award the contract to the next best value bidder or call for new proposals.

In such a case, NMRCL shall invoke the PBG and/or forfeit the EMD.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

48

54

Annexures

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

49

5 Annexure 1 – Template for Pre-Bid Queries

Bidder shall submit all pre-bid queries in excel in the following format.

#

Volume

No.

Clause

No.

Page

No.

Section

(Name

& No.)

Statement as

per tender/

RFP

document

Suggestion

/ Query by

bidder

Rationale for

suggestion

1

2

3

4

5

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

50

6 Annexure 2 – Formats for Submission of the Pre-

Qualification Bid

6.1 No Deviation Certificate

This is to certify that our offer is exactly in line with your tender enquiry/RFP (including

amendments) no. dated _ _. This is to expressly certify that our

offer contains no deviation either Technical (including but not limited to Scope of Work,

Business Requirements Specification, Functional Requirements Specification, Hardware

Specification and Technical Requirements Specification) or Commercial in either direct or

indirect form.

(Authorised Signatory)

Signature:

Name:

Designation:

Address:

Seal:

Date:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

51

6.2 Total Responsibility

This is to certify that I undertake the total responsibility for the defect free operation of the

proposed solution as per the requirement of the RFP for the duration mentioned in all the

volumes of the RFP.

(Authorised Signatory)

Signature:

Name:

Designation:

Address:

Seal:

Date:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

52

7 Annexure 3 – Formats for Submission of the Technical

Bid

7.1 Technical Bid Covering Letter

To,

Shri Brijesh Dixit

Managing Director,

Nagpur Metro Railway Corporation Limited Nagpur Email ID:

Phone number: +91

Subject: Submission of the Technical bid for OSO, 5D BIM & ERP Project

Dear Sir,

We, the undersigned, offer to be the Bidder/Agency to NMRCL in reference to your Request

for Proposal dated November 17, 2015 and our Proposal. We are hereby submitting our

Proposal, which includes Technical and Commercial Bid through the e-tendering site.

We hereby declare that all the information and statements made in this Technical bid are

true and accept that any misinterpretation contained in it may lead to our disqualification.

We agree to abide by all the terms and conditions of all the volumes of this RFP document.

We would hold the terms of our bid valid for the number of days as stipulated in the RFP

document.

We understand you are not bound to accept any proposal you receive.

Yours sincerely,

(Authorised Signatory)

Signature:

Name:

Designation:

Address:

Seal:

Date:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

53

7.2 Bidder’s General Information

I. Bidder

Following table shall be filled with the details of the bidder.

S.

No.

Item

Bidder’s Response

1.

Company Name

2.

Year Established

3.

Incorporated in India

(Yes or No)

4.

Contact Name

5.

Position

6.

Address

7.

Mobile

8.

Telephone

9.

Fax Number

10.

Email Address

11.

Alternate Email Address

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

54

7.3 Bidder’s Experience - Client Citations

S.

No.

Item Bidder’s Response

1.

Proposed Product/Solution/Criteria (for

which the citation has been provided)

2.

Name of bidder entity

3.

Assignment Name

4.

Name of Client

5.

Country

6.

Contact Details

(Contact Name, Address, Telephone Number, e-mail

address)

7.

Approximate Value of the Contract

8.

Relevant Value of the Contract

9.

Duration of Assignment (months)

10.

Award Date (month/year)

11.

Completion Date (month/year)

12.

Narrative Description of the project

13.

Details of Work that defines the scope

relevant to the requirement

14.

Documentary Evidence attached

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

55

7.4 Resource Deployment Plan

I. Before Go-Live (Implementation)

#

Role

T

o

t

a

l

S

t

a

f

f

p

e

r

s

o

n

-

m

o

n

t

Distribution of Total

1

2

3

4

5

6

7

8

9

Total

Onsite Offshore

1.

Engagement director

2.

Program Manager

3.

Solution Architect

4.

5.

6.

7.

8.

<Add more rows>

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

56

II. After Go-Live (Support – IT Helpdesk, Application Support, Infra support)

#

Role

Years

1

2

3

4

5

Total

1.

2.

3.

4.

5.

6.

<Add more rows>

Note:

1. The Resource deployment plan includes not only the names of key personnel but will

also include all other project team members including the development team

2. In highlighted cells enter the number of man-months the resource will be deployed

for

3. While the resource deployment plan is based on roles, the bidder needs to include

the names and CV’s of the key personnel proposed to be deployed on the project.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

57

7.5 Curriculum Vitae (CV) of Key Personnel

S.

No.

Item

Bidder’s Response

1. Name

2. Specify role to be played in the project

3. Name of Organization

4. Number of years with the Current

Organization

5. Total Experience (in Years)

6. Relevant Experience (in Years)

7.

Relevant experience details (Details of

Platforms, systems, applications worked

on/development carried out/Management

experience/etc.)

8. Experience in yrs. (Provide details regarding name of organizations worked

for, Designation, responsibilities, tenure etc.)

Name of

Organization

From

To

Designation/

Responsibilitie

s

8.1.

8.2.

9. Summarized professional experience (Relevant to the Current Project) in

reverse chronological order

From

To

Company/Project/Position/

Relevant Functional,

Technical and Managerial

experience

9.1.

9.2.

10. Educational Background, Training/Certification including institutions, % of

marks, specialization areas etc.

Degree

Year of Award of Degree

University

% of marks

10.1.

10.2.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

58

Generic profiles of important dedicated team members for the Project (including

sustenance phase) shall be provided by the Bidder/Agency. The profile must

include the following:-

Qualifications

Experience in his domain of operation

Certifications

Large projects handled in the past for proposed role.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

59

7.6 Project Plan

S. No. Activity Months

1

2

3

4

5

6

7

8

9

10

11

12

1.

2.

3.

4.

5.

6.

7.

<Add more rows>

The plan shall be prepared and tracked through a professional project management

tool. NMRCL will be provided with a free viewer / PDFs of the plans.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

60

7.7 Bill of Material (BOM) for the Solution

1. Solution Proposed (Site wise)

# Proposed

Solution

(Provide the

Product Name

Nomenclature of Product

Version & Year of Release (if applicable)

OEM (if

applicable)

Features &

Functionalities

Reference in the Submitted Proposal (Please provide page number/section number / volume)

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

61

2. Bill of Material (Software)

# Item Proposed software product (Provide the Product Name and Part Number – to be filled for all COTS/open source and system software)

Unit of

Measurement

Number of

Licenses

(Development

Environment)

Number of

Licenses (UAT)

Number of

Licenses

(Data Center

Production)

Number of

Licenses

(DR Site)

Bidder must provide the licensing matrix for all products proposed to be deployed.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

62

3. Bill of Material (Infrastructure Requirements – excluding system software)

Provide the following information in a table

# Item Referenc

e of Item

Informati

on in

proposal

Purpose

(e.g.

services

proposed

to be

hosted on

the server)

Quantit

y

Make

and

Model

Year of

Introducti

on

Operatin

g system

along

with

version

(if

applicabl

e)

Process

or and

Number

of Cores

Offered

(if

applicab

le)

Capacity

Parameter

s

e.g.

RAM/HD

D/LAN

Ports/HB

A (as

relevant)

Licensing details of

software e.g;

Bundled licenses, end

user agreements,

licensing renewal

agreements, etc

Additi

requi

compl

requi

(e.g.

space

1

2

3

Note: Bidder also needs to provide detailed Bill of quantity (BoQ) of each Infrastructure component along with part number of e ach component

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

63

7.8 Manufacturers'/Producers’ Authorization Form

(On Company letterhead only)

Date: dd/mm/yyyy

To,

Shri Brijesh Dixit

Managing Director,

Nagpur Metro Railway Corporation Limited Nagpur Email ID:

Phone number: +91

Subject: Supply of equipment for “Digital Project Management project” for NMRCL

Sir,

This is to certify that <Insert complete legal name of the OEM>; I/we am/are the Original Equipment Manufacturers (“OEM”) in respect of the products listed below (“Products”). I/We confirm the Products listed herein have not been announced as End-of- Life or End-of-Sale.

I/We confirm that <Insert complete legal name of Bidder/Agency> has due authorization from us to resell and supply certain OEM Equipment(s), to NMRCL. The Bidder/Agency is authorised by us, to provide the solution, implementation, requisite training & maintenance services, provide maintenance and upgrade support services for our products for the listed Information Technology infrastructure and System Integration services to NMRCL.

When resold by reseller the Products shall be subject to applicable warranty terms and service policies of the OEM.

I/We affirm that as of the date of this letter, we shall make support available for the Product(s) and provide support of parts for repair (or functionally equivalent replacements) thereof for a period of up to five (5) years from the date of sale to NMRCL and that we currently expect to make these Products, or subsequent versions or functional equivalents of them, available for sale during such period of time.

We assure you that in the event of Bidder/Agency, not being able to fulfil its obligation as our representative in respect of applicable standard warranty terms we would continue to meet our warranty terms for the entire term of the Bidder/Agency agreement with NMRCL, as signed at the start of the project, through appropriate alternate arrangement(s) through our support mechanism in India.

This authorization letter is applicable against the Products listed below:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

64

S. No. Product Name

1.

2.

3.

For and on behalf of <Insert OEM’s company name>

<Signed and Sealed>

<Name of Authorised Signatory> <Designation> <Contact Details>

Cc: Bidder/Agency’s corporate name & Address

Note: This letter of authority should be on the letterhead of the manufacturer and should be

signed by a person competent and having the power of attorney to bind the manufacturer.

The bidder in its Bid should include it.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

65

7.8.1 OEM Undertaking – Support for COTS Solution/Hardware

We confirm that our firm/company <> takes full responsibility for providing complete technical support for all aspects of project implementation, solution maintenance and support during entire period of Project including extended period if any as stated in RFP. We through this undertaking shall signify and vetting of the COTS solution <product name>/Hardware <product name> as proposed and implemented by bidder.

Sincerely,

<Signed and Sealed>

<Name of Authorised Signatory> <Designation> <Contact Details>

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

66

7.8.2 OEM Undertaking – Support Mechanism

We confirm that our firm/company <> have support mechanism in India, directly through our support office in India or through our authorized channel partners in India. By using this we will provide support during entire period of Project including extended period if any, as stated in RFP. This would be in addition to web support or remote support.

Sincerely,

<Signed and Sealed>

<Name of Authorised Signatory> <Designation> <Contact Details>

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

67

8 Annexure 4 –Formats for Submission of the Commercial

Bid

8.1 Commercial Bid Covering Letter

To: Shri Brijesh Dixit

Managing Director,

Nagpur Metro Railway Corporation Limited Nagpur Email ID:

Phone number: +91

Subject: Submission of the Commercial bid for Digital Project Management Project

Dear Sir/Madam,

We, the undersigned, offer to provide the OSO, 5D BIM & ERP Project in accordance with

your Request for Proposal dated <<Date>> and our Proposal. Our attached Commercial

Bid is for the amount of <<Amount in words and figures>>. This amount is inclusive of

all the taxes.

1. PRICE AND VALIDITY

All the prices mentioned in our bid are in accordance with the terms as specified in

the RFP documents. All the prices and other terms and conditions of this Bid are

valid for a period of <180 days> calendar days from the date of opening of the Bid.

We hereby confirm that our prices include all taxes. However, all the taxes are quoted

separately under relevant sections.

We understand that the actual payment would be made as per the existing indirect

tax rates during the time of payment.

2. UNIT RATES

We have indicated in the relevant forms enclosed the unit rates for the purpose of on

account of payment.

3. RFP PRICING

We further confirm that the prices stated in our bid are in accordance with your

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

68

Instruction to bidders included in RFP documents.

4. QUALIFYING DATA

We confirm having submitted the information as required by you in your Instruction to

bidders. In case you require any other further information/documentary proof in this

regard before evaluation of our bid, we agree to furnish the same in time to your

satisfaction.

5. BID PRICE

We declare that our Bid Price is for the entire scope of the work as specified in all the

Volumes of this RFP and Annexures thereto. Our bid prices are mentioned in the

submitted Commercial Bid.

6. PERFORMANCE BANK GUARANTEE

We hereby declare that in case the contract is awarded to us, we shall submit the

Performance Bank Guarantee as specified in the Section 9.1 of this RFP document.

Our Commercial Bid shall be binding upon us subject up to expiration of the validity period

of the Proposal, i.e., [Date].

We understand you are not bound to accept any Proposal you receive.

We hereby declare that our bid is made in good faith, without collusion or fraud and the

information contained in the bid is true and correct to the best of our knowledge and belief.

Thanking you,

(Authorised Signatory)

Signature:

Name:

Designation:

Address:

Seal:

Date:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

69

8.2 Summary of Cost Components

This is the summary table of commercial bid for this RFP. All the base prices in this table shall be picked from tables in the following sub- sections. All expenses related to travelling, lodging, boarding and other expenses, if not specified in the RFP, will have to be borne by the bidder. All amounts are in INR. All the applicable taxes shall be paid by NMRCL on actual as per the tax rates prevailing on the date of invoicing.

SUMMARY OF COST COMPONENTS

Serial No

Item Description

Schedule

C0

C1

C2

C3

C4 C5 C6

Total Value (Inclusive of applicable Taxes) (Total Value

C0+C1+C2+C3+C4+C5+C6)

Percentage of Total Project Cost

1

Capital Expenditure (CAPEX) - Total Capex Value

A

2

Operation & Maintenance Cost (OPEX)

B

3

Total Cost of the Project (A+B)

4

Optional Items

C

Total Bid Value (in FIGURES) (A+B+C)

Total Bid Value (in WORDS) (A+B+C)

Note:

1. Total CAPEX value should not exceed 40% of the Total Cost of the Project.

2. C0 is the subtotal of consolidated charges quoted by the bidder for the Pre Go-LIVE phase (C0 shall include cost of optional items)

3. C1 is the Consolidated Charges payable for year 1 after Go-Live.

4. C2 is the Consolidated Charges payable for year 2 after “Go-Live”

5. C3 is the Consolidated Charges payable for year 3 after “Go-Live”

6. C4 is the Consolidated Charges payable for year 4 after “Go-Live”

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

70

7. C5 is the Consolidated Charges payable for year 5 after “Go-Live”

8. C6 is the Consolidated Charges payable for year 6 after “Go-Live”

8.3 Calculation of Net Present Value

CALCULATION OF NET PRESENT VALUE

Serial No

Item Description Net Present Value

(Inclusive of applicable Taxes)

1

Capital Expenditure (CAPEX)

2

Operating & Maintenance Cost (OPEX)

3

Optional Items

NPV of the Bid Value (in FIGURES) (1+2+3)

NPV of the Bid Value (in WORDS) (1+2+3)

The NPV will be calculated using the formula below:

NPV = C0 + C1/(1+r) + C2/(1+r)2 + C3/(1+r)3 + C4/(1+r)4 + C5/(1+r)5

Note that the optional items shall not be discounted for calculating NPV. NPV will be calculated using r = 9%.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

71

8.4 Capital Investments – Schedule A

CAPITAL INVESTMENT COST TABLE

Serial

No

Item Description

Sche dule

Na me of Tax

Ra te of Ta x

Year 1

Year 2

Year 3

Year 4

Year 5

Total CAPEX (Inclusive of applicable Taxes)

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Co st

Applic able Taxes

Tota l OPE X

1

Infrastructure & Licenses

COTS solutions Tools & Licenses

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Hardware

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Insert others as required

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2

Implementation services

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

5

Others (Insert each item in a separate row as required)

A

(insert detail)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B (insert detail) -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Year-wise Cost

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Total CAPEX Cost (in FIGURES)

Total CAPEX Cost (in WORDS)

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

72

8.5 Operations and Maintenance Costs (OPEX) – Schedule B

OPERATING EXPENDITURE COST TABLE

Serial

No

Item Description

Sche dule

Na me of Tax

Ra te of Ta x

Year 1

Year 2

Year 3

Year 4

Year 5

Total OPEX (Inclusive of applicable Taxes)

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Co st

Applic able Taxes

Tota l OPE X

1

Hosting Charges

DC

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

DR

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2

Bandwidth Cost

F

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

3

Operations & Maintenance (O&M)

G

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

4

Sandbox Operations

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

5

Others (Insert each item in a separate row as required)

A

(insert detail)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B (insert detail) -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Year-wise Cost

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Total OPEX Cost (in FIGURES)

Total OPEX Cost (in WORDS)

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

73

8.6 Hardware Costs – Schedule D

OPERATING EXPENDITURE COST TABLE

Serial

No

Item Description

Schedule

Na me of Tax

Rate of Tax

Year 1

Year 2

Year 3

Year 4

Year 5

Total OPEX (Inclusive of applicable Taxes)

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Base Cost

Applic able Taxes

To tal

Co st

Applic able Taxes

Tota l OPE X

1

Servers

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2

Storage

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

3

SAN Switches

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

4

Others (Insert each item in a separate row as required)

A

(insert detail)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B (insert detail) -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Year-wise Cost

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Total Hardware Cost (in FIGURES)

Total Hardware Cost (in WORDS)

Note:

1. Provide cost for each year i.e. for Year 1 Year 2, Year 3, Year 4 and Year 5. Please add requisite columns.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

74

8.7 COTS Software and other Tools and licenses – Schedule E

SOFTWARE COST TABLE

Serial No

Item Description

Name of TAX

Rate of TAX

Pre Go-Live

Year 1

Year 5

Cost for entire project duration (Inclusive of applicable

Tax)

No of Units (X)

Rate (per unit ) (Y)

Base Cost (= X*Y )

Applicable Tax

Total

No of Unit s (X)

Rat e (per unit ) (Y)

Bas e Cos t (= X*Y )

Applicable Tax

Total

No of Unit s (X)

Rat e (per unit ) (Y)

Bas e Cos t (= X*Y )

Applicable Tax

Total

Cost

Applicable Tax

Total Cost

1

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

2

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

3

Others (Insert each item in a separate row as required)

A

(insert detail)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

B

(insert detail)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

Year-wise

Cost

-

-

-

-

-

-

-

-

-

-

-

-

Total SOFTWARE Cost (in FIGURES)

0

Total SOFTWARE Cost (in WORDS)

Note:

1. Provide cost for each year i.e. for Year 1, Year 2, Year 3, Year 4 and Year 5. Please add requisite columns.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

75

9 Annexure 5 – Template for PBG

9.1 Performance Bank Guarantee

PERFORMANCE SECURITY:

To, Shri Brijesh Dixit

Managing Director,

Nagpur Metro Railway Corporation Limited Nagpur Email ID:

Phone number: +91

Whereas, <<name of the supplier and address>> (hereinafter called “the bidder”) has

undertaken, in pursuance of contract no. <Insert Contract No.> dated. <Date> to provide

Implementation services for <<name of the assignment>> to NMRCL (hereinafter called

“the beneficiary”)

And whereas it has been stipulated by in the said contract that the bidder shall furnish you

with a bank guarantee by a recognized bank for the sum specified therein as security for

compliance with its obligations in accordance with the contract;

And whereas we, <Name of Bank> a banking company incorporated and having its

head/registered office at <Address of Registered Office> and having one of its office at

<Address of Local Office> have agreed to give the supplier such a bank guarantee.

Now, therefore, we hereby affirm that we are guarantors and responsible to you, on behalf

of the supplier, up to a total of Rs.<Insert Value> (Rupees <Insert Value in Words>

only) and we undertake to pay you, upon your first written demand declaring the supplier

to be in default under the contract and without cavil or argument, any sum or sums within

the limits of Rs. <Insert Value> (Rupees <Insert Value in Words> only) as

aforesaid, without your needing to prove or to show grounds or reasons for your demand or

the sum specified therein.

We hereby waive the necessity of your demanding the said debt from the bidder before

presenting us with the demand.

We further agree that no change or addition to or other modification of the terms of the

contract to be performed there under or of any of the contract documents which may be

made between you and the bidder shall in any way release us from any liability under this

guarantee and we hereby waive notice of any such change, addition or modification.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

76

This Guarantee shall be valid until <<Insert Date>>)

Notwithstanding anything contained herein:

I. Our liability under this bank guarantee shall not exceed Rs. <Insert Value> (Rupees

<Insert Value in Words> only).

II. This bank guarantee shall be valid up to <Insert Expiry Date>)

III. It is condition of our liability for payment of the guaranteed amount or any part thereof

arising under this bank guarantee that we receive a valid written claim or demand for

payment under this bank guarantee on or before <Insert Expiry Date>) failing which our

liability under the guarantee will automatically cease.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

77

9.2 Bank Guarantee for Earnest Money Deposit

To, Shri Brijesh Dixit

Managing Director,

Nagpur Metro Railway Corporation Limited Nagpur Email ID:

Phone number: +91

Whereas <<Name of the bidder>> (hereinafter called 'the bidder') has submitted the bid for

Submission of RFP # <<RFP Number>> dated <<Date>> for <<Name of the assignment>>

(hereinafter called "the Bid") to <<Nodal Agency>>

Know all Men by these presents that we << >> having our office at <<Address>>

(hereinafter called "the Bank") are bound unto the <<Nodal Agency>> (hereinafter called

"the Purchaser") in the sum of Rs. <<Amount in figures>> (Rupees <<Amount in words>>

only) for which payment well and truly to be made to the said Purchaser, the Bank binds

itself, its successors and assigns by these presents. Sealed with the Common Seal of the said

Bank this <<Date>>

The conditions of this obligation are:

1. If the bidder having its bid withdrawn during the period of bid validity specified by the

bidder on the Bid Form; or

2. If the bidder, having been notified of the acceptance of its bid by the Purchaser during the

period of validity of bid

(a) Withdraws his participation from the bid during the period of validity of bid document;

or

(b) Fails or refuses to participate in the subsequent Tender process after having been short

listed;

We undertake to pay to the Purchaser up to the above amount upon receipt of its first written

demand, without the Purchaser having to substantiate its demand, provided that in its

demand the Purchaser will note that the amount claimed by it is due to it owing to the

occurrence of one or both of the two conditions, specifying the occurred condition or

conditions.

This guarantee will remain in force up to <<insert date>> and including <<extra time over

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

78

and above mandated in the RFP>> from the last date of submission and any demand in

respect thereof should reach the Bank not later than the above date.

NOTHWITHSTANDING ANYTHING CONTAINED HEREIN:

I. Our liability under this Bank Guarantee shall not exceed Rs. <<Amount in figures>>

(Rupees <<Amount in words>> only)

II. This Bank Guarantee shall be valid upto <<insert date>>)

III. It is condition of our liability for payment of the guaranteed amount or any part thereof

arising under this Bank Guarantee that we receive a valid written claim or demand for

payment under this Bank Guarantee on or before <<insert date>>) failing which our

liability under the guarantee will automatically cease.

(Authorized Signatory of the Bank)

Seal:

Date:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

1

Request for Proposal

(RFP)

Selection of Agency for creation Of Digital Project Management

Platform comprising OSO, Supply, Implementation and Support of 5D-

BIM & ERP

Volume - 2

Nagpur Metro Railway Corporation Limited

Ref: No.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

2

Contents 1.1 Introduction of NMRCL ............................................................................................................................ 8

1.2 Goal of this RFP ........................................................................................................................................ 8

2 Scope of work ................................................................................................................................................. 10

2.1 Overview of Scope of work .................................................................................................................... 10

2.2 Track 1: Definition of Owner Support Office ......................................................................................... 10

2.2.10 Go-live definition .................................................................................................................................... 14

2.3 Implementation of 5D BIM .......................................................................................................................... 14

2.4 Project efficiency benefits............................................................................................................................ 17

2.5 Business benefits of BIM .............................................................................................................................. 18

2.6 Safety benefits ............................................................................................................................................. 19

2.7 Quality benefits ............................................................................................................................................ 19

2.8 Cost benefits ................................................................................................................................................ 19

2.9 Planning and Design ..................................................................................................................................... 20

2.10 Design Review ............................................................................................................................................ 20

2.11 Engineering Information Collaboration System ......................................................................................... 21

2.12 Work Sharing: Create and Manage Ongoing Work Efficiently ................................................................... 21

2.13 Content Reuse: Keep Project Stakeholders Informed ............................................................................... 22

2.14 Dynamic Feedback: Synchronize With the Source to Resolve Issues ........................................................ 22

2.15 Digital Content Management System ........................................................................................................ 24

2.16 Master Data Management ......................................................................................................................... 24

2.17 Collaboration Platforms ............................................................................................................................. 25

2.18 Document and Data Control ...................................................................................................................... 26

2.19 Contract Administration Work Orders ....................................................................................................... 26

2.20 Asset information Management System ................................................................................................... 26

2.21 Web Geographical Information System ..................................................................................................... 28

2.22 Mobile Applications ................................................................................................................................... 29

2.23 Stages of Application Development .......................................................................................................... 30

2.24 Track 3: IT Infrastructure procurement, supply, installation and info security ........................................ 33

2.25 Track 4: Helpdesk Setup and Operations ................................................................................................. 34

2.26 Selection & Deployment of Manpower .................................................................................................... 35

2.27 Training to Help Desk Manpower .............................................................................................................. 36

2.28 Set up IT Infrastructure for Helpdesk Operations ..................................................................................... 37

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

3

2.29 Helpdesk operations .................................................................................................................................. 38

2.30 Track 5 Training and Capacity Building ....................................................................................................... 40

2.31 Operation and Maintenance (O&M) ........................................................................................................ 42

2.32 IT Infrastructure Support and Maintenance .............................................................................................. 45

3 Project timelines and schedule of implementation ....................................................................................... 53

3.1 Project Timeline ......................................................................................................................................... 53

3.2 Payment Schedule ................................................................................................................................. 55

4. 5D BIM & ERP System Architecture Requirements............................................................................................ 59

4.1 Detailed Solution Architecture ............................................................................................................... 59

5 Compliance to Standards & Certifications ..................................................................................................... 61

6 Project Management and Governance .......................................................................................................... 64

6.1 Project Management Office (PMO) ........................................................................................................ 64

6.2 Steering Committee ................................................................................................................................... 65

6.3 Project Monitoring and Reporting ............................................................................................................. 65

6.4 Risk and Issue management ....................................................................................................................... 65

6.5 Staffing requirements ............................................................................................................................ 66

6.6 Governance procedures ............................................................................................................................. 66

6.7 Transition and Exit Management ........................................................................................................... 66

6.8 Planning and Scheduling ............................................................................................................................ 67

7 Change Management and Control ................................................................................................................. 69

7.1 Change Request ..................................................................................................................................... 69

7.2 Purpose and Objective ........................................................................................................................... 69

7.3 Institutional Framework for Change Requests ....................................................................................... 70

7.4 Process, Timelines and Responsibility Center ............................................................................................ 70

7.5 Proposed Categories of Change ............................................................................................................. 73

7.6 Change Control Procedure Guidelines ................................................................................................... 74

8 Testing and Acceptance Criteria ................................................................................................................. 77

9 Service Level Agreements (SLA) ..................................................................................................................... 83

10 Annexure A- System - Solution Architecture ................................................................................................. 113

11 Annexure B - System Functional Requirements ............................................................................................. 113

12 Annexure C - IT Infrastructure Requirements, info security & other details ................................................. 113

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

4

Acronyms

Acronym Description

AECO Architects, Engineers, Construction Companies and Owners

AMC Annual Management Contract

APIs Application Programming Interface

ABG Advance Bank Guarantee

ASP Application Service provider

BI Business Intelligence

BPM Business Process Management

CAB Change Advisory Board

CAPEX Capital Expenditure

CBT Computer Based Training

CCTV Closed-circuit television

CEO Chief Executive Officer

CRM Customer relationship management

COTS Commercial Off-the –Shelf

CSE Customer Service Executive

CSV Comma Separated values

COBIT Control Objectives for Information and Related Technology

CMMi Capability Maturity Model Integration

DC Data Centre

DR Disaster Recovery

DDS Distributed Data Service

DM Document Management

DMS Document Management System

DNIS Dialed Number Identification Sequence

ECM Enterprise Content Management

EM Email Management

ESB Enterprise Service Bus

ETL Extract, Transform and Load

GRC Governance, Risk Management and compliance

NMRCL Nagpur Metro Railway Corporation Limited

IEEE Institute of Electrical and Electronics Engineers

IPR Intellectual Property Rights

ISO International Organization for Standardization

IVR Interactive Voice Response

KVA Kilovolt-ampere

LDAP Lightweight Directory Access protocol

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

5

MIS Management Information System

MPLS Multiprotocol Label Switching

MSDG Mobile Service Delivery Gateway

OLAP Online analytical processing

OTP One-Time Password

OEM Original Equipment Manufacturer

OPEX Operational Expenditure

PAN Permanent Account Number

PBG Performance Bank Guarantee

PWG Project Working Group

RBAC Role based access control

RCA Root Cause Analysis

RDBMS Relational Database Management System

SDLC Software Development Lifecycle

SGST State Goods and Services Tax

SLA Service Level Agreement

SSL Secure Sockets Layer

SMS Short Message Service

SOA Service Oriented Architecture

SOP Standard Operating Procedure

SRS System Requirement Specifications

TLS Transport Layer Security

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

6

Disclaimer

1. This Request for Proposal ("RFP") is issued by Nagpur Metro Railway Corporation

Limited (“NMRCL”)

2. The information contained in this RFP or subsequently provided to Bidders, whether

verbally or in documentary or any other form by or on behalf of NMRCL or any of its

employees or advisers, is provided to Bidders on the terms and conditions set out in this

RFP and all other terms and conditions subject to which such information is provided.

3. This RFP is not a contract and is neither an offer nor invitation by NMRCL to the

prospective Bidders or any other person. Whilst the information in this RFP has been

prepared in good faith, it is not and does not purport to be comprehensive or to have been

independently verified. Neither NMRCL, nor any of its officers or employees, nor any of

their advisers nor consultants accept any liability or responsibility for the accuracy,

reasonableness or completeness of, or for any errors, omissions or misstatements in the

information or makes any representation or warranty, express or implied, with respect to

the information contained in this RFP or on which this RFP is based or with respect to any

written or oral information made or to be made available to any of the recipients or their

professional advisers and, so far as permitted by law and liability therefore is hereby

expressly disclaimed.

4. The purpose of this RFP is to provide the Bidder(s) with information that may be useful

to them in the formulation of their Proposals in pursuant to this RFP. The information

contained in this RFP is selective and is subject to updating, expansion, revision and

amendment at the sole discretion of NMRCL. This RFP document is not exhaustive and

does not purport to contain all the information that a Bidder may require for the purpose

of making a decision for participation in this bidding process. Neither NMRCL nor

any of its officers, employees nor any of its advisors nor consultants undertakes to provide

any Party with access to any additional information or to update the information in this

RFP or to correct any inaccuracies therein which may become apparent. Each Bidder

should conduct its own analysis of the information contained in this RFP, to correct any

inaccuracies therein and is advised to carry out its own investigations in the project, the

regulatory regime which applies thereto and by and all matters pertinent to NMRCL and

to seek its own professional advice on the legal, financial and regulatory consequences of

entering into an agreement or arrangement relating to the project.

5. NMRCL accepts no liability of any nature whether resulting from negligence or otherwise

however caused arising from reliance of any Bidder upon the statements contained in this

RFP.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

Section 1:

Introduction

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

8

1 Introduction

1.1 Introduction of NMRCL

NMRCL has conceptualized the project to deploy a proven integrated ERP (Enterprise Resource

Planning) and 5D-BIM (5 Dimensional Building Information Modeling) solution to automate its

operations and integrate its processes. An Owners Support Office shall be created which will

depend on the mentioned solutions for strategic and operational design, delivery, execution and

subsequent support.

The key outcome of OSO, ERP & 5D-BIM implementation are linked to service delivery,

operational excellence, transparency and compliance

Service delivery to stakeholders

Multi-channel service delivery for optimum and efficient processes to end points via the

best suited technology and user interface that may include thick/thin client, portals and

mobile devices.

Secure and convenient access to internal and external stakeholders to avail the services

including but not limited to features for direct upload of directives, monitoring KPIs, and

process execution as empowered by NMRCL

Facilitate and enable employees of NMRCL in administration, support and service

delivery

Operational excellence

Integration of processes for all functions like Finance, Procurement, Materials, Project

Management, HR, etc.

Estimation and optimum utilization of resources: Assets, Financial resources and

Intellectual resources for delivering the services

Quick turnaround time for financial transactions, reporting, analysis and feedback

Excellence in the Deployment of facilities and resources, project planning, and exploiting

internal expertise

Transparency and compliance

Proactive and tight adherence to regulation in financial transactions and operations of

NMRCL

Adherence to standard government norms in financial transactions, reconciliation and

reporting as required by regulatory authorities, dashboards, reports and analytics needs of

stakeholders.

Compliance to best practices in project management, customer management, and service

delivery

1.2 Goal of this RFP

NMRCL intends to select an Agency by following competitive bidding process to create the OSO,

design, implement and maintain the 5D BIM & ERP system for a period of six years after Go Live date.

This document contains the scope of work and other terms and conditions.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

Section 2:

Scope of Work

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

10

2 Scope of work

2.1 Overview of Scope of work

The scope of work is to design the Owner Support Office (OSO), and implement the 5D

BIM & ERP Systems. The scope includes software/solution development and

implementation, Information Technology (IT) infrastructure procurement, deployment,

implementation and maintenance of the system. The maintenance phase will be for a period

of 6 (six) years after Go-Live. Post completion of the 6 year period, the contract can be

extended, at discretion of NMRCL, for additional six years on yearly basis or part thereof.

Bidder/Agency needs to design, implement and operate the systems on turnkey basis.

Bidder/Agency needs to do the appropriate solution design and sizing for the project as per

the scope of work and other terms and conditions of the RFP. In case Bidder/Agency has

not considered any component/service which is necessary for the project requirement, the

same needs to be brought by the Bidder/Agency at no additional cost to NMRCL.

Brief summary of the key components of the scope of work are as mentioned below:

1. Track 1: Definition of Owner Support Office 2 . Track 2: Implementation of 5D BIM & ERP 3. Track 3: IT Infrastructure procurement, supply, installation and Info Security 4. Track 4: Helpdesk Setup and Operations 5. Track 5: Training and Capacity Building 6. Track 6: Operations and Maintenance of the System

The detailed scope of the project for each track is detailed below:-

2.2 Track 1: Definition of Owner Support Office

NMRCL realizes the tremendous value IT can add during the Design, Build and Run phases of

Nagpur Metro Rail project. Effective usage of technology will help in completing the project on

time and within budget with proper governance. NMRCL views the current tender as a high end

IT enabled digital engineering project management platform which requires skill beyond

technology and its integration.

Being a new organization with a lean structure, NMRCL will depend heavily on OSO for smooth

launch and roll out of the Digital project. NMRCL views the OSO as its extended arm brining in

Processes; frameworks defined enables the use of technology to deliver Nagpur Metro within the

timelines and budget. The purpose of seeking OSO services from the bidder organization

implementing ERP and 5D BIM solution is to ensure minimal handshakes thereby get the

conceptualized Digital project implemented successfully.

OSO will be the first team to onboard the NMRCL project upon award of contract to the

successful bidder. It will comprise consultants with experience in IT Project/Program

Management, Business Process Reengineering, Human Resource, Change management,

Information Technology , Domain experts etc. some of which is defined in Volume 1.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

11

2.2.1 Digital Project Strategy Definition

1. OSO will study the vision, mission & objectives of NMRCL and hold discussions with

NMRCL stakeholders to understand and appreciate the strategic intent of the Digital

Project.

2. OSO will draft the Digital Project Strategy in line with the overall organizational strategy

of NMRCL.

3. OSO will prepare the Project charter for the IT project which will cover

Project Organization

Project Governance

Project Plan

Communication Plan etc.

2.2.2 Organization Design

1. OSO will study the current nascent Organizational structure of NMRCL in detail and

then suggest changes (if any) required to achieve the objectives. It is important to note

that NMRCL would undergo structural change once it transforms from Design/Build

phase to Run phase.

2. OSO will define the To-Be Organizational structure for the Design/ Build phase along

with associated Human Resources Policies, Processes and Procedures covering complete

employee life cycle from joining the organization to Retirement.

3. It is desirable that OSO uses a framework like People Capability Maturity Model

(PCMM) from Carnegie Mellon University as the reference while defining People

practices. Evidence of use of similar framework for such design is desirable.

4. OSO will take in to account the existing HR policies of NMRCL (currently following all

practices of DMRC) as approved by the Board till such time that NMCRL doesn’t frame

its own Board approved HR Policies.

2.2.3 Business Process Design/ Re-engineering.

1. By the time OSO is deployed, NMRCL expects some business processes and/or policies

may already be established. OSO will identify the gaps and re-engineer the processes and

Policies to ensure that they are digitally enabled in the 5D BIM & ERP systems. The To-

Be processes will be recommended by the OSO.

2. It is likely that most of the business processes to be integrated by ERP may not exist in

NMRCL at the time of Digital project commencement. These processes need to be

defined ground up by the OSO in consultation with NMRCL. OSO will prepare the list of

processes to be defined.

3. OSO will conduct workshops involving NMRCL officers to define To-Be processes. OSO

may use Process improvement methods/tools like Lean, Six Sigma etc. wherever

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

12

possible during BPD/BPR. Bidders who demonstrate practitioner experience in above

methods with documentary proof will be given weightage in technical evaluation.

4. During BPR, OSO will involve ERP team along with NMRCL officials - so as to strike a

right balance between To-Be processes suggested and standard processes available in

the ERP.

5. OSO shall ensure that the processes are able to use the 5D BIM system to create the

virtual metro rail which will take data from all internal and external stakeholders. The

system will be used by the team onsite to enable technology led execution. Where the

data exists in different systems, OSO will endeavor on best effort basis to convert to 5D

BIM.

6. OSO will submit the To-Be processes maps and get it approved by NMRCL.

7. OSO will set processes and metrics for the General Consultant (GC) such that GC

collaboratively with OSO delivers the data required from the contractors and consultants

in a way that all the data feeds are available in the system within the stipulated timelines.

OSO will provide exception reports and alerts to NMRCL with full transparency

wherever there is potential adverse impact to the project. In case of conflict between OSO

and GC, the matter shall be put up to the NMRCL Management for resolution.

2.2.4 Functional Requirement Specification and Business Blue Printing

1. Based on the reengineered To-Be processes, OSO will prepare the Functional

Requirement Specification (FRS) for ERP & 5D BIM implementation.

2. Once the FRS is approved by NMRCL, the team will prepare the detailed Business Blue

print document for ERP/5D BIM.

2.2.5 Training Need Analysis and Capacity Building Plan

1. While OSO will support NMRCL during the tenure of contract, NMRCL realizes the

importance of building adequate capacity internally so that it does not have undue

dependency on any external party in the future. Hence the OSO will prepare a Capacity

building plan by which existing & new employees of NMRCL are adequately equipped to

handle the Digital initiative in the future.

2. The capacity building plan will also cover the Knowledge transfer from OSO to NMRCL

over period of time.

3. OSO will also identify the Training needs of NMRCL officers to contribute effectively to

the organization.

2.2.6 Communication & Change Management Plan

1. NMRCL acknowledges the fact that key to successful execution of any project is

overcoming resistance and making people adapt to changed scenario in a smooth

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

13

manner. This is easy said than done. NMRCL realizes that its officers and entire partner

Ecosystem covering General consultant, Contractors, Consultants, Engineers etc. need

to be motivated to adapt IT and new way of working. Effective and Continuous

Communication is the key to overcome resistance. OSO will prepare a comprehensive

communication and change management plan. Bidders who demonstrate documentary

evidence for having conducted Change Management initiatives in Indian Government

sector will be given weightage in technical scoring.

2.2.7 Build Phase of Digital Project

1. OSO will monitor the implementation of the ERP & 5D BIM solution and provide

periodic as defined by NMRCL update to NMRCL.

2. OSO will promote the usage of Project management tools for tracking the progress of

Digital and overall NMRCL projects.

3. OSO will facilitate conduct of the training programs for ERP, 5D BIM and allied

applications to NMRCL, the GC and its partner ecosystem.

4. OSO will conduct Change Management workshops to gain acceptance for Digital project

among NMRCL and its partners.

5. OSO will create and run a Center of Excellence along with the GC to provide assistance

and handholding to existing and future partners of NMRCL to enable them to use the

Digital Platform effectively. This shall provide additional weightage to the Bidder.

6. OSO will participate in the User acceptance tests conducted for the solutions along with

NMRCL and confirm that the implementation is done as per requirements documented

in Design phase.

7. OSO will work with NMRCL and the GC to ensure smooth Go-Live of applications.

8. OSO will monitor the integration of ERP and 5D BIM solutions.

9. OSO will conduct Vulnerability assessment on the IT Infrastructure of NMRCL to ensure

Confidentiality, Availability and integrity of Information.

10. OSO will assist NMRCL to take over the complete documentation from ERP, 5D BIM

and other IT implementation teams.

11. OSO will monitor the smooth Transition of work from ERP/5D BIM implementation

teams to the respective sustenance teams.

2.2.8 Run Phase of the Digital Project

1. Once the sustenance/maintenance teams onboard, OSO will ensure that they are

updated on project details, SLAs etc.

2. OSO will monitor the usage of ERP, 5D BIM and other tools by NMRCL and its partners

for the period specified in RFP.

2.2.9 Implementation of 5D BIM & ERP

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

14

The implementation of 5D BIM & ERP will be done as a single project with 2 different streams

running parallel; the integration between the chosen 5D BIM & ERP systems will be done by

design, automated to the fullest extent possible without compromising any required controls.

While each of the systems shall be able to independently operate and provide required

functionality to respective users, it shall also receive inputs from other vendor systems as defined

by the GC via interfaces in real-time, on-demand, end-of-day, or manually as the case may be.

2.2.10 Go-live definition

The system is deemed to have gone-live when the following milestones have been achieved:

1. The software have been installed on the defined servers and configured as per the business

rules signed off by NMRCL

2. User Acceptance Tests and successful use cases have been signed off by the respective

functions within NMRCL and all critical bugs have been fixed to the satisfaction of NMRCL;

timeline for the non-critical bugs has been signed off by NMRCL

3. Training has been completed and signed off by the respective functions within NMRCL. The

training scope includes NMRCL staff and its associates, partners, and consultants

4. Client software if any as required has been installed on the respective user end user devices

(desktop, laptop, tablet, and mobiles), tested and found working

5. User profiles and roles/responsibilities have been defined within the software solutions with

appropriate controls and segregation of duties as agreed in the business requirement

document

6. Integration testing has been completed and signed off across all the software solutions and

their modules which includes interfaces (manual and automated), data transfers from

internal and external sources, and processes defined for exception management of errors

7. All defined and signed off critical reports have been tested and signed off by NMRCL

8. Master Data has been inputted into the systems and tested for referential integrity

The system is ready to use and users can start entering data into the system to run

their business operations moving away from legacy or manual processes that

precede the system. The sustained use for a week will be monitored and Go-live

will be declared on the seventh (7th) day if the system is functioning as defined and

designed with minimal disruption.

The above definition applies to ERP, 5D BIM, and other associated technologies defined in the

Architecture by the Bidder/Agency and agreed to and signed off by NMRCL.

The Bidder/Agency will also create a fall back plan with a team of experts to mitigate the risks

should the go-live not meet expectations. NMRCL reserves the absolute right to defer the go-live

should any of the conditions above are not met to the satisfaction of NMRCL.

2.3 Implementation of 5D BIM

Building Information Modeling (BIM) is the process of creating and managing information

throughout the whole life of the asset by using model-based technologies linked to a database of

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

15

reliable information. Virtual models are created in three dimensions before work proceeds on

site; the attributes of all the elements of the metro rail assets that will be constructed can be found

in the model; and spatial ‘clashes’ can be identified and resolved in the model instead of on site.

The process will start with developing individual intelligent 3D models in an engineering

modeling and design application catering to various disciplines such as track design, viaduct

design, signaling, station buildings, geospatial analysis, geotechnical and miscellaneous civil

works. All the discipline applications shall seamlessly collaborate with an Engineering

Information Collaboration System which shall form a central repository for all the engineering

information that is being created (3D models, 2D drawings, and analysis and design documents).

The system shall support readymade templates as per widely used BIM standards around the

globe called BS1192 and store common data such as topographic and aerial maps, libraries, seed

files etc. and other relevant documents.

Individual discipline 3D models will then be integrated to come up with a master model and

converted into a model which will then be submitted for review and markup. The system will

then be used for clash detection (especially for the subsurface utilities), schedule simulation and

quantity take offs. It will also act as a contextual tool for visualization, analysis and reporting of

project information.

The content management system shall be implemented using an appropriate database. It will be

used by all contractors as the electronic document management system (EDMS) for contract

administration, work orders, transmittals, submittals document management, asset data, etc. It

will be the main repository of information for NMRCL and will meet the Asset Information

Management System requirements for tagging assets, creating hierarchies based on location,

function, and class; and relating assets to each other.

The system shall offer Configuration Management which will be used as the process for

establishing and maintaining the consistency and integrity of vital information, and the

relationships between the items facilitating effective handover of the asset information from

design and construction phase onto the operation and maintenance (O&M) phase and will be the

key to the success of BIM process.

The digital information created in the office will be taken to the construction field via mobile

applications to access to 3D models, work packages for review and mark up.

The process flow diagram that will be adopted to effectively implement 5D BIM is as shown

(please refer next page). Each of the solutions used for the 5D BIM are explained in brief in

succeeding paragraphs.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

16

The diagram above is purely illustrative and the Bidder/Agency can suggest

alternative approaches or tools which can be individually or collectively used to

achieve the same objectives.

Ideally within a BIM perspective, the 3D model and related information (within databases) exist

and are developed throughout the whole life of the asset – from initial conception to final disposal

of the asset – and houses the on-going work and communication efforts of the complete supply

chain. 3D models help visualize and understand the relationships between the structure and its

systems in regards to aesthetics, performance and program issues.

In a BIM environment, data and information is structured and managed to ensure only the right

information is used and created at the right time for optimizing the whole life usage of the

infrastructure. This means the requirements during the operation and maintenance phases are

key drivers for what data is required (and when). Effective handover of the asset information

from design and construction phase onto the operation and maintenance (O&M) phase is key to

the success of BIM process and therefore a versatile, interoperable asset information

management system needs to be in adopted.

BIM can streamline processes through the integration of design, engineering, construction,

operation, maintenance and decommissioning of an asset into rich models of data that include:

3D models, spatial mapping, asset information, documentation, financials, etc.

BIM offers business benefits, project efficiency benefits, safety benefits, quality benefits and cost

benefits. BIM process does not stop at just creating the 3D model and building the information

into it but it is equally important to make use of the information rich 3D model and extend it to

4D (time) and 5D (cost). Using simple 4D models as visual validation that the contractor and site

teams understand what is to be built and when, and the key steps to starting groundworks. Using

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

17

4D (time-based) data provides tools to maximize the efficient coordination of site labor. Utilizing

5D (cost-based) data can provide quick access to material and cost information. This

functionality helps phase a project by determining more accurately when to, for example, open a

section of a remodeled building or close a corridor to allow work to proceed. However, data and

information should only be produced for one of two purposes:

To meet a requirement or obligation

To assist in decision making

BIM methodologies have a focus on what is required to operate and maintain facilities and

infrastructure. This helps to optimize the process of ensuring the appropriate data will be

delivered and:

Not too little so that maintainers have to re-visit assets to collect more data

Not too much that can be unmanageable.

2.3.1 Design

The Design BIM shall include modeling, visualization, documentation and analytical processes,

special coordination, engineering analysis, quantity extraction of the facility design (building

/infrastructure all disciplines).

The digital representation of the physical and functional characteristics of the facility shall be

linked with a database of project information. The DESIGN BIM shall deliver true 3D BIM data

and not glorified 3D CAD data.

Model elements are parametric and thereby interconnected. Information is directly embedded

into the model elements, creating a complete set of information for use throughout the lifecycle

of the facility.

All attributes must be captured and embedded in the BIM Model elements as live dynamic

parameters. The structure of the model elements and attributes must be set to allow automatic

data Population/Extraction and also generation of 2D drawing (plans, sections, elevations,

detail) and schedules. The attributes may have several data dependent, this must be identified

and correctly set to assure a full parametrical BIM Models and well consolidated project dataset.

2.4 Project efficiency benefits

Improved collective understanding of design intent

Because of BIM’s ability to support 3D visualization and its rich database of reliable

information, the collective understanding of design intent provides a high level of value

because models can be used to better understand and monitor ideas that carry through the

whole life of the assets.

Early mitigation of potential conflicts and changes during construction

Conflicts and changes in the field are costly, affecting both budget and schedule. By using the

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

18

BIM model to identify potential issues before they occur on site, users can prevent costly

mistakes and reduce Requests for Information (RFIs), site change requests, non-

conformities and site coordination problems.

Risk Reduction

o Increased confidence in design, construction and operational costs

o Crowd behavior and fire modelling capability enable designs to be optimized for public

safety. Asset managers can use the 3D model to enhance operational safety. Contractors

can minimize construction risks by reviewing complex details or procedures before going

on site.

Enables efficient project team coordination and collaboration

All project partners, different design disciplines, the customer, contractor, specialists and

suppliers use a single, shared 3D model, cultivating collaborative working relationships. This

ensures everyone is focused on achieving best value, from project inception to eventual

decommissioning

Makes project delivery efficient and economical by leveraging the latest computing

technology e.g. data mobility, apps, etc.

Reduced information loss throughout the whole life of the asset including between project

phases

Delivering quality training to staff by using the BIM model to deliver interactive learning

applications and animated 3D simulations

2.5 Business benefits of BIM

Business outcomes that can be influenced by BIM typically include:

Designing assets to support maintenance regimes that minimize track occupations,

resulting in more train availability for passengers

Designing maintenance processes that will minimize intrusion or local station closure by

innovative grouping and planning, increasing asset availability

Use of smart technologies for monitoring asset performance which results in lower

maintenance costs

Developing models and visualization to support interface requirements from outside

parties, e.g. Fire Brigade, retail, and reducing costs associated with digital and paper

distribution

Providing station staff with interactive learning applications and animated 3D simulations

to deliver quality training without the need to create physical mock-ups

Providing operations staff with information, such as visualization models, which can

support key decisions reducing the reliance on manual validation onsite

Providing a model which can be accessed by a number of systems to enable swift and

accurate comparisons of information, reducing the risk of delay misuse in the event of a

problem being identified at a station, thereby reducing operational costs

Providing a data model which can be monitored against trends in failures and repairs

reducing maintenance cost through developing strategies dealing with proactive

preventative measures, resulting in lower maintenance costs

Minimizing re-surveying areas before design/construction changes though the re-use of

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

19

information, reducing repair, replace and new project creation costs

Supporting maintenance activities through the use of rehearsing complex procedures,

optimizing temporary works designs and planning procurement of materials, equipment

and manpower, reducing renewal and maintenance costs.

2.6 Safety benefits

Understanding what is proposed during construction

Because of BIM’s ability to support 3D visualization and its rich database of reliable

information, the collective understanding of design intent provides a high level of value

because models can be used to better understand and monitor ideas that carry through the

whole life of the asset and enables non-technical staff to readily understand processes and

relationships.

Demonstrating “Readiness to Dig”

Using simple 4D models as visual validation that the contractor and site teams understand

what is to be built and when, and the key steps to starting groundworks.

Eliminating mistakes with the potential to cause harm

Documentation and briefing materials is improved as objects are only modelled once in BIM,

meaning that drawings automatically derived from that model are more consistent and

accurate, and avoid clashes that may otherwise occur.

2.7 Quality benefits

Contractors using BIM report a general improvement in the quality of design data and

information received for construction. Design errors, typically through clashes and spatial

interfacing conflicts can typically account for some 2% of cost increases in civil engineering

works. Quality benefits include:

High quality, single source of truth in data and information for decision-making ensures only

one version of each document is kept

Provides up-to-date reliable and trusted information for both client and supply chain

4D (time-based) data provides tools to maximize efficient coordination of site labor

5D (cost-based) data can provide quick access to material and cost information.

Requests for Information (RFIs), change requests and non-conformities will be significantly

reduced during field construction due to the enhanced coordination and conflict reduction

with the use of 3D models

Accurate as-built drawings are available immediately at the close of construction. The 3D

model, as it is updated throughout the project duration, provides a virtual as-built

representation of the physical asset.

2.8 Cost benefits

BIM has been proven to help reduce waste and errors that occur in infrastructure projects, where

the assembly process is usually a “one-off”. Studies in the US have shown that net savings when

using BIM are around 5% on construction of new-build projects, and the ROI for BIM systems

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

20

has been estimated at more than 60%. Data published by the UK government shows a consistent

reduction of 8-10% of construction costs.

In addition to above benefits by embracing BIM, NMRCL can provide “a world class passenger

experience” with access to more intelligent station information for easy navigation, train

performance (delays due to maintenance) and smart ticketing.

The BIM solution will broadly consist of following components:

1) Planning and Design

2) Design Review

3) Engineering Information Collaboration

4) Digital Content Management System

2.9 Planning and Design

BIM involves people, process and technology. The technology aspect of BIM involves use of

engineering applications that are used for planning as well as design of the asset. The metro rail

to be constructed involves different engineering disciplines such as rail track, viaducts, station

buildings, signaling, geotechnical, geospatial etc. Each of these disciplines will use discipline-

specific design applications (with ability to attach intelligent attributes) to create individual 3D

intelligent models (and 3D intelligent master model for review and analysis).

All such design applications need to be interoperable and able to exchange information

seamlessly. The design applications will work in a 3D as well as 2D environment (for plans

production, detailing, measurements, markups etc.). The 3D design models from the different

applications needs to be geo-coordinated so that the master model which is a result of

collaboration can exactly fit at the desired location if referenced back on the map and is an

important aspect of the applications to be used.

All such design applications needs to be interoperable and able to exchange information

seamlessly. Each discipline works with a standardized model structure, object structure and layer

structure (part of Standards, Methods and Processes set for the project) to ensure that model

information can be exchanged. At the same time these applications need to tightly integrate with

the engineering collaboration system in order to use their workflow and process set.

2.10 Design Review

The review solution used should be able to:

Help reviewers make better decisions, faster, throughout the lifecycle of a project, while

reducing project risk. The solution should be able to give an insight into the project and

operations with clearer visibility into the information in 3D models

Speedy project delivery with immediate access to latest information through consistent

experience on every device, in the office, on-site, or in the field (through mobile or native

tablet based apps). Improve project coordination and accelerate collaboration through faster

reliable capture of feedback from field staff

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

21

Ensure the coordination of engineering disciplines with the ability to perform clash detection

for timely issue resolution during design

Perform construction simulation and collaborate between office, site, and field to gain insight

into project planning and execution for faster resolution of issues found in the field during

construction

To improve the safety and speed of inspections and maintenance with the ability to see asset

information within the context of 3D models during operations

Thus the integrated master 3D model will be utilized for reviews at various phases of the project

right from design to operations. Especially during the design phase markups needs to be created

and directed to the originator for revisions (if any). These markups needs to be in neutral formats

such as pdf’s. Also these review solutions should be able to create intelligent 3D pdf’s that can be

used for review in absence of the originator software. At the same time one can query in to get

the intelligent attributes attached to the 3D model. Also walkthrough, flythrough can be created

to review the model in detail.

This solution needs to tightly integrate with the engineering collaboration system in order to use

their workflow and processes set. The solution needs to cater to the 4D (time) and 5D (cost)

aspect of the BIM thus offering a complete review solution.

2.11 Engineering Information Collaboration System

The engineering collaboration system will connect people and information across distributed

teams and will be used by design consultants to manage, find, and share engineering information

such as 2D drawings, 3D CAD models, designs, office documents, pdfs etc., geospatial content

and project data. Such a system is designed to connect distributed enterprises and related

systems through a single federated interface and enables teams to distribute the files and content

they work on and federate that data using a single tool making all files appear to be both central

to the team and local to the user.

The engineering collaboration system ensures information mobility with integrity for AECO

(Architect, Engineer, Construction Company, & Owner) information used in the design and

construction of infrastructure projects while the work is in progress. It needs to be scalable,

industry-proven, interoperable and should be able to provide AECO work-sharing, content

reuse, and dynamic feedback capabilities that are so essential to leveraging information modeling

through integrated projects for high-performing, intelligent infrastructure.

2.12 Work Sharing: Create and Manage Ongoing Work Efficiently

With such a system, everyone can collaborate on projects, which is how interdisciplinary project

teams must work to meet the challenges of sustaining infrastructure. Distributed team members

can use their own applications and file formats at their own locations. And through the

collaboration systems, find, share, and interact with appropriately managed, interrelated

engineering content using their preferred workflows.

The system should facilitate smart work sharing so that the team working on the project realizes

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

22

higher productivity, increased project performance, and improved project quality that results

from the ability to automate the management of complex relationships among documents and

countless components within them; share large work-in-progress datasets across offices in real

time, instantly seeing the impact of design changes made by others; automatically enforce

document standards across distributed teams; control document access; and make it easy to

search at file and component level.

The collaboration system needs to provide powerful work-sharing capabilities such as spatial

view for map-based navigation, web view for online browser access, permissions view for access

control management, dependency view for understanding and managing complex file

relationships, component view to search for information across file types, and 2D and 3D views

without needing the authoring applications. These will empower team members to interact with

project information in views that directly relate to their specific task requirements

2.13 Content Reuse: Keep Project Stakeholders Informed

Collaboration system will keep project stakeholders informed by creating consistent, timely,

high-impact deliverables in a predictable manner. Designers can publish project information

according to a predefined schedule or on demand – and always in accordance with user-defined

standards. Precise, data-rich, native engineering content needs to be published that are

appropriate for different audiences, such as electronic files, drawings, renderings, 3D PDFs, and

3D prints. Digital files to devices such as plotters, tablets, iPads, and the Web can also be

published.

With flexible publishing capabilities, one can benefit from improved project quality, faster design

approvals, and broader project awareness. Project teams can:

Transform digital designs into high-quality, precise deliverables.

Securely publish engineering content.

Package and publish 2D drawings and 3D models in universally viewable portable formats

Improve communication with stakeholders through photorealistic visualizations (including

images and movies)

2.14 Dynamic Feedback: Synchronize With the Source to Resolve Issues

The collaboration system should support a dynamic, closed-loop review process that captures

feedback from reviewers – irrespective of their locations – and returns it in context to all relevant

designers in a way that’s instantly actionable. Comments and feedback on designs can be

captured from anywhere – on a PC, iPad, or paper while at a construction site, online or offline.

Electronic markups need to be captured and synchronized through the design review solution or

Acrobat™ files. Reviewers can open these files using any computer or iPad – without the need

for costly, proprietary design software – and comment on 2D and 3D i-models and PDFs. When

markups are returned to the collaboration system, they need to automatically synchronize with

the correct design files and team members, and include an audit trail of all comments and

changes.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

23

Since a hard copy is sometimes the best medium for sharing designs with stakeholders,

document scan can be marked up with special digital plan and then placed in docking station to

instantly synchronize the markups with the original design file in the system. Regardless of how

markups are captured, the collaboration system needs to automatically synchronize them with

the appropriate project source documents and team members for action, complete with an audit

trail. With dynamic reviews, everyone benefits from faster issue resolution, lower project risk,

and reduced project time. Project teams can:

Accelerate the creation and sharing of markups and feedback.

Simulate and resolve clashes during the design phase and optimize schedules to eliminate

on-site errors

View valuable component information, filter views of models, and precisely measure

distances.

Ensure feedback is routed to the right team

Readymade templates as per widely used BIM standards around the globe (BS 1192, PASS1192,

COBIE etc.), which support a number of workflow states needs to be part of the collaboration

System.

In summary the collaboration system should be able to provide:

Collaborative, interoperable, mobile platform that connects global project teams where

information and deliverables are available on-demand for improved performance and

increased project transparency for high performance project delivery.

Gold standard for engineering design collaboration and work-sharing for multi-discipline,

geographically dispersed teams

Support for virtual project delivery processes including document management, change

control, and third-party reviews and approvals

With unparalleled information mobility and federated information access that helps project-

intensive companies avoid risk and stay competitive with high performance project delivery.

By deploying such a system Owners will benefit from:

Reduced Delivery Risk: Improve accuracy, reuse, and auditing of design and construction

documents, and data to start projects faster, eliminate redesigns, and reduce the risk of

rework.

High Performance: Collaboration results in better decisions, effective use of resources,

increased productivity and better team performance, ultimately lowering CAPEX project

costs.

Increased Transparency: With increased transparency throughout the project lifecycle,

organizations will increase accountability and improve responsiveness to minimize delays

and keep the project moving forward.

Faster Time to Value: Configurable deployment options provide project intensive

organizations with enhanced agility to respond to varying project requirements, improved

operational readiness resulting in improved ROI on the project and at the organizational

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

24

level.

2.15 Digital Content Management System

NMRCL will create and manage different types of enterprise information throughout the project,

including: project controls, finance, IT, commercial, human resources, training, etc. The BIM

environment tends to focus on the project’s technical information, starting as the Employers

Information Requirements, developing granularity through design evolution and resulting in

assets and associated data that will be handed over to the Infrastructure Managers.

The efficient and effective management of enterprise data is critical to the effectiveness of BIM

in NMRCL. This will be characterized by the way in which contracts are procured and contractors

are engaged, how data is shared and how a collaborative environment is encouraged.

NMRCL will employ best practices, achieved through a standardized and consistent way of

working based on a framework of policies, procedures processes, guidance and instructions

which must be adopted to engender a culture of continuous improvement. An important

characteristic of NMRCL approach to information management is that software needs to be

deployed always out-of-the-box with minimal customization, to minimize support issues.

Benefits of adopting best practice include:

Increased productivity

Reduced costs

Increased customer satisfaction

Improved communications

Reduced risk.

2.16 Master Data Management

Across the construction industry, some estimates show as much as 80 per cent of vital business

information is stored in unmanaged repositories, making its efficient and effective use a near

impossibility. In a BIM environment, where data is centralized, the concept of Master Data

Management (MDM) is critical. MDM seeks to ensure that we do not use multiple versions of the

same data. We seek to create and maintain an authoritative, reliable, sustainable, accurate and

secure data environment that represents a single and holistic version of the truth. This overcomes

traditional issues with the quality of data, ownership, consistent classification or identification of

data, and data-reconciliation issues. This is what we are seeking to achieve in NMRCL.

BIM is process-driven and does not rely on a single piece of software. Interconnected models and

databases of reliable information need a high level of interoperability between software packages

and need to be capable of integrating data from a number of disparate software systems. This

enables participants to use, re-use and exchange information for decision-making or design

purposes in a coordinated and efficient manner.

An important aspect within BIM is the dynamic ability to explore the structure of objects and

their relationships to each other. For example, 3D modelling is not new but in BIM, schedules,

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

25

databases, budgeting and other data are embedded and can interact together with the 3D models,

so that information such as quantities, estimates and schedules can be easily extracted or linked.

NMRCL requires a scalable content management system to accommodate growth through the

project. The MDM architecture in conjunction with the ERP, must be well composed and address

a range of data management requirements:

Creation and managements of the core data stores

Management of processes that implement data governance and data quality

Metadata management

Extraction, translation and loading of data from source to target(s)

Backup and recovery

Analytics

Security and visibility

Synchronization of data changes

Entity matching and generation of unique identifiers

The content management system must employ a metadata-driven ‘Service-Oriented

Architecture’ (SOA) so that information can be invoked by different applications for different

purposes through a variety of platform-independent service interfaces. The following

information architecture aspects must be supported:

De-coupling information from applications and processes to enable it as a standalone,

interoperable asset

Support the concept that information shall be captured once and validated at sources,

creating a right-first-time culture

Enable measurements, assessments and management of data quality in accordance with

information quality standards

Ensure data security

Provide effective platforms and training for standardizing content, definitions, structures

and formatting at source

Promote metadata-driven definition for all data

Preserve a well-supported and well defined data governance policy.

NMRCL’s MDM implementation will leverage people, processes and technology as critical

factors to the successful delivery of an information architecture that enables the organization to

become agile, operate effectively, consistently and accurately.

2.17 Collaboration Platforms

NMRCL requires content management system (CMS) use appropriate database. The CMS will

form the core of the project’s common data environment. It will be used by all contractors as the

electronic document management system (EDMS) for contract administration, document

management, asset data, etc., and it will be the main repository of information for NMRCL.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

26

Each record kept in NMRCL will be accessed utilizing a standard web browser, capable of

generating and distributing reports, managing publishing packages and interfacing with other

document repositories such as SharePoint or any other open source platform.

The content management system will be used for many of the basic transactions required in the

management and administration of the project. The metadata in these transactions will ensure

that the details (of letters, instructions, requests etc.) are immediately stored in the database.

2.18 Document and Data Control

Document and data control will be undertaken within the content management system, and all

contractors will be required to work within it. Typical workflows that are to be used in the

database to manage the documentation environment include:

Transmittals/Submittals

A formal method of distributing information to people within NMRCL and external parties,

which includes a ‘reason of issue’ (such as Issued for Review, For Acceptance, etc.).

Work Orders (Review and Acceptance, Distribution)

Distributing information via a controlled workflow e.g. Review and Acceptance, Distributing

Correspondence. A Work Order contains a defined set of tasks for a specific business process and

provides users with visibility of tasks that are:

Forthcoming

Awaiting Action

In Progress

Completed

Rejected

Delegated

Require Re-assignment

Each Work Order is composed of one or many tasks which are assigned to different recipients,

and each task has specific instructions of what actions are required.

2.19 Contract Administration Work Orders

The Contract Administration section will allow users to initiate and manage key processes such

as ‘Early Warning Notification’ and other communications, to help highlight and manage project

risks. The content management system will maintain a record of these processes which form part

of the audit trail. Contract Administration Work Orders can be initiated whenever a business

need arises. For example, an ‘Early Warning Notification’ can be raised to highlight project risks.

2.20 Asset information Management System

Besides delivering a functional and efficient railway, NMRCL needs to ensure the railway can be

operated and maintained efficiently and effectively through its whole life in accordance with good

practice approaches to asset management. Availability of good, quality asset information is

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

27

essential for achieving these long-term strategic goals. NMRCL needs to build two metro rails,

one physical and one virtual that involve utilizing a geographic information system (GIS) to pull

together and present asset information holistically, including data, documents, assets, models

and visualizations.

Frequently on engineering projects, the acquisition of asset information is undertaken shortly

before handover, leading to poorer quality asset information and more expensive data gathering

activities post-handover. NMRCL has to collect asset information progressively throughout the

project so that an effective handover is possible from design and construction on to the O&M

phase.

NMRCL will rely on asset information and asset knowledge as key enablers for operations and in

strategic asset management. The provision of high quality asset information is an essential

deliverable to enable long term management of the railway assets – including both stations and

linear infrastructure assets.

The Asset Information Team will be responsible for managing and populating the Asset

Information Management System and the processes used to ensure that asset information is

obtained to the required quality and timescales. Asset details, such as function, location, type and

size will be captured centrally to agreed standards.

Asset information is an important input for NMRCL processes and systems:

It is a key enabler for long term asset management by the Infrastructure Managers and

should be provided in formats that support these objectives.

The provision of asset information is a process that runs throughout the duration of the

project.

Asset information, if not gathered at the appropriate point in a project, will be expensive and

difficult to obtain after handover.

The process of providing information shall be managed, with progress and issues visible to

relevant stakeholders.

As a standard practice a number of quality asset information enablers needs to be in place to

support the establishment and ongoing maintenance of good quality asset information. It will be

a joint responsibility of the supply chain to get these enablers in place. The content management

system needs to support these enablers such as Asset Data Dictionary, Asset Data Dictionary

Master Configuration etc., and application of asset tags to design elements and subsequently link

the design elements to related asset information.

Configuration management is a method of ensuring that asset configurations conform to their

requirements. It addresses not only the classical aspects of document management – such as

capture, storage, management, and retrieval – but also the ability to identify and retain the

context of information and its relationship to projects, products, plants, processes, equipment,

organizations, and users throughout their lifecycles. Configuration management ensures

information integrity through closed-loop change management, ensuring consistency between

all aspects of operational information and the requirements related to the asset being described.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

28

The asset information classification system needs to be based on NMRCL’s “Asset Identification

Standard” that the will be established at the start of the project and explains the system and

describes the processes to be used for identifying, labelling and marking assets and collecting of

asset information.

NMRCL asset data will be collected and stored in the content management system, which will be

used for migrating data into the Infrastructure Management system in accordance with the

operational data migration strategy.

Thus in summary the digital content management system implemented will be at the core of

project’s common data environment. It will be used by all contractors as the electronic document

management system (EDMS) for contract administration, work orders, transmittals, submittals

document management, asset data, etc. The content management system will be the main

repository of information for NMRCL. The system needs to meet the Asset Information

Management System requirements for tagging assets, creating hierarchies based on location,

function, and class; and relating assets to each other. The content management system needs to

offer Configuration Management which will be used as the process for establishing and

maintaining the consistency and integrity of vital information, and the relationships between the

items.

Thus the Digital Content Management System will facilitate effective handover of the asset

information from design and construction phase onto the operation and maintenance (O&M)

phase and will be the key to the success of BIM process.

2.21 Web Geographical Information System

A key focus of BIM is to support much more efficient planning, design, fabrication, construction

and maintenance of new facilities. Software products are now becoming optimized to facilitate

and allow multiple users with unique disciplines to interoperate and perform complimentary

functions.

In contrast, GIS has a much less defined role. It is intended that relationship between GIS and

BIM within NMRCL is primarily focused around the integration and adoption of data,

procedures and standards to ensure that GIS can act as a contextual tool for the visualization,

analysis and reporting of project information. It relies on the interoperability of data between

systems to ‘draw down’ information into a centralized data model which can enable 2, 3 and even

4D views to be created for users to consume.

Key outputs that will be needed are:

Accessing documents through spatial queries of the GIS system “Nagpur Metro Maps” e.g.

linking contract documents to a specific area on a map

Utilizing mapping data to identify and locate drawings and models which can be further

interrogated to view tags and their associated asset information

A fundamental tenet of GIS, particularly in the context of the enterprise database environment,

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

29

is that a single source of data can be used to create dynamic outputs, allowing both standard

geographic views of spatial data as well as linearly referenced or graph database (network

topology) derivatives. The use of open data sources also allows data to be consumed by a variety

of systems and applications that are accessible on multiple platforms, from desktop, web and

mobile sources, without the need to recreate data

However, GIS can offer many advantages to the future operation and maintenance of Nagpur

Metro including:

Overlay analysis (how things intersect and interface)

Proximity analysis

Surface analysis

Statistical and time-based analysis

One of the areas where this GIS based technology can help is tracking and identifying location

and material and pieces on site. GIS data has begun to be used by facilities managers to help

operate facilities across wide geographical areas to answer typical questions that involve location,

time and tabular data.

System should enable creation of polygon shapes within the GIS system and pull out all

associated documents to that area. From a station operations perspective, this could be refined

to identify “how many fire extinguishers do we have to inspect at a station next month and where

are they?”, or “how many leased spaces do we have available in the next six months to support a

coffee shop outlet?”. The current development of mobile computing devices with cloud-based

tools will make information even more accessible.

2.22 Mobile Applications

The digital information created in the office needs to be taken to the construction field via mobile

devices and applications. Stakeholders should be able to access the project information such as

construction packages, drawings, specifications. Forms needs to be made available to make field

notes, annotate and red line the documents. The apps will be used to access 3D Model views,

filter by attributes, annotate, measure and redline the models and construction status updates in

model. The apps need to support access of GIS maps as well.

The apps should also allow access information related to assets, structures and utilities, as well

as links to external information such as information plan drawings held within the digital content

management system.

Functional requirements are aggregated in the BIM FS spreadsheet.

Currency of product/applications:

Bidder/Agency shall be entirely responsible for proposing the solution which satisfies all

features, functions and performance as described in this RFP. Bidder/Agency shall be

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

30

responsible for design, development, and implementation of the proposed solution and shall

ensure that systems/applications/product proposed are current to not lower than at N-1

level (where N is the current latest commercially available release) at the cost of the

Bidder/Agency for entire life of the project.

SMS Integration

NMRCL will procure SMS gateway through separate procurement process which needs to

be integrated to send tactical defined alerts to various stakeholders. Bidder/Agency should

not include cost of recurring SMS charges in its commercial proposal but needs to factor for

SMS API integration (http based & SMTP protocol based) with SMS gateways during the

contract duration.

Authentication of users

System will be required to have provision for two factor authentication using any relevant

technology that can address non-repudiation.

2.23 Stages of Application Development

Each phase of application development and implementation need to adhere to the below

defined lifecycle:

2.23.1 Project Initiation

The Bidder/Agency will be responsible for preparation of detailed project plan. The plan

shall address at the minimum the following:

a. Define an organized set of activities for the project and identify the

interdependence between them.

b. Resource planning and loading for each phase/activity. This must also indicate

where each resource would be based during that phase, i.e. onsite at the NMRCL office

or off site at Bidder/Agency premises.

c. Establish and measure resource assignments and responsibilities

d. Highlight the milestones and associated risks

e. Communicate the project plan to stakeholders with meaningful reports.

f. Measure project deadlines and performance objectives.

g. Project Progress Reporting: during implementation the Bidder/Agency should

present weekly reports which will be presented to the Project Working Group

(PWG) meeting at NMRCL. The report should contain at minimum the following:

o Results accomplished during the period (weekly)

o Cumulative deviations from schedule date as specified in the finalized

Project Plan

o Corrective actions proposed to return to planned schedule of progress

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

31

o Plan for the next week

o Proposed revision to planned schedule provided such revision is

necessitated by reasons beyond the control of the Bidder/Agency

o Support needed

o Highlights/lowlights and Issues/Concerns

o Risks/Show stoppers along with mitigation

o Proposed changes if any for consideration of Change Advisory Board

h. Identify activities that require participation of NMRCL personnel and communicate

their time requirements and schedule early enough to ensure their full participation at

the required time.

2.23.2 System Requirement Study

The Bidder/Agency must perform detailed assessment of the business requirements and IT

Solution requirements as mentioned in this RFP. Based on the understanding and its own

individual assessment, Bidder/Agency shall develop and finalize System Requirement

Specifications (SRS) in consultation with NMRCL and its representatives. While doing so,

Bidder/Agency at least is expected to do following:

Bidder/Agency shall translate all the requirements as captured in the FRS document into

SRS.

Bidder/Agency shall develop and follow standardized template for requirements

capturing and system documentation.

Bidder/Agency must maintain traceability matrix from SRS stage for the entire

implementation.

Bidder/Agency must get the sign off from user groups formed by NMRCL.

For all the discussion with NMRCL team, Bidder/Agency shall be required to be present

at NMRCL office with the requisite team members.

2.23.3 Design

The Bidder/Agency shall build the solution as per the solution architecture detailed in

Annexure – A. The solution proposed by Bidder/Agency should comply with the

solution architecture requirements as mentioned therein.

2.23.4 Develop

The Bidder/Agency shall carefully consider the scope of work and provide a solution that

best meets NMRCL System's requirements. Considering the scope set in this RFP, the

Bidder/Agency shall carefully consider the solutions it proposes and explicitly mention

the same in the technical proposal and execute using the guidelines below:

Software Products (Configuration and Customization):

Bidder/Agency will be responsible for supplying the application and licenses of

related software products and installing the same to meet requirements.

Bidder/Agency shall have provision for procurement of licenses in a staggered manner

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

32

as per the indicative scale up requirements. However, if these assumptions undergo a

change impacting the overall business, Bidder/Agency is expected to suggest an

approach which can address this business eventuality.

The Bidder/Agency shall perform periodic audits to measure license compliance

against the number of valid End User software licenses consistent with the terms and

conditions of license agreements, volume purchase agreements, and other mutually

agreed upon licensed software terms and conditions. The Bidder/Agency shall report

any exceptions to license terms and conditions at the right time to NMRCL. The

responsibility of license compliance solely lies with the Bidder/Agency and any

financial penalty imposed on NMRCL during the contract period due to license non-

compliance shall be borne by the Bidder/Agency.

Bidder/Agency shall also supply any other tools & accessories required to make the

integrated solution complete as per requirements. For the integrated solution, the

Bidder/Agency shall supply:

Software & licenses.

Supply tools, accessories, documentation and provide a list of the same.

Tools and accessories shall be part of the solution.

System Documentation: Both in hard copy and soft copy to be supplied along with

licenses and shall include but not limited to following documentation to be

maintained, updated and submitted to NMRCL regularly:

Functional Requirement Specification (FRS)

High level design of whole system

Low Level design for whole system / Module design level

System requirements Specifications (SRS)

Any other explanatory notes about system

Traceability matrix

Compilation environment

Technical and product related manuals

Installation guides

User manuals

System administrator manuals

Toolkit guides and troubleshooting guides

Other documents as prescribed by NMRCL

Quality assurance procedures

Change management histories

Version control data

SOPs, procedures, policies, processes, etc developed for NMRCL

Programs :

o Entire Source codes as applicable

o Code documentation for understanding or programs

o Version control mechanisms and maintained old versions

Test Environment : o Detailed Test methodology document o Module level testing

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

33

o Overall System Testing o Acceptance test cases

(These documents need to be updated after each phase of project and to be maintained

updated during entire project duration. The entire documentation will be the property of

NMRCL.)

Bespoke (Custom Developments) The successful Bidder/Agency shall identify, design and develop components / functionalities

that are required to address the requirements mentioned in this RFP. The Bidder/Agency

shall supply the following documents along with the developed components:

Business process guides;

Program flow descriptions;

Data model descriptions;

Sample reports; Screen formats;

Frequently asked question (FAQ) guides;

User manual

Technical manual

Any other documentation required for usage of implemented solution

2.23.5 Testing

The Bidder/Agency shall provide the testing strategy including traceability matrix, test cases

and shall conduct the testing of various components of the software developed/customized

and the solution as a whole. The testing should be comprehensive and should be done at each

stage of development and implementation.

The detailed testing requirements are mentioned in section 8. 2.23.6 Go-Live Preparedness and Go-Live

a. Bidder/Agency shall prepare and agree with NMRCL, the detailed plan for Go-Live (in-line

with NMRCL’s implementation plan as mentioned in RFP).

b. The Bidder/Agency shall define and agree with NMRCL, the criteria for Go-Live and the

timelines for the same.

c. The Bidder/Agency shall ensure that all the data migration is done and the system is released

for operations.

d. Bidder/Agency shall submit signed-off UAT report (issue closure report) ensuring all issues

raised during UAT are being resolved prior to Go-Live.

e. Bidder/Agency shall ensure that Go –Live criteria as mentioned in User acceptance testing of

system is met and Bidder/Agency needs to take approval from NMRCL team on the same.

f. Go-live of the application shall be done as per the finalized and agreed upon Go-Live plan.

g. Once the System has gone live for each phase of application development the above UAT

process needs to be followed.

2.24 Track 3: IT Infrastructure procurement, supply, installation and info

security

The Bidder/Agency shall be responsible for sizing of the IT infrastructure including the

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

34

servers, storages, back up, networking, load balancers, security equipment, operating

systems, database, enterprise management system, help desk system and other related IT

infra required for running and operating the envisaged system. NMRCL may procure the IT

infrastructure from the Bidder/Agency, or any other reseller or OEM. Following critical

parameters need to be factored during the sizing:

Ensure redundancy at each level

Support peak loads

Virtualization technologies to be used where possible

On request from NMRCL should the Bidder/Agency procure the infrastructure, the

ownership shall get transferred to NMRCL after “Acceptance and Go Live” of such items by

NMRCL or NMRCL appointed Consultant(s). In case the infrastructure is proposed to be

supplied by Bidder/Agency in phases, the payment for the same shall also be made in phases

after actual delivery and acceptance of such infrastructure at defined locations. Ownership

of these infrastructures shall also be transferred to NMRCL after verification and acceptance

of such infrastructure.

Bidder/Agency to ensure warranties/AMCs are procured for all the hardware components

for entire duration of the project. For software components the support from OEM to be

obtained for prescribed components. There would be a mechanism to verify these details on

annual basis.

Specifications of the IT infra are detailed in Annexure-C, the bidder needs to size and provide

IT infra to meet the project functional requirements and Service Level Agreements (SLAs).

Bidders should prepare and submit along with their technical proposal, the details of

methodologies and computations for sizing and capacity of storage, compute, routers,

switches, Internet facing IPS, backup, tape libraries, sizing of security appliances and their

compute requirements. The technical evaluation of responses shall analyze the

computations for viability.

2.25 Track 4: Helpdesk Setup and Operations

1. This track includes running centralized helpdesk setup and operations for all the Systems

for a period of 6 years from the date of Go Live.

2. The help desk will primarily handle technical queries of NMRCL and contractors relating to 5D BIM & ERP Systems.

3. Bidder/Agency shall follow the implementation plan for the helpdesk launch as specified

in the project timelines.

4. Helpdesk is required to ensure that users can log calls and complaints for any technical

issues they face while using the systems. The following is included in the scope of work

of Bidder/Agency:

Landline/mobile number (Not Toll Free) will be taken by Bidder/Agency in

NMRCL’s name. This number will be published and users call this number for their

issues. Recurring telephone bill costs to be paid by Bidder/Agency for the entire

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

35

project duration.

Bidder/Agency needs to provide help desk on services model. Bidder/Agency may take

space in a call center and quote per seat charges of CSE for 8 hours shift including

supervisor and infrastructure costs per month.

The Bidder/Agency will be paid on per seat basis.

In addition to telephone calls, the Bidder/Agency shall also provide other channels

for call logging like email and web interface.

Following is also part of scope of work of Bidder/Agency:

a. Development of training material for CSEs and supervisors b. Training to be imparted to CSEs and supervisors c. Provision of Call center application including CRM on services model d. Development of standard operating procedures with call prioritization

guidelines, problem security codes and escalation procedures etc. in consultation with NMRCL

e. Helpdesk related infrastructure. f. Sharing training content and maintaining liaison with State, UTs and CBEC help

desk. g. Estimated number of CSEs: Estimated ratio of CSEs to supervisor is 10:1. h. Language Capabilities : Hindi, Marathi and English i. The service window for Help Desk is 365X24X7 (Monday to Sunday) in the

initial stages, which may be adjusted in the future based on call volume. j. Estimated number of CSEs at the start of the project: 20 for peak shift. k. During non-peak hours reduced number of seats may be operated. The call

statistics will be analyzed every quarter after Go-Live and the number of CSEs may be ramped up or down accordingly on a week’s notice.

l. NMRCL also reserves the right to remove the helpdesk requirement from the scope of work of the Bidder/Agency at any stage of the project. NMRCL will provide sixty (60) days’ prior notice to Bidder/Agency in this regard.

m. Bidder/Agency shall deploy helpdesk application accessible to all users n. Bidder/Agency to provision for both inbound and outbound calls. Outbound calls

would be required to provide update/status to limited number of end users as per SOPs.

o. In the technical proposal bidder need to provide details of help desk facility including agency from whom help desk services are being taken, address of help desk facility, IT and non IT infra facilities available in the help desk as well as other details of the facility. NMRCL reserves the right to visit the proposed facility during bid evaluation as well as during operations phase.

p. Bidder/Agency need to provide one cabin and two seats in help desk center for NMRCL team members to be based at the help desk facility.

q. The help desk will serve as single point of contact for reporting/resolution of all tickets (queries, errors, incidents, issues either application or infrastructure or operations related).

2.26 Selection & Deployment of Manpower

a. Bidder/Agency shall select & deploy the skilled and qualified manpower required

for running the helpdesk.

b. Minimum Manpower Profile – Manpower deployed by Bidder/Agency for

Helpdesk should comply with minimum qualification as mentioned in following

table:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

36

S.

No.

Position

Minimum Qualification

1

Customer

Service

executive

(CSEs)

Minimum 12th passed and pursuing graduation,

preferably graduate or equivalent

Able to fluently speak, read and write in Marathi,

Hindi and English.

Able to communicate confidently and politely, with

good speaking skills

Experience of at least 1 year in Technical Helpdesk

(L1) role

2

Team Leaders

Must be a Graduate or equivalent

Able to speak, read and write in Hindi and English

Able to communicate confidently and politely, with

good speaking skills

Experience of at least 3 years in a Call Centre /

Technical Helpdesk role

Experience in coaching and developing skills of people

Effective problem-solving and decision-making skills

c. Manpower profiles could be audited by NMRCL with/without any notice. d. Bidder/Agency shall submit an undertaking with the periodic invoice declaring the

compliance to minimum manpower profile.

2.27 Training to Help Desk Manpower

a. Considering the nature of the services, training is an important aspect of Help Desk.

Bidder/Agency should make arrangements for imparting proper training in soft skills;

call handling, exposure to related application so as to prepare the CSEs to answer

different types of queries, and on other aspects of Help Desk.

b. The Bidder/Agency should ensure that all the CSEs are put on actual duty only after

providing them proper training on at least the following areas:

S. No.

Training Area

Responsibility

1

Soft Skills

Bidder/Agency

2

Application (s)

Bidder/Agency

3

Call Handling procedures

Bidder/Agency

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

37

4

Business process / workflows

Bidder/Agency (with support from NMRCL team)

Note: For such training sessions,

arrangement of logistics, travel, etc. for

the Bidder/Agency’s resources shall be

the responsibility of the Bidder/Agency.

c. The Bidder/Agency shall include the cost of training the resources for any new process,

modules, etc., in the per seat cost quoted in the price bid.

d. Before deployment of CSE, he/she need to undergo training for at least a week time

covering above areas. Certificate of such training need to be submitted on quarterly

basis to NMRCL.

2.28 Set up IT Infrastructure for Helpdesk Operations

Bidder/Agency shall arrange for IVR, dialer and related hardware and network

components for running the IT Help Desk Operations.

a. Help Desk application (CRM): i. Bidder/Agency would provide and implement a comprehensive CRM solution.

ii. The software would maintain complete history of all calls received. iii. CSEs would capture all relevant caller information in this application for

recording customer communication and should be integrated with required

NMRCL applications etc.

iv. The Bidder/Agency shall provide NMRCL with all the data of this application

at end of contract period or immediately, in case of an early termination of the

project/ service. The formats can be industry standard formats e.g. MS Excel,

csv or MS Access DB.

v. This application need to be integrated by Bidder/Agency with Help Desk tool that

will be procured and implemented by Bidder/Agency.

vi. Help Desk application (CRM) will remain property of the Bidder/Agency

b. Call Number: i. Bidder/Agency shall take two access numbers, from two different operators.

ii. The access number shall be in name of NMRCL.

iii. Numbers should be accessible from anywhere in India and from other

network operators also. Customer should be able to dial this number from

mobile as well as landline.

iv. Bidder/Agency shall provide the PRI line(s) to route the number(s)

c. Automatic Call Distributor (ACD): ACD distributes incoming calls to CSEs as they are received. It should have at least

the following features:

i. System should be able to intelligently route the callers to CSEs based on their

availability to take calls on first come first serve basis.

ii. Standard features like Call Transfer, Conference, Barge in, Dialed Number

Identification Sequence (DNIS), Automatic Number Identification (ANI), and

Caller Line Identification (CLI) etc.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

38

iii. System should announce the queue waiting time for the caller before getting

attended by a CSEs

iv. System shall support the ability to play customized announcements per queue as

defined by the administration.

d. Other Infrastructure, but not limited to, to be provided by Bidder/Agency are:

i. Call barging and recording software ii. CSEs computers, phone sets and head sets.

iii. Connectivity between Helpdesk & DC and Helpdesk & DR.

2.29 Helpdesk operations

Helpdesk would have following major activities and tasks:

a. Issues logged by users through Helpdesk should be accessed and serviced by the

helpdesk personnel.

b. Track and route requests for service and to assist end users in answering questions and

resolving problems. Assign severity level to each ticket as per the SOPs.

c. Acknowledgement should be sent to user along with service ticket number through an

email immediately on call logging.

d. Routing the query received to the concerned team of the Bidder/Agency for resolution of tickets (Issues that the helpdesk personnel are not able to resolve)

e. Escalate the issues/complaints, to NMRCL if necessary as per the escalation matrix.

f. Notifying users the problem status and resolution through tickets over email/SMS.

g. All the issues on logging shall be assigned severity of issue. Basic guideline for

assigning severity is as follows:

Severity

Definition

Severity 1

Severity 1 problems are the ones which have a critical business impact.

These problems will have any of the following characteristics:

Entire or part of any service unavailable (including APIs)

Incorrect behavior of the system (wrong calculations, etc.)

Security Incidents

Data Theft/loss/corruption

Severe impact on customer satisfaction/NMRCL reputation –

bad media publicity

No work-around to mitigate the disruption in service

Repeat calls (same problem that has occurred earlier reported

more than 2 times)

Financial impact on NMRCL

Severity 2

Severity 2 problems are the ones which have a significant business

impact. These problems will have any of the following characteristics:

The efficiency of users is being impacted

Has a viable workaround

Severely degraded performance (slow service)

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

39

Severity 3

Severity 3 problems are the ones which have a minimal business impact.

These problems will have any of the following characteristics:

No impact on processing of normal business activities.

A low impact on the efficiency of users

Has a simple workaround

Enhancement requests

h. Every call received/done from the Helpdesk would be recorded in the Helpdesk application

against the respective id.

i. Each call would have a unique identifier and in case there is any query/any other request,

stakeholder shall be intimated about the call id for future tracking purpose.

j. To ensure Customer Service Quality, NMRCL shall conduct regular audits, random audits

and call barging

i. NMRCL will do a random sample survey of calls on call quality as well as be

involved into calls without prior notification. For this purpose administration level

permissions to access all sub-systems/servers to monitor and generate reports

including those required for cross-verification of SLAs and related payments will be

provided by the Bidder/Agency.

ii. All calls (both inbound and outbound) should be recorded. The call data from the

voice logger should be archived on to hard disk every 15 days. The data on the hard

disk should be stored in using such naming conventions that supports easy retrieval.

These records shall be retained on hard disk for another 30 days.

k. If it is observed by NMRCL that a CSE/team leader has misbehaved with a caller on

telephone, or if complaint is received against any CSE/team leader or if performance is

found to be lacking in the opinion of NMRCL, NMRCL may instruct Bidder/Agency to

remove such person from Helpdesk immediately and provide replacement within 1 week.

l. Helpdesk shall keep the user informed on various stages of resolution through email. m. If the call is forwarded to external entity, coordination between user and external entity

would be maintained by helpdesk along with informing the user on call status.

n. Incidents which are not meeting SLAs and which are exceptional in nature (highly critical,

wider spread etc.) shall be escalated as per defined escalation matrix.

o. Helpdesk should comply with SLAs applicable to them as mentioned in this RFP.

Non-adherence to SLAs shall lead to imposition of liquidated damages.

p. Continuous Improvement:

i. Prepare Knowledge base for frequently reported problems along with the

resolution steps/solutions and publish on the portal.

ii. Publish and continuously update the knowledge basis on the website that can

enable user to find resolution without calling the helpdesk.

iii. On a quarterly basis, Bidder/Agency shall carry out the analysis of help desk

tickets (open and closed) to identify recurring incidents and conduct a root cause

analysis on the same. Bidder/Agency shall submit a report to NMRCL with the

analysis and provide inputs to NMRCL on user training requirements, awareness

messages to be posted on the portal, redesign recommendations and/or

application enhancements (functional/design) based on help desk ticket

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

40

analysis. The objective of the analysis should be to address the repeat incidents and

enhance the delivery of services to the end users.

q. Bidder/Agency shall prepare and submit reports to NMRCL team as per mutually

agreed reporting structure. Reports shall include but not limited to the following:

i. Incident logs (category, severity and status of call etc.) ii. Incidents escalated

iii. SLA compliance/non-compliance report with reasons for non-compliance iv. Problem management v. Detailed analysis containing opportunities of automation, trainings, FAQs, etc.

vi. Helpdesk & CSE utilization reports, benchmarked against industry standards for

similar application/environment.

2.30 Track 5 Training and Capacity Building

2.30.1 Introduction

1. The purpose of this section is to define the scope of work for training and capacity

building to be implemented at NMRCL.

2. The Bidder/Agency’s scope of work also includes preparing the necessary

documentation and aids required for successful delivery of such trainings.

3. The details provided in this section are indicative and due to the complex nature of

the project the number of training sessions may increase. Over and above the team

considered for performing the training as detailed in subsequent sections,

Bidder/Agency has to provision for two personnel (one functional and one technical)

(to be based at NMRCL office) in its Operations & Maintenance (O&M) team for

the first two years during O&M phase to provide periodic training to handle

additional training needs.

4. Further the Bidder/Agency has to provide cost for additional and optional training

sessions in its commercial proposal in case more training’s are required.

Bidder/Agency has to conduct such additional training sessions on NMRCL’s

request.

2.30.2 Training and Capacity Building Strategy

1. Bidder/Agency will develop a training and capacity building strategy that will also include a detailed plan of implementation. The strategy has to be multi- pronged since (a) there are many stakeholders; (b) the IT environment is complex; (c) 5D BIM is new and (d) training may need to be spread across multiple phases of the project.

2. NMRCL envisages that the training and capacity building sessions for extended

stakeholders would primarily be based on ‘Train the Trainer’ concept. These master trainers will further train the respective users. NMRCL will make available to the Bidder/Agency a training room in its corporate office, which will have a seating capacity of twenty persons and will be equipped with a projector.

3. For the two personnel deployed at NMRCL HQ for training purposes during the

O&M phase, the travel and boarding/lodging costs would be borne by NMRCL as per NMRCL’s defined costs for mid manager level personnel.

4. Bidder/Agency will get the Training and capacity building strategy including

training material finalized with NMRCL before starting the training programs.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

41

2.30.3 Scope of work for training and capacity building

2.30.3.1 Types of training

The different types of training that the Bidder/Agency needs to impart are:

Type of Training

Relevant Stakeholder Scope

Functional All Application level details and functional aspects of 5D BIM & ERP

Technical All as defined by NMRCL Technical details API details Integration requirements System operations

2.30.3.2 Preparation of training aids

1. Bidder/Agency will prepare all the requisite audio/visual training aids that are required for successful completion of the training for all stakeholders. These include the following for all the stakeholders:

a. Training manuals for all users

b. Computer based training modules

c. Video (recorded sessions) for portal functionality, back end modules,

business intelligence, dynamic reporting etc. d.

Presentations

e. User manuals

f. Operational and maintenance manuals for the modules provided along with

the application

g. Application/modules training prototype for hands on training using

dummy data

h. Regular updates to the training aids prepared under this project

2. Bidder/Agency will maintain a copy of all the training material on the system and access provided to relevant stakeholders depending on need and role. Access to training would be finalized with NMRCL. Bidder/Agency has to ensure the following points:

a. For each training session, the Bidder/Agency has to provide the relevant

training material copies to all the attendees.

b. The contents developed shall be the property of NMRCL will all rights.

2.30.3.3 Number of trainings

1. Bidder/Agency has to ensure that the personnel deployed for training are properly qualified and understand the area of their training in depth. This section covers the number of training that is required.

2. The number of trainings planned for different stakeholders will be determined during the project planning stages and finalized. It is anticipated that there will be periodic trainings on 5D BIM (say once a month) until the Metro project go-live, while ERP trainings will be specific to go-live of the technology solutions with refresher trainings

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

42

on demand for the duration of the contract.

2.30.3.4 Training Effectiveness

1. Bidder/Agency has to ensure that the training sessions held are effective and that the attendees would be able to carry on with their work efficiently. For this purpose, it is necessary that the effectiveness of training sessions is measured. The Bidder/Agency will prepare a comprehensive feedback form that will capture necessary parameters on measuring effectiveness of the training sessions. This form will be discussed and finalized with NMRCL.

2. After each training session, feedback will be sought from each attendee on either printed

feedback forms or through a link available on the web portal. One member of the stakeholder group would be involved in the feedback process and he/she has to vet the feedback process. The feedback received would be reported to NMRCL for each training session.

3. For each training session, the Bidder/Agency will categorize the feedback on a scale of

1 to 10, where 10 will denote excellent and 1 will denote unsatisfactory.

4. The training session would be considered effective only if cumulative score of feedback [sum of all feedback divided by number of attendees] is more than 7.5.

2.31 Operation and Maintenance (O&M)

Bidder/Agency will operate and maintain all the components of the 5D BIM & ERP Systems

for a period of five (6) years after Go-Live date. During O&M phase, Bidder/Agency shall

ensure that service levels are monitored on continuous basis; service levels are met and are

reported to NMRCL. After Go-Live, if any system/sub-system/appliance that is deployed

during the O&M phase must be added in the system only after proper induction procedures

are followed including hardening and security testing. Bidder/Agency needs to implement

suitable Performance Improvement Process (PIP) in the project. PIP program applies to all

the processes of NMRCL project. Bidder/Agency need to submit its detailed approach for

PIP in its technical proposal. Every process and procedure implemented in the System

project must be reviewed and updated by Bidder/Agency at least on annual basis from the

Go-Live Date.

Some broad details of O&M activities are mentioned below:

2.31.1 Applications Support and Maintenance

Application support includes, but is not limited to, production monitoring,

troubleshooting and addressing functionality, availability and performance issues,

implementing system change requests etc. The Bidder/Agency shall keep the application

software in good working order; perform changes and upgrades to applications as

requested by the NMRCL team. All tickets related to any issue, complaint or observation

about the system shall be maintained in an ITIL compliant comprehensive ticketing

solution. Key activities to be performed by Bidder/Agency in the application support phase

are as follows:

a. Compliance to SLA

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

43

Bidder/Agency shall ensure compliance to SLAs as indicated in this RFP and any

upgrades / major changes to the software shall be accordingly planned by

Bidder/Agency ensuring the SLA requirements are met at no additional cost to the

NMRCL.

b. Annual Technology Support

The Bidder/Agency shall be responsible for arranging for annual technology support for

the OEM products to NMRCL provided by respective OEMs during the entire O&M

phase. For the following software, Bidder/Agency is mandatorily required to take

enterprise level annual support for the entire contract duration:

i. Operating System ii. Virtualization layers iii. RDBMS iv. Analytics tool

c. Application Software Maintenance

i. Bidder/Agency shall provide unlimited support through onsite team/telephone/E-

mail / Video Conferencing/installation visit as required

ii. Bidder/Agency shall address all the errors/bugs/gaps in the functionality in the

solution implemented by the Bidder/Agency (vis-à-vis the FRS, BRS and SRS

signed off) at no additional cost during the O&M phase

iii. All patches and upgrades from OEMs shall be implemented by the

Bidder/Agency ensuring customization done in the solution as per the NMRCL’s

requirements are applied. Technical upgrade of the installation to the new version,

as and when required, shall be done by the Bidder/Agency. Any version upgrade of

the software / tool / appliance by Bidder/Agency to be done after taking prior

approval of NMRCL and after submitting impact assessment of such upgrade.

iv. Any changes/upgrades to the software performed during the support phase shall

subject to the comprehensive and integrated testing by the Bidder/Agency to ensure

that the changes implemented in the system meets the specified requirements and

doesn’t impact any other function of the system. Release management for

application software will also require NMRCL approval. A detailed process will be

finalized by Bidder/Agency in consultation with NMRCL.

v. Issue log for the errors and bugs identified in the solution and any change done

in the solution shall be maintained by the Bidder/Agency and periodically

submitted to the NMRCL team.

vi. Bidder/Agency, at least on a monthly basis, will inform NMRCL about any new

updates or upgrades available for all software components of the solution along with

a detailed action report. In case of critical security patches/alerts, the

Bidder/Agency shall inform about the same immediately along with his

recommendations. The report shall contain Bidder/Agency’s recommendations on

update/upgrade, benefits, impact analysis etc. The Bidder/Agency shall need to

execute updates or upgrades though formal change management process and

update all documentation and Knowledge databases etc. For updates and upgrades,

Bidder/Agency will carry it out free of cost by following defined process.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

44

d. Problem identification and Resolution

i. Errors and bugs that persist for a long time, impact a wider range of users and is difficult to resolve becomes a problem. Bidder/Agency shall identify and resolve all the application problems in the identified solution (e.g. system malfunctions, performance problems and data corruption etc.)

ii. Monthly report on problem identified and resolved would be submitted to

NMRCL team along with the recommended resolution.

e. Change and Version Control All planned or emergency changes to any component of the system shall be through the approved Change Management process. Bidder/Agency needs to follow processes based on industry ITSM framework. For any change, Bidder/Agency shall ensure:

i. Detailed impact analysis ii. Change plan with Roll back plans iii. Appropriate communication on change required has taken place iv. Proper approvals have been received v. Schedules have been adjusted to minimize impact on the production environment vi. All associated documentations are updated post stabilization of the change vii. Version control maintained for software changes

The Bidder/Agency shall define the Software Change Management and Version control

process. For any changes to the solution, Bidder/Agency has to prepare detailed

documentation including proposed changes, impact to the system in terms of functional

outcomes/additional features added to the system etc. Bidder/Agency shall ensure that

software and hardware version control is done for entire duration of contract.

f. Maintain configuration information

Bidder/Agency shall maintain version control and configuration information for

application software and any system documentation.

g. Training

Bidder/Agency shall provide training to NMRCL personnel whenever there is any change

in the functionality. Training plan has to be mutually decided with NMRCL team.

h. Maintain System documentation

Bidder/Agency shall maintain at least the following minimum documents with respect to the system:

i. High level design of whole system ii. System requirements Specifications (SRS) iii. Any other explanatory notes about system iv. Traceability matrix

Bidder/Agency shall also ensure updation of documentation system ensuring that:

i. Source code is documented ii. Functional specifications are documented iii. Application documentation is updated to reflect on-going maintenance and

enhancements including FRS and SRS, in accordance with the defined standards

iv. User manuals and training manuals are updated to reflect on-going changes/enhancements

v. Standard practices are adopted and followed in respect of version control and

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

45

management.

i. All the project documents need to follow version control mechanism. Bidder/Agency will be required to keep all project documentation updated and should ensure in case of any change, the project documents are updated and submitted to NMRCL by the end of next quarter.

j. For application support Bidder/Agency shall keep dedicated software support team to be based at Bidder/Agency location that will single point of contact for resolution of all application related issues. This team will receive all the application related tickets / incidents and will resolve them. This team should also comprise domain experts to provide all domain related support to technical team. In its technical proposal Bidder/Agency needs to provide the proposed team structure of application support including number of team members proposed to be deployed along with roles and skills of each such member.

k. Any changes required due to problems/bugs in the developed software / application will not be considered under change control. The Bidder/Agency will have to modify the software / application free of cost. This may lead to enhancements / customizations and needs to be implemented by the Bidder/Agency at no extra cost.

l. Any additional changes required would follow the Change Control Procedure. NMRCL may engage an independent agency/consultant to validate the estimates

submitted by the Bidder/Agency. The inputs of such an agency would be taken as the final estimate for efforts required. Bidder/Agency to propose the cost of such changes in terms of man month rate basis and in terms of Function point/Work Breakdown Structure (WBS) basis in the proposal.

m. Bidder/Agency will factor in 25 man months of effort towards change requests in its costs of software development. Any effort beyond 25 man months will be considered through the change request process. This may be used at any time during the contract period.

2.32 IT Infrastructure Support and Maintenance

IT infrastructure includes servers, storages, back up, networking, load balancers, security

equipment, operating systems, database, enterprise management system, help desk system

and other related IT infra required for running and operating the envisaged system.

Bidder/Agency shall define, develop, implement and adhere to IT Service Management

(ITSM) processes aligned to ITIL framework for all the IT Services defined and managed as

part of this project. IT infrastructure support and maintenance include but not limited to

the below:

2.32.1 Warranty support for deployed IT infrastructure

i. Bidder/Agency shall provide comprehensive and on-site warranty for 6 years from the

date of Go-Live for the IT infrastructure deployed on the project. Bidder/Agency needs to

have OEM support for these components and documentation in this regard need to be

submitted to NMRCL on annual basis.

ii. Bidder/Agency shall provide comprehensive onsite manufacturer's warranty in respect of

proper design, quality and workmanship of all hardware, equipment, accessories etc.

covered by the RFP. Bidder/Agency must warrant all hardware, equipment, accessories,

spare parts, software etc. procured and implemented as per this RFP against any

manufacturing defects during the warranty period.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

46

iii. Bidder/Agency shall provide the performance warranty in respect of performance of the

installed hardware and software to meet the performance requirements and service levels

in the RFP.

iv. Based on the terms of contract, Bidder/Agency is responsible for sizing and may also be

asked to procure the necessary hardware and software licenses as per the performance

requirements provided in the RFP. During the warranty and contract period

Bidder/Agency shall replace or augment or procure higher-level new equipment or

additional licenses/hardware at no additional cost to the NMRCL in case the procured

hardware or software is not enough or is undersized to meet the service levels and the

project requirements.

v. Mean Time Between Failures (MTBF) - If during contract period, any equipment has a

hardware failure on four or more occasions in a period of less than three months or six times

in a period of less than twelve months, it shall be replaced by equivalent or higher-level

new equipment by the Bidder/Agency at no cost to NMRCL.

vi. During the warranty period Bidder/Agency shall maintain the systems and repair/replace

at the installed site, at no charge to NMRCL, all defective components that are brought to

the Bidder/Agency's notice.

vii. The Bidder/Agency shall carry out Corrective Maintenance for

maintenance/troubleshooting of supplied hardware/software and support infrastructure

problem including network (active/passive) equipment, security and rectification of the

same. The Bidder/Agency shall also maintain complete documentation of problems,

isolation, cause and rectification procedures for building knowledge base for the known

problems in centralized repository, accessible to NMRCL team as well.

viii. Bidder/Agency shall monitor warranties to check adherence to preventive and

repair maintenance terms and conditions.

ix. The Bidder/Agency shall ensure that the warranty complies with the agreed technical

standards, security requirements, operating procedures, and recovery procedures.

x. Bidder/Agency shall have to stock and provide adequate onsite and offsite spare parts and

spare component to ensure that the uptime commitment as per SLA is met.

xi. Bidder/Agency shall ensure that the onsite list of spares is assigned only for NMRCL

infrastructure and that this list of onsite spares is made available to NMRCL and updated

on monthly basis

xi. Any component that is reported to be down on a given date should be either fully

repaired or replaced by temporary substitute (of equivalent configuration) within the time

frame indicated in the Service Level Agreement (SLA).

xiii. The Bidder/Agency shall introduce a comprehensive Assets Management process &

appropriate tool to manage the entire lifecycle of every component of the system.

b) System Maintenance and Management

i. Bidder/Agency shall be responsible for tasks including but not limited to setting up

servers, configuring and apportioning storage space, account management,

performing periodic backup of data and automating reporting tasks, and executing

hardware and software updates when necessary. It shall be noted that the activities

performed by the Bidder/Agency may also be reviewed by NMRCL.

ii. Bidder/Agency shall provision skilled and experienced manpower resources to

administer and manage the entire system.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

47

iii. On an ongoing basis, Bidder/Agency shall be responsible for troubleshooting issues in

the IT infrastructure solution to determine the areas where fixes are required and

ensuring resolution of the same.

iv. Bidder/Agency shall be responsible for identification, diagnosis and resolution of

problem areas pertaining to IT Infrastructure and maintaining the defined SLA.

v. Bidder/Agency shall implement and maintain standard operating procedures for

the maintenance of the IT infrastructure based on the policies formulated in

discussion with NMRCL and based on the industry best practices / frameworks.

Bidder/Agency shall also create and maintain adequate documentation / checklists

for the same.

vi. Bidder/Agency shall be responsible for managing the user names, roles and passwords

of all the relevant subsystems, including, but not limited to servers, other devices, etc.

Bidder/Agency shall be required to set up the directory server. Logs relating to access

of system by administrators shall also be kept and shall be made available to

NMRCL on need basis.

vii. Bidder/Agency shall implement a password change mechanism in accordance with

the security policy formulated in discussion with NMRCL and based on industry best

practices/frameworks like ISO 27001, ISO 20000 etc.

viii. The administrators shall also be required to have experience in latest

technologies so as to provision the existing and applicable infrastructure on a

requirement based scenario.

c) System Administration

i. Bidder/Agency shall ensure proper configuration of server parameters and performance tuning on regular basis. Bidder/Agency shall be the single point of accountability for all hardware maintenance and support the infrastructure. It should be noted that the activities performed by the Bidder/Agency may be reviewed by NMRCL.

ii. Bidder/Agency shall be responsible for operating system administration, including but not limited to management of users, processes, preventive maintenance and management of upgrades including updates, upgrades and patches to ensure that the system is properly updated.

iii. Bidder/Agency shall also be responsible for installation and re-installation of the hardware(s) as well as the software(s) in the event of system crash/failures.

iv. Bidder/Agency shall be responsible for proactive monitoring of the applications hosted v. Bidder/Agency shall appoint system administrators to regularly monitor and maintain a

log of the monitoring of servers to ensure their availability to NMRCL at all times. vi. NMRCL shall undertake regular analysis of events and logs generated in all the sub

systems including but not limited to servers, operating systems etc. The system administrators shall undertake actions in accordance with the results of the log analysis. The system administrators shall also ensure that the logs are backed up and truncated at regular intervals.

vii. The system administrators shall adopt a defined process for change and configuration management in the areas including, but not limited to, changes in servers, operating system, applying patches, etc.

ix. The system administrators shall provide hardening of servers in line with the defined security policies. Validation of hardening configuration will be carried out quarterly and deviations must be tracked through SLA reporting

x. The system administrators shall provide integration and user support on all

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

48

supported servers, data storage systems etc. xi. The system administrators shall provide directory services such as local LDAP services

and DNS services and user support on all supported servers, data storage systems etc. xii. The system administrators shall be required to trouble shoot problems with web

services, application software, server relationship issues and overall aspects of a server environment like managing and monitoring server configuration, performance and activity of all servers.

xiii. The system administrators should be responsible for documentation regarding configuration of all servers, IT Infrastructure etc.

xiv. The system administrators shall be responsible for managing the trouble tickets, diagnosis of the problems, reporting, managing escalation, and ensuring rectification of server problems as prescribed in Service Level Agreement.

xv. The administrators will also be required to have experience in latest technologies so as to provision the existing and applicable infrastructure on a requirement based scenario.

d) Storage Administration

i. Bidder/Agency shall be responsible for the management of the storage solution

including, but not limited to, storage management policy, configuration and

management of disk array, SAN fabric/switches, tape library, etc.

ii. Bidder/Agency shall be responsible for storage management, including but not

limited to management of space, SAN/NAS volumes, RAID configuration, LUN, zone,

security, business continuity volumes, performance, etc.

iii. The storage administrator will be required to identify parameters including but

not limited to key resources in the storage solution, interconnects between key

resources in the storage solution, health of key resources, connectivity and access rights

to storage volumes and the zones being enforced in the storage solution.

iv. The storage administrator will be required to create/delete, enable/disable zones

in the storage solution.

v. The storage administrator will be required to create/delete/modify storage

volumes in the storage solution.

vi. The storage administrator will be required to create/delete, enable/disable connectivity and access rights to storage volumes in the storage solution.

vii. To facilitate scalability of solution wherever required. viii. The administrators will also be required to have experience in latest technologies such

as virtualization and cloud computing so as to provision the existing and applicable infrastructure on a requirement based scenario.

e) Database Administration

i. Bidder/Agency shall be responsible for monitoring database activity and performance, changing the database logical structure to embody the requirements of new and changed programs.

ii. Bidder/Agency shall be responsible to perform physical administrative functions such as reorganizing the database to improve performance.

iii. Bidder/Agency shall be responsible for tuning of the database, ensuring the integrity of the data and configuring the data dictionary.

iv. Bidder/Agency will follow guidelines issued by NMRCL in this regard from time to time including access of data base by system administrators and guidelines relating to security of data base.

v. In addition to restrictions on any direct change in Data by any administrator, the

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

49

Databases shall have Auditing features enabled to capture all activities of administrators.

f) Backup/Restore/Archival

i. Bidder/Agency shall be responsible for implementation of backup & archival policies as finalized with NMRCL. The Bidder/Agency is responsible for getting acquainted with the storage policies of NMRCL before installation and configuration.

ii. For purpose of initial estimations of storage/media/Tools etc., NMRCL proposes online data for 3 years and archival of data (on low cost storage) older than 3 years for next 6 years i.e. total 9 years from date of data creation before any data/Media is purged from the system. However the policy shall be finalized with the Bidder/Agency after placement of PO. It is expected that the data in the archives remains non- editable by any means.

iii. Bidder/Agency shall be responsible for monitoring and enhancing the performance of scheduled backups, scheduled regular testing of backups and ensuring adherence to related retention policies.

iv. Bidder/Agency shall be responsible for prompt execution of on-demand backups of volumes and files whenever required by NMRCL or in case of upgrades and configuration changes to the system.

v. Bidder/Agency shall be responsible for real-time monitoring, log maintenance and reporting of backup status on a regular basis. Bidder/Agency shall appoint administrators to ensure prompt problem resolution in case of failures in the backup processes.

vi. Bidder/Agency shall undertake media management tasks, including, but not limited to, tagging, cross-referencing, storing, logging, testing, and vaulting in fire proof cabinets (onsite and offsite as per the detailed process finalized by during project implementation phase).

vii. Bidder/Agency shall also provide a 24 x 7 support for file and volume restoration requests at the Data Centre(s).

g) Network monitoring

i. Bidder/Agency shall provide services for management of network environment to maintain performance at optimum levels on a 24 x 7 basis.

iii. Bidder/Agency shall be responsible for creating and modifying VLAN, assignment of ports to appropriate applications and segmentation of traffic.

h) Security Management

a. Regular hardening and patch management of components of the system as agreed with NMRCL

b. Performing security services on the components that are part of the NMRCL environment as per security policy finalized with NMRCL

c. IT Security Administration – Manage and monitor safety of information/data d. Reporting security incidents and resolution of the same e. Proactively monitor, manage, maintain & administer all security devices and update

engine, signatures, and patterns as applicable. f. Managing and monitoring of anti-virus, anti-malware, phishing and malware for

managed resources. g. Ensuring 100 percent antivirus coverage with patterns not old more than period

agreed on any given system h. Reporting security incidents and co-ordinate resolution i. Monitoring centralized pattern distribution (live update) and scan for deficiencies

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

50

j. Maintaining secure domain policies k. Secured IPsec/SSL/TLS based virtual private network (VPN) management l. Performing firewall management and review of policies on at least quarterly basis

during first year of O&M and then after at least on half-yearly basis m. Resolution of calls for security notifications, system alerts, vulnerabilities in

hardware/software and alerting NMRCL as appropriate n. Performing patch management using software distribution tool for all security

applications including content management system, antivirus and VPN o. Providing root cause analysis for all defined problems including hacking attempts p. Monthly reporting on security breaches and attempts plus the action taken to thwart

the same and providing the same to NMRCL q. Maintaining documentation of security component details including architecture

diagram, policies and configurations r. Performing periodic review of security configurations for inconsistencies and

redundancies against security policy s. Performing periodic review of security policy and suggest improvements t. Reviewing logs daily of significance such as abnormal traffic, unauthorized

penetration attempts, any sign of potential vulnerability. Security alerts and responses. Proactive measures in the event a problem is detected

u. Policy management (firewall users, rules, hosts, access controls, daily adaptations) v. Modifying security policy, routing table and protocols w. Performing zone management (DMZ) x. Sensitizing users to security issues through regular updates or alerts - periodic

updates/Help NMRCL issuance of mailers in this regard y. Performing capacity management of security resources to meet business needs z. Rapidly resolving every incident/problem within mutually agreed timelines aa. Testing and implementation of patches and upgrades bb. Network/device hardening procedure as per security guidelines from NMRCL cc. Implementing and maintaining security rules dd. Performing any other day-to-day administration and support activities

i) Other Activities

i. Bidder/Agency shall ensure that it prepares configuration manual for OS, appliances, middleware, all tool, servers/devices and all equipment’s and the same need to be submitted to NMRCL, any changes in the configuration manual need to be approved by NMRCL. Configuration manual to be updated periodically.

ii. Bidder/Agency shall maintain data regarding entitlement for software upgrades, enhancements, refreshes, replacements and maintenance.

iii. If the Operating System or additional copies of Operating System are required to be installed/reinstalled/un-installed, the same should be done as part of O&M.

iv. Bidder/Agency should carry out any requisite adjustments/changes in the configuration for implementing different versions of Application Software.

v. Updates/Upgrades/New releases/new versions: The Bidder/Agency shall provide from time to time the Updates/Upgrades/new releases/new versions of the software and operating systems as required. The Bidder/Agency should provide free upgrades, updates & patches of software and tools to NMRCL as and when released by OEM.

vi. Bidder/Agency shall provide patches to the software as part of IT infrastructure, operating system, databases and other applications.

vii. Software License Management: The Bidder/Agency shall provide for software license management and control. Bidder/Agency shall maintain data regarding entitlement of software updates, enhancements, refreshes, replacements, and

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

51

maintenance. ix. All other activities required to meet the project requirements and service levels.

It is responsibility of the Bidder/Agency to scale up the Operations & Maintenance (O&M) team as and when required to ensure smooth project execution throughout the project duration. The basic expectations on profile of some key O&M positions are as given below:

Sr. No

Role Experience Qualifications/Certifications/ Skills

1 IT infrastructure – L1 1-3 years Min. Engineering Diploma/B.Sc. for L1.

Engineering Graduate for L2/L3 levels

Good Communication (written/Oral)

Relevant Knowledge and expertise on IT Infrastructure Management

Relevant technical certifications

Specific experience in operating domain

Willing to work in 24X7 environment

2 IT infrastructure – L2 3-6 years 3 IT infrastructure – L3 > 6 years

4 Networks – L1 1-3 years Min. Engineering Diploma/B.Sc. for L1

Engineering graduate for L2/L3 levels

Good communication (written/Oral),

Relevant certifications

5 Networks – L2 3-6 years 6 Networks – L3 >6 years

7 IT security – L1 1-3 years Min. Engineering Diploma/B.Sc. for L1

Engineering graduate for L2/L3 levels

Good communication (written/Oral),

Relevant certifications

8 IT security – L2 3-6 years 9 IT security – L3 > 6 years

10 Application support – L2/L3

> 5 years B.E./B. Tech/MCA

Good communication (written/Oral)

Experience in relevant tools & Technologies

2.32.3 Compliance to SLA

2.32.3.1 Requirements

Bidder/Agency shall ensure compliance to uptime and performance requirements of project solution as indicated in the SLA table of RFP and any upgrades/major changes to the System shall be accordingly planned by Bidder/Agency for ensuring the SLA requirements.

2.32.3.2SLA Measurement

Bidder/Agency shall be responsible for measurement of SLAs at the System level as well as at user level with the help of enterprise monitoring tool on a periodic basis.

2.32.3.3Reporting

Reports for SLA measurement must be produced for NMRCL officials as per the project requirements.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

58

Section 3:

Project timelines and Schedule of

implementation

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

53

3 Project timelines and schedule of implementation

3.1 Project Timeline

The project delivery timelines are to be cast by the Bidder/Agency keeping in mind that the project has been cast in an aggressive schedule and needs a sense of urgency and resource allocation to ensure that the project is delivered in time within budgets. Technology will play an important role in the execution of the overall NMRCL project and thus it is critical that the Bidder/Agency work on tight schedules with the best resources possible to deploy. Some of the key milestones are given below. The time below is indicative, the Bidder/Agency may improve upon them to deliver the project earlier if possible.

Activity Deliverables Time (in weeks)

Detailed Project plan and project kick off

Detailed Project plan including Resource deployment plan Status reporting and Communication strategy

Deployment of key personnel

T+3

T+5

Documentation Submission of project charter. It should, inter alia, include:

Capacity Building and Change Management Plan

Risk Management and Mitigation plan

Information Security Plan

Communication Plan

Data migration plan

Exit Management Plan including transition management

T+8

Stage I – Owner Support Office

Formulation of OSO and associated processes measurements, dashboards, practices, and governance

TBD

Core 5D BIM system and ERP system

Business Requirement Document – 5D BIM

T+8

System Requirement Specification – ERP T+10

High level design, low level design document and System Architecture document (in compliance with Annexure A of the RFP)

T+12

Deployment Architecture Document T+13

User Acceptance Test cases T+14

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

54

Integration requirements shared with all Stakeholders

T+16

Development and Testing of core services T+18

Migration of data of existing master data T+22

UAT of Core Modules including integration Testing

T+22

Closure on observations of stakeholders on Core Modules

T+24

Production deployment and Go-Live T+26

BI/Analytics and Other Components

Business Requirement Document T+34

Preparation of SRS and System Architecture document (in compliance with Annexure A of the RFP)

T+38

UAT and Closure on observations of Stakeholders

T+44

Go-Live of Other components T+48

Stage II – Infrastructure Readiness

Procurement of Hardware

Order placement with OEMs (copy to NMRCL)

T+8

Hardware delivery and receipt at site(s) T+18

Acceptance of hardware as per acceptance criteria defined in the RFP

T+20

Procurement of System software & COTS licenses

Order placement with OEMs (copy to NMRCL)

T+16

License availability (link/CD) Acceptance T+19

Commissioning and Go-Live

Benchmarking report, Load Testing and other tests

T+21

Deployment of software licenses T+22

Deployment of Application components and UAT

T+23

Go-Live T+30

State III – Training and Capacity Building

Training ( Part-I) Preparation of training plan and strategy (for all stakeholders including citizens)

T+12

Preparation of training material (CBTs, Presentations, documents, Help modules, etc.)

T+18

Detailed training on functionalities of the application and the underlying technologies to NMRCL

T+20-24

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

55

Training completion report T+28

Detailed training (BI functionalities) of the and the underlying technologies to NMRCL

T+40

Training completion report T+46

Stage IV – Data Migration

Documentation Study existing data in current systems and manual registers

T+14

Mapping document for migration T+18

Migration Creation of data base T+20

Deployment of required tools and Data Migration

T+22

Completion report Data Migration completion report T+24

Stage V – Helpdesk

Set up Setting up of required infrastructure for Helpdesk (including availability of landline and mobile numbers)

T+24

Team deployment Deployment and Training to helpdesk team T+28

Go-Live Go-Live of helpdesk T+30 Stage VI – Operations and Maintenance (Warranty support) for five years after Go-Live

Processes as per ITSM standards for O&M

Setup Processes, procedures, Policy framework as per ITSM standards for O&M Set up

T+24

Process Audits (as defined in row above) Ongoing (at least 2 audits per month)

Quarterly reports (within 2 weeks after end of every quarter)

SLA Compliance report Ongoing

Project Status Report Ongoing Change Control Note and Report Ongoing Issue/Incident reports Ongoing

a. T – Project start date i.e. the date of receipt of Letter of Acceptance of Award from Bidder/Agency OR Seven (14) days after issuance of Letter of award to Bidder/Agency by NMRCL whichever is earlier.

b. For all deliverables submitted by Bidder/Agency, NMRCL will approve /reject /provide feedback to the Bidder/Agency within seven (7) working days after submission of a deliverable.

3.2 Payment Schedule

The proposed payment schedule has been determined based on specific milestones, their achievement, deployment of resources, and cash-flow for procurement of hardware, software licenses, and other expenses on the project. All payments will be made within 30 days of submission of specific invoices along with supporting signed documents by NMRCL. In case there is a dispute on any line item in the invoice, NMRCL shall withhold the disputed amount and pay the rest of the monies due to the Bidder/Agency.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

56

Sr. No.

Description Payment

1. Signing of contract 10% of the implementation cost of the ERP, 5D BIM and other software tools

2. Creation of the master plan for the project

5% of the amount as specified for the OSO consulting

3. Deployment of resources for OSO Payments for this will be divided into monthly equated installments and paid on completion of the month. The last 2 months payment will be withheld and paid on handing over of completed documentation after adjusting the advance amount as listed in point 2

4. Submission and sign off on Business Requirement Document or Blueprint for 5D BIM and related technologies

15% of the implementation cost of 5D BIM solution

5. Submission and sign off on Business Requirement Document or Blueprint for ERP and related technologies

15% of the implementation cost of the ERP solution

6. Initial license procurement for development and training. This is not the full licenses required for go-live

100% on delivery of the software and documentation in physical or electronic medium as the case may be and acknowledged by NMRCL

7. Submission and sign off on Technology Reference Architecture

5% of the implementation cost of the ERP, 5D BIM and other software tools

8. Submission and approval of the test and development hardware configurations for procurement

20% advance 60% on delivery 20% on successful commissioning

9. Use case and test cases for ERP submission and acceptance by NMRCL

10% of the implementation cost of the ERP solution

10. Use case and test cases for 5D BIM, submission and acceptance by NMRCL

10% of the implementation cost of the 5D BIM solution

11. Training of teams identified by NMRCL on 5D BIM and signed off as satisfactory

10% of the implementation cost of the 5D BIM solution, on completion of the training

12. Training of teams identified by NMRCL on ERP and signed off as satisfactory

10% of the implementation cost of the ERP solution, on completion of the training

13. Technical testing of the ERP system after configuration, development, and customizations

10% of the implementation cost of the ERP solution, on completion of the training

14. Technical testing of the 5D BIM system after configuration, development, and customizations

10% of the implementation cost of the 5D BIM solution, on completion of the training

15. User Acceptance Test of the ERP system certified by NMRCL

10% of the implementation cost of the ERP solution

16. User Acceptance Test of the 5D 10% of the implementation cost of the 5D

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

57

BIM system certified by NMRCL BIM solution 17. Interfaces between the ERP and

5D BIM systems, and with other third party systems as identified and agreed to in the scope of work, duly certified by NMRCL

10% of the implementation cost of the ERP and 5D BIM solutions

18. Submission and approval of the final hardware configurations required for go-live for procurement

20% advance 60% on delivery 20% on successful commissioning

19. Final license procurement for deployment in go-live.

100% on delivery of the software and/or license keys and documentation in physical or electronic medium as the case may be and acknowledged by NMRCL

20. Master Data entry completion for go-live for 5D BIM solution and signed off by NMRCL

5% of the implementation cost of the 5D BIM solution

21. Master Data entry completion for go-live for ERP solution and signed off by NMRCL

5% of the implementation cost of the ERP solution

22. Go-live of 5D BIM solution as defined in 2.2.10

10% of the implementation cost of the 5D BIM solution

23. Go-live of ERP solution as defined in 2.2.10

10% of the implementation cost of the ERP solution

24. Final payment of the ERP & 5D BIM solutions implementation

10% of the implementation costs of the 5D BIM & ERP solutions will be paid 6 months after the go-live

25. Post go-live operations and maintenance

Payment for support services will be quarterly in advance after go-live until the end of term after deducting any penalties for not meeting the SLA for the previous term.

Note: h. Order for Infrastructure items including Hardware, COTS Software licenses and other

system software etc. shall be placed by Bidder/Agency only after receipt of written confirmation from NMRCL in this regard. NMRCL may request the Bidder/Agency for deferment of procurement of such components for maximum period of twelve months. In case NMRCL requests for deferment of procurement of infrastructure the timelines will extend accordingly. Also the SLA relating to infrastructure will apply from the date when NMRCL gives intimation to Bidder/Agency for start of procurement.

ii. All the milestone payments that are due to Bidder/Agency after requisite approvals /

acceptance as prescribed shall be made to Bidder/Agency within 20 working days after receipt of valid invoice in this regard from the Bidder/Agency, subject to correctness and validation of the invoice and no objections / observations by NMRCL.

iii. If the contract is terminated due to default of the Bidder/Agency, the advance would be

deemed as interest bearing advance at an interest rate of 9 percent per annum to be compounded quarterly.

iv. Unless otherwise mentioned in this RFP for any component, payment terms for additional

work assigned through change management shall be defined in the change management order which will be, to the extent applicable, in line with payment terms defined above table.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

Section 4:

5D BIM & ERP System Architecture

Requirements

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

59

4. 5D BIM & ERP System Architecture Requirements

4.1 Detailed Solution Architecture

The detailed Solution Architecture is at Annexure A.

Section 5:

Compliance To Standards &

Certifications

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

61

5 Compliance to Standards & Certifications

a. For a large set up such as the 5D BIM & ERP System, it is imperative that the highest standards applicable are adhered to. In this context, the Bidder/Agency will ensure that the entire setup is certified and is in compliance with the applicable standards. Following table depicts the standards which NMRCL intends to get certified on along with the timelines:

Area Standard/Certificatio

n Timelines

Security ISO 27001 Within 30 months of G0-Live

ISO 27002 ( Code of

Practice to be used

for implementation)

Within 36 months of Go-Live

BCP ISO 22301 Within 24 months of Go-Live

IT Operations ISO 20000/ITIL Within 24 months of Go-Live

b. The Standard/Certification will be the latest version as at the time of implementation.

In case any standard/certification is withdrawn or replaced with a new standard/certification, the Bidder/Agency has to ensure that the new standard / certification is taken within defined timelines or within 18 months of declaration of such change. The cost required for such certifications will be borne by NMRCL. Cost relating to compliance with the above standards/certification including documentation and certification fees etc., to be borne by the Bidder/Agency.

c. During project duration, the Bidder/Agency will ensure adherence to prescribed

standards as provided below:

Sl. No.

Component/Application/System Prescribed Standard

1. Information Security ISO 27001 certified

2. IT Infrastructure Management ITIL specifications

3. Service Management ISO 20000 specifications

4. Project Documentation IEEE/ISO/CMMi (where applicable) specifications for documentation

d. Apart from the above the Bidder/Agency needs to ensure compliance of the project with Government of India IT security guidelines including provisions of:

i. The Information Technology Act, 2000” and amendments thereof and ii. Guidelines and advisories for information security published by Cert-

In/DeitY (Government of India) issued till the date of publishing of tender notice. Periodic changes in these guidelines during project duration need to be complied with.

Quality Audits:

1. The Bidder/Agency is expected to align all phases of the project and sustenance as per

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

62

best industry standards e.g. ITIL, ISO 20000, ISO 27001, etc. It is expected that an independent Quality Team of Bidder/Agency’s shall independently and regularly audit the systems against these standards and processes laid down by Bidder/Agency. The frequency of such audits must be at least once per half-year for every process. The result of the audit shall be directly shared with NMRCL with an effective action plan for mitigations of observations/non-compliances, if any.

2. NMRCL, at its discretion, may also engage independent auditors to audit any/some/all standards/processes. The Bidder/Agency shall support all such audits as per calendar agreed in advance. The result of the audit shall be shared with the Bidder/Agency who has to provide an effective action plan for mitigations of observations/non- compliances, if any.

72

Section 6:

Project Management & Governance

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

64

6 Project Management and Governance

Project Management

Some of the key project management governance requirements are covered in this section. The Bidder/Agency is expected to detail the governance framework in its proposal and can also propose its own governance structure as part of response to this RFP. The Bidder/Agency’s proposed governance model will be discussed between Bidder/Agency and NMRCL at the time of on-boarding. The final governance model needs to be approved by NMRCL.

6.1 Project Management Office (PMO)

A Project Management office will be set up during the start of the project. The PMO will, at the minimum, include a designated full time Project Manager from Bidder/Agency. It will also include key persons from other relevant stakeholders including members of NMRCL’s Project Working Group (PWG) and other officials/representatives by invitation.

The operational aspects of the PMO need to be handled by the Bidder/Agency including maintaining weekly statuses, minutes of the meetings, weekly / monthly / project plans, etc. PMO will meet formally on a weekly basis covering, at a minimum, the following agenda items:

i. Project Progress ii. Delays, if any – Reasons thereof and ways to make-up lost time iii. Issues and concerns iv. Performance and SLA compliance reports; v. Unresolved and escalated issues; vi. Change Management - Proposed changes, if any vii. Project risks and their proposed mitigation plan viii. Discussion on submitted deliverable ix. Timelines and anticipated delay in deliverable if any x. Any other issues that either party wishes to add to the agenda.

During the development and implementation phase, there may be a need for more frequent meetings and the agenda would also include: i. Module development status ii. Testing results iii. IT infrastructure procurement and deployment status iv. Status of setting up/procuring of the Helpdesk, Bandwidth procurement, etc. v. Any other issues that either party wishes to add to the agenda.

Bidder shall recommend PMO structure for the project implementation phase and operations and maintenance phase.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

65

6.2 Steering Committee

The Steering Committee will consist of senior stakeholders from NMRCL, its nominated agencies and Bidder/Agency. Bidder/Agency will nominate its country head or his/her immediate sub-ordinate to be a part of the Project Steering Committee. The Bidder/Agency shall participate in monthly Steering Committee meetings and update Steering Committee on Project progress, Risk parameters (if any), Resource deployment and plan, immediate tasks, and any obstacles in project. The Steering committee meeting will be a forum for seeking and getting approval for project decisions on major changes etc.

All relevant records of proceedings of Steering Committee should be maintained, updated, tracked and shared with the Steering Committee and Project Management Office by Bidder/Agency. During the development and implementation phase of the project, it is expected that there will be at least fortnightly Steering Committee meetings. During the O&M phase, the meetings will be held at least once a quarter.

Other than the planned meetings, in exceptional cases, NMRCL may call for a Steering Committee meeting with prior notice to the Bidder/Agency.

6.3 Project Monitoring and Reporting

The Bidder/Agency shall circulate written progress reports at agreed intervals to NMRCL and other stakeholders. Project status report shall include Progress against the Project Management Plan, status of all risks and issues, exceptions and issues along with recommended resolution etc. Other than the planned meetings, in exceptional cases, project status meeting may be called with prior notice to the Bidder. NMRCL reserves the right to ask the bidder for the project review reports other than the standard weekly review reports.

6.4 Risk and Issue management

The Bidder/Agency shall develop a Risk Management Plan and shall identify, analyze and evaluate the project risks, and shall develop cost effective strategies and action plans to mitigate those risks. The Bidder/Agency shall carry out a Risk Assessment and document the Risk profile of NMRCL based on the risk appetite and shall prepare and share the NMRCL Enterprise Risk Register. The Bidder/Agency shall develop an issues management procedure to identify, track, and resolve all issues confronting the project. The risk management plan and issue management procedure shall be done in consultation with NMRCL. The Bidder/Agency shall monitor, report, and update the project risk profile. The risks should be discussed with NMRCL and a mitigation plan be identified during the project review/status meetings. The Risk and Issue management should form an agenda for the Project Steering Committee meetings as and when required.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

66

6.5 Staffing requirements

NMRCL has identified certain key positions that should be part of Bidder/Agency’s team during execution. Bidder/Agency shall provide resource deployment schedule including these key positions and other team members as mentioned in RFP Vol 1. CVs of the key resources need to be submitted along with the proposal. Please note that NMRCL shall require that all project related discussion should happen in NMRCL office. While the identified key personnel will operate out of NMRCL’s office, other key members of the development/Data Centre team may need to travel to NMRCL office for critical Project/Steering Committee meetings at their own expenses.

6.6 Governance procedures

a. Bidder/Agency shall document the agreed structures in a procedures manual.

6.7 Transition and Exit Management

a. The bidder shall submit a structured & detailed Transition and Exit Management plan along with its technical proposal. NMRCL will evaluate all the Transition and Exit management plans submitted by various bidders. NMRCL will adopt the best plan which will be implemented by the selected Bidder/Agency. Bidder/Agency needs to update the Transition and Exit management on half yearly basis or earlier in case of major changes during the entire contract duration. The plan needs to be discussed and approved by NMRCL.

b. At the end of the contract period or during the contract period or contract termination, if any other agency is identified or selected for providing services related to Bidder/Agency’s scope of work, the Bidder/Agency shall ensure proper and satisfactory Transition is made to the other agency. In case NMRCL wants to take over the project itself, then Bidder/Agency has to ensure proper transition to the NMRCL team.

c. All risk during transition stage shall be properly documented by Bidder/Agency and mitigation measures are planned in advance so as to ensure smooth transition without any service disruption.

d. Bidder/Agency shall provide necessary handholding and transition support. This includes:

i. Bidder/Agency has to ensure complete documentation for the entire system is handed over to NMRCL/identified agency

ii. Bidder/Agency to handover all AMC support related documents, credentials etc. for all OEM products supplied/maintained by him in the system

iii. The Bidder/Agency must ensure that no end of support products (software/hardware) are existing at time of transition in the system

iv. Bidder/Agency to handover the list of complete inventory of all assets created for the project

v. Bidder/Agency to assist the new agency/NMRCL in complete audit of the system including system licenses and physical assets

vi. Bidder/Agency to give detailed walk-through and demos for the solution

vii. Bidder/Agency to hand-over the entire software including source code, program files, configuration files, setup files, project documentation, etc.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

67

viii. Bidder/Agency to provide shadow support for at least three months and secondary support for further three months after the end of O&M period or termination of contract, as applicable at no additional cost to NMRCL

ix. Bidder/Agency shall close all critical open issues as on date of exit. All other open issues as on date of Exit shall be listed and provided at NMRCL.

e. The Bidder/Agency shall provide all knowledge transfer of the system to the incoming

Bidder/Agency to the satisfaction of NMRCL as per the specified timelines.

f. Bidder/Agency shall be released from the project once successful transition is done meeting the parameters defined for successful transition.

6.8 Planning and Scheduling

The Bidder/Agency will prepare a detailed schedule and plan for the entire project covering all tasks and sub tasks required for successful execution of the project. The Bidder/Agency has to get the plan approved from NMRCL at the start of the project and it should be updated every week to ensure tracking of the progress of the project. The project plan should include the following: 1. The project break up into logical phases and sub-phases; 2. Activities making up the sub-phases and phases; 3. Components in each phase with milestones; 4. The milestone dates are decided by NMRCL in this RFP. Bidder/Agency cannot change

any of the milestone completion dates. Bidder/Agency can only propose the internal task deadlines while keeping the overall end dates the same. Bidder/Agency may suggest improvement in project dates without changing the end dates of each activity.

5. Key milestones and deliverables along with their dates including those related to delivery and installation of hardware and software;

6. Start date and end date for each activity; 7. The dependencies among activities; 8. Resources to be assigned to each activity; 9. Dependency on NMRCL

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

68

Section 7:

Change Management and Control

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

69

7 Change Management and Control

7.1 Change Request

a. Due to the evolving nature of the project requirements and the complexity of the project,

NMRCL recognizes that frequent changes may be required before, during and after rollout

of the system. NMRCL also recognizes that these changes may require modification to the

software, infrastructure and underlying processes and may thus have a financial impact.

b. Bidder/Agency is required to work with the NMRCL to ensure that all changes are

discussed, managed, and implemented in a constructive manner.

c. One of the key requirements is that the Bidder/Agency will be responsible for providing

system availability according to defined service levels. This responsibility includes

responsibility to implement upgrades, enhancements, extensions and other changes to the

software application in order to maintain and extend reliable information systems, services

and service delivery mechanism. It is important that changes to the computing

environment and underlying infrastructure are executed in a standardized and controlled

manner in order to mitigate the risk of interruptions to the services and to maintain a

repository of knowledge about the current as well changed configurations as well as status

of the computing environment at all times.

d. This section describes the procedure to be followed in the event of any proposed change

to the scope of work and SLAs. Such change shall, inter alia, include:

i. Requests for requirements changes (additions, deletions, modifications, deferrals)

in Scope of Work

ii. Reports for resolving the problems in current production systems iii.

Requests for enhancements in current production systems

iv. Requests for new development projects e. The Change Control process applies to base-lined work products created or managed by the

members of the project.

7.2 Purpose and Objective

The purpose of the Change Request procedure is to control changes to the System

environment throughout the solution.

The Change request procedure has the following objectives:

a. To protect the System environment from uncontrolled changes. b. To minimize unintended affects during the implementation of necessary

changes.

c. To avoid implementation of any changes which is not reviewed, approved or

analyzed.

d. To control the impact of changes and minimize the effect on effective as well

as efficient service delivery.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

70

Bidder/Agency will implement a Change Control system that will facilitate and maintain

all records pertaining to Change Control.

7.3 Institutional Framework for Change Requests

Given below is the overall Institutional Framework required to be setup for the project:

Role

Description

Change

Advisory Board

(CAB)

Chairperson

Chairperson of the change advisory board;

NMRCL employee or NMRCL nominated individual

Final decision-making authority if CAB does not reach an

agreement;

Deputes a member from the Board to be the evaluator for each

change request

Deputes additional member (part of Bidder/Agency team) to be

the modifier for each approved change request

Change

Advisory

Board

Constitution of Change Advisory Board (CAB): o NMRCL

o Bidder/Agency

o PMU/Other third party agency nominated/engaged by NMRCL

CAB decides whether to approve or reject proposed changes

Authorized to review, approve and schedule all changes to the

computing environment including software

Decision of CAB will be final and binding on all parties involved

Evaluator

The person whom NMRCL asks to analyze the impact of a

proposed change

Modifier

The person who is assigned responsibility for making changes in a

work product in response to an approved change request; updates the

status of the request over time

Originator

The person who submits a new change request

Verifier

The person who determines whether a change was made correctly

NMRCL may constitute a sub Change Advisory Committee (CAC) to handle minor Change

Requests (pre-defined by NMRCL). This will be headed by a NMRCL official and will

include members of the Bidder/Agency and other third party agency nominated by

NMRCL. It will follow the processes similar to the Change Advisory Board, but will be

focusing only on minor Change Requests.

7.4 Process, Timelines and Responsibility Center

The entire change request process will be implemented as mentioned below. The proposed

timelines for each steps/activity and the corresponding responsibility center is also shown

in the table below:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

71

S.

No.

Process

Timelines

(Weeks)

(Development

phase/O&M

phase)

Responsib

ility

Center

1.

Authorized official from the CAB/NMRCL (Originator)

requesting a change will initiate the request in the

Change Management System using his/her credentials

Immediate

CAB/NMRCL

2.

Once the Change request is submitted in the system,

an email will automatically be triggered to:

a) CAB members b) NMRCL Project Manager c) Bidder/Agency Program Manager

Immediate

System

3.

NMRCL will evaluate the change request report for

risks, process of evaluating & implementing change,

time required for completing the change(s) and any

other additional requirement/information needed to

clarify the Change requested; and will provide the

recommendations in the change request module by

logging with their credentials.

1 day/1 week

NMRCL

4.

Bidder/Agency will be required to study the Change

requested and log in their queries/suggestions on the

requested change. This will be done by the authorized

representative of the Bidder/Agency in the Change

Request Module.

Bidder/Agency

5.

NMRCL will discuss and provide adequate responses

to the queries/suggestions from the Bidder/Agency on

the requested change. CAB will further decide on

the responses to the queries/suggestions and log the

final decision in the system

1 day/1 week

CAB

6.

Based on the responses provided by CAB,

Bidder/Agency will prepare and submit techno

commercial proposal.

1 day/3 week

Bidder/Agency

7.

a) The Bidder/Agency will submit their Techno

Commercial proposal through the Change Request

system.

b) After submission, an email will be auto triggered to

NMRCL designated official along with a copy to all

the CAB committee members.

Bidder/Agency

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

72

8.

a) NMRCL will evaluate the techno-commercial

proposal submitted by Bidder/Agency and provide

the recommendations to CAB.

b) CAB will review the evaluation and decide on the

final status. This will be logged in the change

request module by authorized representatives.

2 days/2 weeks

CAB/NMRCL

9.

a) If CAB does not approve the proposal in its entirety,

then CAB will initiate negotiation with the

Bidder/Agency based on any of the aspects like

cost, time, resources, impact on systems and/or

operations and additional parameters, as

applicable.

b) Based on the negotiation, NMRCL will submit the

final recommendation to CAB and log the decisions

in the change request module.

c) If CAB approves the proposal in its entirety the

Change request sign-off between CAB and

Bidder/Agency will be initiated.

CAB/NMRCL

10.

During Sign-off, the form will be electronically signed

with all supporting annexures as logged in the system.

The authorized signatory from CAB as well as the

Bidder/Agency will sign the Change request

Evaluation and Finalization form (at first place) and

accordingly a formal go- Ahead will be provided by

CAB.

Immediate

CAB/Bidder/Agency

11.

Bidder/Agency will then initiate the change following a

standard predefined procedure along with proper

documentation at each stage.

As

required/agreed

Bidder/Agency

12.

Once the Change is completed as per agreed timelines

and specifications, CAB representatives and/or

NMRCL will conduct UAT and auditing respectively to

provide comments/recommendations to committee

members.

2 days/1 week

CAB/NMRCL

13.

If any further activities need to be carried out as per

the recommendations during UAT and Audit, it will be

done by the Bidder/Agency. After that an Acceptance

Certificate will be issued to Bidder/Agency by CAB and

instructions for deployment/implementation, again as

per standard deployment plan. This will follow a

second sign-off on the ‘Change Request Evaluation &

Finalization’ Form.

2 days/1 week

(as required)

CAB/Bidder/Agency

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

73

14.

Bidder/Agency will deploy the changed solution and notify CAB.

1 day/1 week

Bidder/Agency

15.

NMRCL will finally review and confirm the deployed

solution as per agreed standard, specifications and

requirements, and provide status to CAB.

NMRCL

16.

A final sign off will be done on the ‘Change Request

Evaluation & Finalization’ Form and completion

Certificate will be issued to the Bidder/Agency by CAB.

A copy of this completion certificate will have to be

submitted to CAB along with the invoices for this

change implementation.

Immediate

CAB

Note:

1. The timelines mentioned in the table above are indicative and would be dependent

on the phase of the project.

2. During development and implementation phase, timelines are stringent and

indicated above. These will be further evaluated during the project initiation.

NMRCL will provide the timelines to be followed during the development and

implementation phase that will be binding on the Bidder/Agency.

7.5 Proposed Categories of Change

1. Application Software

a. Description

Change request for any new module/change in module/functionality/Process re-

engineering etc., any new services and any new forms, etc.

b. Method of Evaluation

Man-days or Man-months

c. Documents Required

i. Detailed Project Plan ii. Effort Estimates (Module wise/Process wise/Screen wise, as applicable) iii. Resource Deployment Plan/Types of Resources iv. Resource Plotting Sheet v. CVs/Profiles of Resources (if required) vi. Techno-Commercial Proposal

2. Infrastructure procurement/Facility Management a.

Description

Additional computing resources, bandwidth, as per NMRCL application scalability

requirements

b. Method of Evaluation

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

74

Actual Cost (Prevailing Rate contract if any)

c. Documents Required

i. Quantity (BoM) ii. Specifications

iii. Software Licenses, if any iv. Warranty & Support services details v. Bandwidth Requirements, as applicable

vi. Efforts required, resource quantity and category vii. Any other details as applicable

3. Helpdesk/Call Center Facility a.

Description

Additional manpower/seating capacity, based on call volume

b. Method of Evaluation

Per seat Cost (Prevailing Rate contract if any)

c. Documents Required

i. Call Volume analysis/report ii. Resource Deployment Plan/Types of Resources iii. CVs/Profiles of Resources (if required) iv. Techno-Commercial Proposal

Note: The details of description and the documents required provided above are only

indicative and these may be changed as per directions from NMRCL.

7.6 Change Control Procedure Guidelines

1. Change requests in respect of the Agreement, the Project Implementation, or the SLA will

emanate from the Parties' respective authorized officials, who will be responsible for

obtaining approval for the change and will initiate the Change Request.

2. Parties, while evaluating and finalizing the Change Request, shall consider the change in

the context of the following parameter, namely whether the change is beyond the scope of

Services including ancillary and concomitant services required and as detailed in the sign-

off version of all required documents.

3. Except during exceptional circumstances as decided by NMRCL, change requests will be

reported monthly to NMRCL who will prioritize and review progress. Bidder/Agency

shall be required to implement any proposed changes once approved with effect from the

date agreed for implementation.

4. On evaluation of the financial impact, the charges for such a change will be decided

between CAB and the Bidder/Agency and will be a part of the Change Control Notice

(Evaluation and Finalization). The payment for such changes will be as per the Terms of

Payment to be decided by NMRCL.

5. On receiving any Change Request from CAB, the Bidder/Agency must submit its proposal

with all the required information in the prescribed format for CAB’s perusal within defined

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

75

number of working days.

6. The Bidder/Agency may also submit any queries/clarifications that it may have with respect

to implementation of Change requested. If the Bidder/Agency fails to submit any proposal

within the prescribed time duration, appropriate SLA and liquidated damages will be levied

on the Bidder/Agency. Bidder/Agency must not deny the implementation of any Change

requested by CAB under any circumstances, unless technical feasibility is in question. In

all such matters, NMRCL’s decision will be final and binding on all parties.

7. The change request should be categorized as simple, medium and complex change.

The Bidder/Agency must provide the list of deliverables within timelines.

8. The acceptance criteria for any such ‘Change’ will remain the same as described in

the RFP with respect to the performance and quality parameters.

9. The final sign-off and “Acceptance Certificate” would be provided by CAB. CAB will in all

such cases revert within predefined number of working days after final implementation of

the change and provide satisfactory completion certificate or the reasons for non-

acceptance. Till that certificate is issued, all such changes will be deemed unaccepted

and all the necessary SLAs and liquidated damages will apply on the Bidder/Agency. In case

there is no response from CAB within the prescribed time duration the said

implementation will automatically be deemed accepted.

10. The Bidder/Agency must take all necessary steps to implement the change as per project

plan submitted without compromising on quality and performance standards. If the

Bidder/Agency fails to comply with acceptable standards & requirements of implementing

of the requested change, or denies implementation of the requested change at any stage

during the contract period, CAB will have complete authority to get the change

implemented from any of the third party/nominated agency independently. In all such

cases the entire cost of change implementation will be recovered completely from the

Bidder/Agency, along with applicable interest. Also, CAB reserves the right to impose any

other financial or legal penalties depending upon the gravity of impact on the Service

Delivery due to non-implementation of the requested Change. In all such matters the

decision of CAB will be final and binding on all parties.

11. If CAB gives any new requirement or change request, the Bidder/Agency should follow

the change management procedure to implement the change on additional payment basis.

The requirements for required infrastructure to implement the change should be specified

by the Bidder/Agency so that CAB can make necessary provisions. The change request

procedure would be considered complete only when training is imparted to the target users

for whom the change is being done and feedback is evaluated by CAB.

12. It is proposed that the prevailing rates for all kinds of change, as and when initiated by

CAB will be taken into consideration and the proposals accordingly evaluated. In all such

matters the decision of the CAB will be final and binding on all parties.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

Section 8:

Testing and Acceptance Criteria

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

77

8 Testing and Acceptance Criteria

a) Bidder/Agency shall demonstrate the following mentioned acceptance criteria prior to

acceptance of the solution as well as during project operations phase, in respect of

scalability and performance etc. The Bidder/Agency may propose further detailed

Acceptance criteria which the NMRCL will review. Once NMRCL provides its approval,

the Acceptance criteria can be finalized. In case required, parameters might be revised by

NMRCL in mutual agreement with bidder and the revised parameters shall be considered

for acceptance criteria.Bidder/Agency would set up a testing environment in its own facility

that is separate from the development, staging and production environment. A

comprehensive system should be set up that would have the capability to log and track

the testing results, upload and maintain the test cases and log and track issues/bugs

identified.

b) The following table depicts the details for the various kinds of testing envisaged for each

phase of the project ( Phase-I, II and III):

Type of

Testing

Responsibility

Scope of Work

System

Testing

Bidder/Agency

1. Bidder/Agency to perform System testing

where the development work is being

executed

2. Bidder/Agency to prepare test plan and test

cases and maintain it. NMRCL may request

the Bidder/Agency to share the test cases

and results

3. Should be performed through manual as well

as automated methods

4. Automation testing tools if required to be

provided by Bidder/Agency. NMRCL

doesn’t intend to own these tools

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

78

Integration

Testing

Bidder/Agency

1. Bidder/Agency to perform Integration

testing in its own setup

2. Bidder/Agency to prepare and share with

NMRCL the Integration test plans and test

cases

3. Bidder/Agency to perform Integration

testing as per the approved plan

4. Integration testing to be performed through

manual as well as automated methods

5. Automation testing tools if required to be

provided by Bidder/Agency. NMRCL

doesn’t intend to own these tools

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

79

Performance

and load esting

Bidder/Agency

NMRCL /

Third Party

Auditor ( to

monitor the

performance

testing)

1. Bidder/Agency to do performance and load

testing

2. Various performance parameters such as

transaction response time, throughput, hits

per second and transactions per second etc.

should be taken into account.

3. Load and stress testing of the system to be

performed on business transaction volume

4. Test cases and results to be shared with

NMRCL. 5. Performance testing to be carried out in the

exact same architecture that would be set up

for production.

6. Bidder/Agency needs to use performance and

load testing tool for testing. NMRCL doesn’t

intend to own these tools.

7. NMRCL if required, may involve third party

auditors to monitor/validate performance

testing. Cost for such audits to be paid by

NMRCL.

Security

Testing

(including

Penetration

and

Vulnerability

testing)

Bidder/Agency

NMRCL /

Third Party

Auditor ( to

monitor the

security

testing)

1. The solution should demonstrate compliance

with security requirements as mentioned in

the RFP including but not limited to security

controls in the application, at the network

layer, network, data centre(s), or security

monitoring system

2. The solution shall pass vulnerability and

penetration testing. The solution should pass

web application security testing for the portal

and security configuration review of the

baseline infrastructure.

4. Security testing to be carried out in the exact

same environment/architecture that would

be set up for production.

5. Security test report and test cases should be

shared with NMRCL

6. Testing tools if required, to be provided by

Bidder/Agency. NMRCL doesn’t intend to own these tools

7. During O&M phase, penetration testing to be

conducted on yearly basis and vulnerability

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

80

assessment to be conducted on half-yearly

basis

NMRCL will also involve third party auditors

to perform the audit/review/monitor the

security testing carried out by Bidder/Agency.

Cost for such auditors to be paid by NMRCL.

User

Acceptance

Testing of

System

NMRCL or

NMRCL

appointed

third party

auditor

1. NMRCL/NMRCL appointed third party auditor

to perform User Acceptance Testing

2. Bidder/Agency to prepare UAT test cases

3. UAT to be carried out in the exact same

environment/architecture that would be set

up for production

4. Bidder/Agency should fix bugs and issues

raised during UAT and get approval on the

fixes from NMRCL/third party auditor before

production deployment

5. Changes in the application as an outcome of

UAT shall not be considered as Change

Request. Bidder/Agency has to rectify the

observations.

Note:

a. Bidder needs to provide the details of the testing strategy and approach including details

of intended tools/environment to be used by Bidder/Agency for testing in its technical

proposal. NMRCL does not intend to own the tools.

b. The Bidder/Agency shall work in a manner to satisfy all the testing requirements and

adhere to the testing strategy outlined. The Bidder/Agency must ensure deployment of

necessary resources and tools during the testing phases. The Bidder/Agency shall

perform the testing of the solution based on the approved test plan, document the

results and shall fix the bugs found during the testing. It is the responsibility of the

Bidder/Agency to ensure that the solution delivered meets all the requirements

specified in the RFP. The Bidder/Agency shall take remedial action based on outcome

of the tests.

c. The Bidder/Agency shall arrange for environments and tools for testing and for training

as envisaged. Post Go-Live; the production environment should not be used for testing

and training purpose. If any production data is used for testing, it should be masked

and it should be protected. Detailed process in this regard including security

requirement should be provided by the Bidder/Agency in its technical proposal. The

process will be finalized with the selected bidder.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

81

d. All the Third Party Auditors (TPA) as mentioned above will be appointed and paid by

NMRCL directly. Bidder/Agency can also suggest the auditors who may be appointed

by NMRCL at its sole discretion. All tools/environment required for testing shall be

provided by the Bidder/Agency.

e. Bidder/Agency needs to engage with the NMRCL appointed TPA at the requirement

formulation stage itself. This is important so that unnecessary re-work is avoided and

audit is completed in time. The audit needs to be completed before Go-Live.

Bidder/Agency needs to prepare and provide all requisite information/documents to

third party auditor and ensure that there is no delay in overall schedule.

f. The cost of rectification of non-compliances shall be borne by the Bidder/Agency.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

Section 9:

Service Level Agreement

And liquidated damages

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

83

9 Service Level Agreements (SLA)

The SLA’s specify the levels of service to be provided by the Bidder/Agency to NMRCL. This level is also called the baseline. Any degradation in the performance of the solution and services is subject to levying liquidated damages as specified in this section. The liquidated damages mentioned in this RFP are genuine pre-estimate of damages likely to flow from the breach of timelines and service levels. The liquidated damages mentioned in this RFP are not the sole and exclusive remedies available with NMRCL for any breach and Bidder/Agency shall not be relieved from any obligations by virtue of payment of such liquidated damages

A set of parameters has been identified as key to the successful implementation of the Project. If the performance of the Bidder/Agency in respect of any parameter falls below the prescribed tolerance limit, liquidated damages are imposed for the breach. All the payments to the Bidder/Agency are linked to the compliance with the SLA metrics specified in this section. During the contract period, it is envisaged that there could be changes to the SLAs, in terms of addition, alteration or deletion of certain parameters, based on mutual consent of both the parties i.e. NMRCL and Bidder/Agency.

Definitions

a. Non-Working Days: All Sundays and Public Holidays declared by Government of

Maharshtra

b. Days: All Working and Non-working days (365 days in a calendar year)

c. 24*7 means three shifts of 8 hours every day. This is applicable for all seven days of the

week without any non-working days

d. “Scheduled Maintenance Time” shall mean the time that the System is not in service

due to a scheduled activity as defined in this SLA. The scheduled maintenance time would

not be during 16X7 (7:00 am to 11:00 pm) timeframe. Further, scheduled maintenance

time is planned downtime taken after permission of NMRCL.

e. “Scheduled operation time” means the scheduled operating hours of the System for the

month. All scheduled maintenance time on the system would be deducted from the total

operation time for the month to give the scheduled operation time.

f. “System or Application downtime” means accumulated time during which the System is

totally inoperable within the Scheduled Operation Time but outside the scheduled

maintenance time and measured from the time a call is logged with the Bidder/Agency of

the failure or the failure is known to the Bidder/Agency from the availability measurement

tools to the time when the System is returned to proper operation.

g. “Availability” means the time for which the services and facilities are available for

conducting operations on the system including application and associated infrastructure.

Availability is defined as: {(Scheduled Operation Time – System Downtime)/(Scheduled

Operation Time)} * 100% measured on monthly rest basis.

h. “Helpdesk Support” shall mean the support center which shall handle Fault reporting,

Trouble Ticketing and related enquiries during this contract. Helpdesk support is to be

provided as per service window defined in this RFP.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

84

i. “Incident” refers to any event/abnormalities in the functioning of the any of IT

Equipment/Services that may lead to disruption in normal operations of the Data Centre,

System or Application services.

Interpretation & General Instructions

a. During O&M phase, the SLA parameters shall be monitored on a monthly basis as per

the individual SLA parameter requirements. In case the service levels cannot be achieved

at service levels defined in the tables below, it shall result in a breach of contract and shall

invoke liquidated damages.

b. SLAs would be reported monthly. A Service Level breach will occur if the Bidder/Agency

fails to meet Minimum Service Levels on a monthly basis for a particular Service Level.

Root cause analysis (RCA) to be prepared for all cases of breach in SLA’s and shared with

NMRCL.

c. However, liquidated damages would be levied every quarter. The percentage of SLA

violation would be the average of monthly SLA measurements for the months in that

respective quarter.

d. Overall Availability and Performance Measurements will be on a quarterly basis for the

purpose of Service Level reporting. Month wise “Availability and Performance Report” will

be provided by the Bidder/Agency every quarter in the NMRCL suggested format and a

review shall be conducted based on this report. Availability and Performance Report

provided to the NMRCL shall contain the summary of all incidents reported and associated

performance measurement for that period.

e. Liquidated damages are mentioned as a percentage of certain components of cost.

During the Development & Implementation phase, the maximum liquidated damages are

capped at 10% of Total Project Value. If the liquidated damages during Development and

Implementation phase exceed 10% of the Total project value, then NMRCL reserves the

right to terminate the contract.

f. During O&M phase, liquidated damages per quarter are capped at 20% of that

quarter’s payment. If liquidated damages calculations exceed 19% of the quarterly

payment for two consecutive quarters, then NMRCL can take appropriate action including

termination of the contract and forfeiting of Performance Bank Guarantee. If liquidated

damages calculations in any quarter exceed 30% of quarterly payment, then NMRCL can

take appropriate action including termination of the contract and forfeiting of

Performance Bank Guarantee.

g. In case there are successive breaches of SLA’s for two quarters, NMRCL can issue show

cause notice to the Bidder/Agency to explain the non-performance. Also Steering

Committee meeting may be called wherein Bidder/Agency needs to explain the action taken

to prevent such recurrences in future. This is without prejudice to other rights of NMRCL.

h. For levying liquidated damages on non-performance during sustenance support period,

Quarterly payment instalment of Operations & maintenance phase would be

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

85

considered for calculation purpose. Liquidated damages would be deducted from the next

payment being made to Bidder/Agency.

i. SLA’s are categorized under two heads depending on the phase the project is i.e.

during implementation and Operations & Maintenance.

Development and Implementation

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

86

Delay in Team mobilization

Liquidated damages as % of the Total Contract value

> 7 days & <= 10 days

0.01%

> 10 days & <= 15 days

0.02%

> 15 days & <= 20 days

0.05%

Number of Key personnel Changed

Liquidated damages as % of the Total Contract value

1 (not including Program Manager)

0.001%

2 to 4

0.002%

4 to 6

0.004%

Sr. No.

SLA Parameter Description Target Liquidated damages

1. Team mobilization and commencement of work including deployment of Key personnel on site

Deployment of identified key personnel in NMRCL, mobilization of team and commencement of work as per the project schedule

< 7 working days

Liquidated damages will be levied as per the following table:

For each additional day after 20 days, liquidated damages of 0.01% will be levied as additional liquidated damages

2. Change in named Key Personnel

Key personnel team deputed at NMRCL’s office to consist of same members whose names were proposed in the Bid

No deviation Liquidated damages will be levied as per the following table:

For each additional change, liquidated damages of 0.003% of Total Contract value will be levied as additional liquidated damages. In case the Program Manager recommended for the assignment is changed, an additional liquidated damages of 0.02% of the Total Contract Value will be levied.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

87

Delay in Project milestones

Liquidated damages as % of the value of the track / Phase to which the deliverable pertains

> 7 day & <= 10 days

0.5%

> 10 days & <= 15 days

1%

> 15 days & <= 17 days

2%

Delay in Go-Live

Liquidated damages as % of the Total Contract value

> 10 days & <= 15 days

0.1%

> 15 days & <= 20 days

0.25%

> 20 days & <= 25 days

0.4%

3. Delay in any of the project milestones

Measured as the

difference between

the planned date for

the milestone and

the actual date of its

completion

< 7 days Liquidated damages will be levied as per the following table:

For each additional day after 17 days, liquidated damages of 1% will be levied as additional liquidated damages

4. Delay in overall Go-Live date

Measured as the difference between the planned date for the Go-Live and the actual date of Go- Live

< 10 days Liquidated damages will be levied as per the following table:

For each additional day after 25 days, liquidated damages of 0.2% will be levied as additional liquidated damages

5. Training and Capacity Building

Feedback to be taken from all attendees

>75% of training audience to

In case session is rated Satisfactory or Excellent by more than 50 percent but less than 75 percent attendees, then the Bidder/Agency has to take

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

88

Error rate in Data Migration

Liquidated damages as % of the Total Contract value

> 0.25% & <= 0.30%

0.05%

> 0.30% & <= 0.35%

0.1%

> 0.35% & <= 0.40%

0.2%

give a satisfactory or above rating (per training)

the training session again and will be paid only 50 percent of the per training cost.

In case session is rated Satisfactory or Excellent by less than 50 percent attendees, then the Bidder/Agency has to take the training session again and will be paid only twenty five percent of the per training cost. No payment would be due for re-training session.

6. Data Migration Migration of Data From legacy

Error rate

< .25%

Liquidated damages will be levied as per the following table:

For each additional drop of 0.05% in Error rate after 0.40%, 0.2% of Total Contract value will be levied as additional liquidated damages.

7. Change Management

Handling of Change Requests

As per timelines defined in Change Management section in the RFP (or timelines agreed during the project)

Liquidated damages will be levied as per the following table:

Delay in submission of CR documents

Liquidated damages as % of the relevant cost of Application software phase / capital cost of IT infrastructure component

> 2 days & <= 5 days

0.05%

> 5 days & <= 10 days

0.1%

> 10 days & <= 15 days

0.2%

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

89

% Availability

Liquidated damages as % of the

Quarterly payments during

Operations & Maintenance Phase

<99.9% & >=99%

1% *{(99.9 –Achieved SLA)/99.9}*100

< 99% & >= 98%

3% *{(99 –Achieved SLA)/99}*100

< 98% & >= 97%

5% *{(98 –Achieved SLA)/98}*100

For each additional day after 15 days, 0.2% of Total contract value will be levied as additional liquidated damages.

This SLA will continue during the O&M phase. During O&M phase, the liquidated damages will be calculated as percentage of total Quarterly payment

Operations & Maintenance phase

Availability

Sr. No.

SLA Parameter Description Target Liquidated damages

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

104

8.

Availability of

below critical

functionalities of

System to end

users

Availability of

critical

functionality for

at least 99.9% of

time measured

on monthly

basis for a

24x7x365 time

period.

Note: This SLA

will apply for

non-availability

of one or more

critical modules

e.g. if two

functionalities/

modules are not

>=99.9%

Liquidated damages will be levied as per the following table:

For each additional drop of 1% in performance below 97%, 3% of Quarterly

payments of Operations & Maintenance cost will be levied as additional

liquidated damages.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

103

% Availability

Liquidated damages as % of the

Quarterly payments during

Operations & Maintenance Phase

<99.6% & >=99%

1% *{(99.6 –Achieved SLA)/99.6}*100

< 99% & >= 98%

2% *{(99 –Achieved SLA)/99}*100

< 98% & >= 97%

4% *{(98 –Achieved SLA)/98}*100

Available at the same time, they would be considered as one for the availability SLA calculation.

9.

Availability of all

remaining

functionalities of

the system

Availability of all

functionalities for

at least 99.6% of

time measured

on monthly basis

for a 24x7x365

time period.

Note: This SLA

will apply for

non-availability

of one or more

modules e.g. if

two modules/

functionalities

are not available

at the same time,

they would be

considered as

one for the

availability SLA

calculation

>=99.6%

Liquidated damages will be levied as per the following table:

For each additional drop of 1% in performance below 97%, 3% of Quarterly

payment of Operations & Maintenance will be levied as additional

liquidated damages.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

104

% transaction with more

response time as mentioned

in SLA table

Liquidated damages as % of the

Quarterly payments during

Operations & Maintenance

Phase

<100% & >=98%

0.5%

< 98% & >= 96%

1%

< 96% & >= 94%

2%

Incident/Helpdesk

Sr. No.

SLA Parameter

Description Target Liquidated damages

13

Helpdesk

ticket/Incident

Response time

Average Time

taken to

acknowledge

and respond

once a ticket

/incident is

logged through

one of the

agreed

channels. This

is calculated

for all tickets /

incidents

reported

within the

reporting

quarter

(24x7x365)

100% within 15

minutes

Liquidated damages will be levied as per the following table:

For each additional drop of 1% in performance below 94%, 1% of Quarterly

payment of Operations & Maintenance cost will be levied as additional

liquidated damages.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

105

% of incidents with more

response time as mentioned

in SLA table

Liquidated damages as % of the

Quarterly payments during

Operations & Maintenance

Phase

<100% & >=99%

1%

< 99% & >= 98%

2%

< 98% & >= 97%

4%

14

Time to

Resolve –

Severity 1

Time taken to

resolve the

reported

problem.

For Severity 1,

100% of the

incidents should

be resolved

within 30

minutes of

problem

reporting

Liquidated damages will be levied as per the following table:

For each additional drop of 1% in performance below 97%, 3% of Quarterly

payment of Operations & Maintenance cost will be levied as additional

liquidated damages.

15 Time to resolve – Severity 2 & 3

Time taken to resolve the reported problem.

100% of

Severity 2

within 4 hours

of problem

reporting

Severity 3

within 16

hours of

problem

reporting

Liquidated damages will be levied as per the following table:

% of incidents with more

response time as mentioned in

SLA table (Severity wise)

Liquidated damages as % of

the Quarterly payments

during Operations &

Maintenance Phase

<100% & >=99%

0.25%

< 99% & >= 98%

0.5%

< 98% & >= 97%

1%

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

106

% of reopened

incidents

Liquidated damages as % of the

Quarterly payments during

Operations & Maintenance Phase

<=4% & >2%

0.5%

<=6% & >4%

1%

<=8% & >6%

2%

For each additional drop of 1% in performance below 97%, 1% of Quarterly payment of Operations & Maintenance cost will be levied as additional liquidated damages.

16 Percentage of reopened incidents

For all incidents which are designated resolved by the Bidder/Agency, but are re-opened by the client. This is calculated for all incidents reported within the quarter

<= 2%

Liquidated damages will be levied as per the following table: For each additional increase of 2% in reopened incidents above 8%, 2% of Quarterly payment of Operations & Maintenance cost will be levied as additional liquidated damages

17 Submission of Root Cause Analysis (RCA) reports

For all Severity 1 & Severity 2 incidents resolved during the quarter, Bidder/Agency to submit RCA reports

Average within 7 Working days

For delay of every 2 working days in submitting Root Cause Analysis (RCA) report above defined timelines, 0.5% of Operations & Maintenance cost for that Quarter will be levied as liquidated damages.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

107

Security

Sr. No.

SLA Parameter

Description Target Liquidated damages

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

108

% Uptime

Liquidated damages as % of the

Quarterly payments during Operations

& Maintenance Phase

<99.9% & >=99%

0.5%

< 99% & >= 98%

1%

< 98% & >= 97%

2%

Delay in submission of Security Reporting MIS report

Liquidated damages as % of the Quarterly payments during Operations & Maintenance Phase

> 1 day & <= 5 days

0.5%

> 5 days & <= 10 days

1%

> 10 days & <= 15 days

2%

18

Average

uptime for the

Security

components

Measured as

the percentage

of time the site

is up and

running on a

monthly basis.

This will be

measured on

24X7 basis

>= 99.9%

Liquidated damages will be levied as per the following table:

For each additional drop of 1% in performance below 97%, 2% of Quarterly

payment of Operations & Maintenance will be levied as additional liquidated

damages.

19

Security

reporting

MIS report to

be submitted

on quarterly

basis within

pre-defined

timelines

100%

reporting of

the security

KPI’s (defined

during project

start)

100% on time

reporting

Liquidated damages will be levied as per the following table:

For each additional day after 15 days, 1% of Quarterly payment will be levied as

additional liquidated damages

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

109

Percentage of system components on which latest patches are installed

Liquidated damages as % of the Quarterly payments during Operations & Maintenance Phase

>= 94% & < 96%

0.5%

>= 92% & < 94%

1%

>= 90% & < 92%

2%

Percentage of system components on which latest AV signatures are updated

Liquidated damages as % of the Quarterly payments during Operations & Maintenance Phase

>= 94% & < 96%

0.5%

>= 92% & < 94%

1%

>= 90% & < 92%

2%

2 0 Patch updates

Availability of

latest patches

on the system

components

All patches

released, to be

installed on at

least 96% of all

applicable

components

Liquidated damages will be levied as per the following table:

For each additional drop in percentage after 90%, 1% of Quarterly payment will be levied as additional liquidated damages

21 Anti-virus signature update

Availability of

latest AV

signature on

the system

components

Latest AV

signature to be

installed on at

least 96% of all

applicable

components

Liquidated damages will be levied as per the following table:

For each additional drop in percentage after 90%, 1% of Quarterly payment will be levied as additional liquidated damages

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

110

Delay in Vulnerability assessment and closure of vulnerabilities after due date (in days)

Liquidated damages as % of the Quarterly payments during Operations & Maintenance Phase

>= 10 & < 20

0.5%

>= 20 & < 30

1%

>= 30 & < 35

2%

Delay in penetration testing and closure of detected vulnerabilities after due date (in days)

Liquidated damages as % of the Quarterly payments during Operations & Maintenance Phase

>= 10% & < 20%

0.5%

>= 20% & < 30%

1%

>= 30% & < 35%

2%

23 Vulnerability assessment and closure

Six monthly

Vulnerability

Assessment for

all systems / sub

systems, network

devices shall be

performed once

every six months

and all detected

vulnerabilities

closed within the

cycle.

Liquidated damages will be levied as per the following table:

For each additional five days delay beyond 35 days, 2% of Quarterly payment will be levied as additional liquidated damages

2 4 Penetration Testing

Yearly

Penetration

Testing

(external) will be

conducted once every year. All detected vulnerabilities to be closed within the year

Liquidated damages will be levied as per the following table: For each additional five days delay beyond 35 days, 2% of Quarterly payment will be levied as additional liquidated damages

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

111

Delay in reporting of Security incidents

Liquidated damages as % of the Quarterly payments during Operations & Maintenance Phase

> 1 hour & <= 3 hours

0.5%

> 3 hours & <= 5 hours

1%

> 5 hours & <= 8 hours

2%

25 Reporting of Security Incidents

Reporting of

security

incidents/thre

ats with cause,

action and

remedy.

MIS report to be submitted on quarterly basis

100% within 1

hour

Liquidated damages will be levied as per the following table:

For each additional day after 8 hours, 1% of Quarterly payment will be levied as additional liquidated damages

2 6 Security breach including Data Theft/Loss/Co rruption

Any incident wherein system compromised or any case wherein data theft occurs (including internal incidents)

No breach For each breach/data theft, liquidated damages will be levied as per following criteria. Any security incident detected will incur a liquidated damages of INR 20 lacs. This liquidated damage is applicable per incident. These liquidated damages will not be part of overall SLA liquidated damages cap per quarter. In case of serious breach of security wherein the data is stolen or corrupted, NMRCL reserves the right to terminate the contract.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

112

System Performance

Bidder/Agency may propose system performance parameters for the technology landscape.

Key Performance Indicators

The table below captures the key parameters which, though excluded from the SLA’s, will form part of the Key Performance Indicators which the Bidder/Agency needs to capture in its Monthly report to NMRCL. NMRCL can highlight the indicators, which in NMRCL’s opinion, are at a level higher than expected. Bidder/Agency will have to take suitable action to ensure that the risks are mitigated.

Sr. No.

Key Performance Indicator

Target performance

Description

1.

Average uptime of the

application

>= 99%

Measured as the average uptime of server at DC/DR on a monthly basis.

Uptime of the equipment will be measured on 24X7 basis

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

113

10 Annexure A- System - Solution Architecture

Attached separately

11 Annexure B - System Functional Requirements

Attached separately

12 Annexure C - IT Infrastructure Requirements, info security

& other details

Attached separately

END OF RFP VOLUME 2

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

1

Request for Proposal

(RFP)

Selection of Agency for creation Of Digital Project Management

Platform comprising OSO, Supply, Implementation and Support of 5D-

BIM & ERP

Volume - 3

Nagpur Metro Railway Corporation Limited

Ref: No.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

2

Contents 1 MASTER SERVICES AGREEMENT ...................................................................................................................... 7

1.1 Introduction ............................................................................................................................................. 7

1.2 DEFINITIONS AND INTERPRETATION ........................................................................................................ 8

2 SCOPE OF THE PROJECT ................................................................................................................................... 9

3 TERM AND DURATION OF THE AGREEMENT ................................................................................................... 9

4.1. Provisions to take effect upon fulfilment of Conditions Precedent ............................................................. 9

4.2. Conditions Precedent for the Bidder/Agency ................................................................................................ 9

5 OBLIGATIONS UNDER THE SERVICE LEVEL AGREEMENTS (SLAs) ................................................................... 10

5.1 Service Levels ............................................................................................................................................... 10

5.2. Change of Control ......................................................................................................................................... 10

5.3. Final testing and certification ....................................................................................................................... 11

5.4. Change control ........................................................................................................................................ 11

6 REPRESENTATIONS AND WARRANTIES .......................................................................................................... 11

6.1. Representations and warranties of the Bidder/Agency .............................................................................. 11

6.2 Representations and warranties of NMRCL .................................................................................................. 13

7 OBLIGATIONS OF NMRCL ............................................................................................................................... 13

8 ACCEPTANCE OF DELIVERABLES AND TESTING .............................................................................................. 13

8.1 Acceptance of Deliverables .................................................................................................................. 13

8.2 Acceptance Procedure ............................................................................................................................ 14

8.3 Acceptance .................................................................................................................................................... 16

9 USE OF ASSETS BY THE BIDDER/AGENCY ....................................................................................................... 17

10 ACCESS TO NMRCL OR ITS NOMINATED AGENCIES TO CERTAIN LOCATIONS .................................................. 17

11 MANAGEMENT OF THE PROJECT ...................................................................................................................... 19

11.1 Governance ................................................................................................................................................. 19

11.2 Changes ...................................................................................................................................................... 19

11.3 Security And Safety .................................................................................................................................... 19

11.4 Cooperation ................................................................................................................................................. 19

12 FINANCIAL MATTERS ....................................................................................................................................... 20

12.2 Invoicing and Settlement ............................................................................................................................. 20

12.3 Tax ............................................................................................................................................................... 21

13 TERMINATION AND SUSPENSION ................................................................................................................... 22

13.1 Termination for Breach ................................................................................................................................ 22

13.2 Termination for Convenience ...................................................................................................................... 22

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

3

13.3 Effects of termination .................................................................................................................................. 22

13.4 Termination of this Agreement due to bankruptcy of the Bidder/Agency ................................................... 22

13.5 SUSPENSION ................................................................................................................................................ 23

14 INDEMNIFICATION & LIMITATION OF LIABILITY ............................................................................................. 23

15 FORCE MAJEURE ............................................................................................................................................. 25

15.1 Definition of Force Majeure ................................................................................................................. 25

15.2 Force Majeure events .......................................................................................................................... 25

15.3 Notification procedure for Force Majeure ........................................................................................ 26

15.4 All ocation of costs arising out of Force Majeure ........................................................................... 26

15.5 Consultation and duty to mitigate ...................................................................................................... 27

16 CONFIDENTIALITY ............................................................................................................................................. 27

17 AUDIT, ACCESS AND REPORTING ..................................................................................................................... 28

18 OWNERSHIP AND INTELLECTUAL PROPERTY RIGHTS ..................................................................................... 28

18.1 Products and fixes: ..................................................................................................................................... 28

18.2 Bespoke development: .............................................................................................................................. 28

18.3 Training and other material: ..................................................................................................................... 28

18.4 Pre-existing work of the Bidder/Agency: ................................................................................................. 28

18.5 Third Party Products: .................................................................................................................................. 29

19 Transfer of risk and ownership in Goods ................................................................................................. 29

20 WARRANTY .................................................................................................................................................. 29

20.1 General: ..................................................................................................................................................... 30

20.2 Warranty for Goods ................................................................................................................................... 30

20.3 Warranty for Software ............................................................................................................................... 31

20.4 Warranty for Services ................................................................................................................................ 31

20.5 Warranty for System ................................................................................................................................. 31

20.6 Modifications ............................................................................................................................................ 31

21 INSURANCE COVER ........................................................................................................................................ 32

21.1 Obligation to maintain insurance .................................................................................................... 32

21.2 Certificates of currency ....................................................................................................................... 32

21.3 Non-compliance .................................................................................................................................... 32

22 MISCELLANEOUS ............................................................................................................................................ 33

22.1 Personnel ............................................................................................................................................... 33

22.2 Independent Contractor ....................................................................................................................... 33

22.3 Sub-contractors....................................................................................................................................... 34

22.4 Assignment............................................................................................................................................... 34

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

4

22.5 Trademarks, Publicity .............................................................................................................................. 34

22.6 Notices ..................................................................................................................................................... 34

22.7 Variations and Further Assurance ..................................................................................................... 35

22.8 Severability and Waiver ......................................................................................................................... 35

22.9 Compliance with Applicable Law ......................................................................................................... 36

22.10 Professional Fees .................................................................................................................................... 36

22.11 Ethics ....................................................................................................................................................... 36

22.12 Entire Agreement ................................................................................................................................. 36

23 Performance Bank Guarantee ................................................................................................................... 37

24 GOVERNING LAW AND DISPUTE RESOLUTION ........................................................................................ 37

SCHEDULE – I – DEFINITIONS ................................................................................................................................ 40

SCHEDULE- II - AUDIT, ACCESS AND REPORTING ................................................................................................. 43

SCHEDULE – III - PROJECT DELIVERABLES & PAYMENT SCHEDULE ..................................................................... 46

SCHEDULE – IV – Transition and Exit Management ............................................................................................. 47

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

5

Disclaimer

1. This Request for Proposal ("RFP") is issued by Nagpur Metro Railway Corporation

Limited (“NMRCL”)

2. The information contained in this RFP or subsequently provided to Bidders, whether

verbally or in documentary or any other form by or on behalf of NMRCL or any of its

employees or advisers, is provided to Bidders on the terms and conditions set out in this

RFP and all other terms and conditions subject to which such information is provided.

3. This RFP is not a contract and is neither an offer nor invitation by NMRCL to the

prospective Bidders or any other person. Whilst the information in this RFP has been

prepared in good faith, it is not and does not purport to be comprehensive or to have been

independently verified. Neither NMRCL, nor any of its officers or employees, nor any of

their advisers nor consultants accept any liability or responsibility for the accuracy,

reasonableness or completeness of, or for any errors, omissions or misstatements in the

information or makes any representation or warranty, express or implied, with respect to

the information contained in this RFP or on which this RFP is based or with respect to any

written or oral information made or to be made available to any of the recipients or their

professional advisers and, so far as permitted by law and liability therefore is hereby

expressly disclaimed.

4. The purpose of this RFP is to provide the Bidder(s) with information that may be useful

to them in the formulation of their Proposals in pursuant to this RFP. The information

contained in this RFP is selective and is subject to updating, expansion, revision and

amendment at the sole discretion of NMRCL. This RFP document is not exhaustive and

does not purport to contain all the information that a Bidder may require for the purpose

of making a decision for participation in this bidding process. Neither NMRCL nor

any of its officers, employees nor any of its advisors nor consultants undertakes to provide

any Party with access to any additional information or to update the information in this

RFP or to correct any inaccuracies therein which may become apparent. Each Bidder

should conduct its own analysis of the information contained in this RFP, to correct any

inaccuracies therein and is advised to carry out its own investigations in the project, the

regulatory regime which applies thereto and by and all matters pertinent to NMRCL and

to seek its own professional advice on the legal, financial and regulatory consequences of

entering into an agreement or arrangement relating to the project.

5. NMRCL accepts no liability of any nature whether resulting from negligence or otherwise

however caused arising from reliance of any Bidder upon the statements contained in this

RFP.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

Section 1: Master Services Agreement

(MSA)

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

7

1 MASTER SERVICES AGREEMENT

1.1 Introduction

THIS MASTER SERVICES AGREEMENT (“Agreement”) is made on this the _______ day of ________ 20___ at Nagpur, India.

BETWEEN

Nagpur Metro Railway Corporation Limited, a Special Purpose Vehicle (SPV) of Govt. of India and Govt. of Maharashtra registered under the Companies Act, 2013 for construction, operation and maintenance of Nagpur Metro Rail Project, having its Registered Office at Metro House, Bungalow No: 28/2, Anand Nagar, C K Naidu Road, Civil Lines, Nagpur-440001 (hereinafter referred to as ‘NMRCL’, which expression shall, unless the context otherwise requires, includes its successors and permitted assigns) of the First Part; AND _________, a Company incorporated under the Companies Act, 1956, having its registered office at __________ (hereinafter referred to as ‘Bidder/Agency’ which expression shall, unless the context otherwise requires, includes its permitted successors and assigns) of the Second Part.

Each of the parties mentioned above are collectively referred to as the ‘Parties’ and individually as a ‘Party’.

WHEREAS:

a) NMRCL wishes to, on the basis of International Competitive Bidding (ICB), appoint Bidder/Agency on Quality & Cost Based Selection (QCBS) for selection, supply, installation, implementation of and support for ERP and 5D-BIM solution and provide services to setup and ramp-up Owners Support Office in Nagpur Metro Rail Project (‘Project’);

b) In furtherance of the Project, NMRCL undertook the selection of a suitable managed service provider through a competitive bidding process for implementing the Project and issued Request for Proposal bearing number ______ dated ______ and subsequent corrigendum thereto (together the ‘RFP’);

c) The Bidder/Agency has been selected as the successful bidder on the basis of the bid submitted in response to the RFP as set out in Annexure ____ (Proposal) to this Agreement, to undertake the Project and has been informed about the same vide NMRCL letter dated _________ ( ‘Letter of Award’);

d) Parties now wish to enter into this Agreement to govern their mutual rights and obligations with respect to provision of goods and services and implementation of the Project.

NOW THEREFORE, in consideration of the mutual covenants, promises, assurances, representations and provisions set forth herein, the Parties hereto agree as follows:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

8

1.2 DEFINITIONS AND INTERPRETATION

1.2.1 Definitions

Terms and expressions used in this Agreement (including the Introduction) shall have the meanings set out in Schedule 1. Other terms used in this Agreement are defined where they are used and have the meanings there indicated. Unless otherwise specifically defined, those terms, acronyms and phrases in this Agreement that are utilized in the information technology services industry or other pertinent business context shall be interpreted in accordance with their generally understood meaning in such industry or business context.

1.2.2 Interpretation In this Agreement, unless otherwise specified:

a) references to Clauses, Sub-Clauses, Paragraphs, Schedules and Annexures are to clauses, sub-

clauses, paragraphs, schedules and annexures to this Agreement; b) words denoting the singular include the plural and vice versa and use of any gender includes

the other genders; c) references to a ‘company’ shall be construed so as to include any company, corporation or other

body corporate, wherever and however incorporated or established; d) references to a ‘person’ shall be construed so as to include any individual, firm, company,

government, state or agency of a state, local or municipal authority or government body or any joint venture, association or Bidder/Agencyship (whether or not having separate legal personality);

e) a reference to any statute or statutory provision shall be construed as a reference to the same as it may have been, or may from time to time be, amended, modified or re-enacted;

f) unless otherwise specified, any reference to a ‘day’ (including within the phrase ‘business day’) shall mean a period of 24 hours running from midnight to midnight;

g) references to a ‘business day’ shall be construed as a reference to a week day (other than Saturday and Sunday). In addition a “business day” shall also not include NMRCL’s listed holidays;

h) references to times are to Indian Standard Time; i) a reference to any other document referred to in this Agreement is a reference to that other

document as amended, varied, novated or supplemented at any time; and

j) all headings and titles are inserted for convenience only. They are to be ignored in the interpretation of this Agreement.

1.2.3 Measurements and Arithmetic Conventions

All measurements and calculations shall be in the metric system and calculations done to 2 (two) decimal places except as required for accuracy of drawings and other engineering exhibits.

1.2.4 Ambiguities within Agreement In case of ambiguities or discrepancies within this Agreement, the following principles shall apply:

a) as between two Clauses of this Agreement, the provisions of a specific Clause relevant to

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

9

the issue under consideration shall prevail over those in a general Clause; b) as between the provisions of RFP and any corrigendum issued thereafter, the provisions of

corrigendum shall, to that extent only, prevail over the corresponding earlier provision of RFP; c) as between the provisions of this Agreement and the Schedules/Annexures, NMRCL shall have

the right to determine which provisions shall prevail and Bidder/Agency shall be obliged to abide by the decision of NMRCL; and

d) as between any value written in numerals and that in words, the value in words shall prevail.

2 SCOPE OF THE PROJECT

The overall scope of work for the Bidder/Agency is selection, supply, installation, implementation of and support for ERP and 5D-BIM solution and provide services to setup and ramp-up Owners Support Office in Nagpur Metro Rail for successful accomplishment of the Project. The scope includes software/solution deployment and implementation, IT infrastructure procurement, deployment, implementation and maintenance of the system. The maintenance phase will be for a period of 6 (six) years after Go- Live of the system. The Bidder/Agency agrees to perform its obligations and the entire scope of work defined in the RFP, this Agreement and the Proposal (to the extent agreed by NMRCL as per the attached Annexure_. The roles and responsibilities of the Parties under this Agreement have been set out in detail in this Agreement and the RFP.

3 TERM AND DURATION OF THE AGREEMENT This Agreement shall come into effect on _______20 __ (insert the same date as in timelines) (hereinafter the ‘Effective Date’) and shall continue for a period of 6 years from the date of Go-Live (‘Term’) extendable at the option of NMRCL for a period of up to six years (or part thereof) on mutually agreed terms and conditions. The Term, for the purposes of any payments to Bidder/Agency, does not include (a) any extension arising out of breach of any obligations by Bidder/Agency, (b) unless otherwise agreed, time duration for implementation of exit management plan.

4 CONDITIONS PRECEDENT

4.1. Provisions to take effect upon fulfilment of Conditions Precedent

Subject to express terms to the contrary, the rights of Bidder/Agency to receive payments, and obligation of NMRCL to make payments under this Agreement, shall take effect only upon fulfilment of all the Conditions Precedent set out below. However, NMRCL may, at any time at its sole discretion, waive fully or partially any of the Conditions Precedent for the Bidder/Agency.

4.2. Conditions Precedent for the Bidder/Agency

a) The Bidder/Agency shall be required to fulfill the Conditions Precedent which are as follows:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

10

i. to provide an unconditional, irrevocable and continuing Performance Security / Guarantee for an amount equal to 10% of the Total Value of the Project from any Commercial bank in the format acceptable to NMRCL within 15 days of receipt of Letter of Award by the Bidder/Agency; and

ii. to provide NMRCL certified true copies of its constitutional documents and board resolutions authorizing the execution, delivery and performance of this Agreement by the Bidder/Agency.

5 OBLIGATIONS UNDER THE SERVICE LEVEL AGREEMENTS

(SLAs)

5.1 Service Levels

The Bidder/Agency shall accomplish the scope of work under this Agreement as per the Timelines and as per the Service Level Agreements. If the Bidder/Agency fails to achieve the Timelines due to reasons attributable to it, or if it fails to achieve the Service Levels (in the SLAs) for any reason whatsoever, the Bidder/Agency shall be liable to pay liquidated damages as per Volume II of the RFP. In case the Bidder/Agency is not solely liable for the breach of Timelines, amount of liquidated damages shall be deducted on proportionate / pro rata basis depending upon the Bidder/Agency’s extent of fault in such breach of Timelines. NMRCL shall have the right to determine such extent of fault and liquidated damages in consultation with Bidder/Agency. Payment of liquidated damages shall not be the sole and exclusive remedies available to NMRCL and the Bidder/Agency shall not be relieved from any obligations by virtue of payment of such liquidated damages. The liquidated damages will be capped as mentioned in Volume II of RFP. If the liquidated damages cross the cap on liquidated damages mentioned in Volume II of RFP, NMRCL shall have the right to terminate the Agreement for breach and consequences for such termination as provided in this Agreement shall be applicable.

5.2. Change of Control

i. In the event of a Change of Control of the Bidder/Agency during the Term, the

Bidder/Agency shall promptly notify NMRCL of the same in the format set out as Annexure A of this Agreement.

ii. In the event that the net worth of the surviving entity is less than that of the Bidder/Agency prior to the Change of Control, the NMRCL may within 30 days of becoming aware of such change in control, require a replacement of existing Performance Guarantee (with same or higher value) furnished by the Bidder/Agency from a guarantor acceptable to NMRCL (which may or may not be the Bidder/Agency or any of its associated entities).

iii. If such a guarantee is not furnished within 30 days of NMRCL requiring the replacement, NMRCL may exercise its right to terminate this Agreement within a further 30 days by written notice, to become effective as specified in such notice.

iv. Pursuant to termination, the effects of termination as set out in Clause 13 of this Agreement shall follow.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

11

For the avoidance of doubt, it is expressly clarified that the internal reorganization of the Bidder/Agency shall not be deemed an event of a change of control for purposes of this Clause unless the surviving entity is of less net worth than the predecessor entity.

5.3. Final testing and certification

Except as otherwise provided in Volume II of the RFP, the Project shall be governed by the mechanism of final acceptance testing and certification to be put into place by the NMRCL and Bidder/Agency as under:

i. Final testing and certification criteria will lay down a set of guidelines following internationally accepted norms and standards for testing and certification for all aspects of project development and implementation covering software and hardware including the processes relating to the design of solution architecture, design of systems and sub-systems, coding, testing, business process description, documentation, version control, change management, security, service oriented architecture, performance in relation to compliance with SLA metrics, interoperability, scalability, availability and compliance with all the technical and functional requirements of the RFP and this Agreement;

ii. Final testing and certification criteria will be finalized from the development stage to ensure that the guidelines are being followed and to avoid large scale modifications pursuant to testing done after the application is fully developed;

iii. Final testing and certification criteria will consider conducting specific tests on the software, hardware, networking, security and all other aspects;

iv. Final testing and certification criteria will establish appropriate processes for notifying the Bidder/Agency of any deviations from the norms, standards or guidelines at the earliest instance after taking cognizance of the same to enable the Bidder/Agency to take corrective action; etc. Final acceptance test criteria will also adhere to the requirements as detailed in volume 2 of the RFP

5.4. Change control

The Parties shall each ensure that the range of the Services/Deliverables under the SLA shall not be varied, reduced or increased except with the prior written agreement between NMRCL and the Bidder/Agency in accordance with the provisions of Change Management and Control set out in Section 7 of Volume 2 of the RFP. Save for the express terms of the Terms of Payment Schedule set out as Schedule III of this Agreement, NMRCL or its nominated agencies and its users may purchase any particular category of Deliverables that may become necessary as per the Change Management and Control set out in Section 7 of Volume II of the RFP, without the need to go for a separate procurement process.

6 REPRESENTATIONS AND WARRANTIES

6.1. Representations and warranties of the Bidder/Agency

The Bidder/Agency represents and warrants to NMRCL that:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

12

a) it is duly organized and validly existing under the laws of India, and has full power and authority

to execute and perform its obligations under this Agreement and other agreements and to carry out the transactions contemplated hereby;

b) it is a competent provider of a variety of information technology and business process management services;

c) it has taken all necessary corporate and other actions under laws applicable to its business to authorize the execution and delivery of this Agreement and to validly exercise its rights and perform its obligations under this Agreement;

d) it has the financial standing and capacity to undertake the Project and obligations in accordance with the terms of this Agreement;

e) in providing the Services, it shall use reasonable endeavors not to cause any unnecessary disruption to NMRCL's normal business operations;

f) this Agreement has been duly executed by it and constitutes a legal, valid and binding obligation, enforceable against it in accordance with the terms hereof, and its obligations under this Agreement shall be legally valid, binding and enforceable against it in accordance with the terms hereof;

g) the information furnished in the Proposal is to the best of its knowledge and belief true and accurate in all respects as at the date of this Agreement;

h) the execution, delivery and performance of this Agreement shall not conflict with,

and Articles of Association or any Applicable Laws or any covenant, contract, agreement, arrangement, understanding, decree or order to which it is a party or by which it or any of its properties or assets is bound or affected;

i) there are no material actions, suits, proceedings, or investigations pending or, to its knowledge, threatened against it at law or in equity before any court or before any other judicial, quasi-judicial or other authority, the outcome of which may result in the breach of this Agreement or which individually or in the aggregate may result in any material impairment of its ability to perform any of its material obligations under this Agreement;

j) it has no knowledge of any violation or default with respect to any order, writ, injunction or decree of any court or any legally binding order of any Government Instrumentality which may result in any Adverse Effect on its ability to perform its obligations under this Agreement and no fact or circumstance exists which may give rise to such proceedings that would adversely affect the performance of its obligations under this Agreement;

k) it has complied with Applicable Laws in all material respects and has not been subject to any fines, penalties, injunctive relief or any other civil or criminal liabilities which in the aggregate have or may have an Adverse Effect on its ability to perform its obligations under this Agreement;

l) no representation or warranty by it contained herein or in any other document furnished by it to NMRCL or its nominated agencies in relation to the Required Consents contains or shall contain any untrue or misleading statement of material fact or omits or shall omit to state a material fact necessary to make such representation or warranty not misleading; and

m) no sums, in cash or kind, have been paid or shall be paid, by it or on its behalf, to any person by way of fees, commission or otherwise for entering into this Agreement or for influencing or attempting to influence any officer or employee of NMRCL or its nominated agencies in connection therewith.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

13

6.2 Representations and warranties of NMRCL

NMRCL represents and warrants to the Bidder/Agency that:

a) it has full power and authority to execute, deliver and perform its obligations under this Agreement

and to carry out the transactions contemplated herein and that it has taken all actions necessary to execute this Agreement, exercise its rights and perform its obligations, under this Agreement and carry out the transactions contemplated hereby;

b) it has taken all necessary actions under Applicable Laws to authorize the execution, delivery and performance of this Agreement and to validly exercise its rights and perform its obligations under this Agreement;

c) this Agreement has been duly executed by it and constitutes a legal, valid and binding obligation enforceable against it in accordance with the terms hereof and its obligations under this Agreement shall be legally valid, binding and enforceable against it in accordance with the terms thereof;

d) the execution, delivery and performance of this Agreement shall not conflict with, result in the breach of, constitute a default under any of the Applicable Laws or any covenant, contract, agreement, arrangement, understanding, decree or order to which it is a party or by which it or any of its properties or assets is bound or affected;

e) it has no knowledge of any violation or default with respect to any order, writ, injunction or any decree of any court or any legally binding order of any Government Instrumentality which may result in any Adverse Effect on NMRCL or its nominated agencies ability to perform its obligations under this Agreement and no fact or circumstance exists which may give rise to such proceedings that would adversely affect the performance of its obligations under this Agreement;

f) it has complied with Applicable Laws in all material respects.

7 OBLIGATIONS OF NMRCL Without prejudice to any other undertakings or obligations of NMRCL under this Agreement or RFP, NMRCL shall perform the following:

a) To provide any reasonable support through personnel to test the system during the Term; b) To provide any reasonable support through personnel and/or test data during development, rollout,

steady state operation, as well as, for any changes/enhancements in the system whenever required due to scope change that may arise due to business, delivery or statutory/regulatory reasons, provided that any enhancement/changes etc. to the system shall always be subject to prior written approval of NMRCL;

c) NMRCL shall provide the data (including in electronic form wherever available) to be migrated; d) To authorize the Bidder/Agency to interact for implementation of the Project with external entities

such as the state treasuries, authorized banks, etc. to the extent deemed necessary by NMRCL.

8 ACCEPTANCE OF DELIVERABLES AND TESTING

8.1 Acceptance of Deliverables

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

14

The successful completion of the Project requires the acceptance by NMRCL of all Deliverables prepared and delivered pursuant to the Project, including the System. The acceptance procedure described in this clause 8 is in addition to, and not in derogation of, the acceptance procedure provided in Volume II of the RFP and the two are to be read harmoniously. Upon completion of a Deliverable, Bidder/Agency will notify NMRCL in writing that the Deliverable has been completed and, in the case of Deliverables constituted of software and/or equipment (“Operational Deliverables”), tested and/or certified as being ready for acceptance (“Ready for Acceptance”) by NMRCL. Promptly after receiving such notice, NMRCL will evaluate the Deliverable for acceptance in accordance with this Clause 8 or specific provisions provided in the RFP. The acceptance process outlined below shall not be deemed to extend the Timelines / scheduled completion date for any Deliverable specified in the RFP.

8.2 Acceptance Procedure

Acceptance by NMRCL (“Acceptance”) requires that the Deliverables be confirmed in writing by NMRCL to meet applicable acceptance criteria (“Acceptance Criteria”) which, in the case of Operational Deliverables, will include the successful completion of agreed acceptance and performance testing and, in the case of the System as a whole, will include meeting the specifications, performance standards and functional requirements set out in the RFP. In the case of Deliverables that are component parts of the System, in addition to acceptance of the component Deliverables, the System will also be subject to Acceptance in its entirety. Bidder/Agency shall prepare and propose the test procedures, which shall be described in the Acceptance Criteria for each Deliverable and shall be subject to agreement by NMRCL. While designing the acceptance test procedures the requirements as mentioned in volume II of RFP need to be adhered. The Acceptance tests and test procedures shall be sufficiently broad in scope and rigorous so as to verify that the System and all other Deliverables meet all applicable specifications, acceptance criteria and performance requirements, including assurance that the Deliverables and the System meet such tests of operational integrity as may be reasonably required by NMRCL. In the case of the System, the Acceptance tests shall consist of unit tests, a system test, and/or stress test. Acceptance procedures for written Deliverables (which are all Deliverables other than Operational Deliverables) and Operational Deliverables are as follows:

(a) Written Deliverables:

(i) The Bidder/Agency may submit interim drafts of written Deliverables (e.g., system designs and documentation) to NMRCL for review. NMRCL agrees to review each interim draft within a reasonable period of time after receiving it from the Bidder/Agency. When the Bidder/Agency delivers a final written Deliverable to NMRCL, NMRCL will have the opportunity to review such written Deliverable for an acceptance period of seven (7) days or such other period as is stated in the RFP or the agreed Project Plan (the “Acceptance Period”). In all cases, NMRCL’s obligation to review a written Deliverable within the applicable Acceptance Period will be contingent on such written Deliverable being delivered to NMRCL as scheduled. If and to the extent any written Deliverable is delivered earlier or later than scheduled, the Acceptance Period for such written Deliverable shall be extended as reasonably necessary to accommodate the availability of NMRCL personnel responsible for reviewing such Deliverable. Similarly, if and to the extent multiple written Deliverables

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

15

are delivered to NMRCL within an Acceptance Period, the Acceptance Period for all such written Deliverables shall be extended as reasonably necessary to accommodate the availability of NMRCL personnel responsible for reviewing them.

(ii) NMRCL agrees to notify the Bidder/Agency in writing by the end of the Acceptance Period either stating that the applicable written Deliverable is accepted/rejected in the form delivered by the Bidder/Agency or describing with reasonable particularity any deficiencies that must be corrected prior to acceptance of such written Deliverable. If the Bidder/Agency does not receive any such notice from NMRCL by the end of the Acceptance Period, the Bidder/Agency shall promptly notify NMRCL in writing that no such notice has been received. If the Bidder/Agency does not receive the required notice within seven (7) days after NMRCL receives such written notification from the Bidder/Agency, such written Deliverable will be deemed to be accepted by NMRCL.

(iii) If NMRCL delivers to the Bidder/Agency a timely notice of rejection/deficiencies, the Bidder/Agency will correct the described deficiencies as quickly as possible and, in any event, within ten (10) days after NMRCL notifies the Bidder/Agency of the rejection/ deficiencies (unless otherwise specified in the agreed Project Plan). Upon receipt of a corrected written Deliverable from the Bidder/Agency, NMRCL will have a period of seven (7) days to review the corrected written Deliverable.

(b) Operational Deliverables:

(i) To the extent not already specified in the RFP or agreed Project Plan, prior to the date on which the Bidder/Agency is scheduled to deliver each Operational Deliverable to NMRCL, both the Bidder/Agency and NMRCL will agree upon the testing procedures for the Operational Deliverable, including without limitation detailed test cases and expected results (the “Acceptance Tests”). The Acceptance Tests will be designed to determine whether the Operational Deliverable contains any defects. NMRCL will have the opportunity during the Acceptance Period to evaluate and test each Operational Deliverable in accordance with the following procedures by executing the Acceptance Tests.

(ii) When the Bidder/Agency has completed an Operational Deliverable, it will deliver the Operational Deliverable at the Installation Site (if not already there), install such Deliverable (if not already installed), and perform an installation test reasonably acceptable to NMRCL to verify that the Deliverable has been properly delivered and installed. The Bidder/Agency shall notify NMRCL when the Operational Deliverable is ‘Ready for Acceptance’, provided that, unless otherwise agreed, such notice shall not occur prior to the successful completion by the Bidder/Agency of any installation tests. Such notice will start the Acceptance Period, which will be fifteen (15) days or such other period as is stated in the RFP or agreed Project Plan. As was the case with written Deliverables, NMRCL’s obligation to review any Operational Deliverable within the applicable Acceptance Period will be contingent on such Operational Deliverable being delivered to NMRCL as scheduled. If and to the extent any Operational Deliverable is delivered earlier or later than scheduled, the Acceptance Period for such Operational Deliverable shall be extended as reasonably necessary to accommodate the availability of the NMRCL personnel responsible for reviewing such Operational Deliverable. Similarly, if and to the extent multiple Operational Deliverables are delivered to NMRCL

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

16

within an Acceptance Period, the Acceptance Period for all Operational Deliverables shall be extended as reasonably necessary to accommodate the availability of the NMRCL personnel responsible for reviewing them.

(iii) NMRCL shall notify the Bidder/Agency in writing by the end of the Acceptance Period stating that the Operational Deliverable is accepted/rejected in the form delivered by the Bidder/Agency or describing the defects as provided in Clause 8.2 (b) (iv) below. If the Bidder/Agency does not receive any notice of defects from NMRCL by the end of the Acceptance Period, the Bidder/Agency shall promptly notify NMRCL in writing that no such notice was received. If Bidder/Agency does not receive a notice of defects within seven (7) days after NMRCL receives such written notification from the Bidder/Agency, such Operational Deliverable will be deemed accepted by NMRCL.

(iv) If NMRCL determines during the Acceptance Period that the Operational Deliverable as delivered by the Bidder/Agency deviates from its approved specifications or otherwise fails to successfully complete applicable Acceptance Tests (or a defect), NMRCL will inform the Bidder/Agency in writing, describing the defect(s) in sufficient detail to allow the Bidder/Agency to recreate/rectify them. The Bidder/Agency will correct any defects in an Operational Deliverable as quickly as possible after receiving NMRCL’s notice of the defects and, in any event, within ten (10) days after receiving such notice (unless otherwise specified in the Project Plan/RFP), and provide the corrected Operational Deliverable to NMRCL for re-testing within ten (10) day period.

(v) NMRCL will have a reasonable additional period of time after receipt of the corrected Operational Deliverable to re-test it so as to confirm its proper functioning. The Bidder/Agency will correct any further defects identified by NMRCL during the re-test as quickly as possible, but in no event more than ten (10) days after NMRCL notifies the Bidder/Agency of the further defects, unless otherwise specified in the agreed Project Plan or RFP or agreed by NMRCL.

(c) Correction of Deficiencies in Deliverables.

(i) If the Bidder/Agency is unable to correct all deficiencies preventing Acceptance of a Deliverable for which it is responsible after a reasonable number of repeated efforts (but not more than three (3), NMRCL may at its election: • allow the Bidder/Agency to continue its efforts to make corrections; or • accept the Deliverable with its Deficiencies and deduct such proportionate amounts from the Bidder/Agency’s fees as deemed appropriate by NMRCL; or • terminate this Agreement for cause in accordance with the procedures set forth in Clause 13 (except that NMRCL is under no obligation to provide the Bidder/Agency any further opportunity to cure) and recover its damages subject to the limitations set forth in this Agreement.

8.3 Acceptance

NMRCL shall be deemed to have accepted the Deliverables and/or System upon the date of

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

17

delivery to the Bidder/Agency by NMRCL of a notice (the “Acceptance Notice”) to that effect.

9 USE OF ASSETS BY THE BIDDER/AGENCY 1. During the Term the Bidder/Agency shall:

a) take all reasonable and proper care of the entire hardware and software, network or any other

information technology infrastructure components, Deliverables used for the Project and other facilities leased / owned / operated by the Bidder/Agency (for itself or for NMRCL or on behalf of NMRCL) exclusively in terms of ensuring their usability for the delivery of the Deliverables/System as per this Agreement (hereinafter the “Assets”);

b) keep all the tangible Assets in as good and serviceable condition (reasonable wear and tear excepted) as at the date the Bidder/Agency takes control of and/or first uses the Assets and during the entire Term of the Agreement;

c) ensure that any instructions or manuals supplied by the manufacturer of the Assets for use of the Assets and which are provided to the Bidder/Agency will be followed by the Bidder/Agency and any person who will be responsible for the use of the Assets;

d) take such steps as may be properly recommended by the manufacturer of the Assets and notified to the Bidder/Agency or as may, in the reasonable opinion of the Bidder/Agency, be necessary to use the Assets in a safe manner;

e) ensure that the Assets that are under the control of the Bidder/Agency, are kept suitably housed and in conformity with Applicable Law and terms agreed with NMRCL;

f) procure permission from NMRCL or its nominated agencies and any persons duly authorized by them to enter any land or premises on which the Assets are for the time being sited so as to inspect the same, subject to any reasonable third party requirements;

g) not knowingly or negligently use or permit any of the Assets to be used in contravention of any statutory provisions or regulation or in any way contrary to Applicable Law;

h) use best efforts to ensure that no lien, mortgage, hypothecation or any other charge is created over the Assets. Bidder/Agency agrees that Bidder/Agency will inform NMRCL immediately if Bidder/Agency feels or comes to know that a charge may be / has been created over any Asset(s). In the event a charge is created over any of the Assets / Goods which are owned by NMRCL, NMRCL shall have the right to get the charge removed at the risk, cost, expense of the Bidder/Agency and Bidder/Agency shall make good all losses, damages, costs, fees, cess, duties, etc. borne or suffered by NMRCL due to creation of such charge and/or in removal of such charge and/or in discharging the obligations for removal of such charge.

10 ACCESS TO NMRCL OR ITS NOMINATED AGENCIES TO

CERTAIN LOCATIONS

For so long as the Bidder/Agency provides services to NMRCL or its nominated agencies location, as the case may be, on a non-permanent basis and to the extent necessary, NMRCL as the case may be or its nominated agencies shall, subject to compliance by the Bidder/Agency with any safety and security guidelines which may be provided by NMRCL as the case may be or its nominated agencies and notified to the Bidder/Agency in writing, provide the Bidder/Agency

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

18

with:

(a) reasonable access to the location from where services are to be performed (except such locations like DC, DR, Bidder/Agency’s or its subcontractor’s offices etc. over which the Bidder/Agency has control), in the same manner as granted to the NMRCL or its nominated agencies’ employees, as the case may be; (b) subject to (a) above, reasonable work space, access to office equipment as mutually agreed and other related support services in such location and at such other locations NMRCL as the case may, if any, as may be reasonably necessary for the Bidder/Agency to perform its obligations hereunder.

Access to locations, office equipment and services shall be made available to the Bidder/Agency on an “as is, where is” basis by NMRCL as the case may be or its nominated agencies. The Bidder/Agency agrees to ensure that its employees, agents and contractors/ sub- contractors shall not use the location, services and equipment referred to in RFP for the following purposes:

(a) for the transmission of any material which is defamatory, offensive or abusive or of an obscene or menacing character; or (b) in a manner which constitutes violation of any law or a violation or infringement of the rights of any person, firm or company (including but not limited to rights of copyright or confidentiality).

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

19

11 MANAGEMENT OF THE PROJECT

11.1 Governance

The review and management process of this Agreement shall be carried out in accordance with the Project Management and Governance Schedule set out in Section 6 of Volume II of the RFP.

11.2 Changes

Any changes to the scope of work and consequent impact on the SLAs shall be dealt with in accordance with the provisions of Change Management and Control set out in Section 7 of Volume II of the RFP.

11.3 Security And Safety

a) The Bidder/Agency shall comply with the technical requirements of the relevant security,

safety and other requirements specified in the Information Technology Act, Telegraph Act of any other Applicable Law including the regulations issued by dept. of telecom (wherever applicable), IT Security Manual of the NMRCL as specified by NMRCL from time to time and follow the industry standards related to safety and security (including those as specified by NMRCL from time to time), insofar as it applies to the provision of the Services / Deliverables under this Agreement.

b) The Bidder/Agency shall also comply with NMRCL or Government of India, and the respective State’s security standards and policies in force from time to time at each location of which NMRCL or its nominated agencies make the Bidder/Agency aware in writing insofar as the same apply to the provision of the Deliverables.

c) The Parties shall use reasonable endeavors to report forthwith in writing to each other all identified attempts (whether successful or not) by unauthorized persons (including unauthorized persons who are employees of any Party) either to gain access to or interfere with NMRCL as the case may be or any of their nominees data, facilities or Confidential Information.

d) The Bidder/Agency shall upon reasonable request by NMRCL as the case may be or their nominee(s) participate in regular meetings when safety and information technology security matters are reviewed.

e) As per the provisions of this Agreement, the Bidder/Agency shall promptly report in writing to NMRCL or its nominated agencies, any act or omission which they are aware that could have an adverse effect on the proper conduct of safety and information technology security at the facilities of NMRCL as the case may be.

11.4 Cooperation

Except as otherwise provided elsewhere in this Agreement, each Party (“Providing Party”) to this Agreement undertakes promptly to provide the other Party (“Receiving Party”)

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

20

with all such information and co-operation which the Receiving Party reasonably requests, provided that such information and co-operation:

a) does not require material expenditure by the Providing Party to provide the same; b) is reasonably required by the Receiving Party in order for it to comply with its obligations

under this Agreement; c) cannot be construed to be Confidential Information; and d) is capable of being provided by the Providing Party.

Further, the Bidder/Agency agrees to co-operate with consultants, contractors, stakeholders and subcontractors of NMRCL as reasonably requested in order to accomplish the purposes of this Agreement.

12 FINANCIAL MATTERS

12.1 Terms of Payment a) In consideration of the obligations undertaken by the Bidder/Agency under this Agreement and

subject to the provisions of this Agreement, NMRCL shall pay the Bidder/Agency for successful delivery of Services/Deliverables/Goods and System in pursuance of this Agreement, in accordance with the Terms of Payment Schedule set out as Schedule III of this Agreement.

b) All payments are subject to deductions of applicable liquidated damages as provided for in the SLA section of the RFP. For the avoidance of doubt, it is expressly clarified that NMRCL will calculate a financial sum and debit the same against the terms of payment as set out in Schedule III of this Agreement as a result of the failure of the Bidder/Agency to meet the Timelines and/or Service Level.

c) Save and except as otherwise provided for herein or as agreed between the Parties in writing, NMRCL shall not be required to make any payments in respect of the Services, Deliverables, obligations and scope of work mentioned in the RFP and Agreement other than those covered in Schedule III of this Agreement. For the avoidance of doubt, it is expressly clarified that the payments shall be deemed to include all ancillary and incidental costs and charges arising in the course of performance of obligations under the RFP and Agreement including consultancy charges, infrastructure costs, project costs, implementation and management charges and all other related costs including taxes (as provided in Clause 14.2 below) which are addressed in this Clause.

12.2 Invoicing and Settlement

a) The Bidder/Agency shall submit its invoices in accordance with the following principles:

i. Generally and unless otherwise agreed in writing between the Parties, the

Bidder/Agency shall raise an invoice as per Schedule III of this Agreement; and ii. Any invoice presented in accordance with this Clause shall be in a form agreed with

NMRCL. b) The Bidder/Agency alone shall invoice all payments after receiving due approval/

acceptance of Deliverables/Services/Goods from NMRCL or any nominated agency. Such

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

21

invoices shall be correct and accurate and shall be raised in a timely manner. c) Subject to accomplishment to obligations of Bidder/Agency and delivery of Deliverables /

Services / Goods to the satisfaction of NMRCL, payment shall be made by NMRCL within 20 days of the receipt of invoice along with supporting documents. Payments will be subject to deduction of any liquidated damages levied on the Bidder/Agency as per the RFP. If any due and payable undisputed invoice remains unpaid for a period of 30 days then the Bidder/Agency shall be entitled to recover it as such with a monthly simple interest of 0.5% for each month of delay calculated from the date of expiry of such 30 days period.

d) Notwithstanding anything contained in clause (c) above, NMRCL shall be entitled to delay or withhold payment of any invoice or part of it where NMRCL disputes such invoice or part of it provided that such dispute is bona fide. The withheld amount shall be limited to that which is in dispute. A notice of such withholding shall be provided within 10 days of receipt of the applicable invoice. The disputed / withheld amount shall be settled in accordance with the escalation procedure as set out in Section 6 (Project Management and Governance) of Volume II of the RFP which shall be settled within reasonable time after notice of reference. However, NMRCL shall release the disputed amounts within 10 days, upon resolution of dispute. Any exercise by NMRCL under this Clause shall not entitle the Bidder/Agency to delay or withhold performance of its obligations or delivery of Deliverables /Services/Goods under this Agreement.

e) The Bidder/Agency shall be solely responsible to make payment to its personnel, sub- contractors, OEMs, third parties.

12.3 Tax

a) NMRCL shall be responsible for withholding taxes from the amounts due and payable to the

Bidder/Agency wherever applicable under extant law. The Bidder/Agency shall pay for all taxes in connection with this Agreement, SLAs, scope of work and any other engagement required to be undertaken as a part of this Agreement, including, but not limited to, property, sales, use, excise, value-added, goods and services, consumption and other similar taxes or duties.

b) NMRCL shall provide the Bidder/Agency with the original tax receipt of any withholding taxes paid by NMRCL or its nominated agencies on payments under this Agreement within reasonable time after payment. The Bidder/Agency agrees to reimburse and hold NMRCL or its nominated agencies harmless from and against any claims, losses, expenses (including attorney fees, court fees) etc. arising out of deficiency (including penalties and interest) in payment of taxes that is the responsibility of the Bidder/Agency.

c) If, after the date of this Agreement, there is any unforeseen change in the levies or rate of levy under the applicable laws of India with respect to indirect taxes and duties, which are directly payable by the Bidder/Agency for providing the Deliverables/Services i.e. service tax or any such other applicable tax from time to time, which increase or decreases the cost incurred by the Bidder/Agency in performing the Services, then the remuneration and reimbursable expense otherwise payable by the NMRCL under this Agreement shall be increased or decreased accordingly by correspondence between the Parties hereto, and corresponding adjustments shall be made to the ceiling amounts specified in Schedule III. However, in case of any new or fresh tax or levy imposed after submission of the proposal the Bidder/Agency shall be entitled to reimbursement on submission of proof of payment of such tax or levy.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

22

13 TERMINATION AND SUSPENSION

13.1 Termination for Breach

a) In the event that NMRCL believes that the Bidder/Agency is in breach of its obligations under

this Agreement, NMRCL shall give notice to the Bidder/Agency and shall give up to 30 days’ time to it for curing such breach. In case the breach continues till / after the expiry of such cure period, NMRCL will have the option to terminate the Agreement. Further, NMRCL may afford a reasonable opportunity to the Bidder/Agency to explain the circumstances leading to such a breach and may increase the time limit for curing such breach before terminating the Agreement. Any notice served pursuant to this Clause shall give reasonable details of the breach.

b) NMRCL may terminate this Agreement due to reason specified in clause 5.2 (iii).

13.2 Termination for Convenience

NMRCL may terminate this Agreement for convenience by giving 90 days prior written notice.

13.3 Effects of termination

a) In the event NMRCL terminates this Agreement pursuant to breach by the Bidder/Agency,

Performance Guarantee furnished by it may be forfeited. b) Upon termination (or prior to expiry/upon expiry, as the case may be) of this Agreement, the

Parties will comply with the Exit Management Schedule/Plan set out as Schedule IV of this Agreement (and as revised from time to time).

c) NMRCL agrees to pay the Bidder/Agency for all charges for Services/Deliverables/Goods provided by it and accepted by NMRCL till effective date of termination.

d) If NMRCL terminates without cause, NMRCL may also pay any applicable adjustment expenses the Bidder/Agency incurs as a result of such termination (which it shall take reasonable steps to mitigate). Such applicable adjustment charges shall be decided by NMRCL in consultation with the Bidder/Agency.

e) Any and all payments under this clause shall be payable only after the Bidder/Agency has complied with and completed the transition and exit management as per the Exit Management Plan to the satisfaction of NMRCL. In case of expiry of the Agreement, the last due payment shall be payable to the Bidder/Agency after it has complied with and completed the transition and exit management as per the Exit Management Plan to the satisfaction of NMRCL.

13.4 Termination of this Agreement due to bankruptcy of the Bidder/Agency

NMRCL may serve written notice on the Bidder/Agency at any time to terminate this Agreement with immediate effect in the event that the Bidder/Agency reporting an apprehension of bankruptcy to the NMRCL or its nominated agencies. No charges to Bidder/Agency shall be payable in case of termination under this Clause 13.4 except payment under clause 13.3 (c).

The termination provisions set out in this Clause are in addition to any termination rights that the NMRCL may have under this Agreement/RFP and are in addition to, and without prejudice

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

23

to, other rights that NMRCL may have under law and this Agreement.

13.5 SUSPENSION

(a) The Bidder/Agency shall, if ordered in writing by NMRCL, temporarily suspend the performance of any services or any part thereof under this Agreement for such specified/ ordered period and time. NMRCL shall inform the Bidder/Agency about such suspension at least 30 days in advance. The Bidder/Agency shall not be entitled to claim compensation for any loss or damage sustained by it by reason of such temporary suspension of the work for a continuous period of 30 days. NMRCL may consider suitable compensation to the Bidder/Agency in event of suspension extending beyond a continuous period of 30 days. An extension of time for completion, corresponding with the delay caused by any such suspension of the works as aforesaid shall be granted to the Bidder/Agency, if written request for the same is made. In case the suspension of works lasts for a period of more than 3 months, the Bidder/Agency shall have the right to request NMRCL to pay reasonable immobilization and mobilization charges as may be consented to by NMRCL. (b) In the event that NMRCL suspends the progress of work for a period in excess of 30 days in aggregate, rendering the Bidder/Agency to extend its performance guarantee then NMRCL shall bear only the cost of extension of such bank guarantee for such extended period restricted to the normal bank rates as applicable in the banking procedures subject to the Bidder/Agency producing the requisite evidence from the bank concerned. (c) NMRCL may suspend this Agreement only (i) prior to giving consent to the Bidder/Agency for purchase of goods and production licences; and (ii) after the Go-Live. (d) Notwithstanding the foregoing in clause 13, Order for Infrastructure items including Hardware, COTS Software licenses and other system software etc. shall be placed by the Bidder/Agency only after receipt of written confirmation from NMRCL in this regard. NMRCL may request the Bidder/Agency for deferment of procurement of such components for maximum period of twelve months. In such case the Bidder/Agency will be paid a pre-defined maintenance cost for the application support and the team deployed. In case NMRCL requests for deferment of procurement of infrastructure the timelines will extend accordingly. Also, the SLA for infrastructure will apply from the date when NMRCL gives intimation to the Bidder/Agency to start procurement.

14 INDEMNIFICATION & LIMITATION OF LIABILITY

14.1 Subject to Clause 14.2 below, the Bidder/Agency (the "Indemnifying Party") undertakes to indemnify NMRCL and its nominated agencies (the "Indemnified Party") from and against all losses, claims, damages, compensation etc. on account of bodily injury, death or damage to tangible personal property arising in favor of any person, corporation or other entity (including the Indemnified Party) attributable to the Indemnifying Party's negligence, willful default, lack of due care or beach of terms of this Agreement.

14.2 If the Indemnified Party promptly notifies the Indemnifying Party in writing of a third party claim against the Indemnified Party that any Deliverables/Services/ Goods/Materials provided by the Indemnifying Party infringes a copyright, trade secret, patents or other intellectual property rights of any third party, the Indemnifying Party will defend such claim

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

24

at its expense and will pay any costs or damages that may be finally awarded against the Indemnified Party. The Indemnifying Party will not indemnify the Indemnified Party, however, if the claim of infringement is caused by (a) the Indemnified Party’s misuse or modification of the Deliverables; or (b) the Indemnified Party’s failure to use corrections or enhancements made available by the Indemnifying Party; or (c) the Indemnified Party’s use of the Deliverables in combination with any product or information not owned or developed or supplied by the Indemnifying Party. If any Deliverable is or likely to be held to be infringing, the Indemnifying Party shall at its expense and option either (i) procure the right for Indemnified Party to continue using it, or (ii) replace it with a non-infringing equivalent, or (iii) modify it to make it non-infringing.

14.3 The Indemnifying Party shall indemnify the Indemnified Party against all losses (including loss of business, reputation, profits, revenue etc.), claims, damages, compensation, charges (including attorney fees) etc. arising out of data loss, data theft, data misuse, data tempering, unauthorized use or disclosure of Confidential Information etc. attributable to the Indemnifying Party's negligence, willful default, lack of due care or beach of terms of this Agreement.

14.4 The indemnities set out in Clause 14 shall be subject to the following conditions:

a) the Indemnified Party , as promptly as practicable , informs the Indemnifying

Party in writing of the claim or proceedings; b) the Indemnified Party shall, at the cost of the Indemnifying Party, give the Indemnifying

Party all reasonable assistance in the defence of such claim including reasonable access to all relevant information, documentation and personnel provided that the Indemnified Party may, at the Indemnifying Party’s cost and expense, reasonably participate, through its attorneys or otherwise, in such defence;

c) if the Indemnifying Party does not assume full control over the defence of a claim as provided in this clause, the Indemnified Party may participate in such defence at the Indemnifying Party’s sole cost and expense, and the Indemnified Party will have the right to defend the claim in such manner as it may deem appropriate;

d) in the event that the Indemnifying Party is obligated to indemnify the Indemnified Party pursuant to this Clause, the Indemnifying Party will, upon payment of such indemnity in full, be subrogated to all rights and defenses of the Indemnified Party with respect to the claims to which such indemnification relates. 14.5 Risk Purchase: If the Bidder/Agency fails to perform its obligations (or any part thereof) under this Agreement or if the Agreement is terminated by NMRCL due to breach of any obligations of the Bidder/Agency under this Agreement, NMRCL reserves the right to procure same or equivalent services/goods/Deliverables from alternative sources at the Bidder/Agency’s risk and responsibility. Any incremental cost borne by NMRCL in procuring such services/goods/deliverables shall be borne by the Bidder/Agency. Any such incremental cost incurred in the procurement of the material from alternative source will be recovered from the undisputed pending due and payable payments/Security Deposit/Bank Guarantee provided by the Bidder/Agency under this Agreement and if the value of the services/materials under risk purchase exceeds the amount of Security Deposit and / or Bank Guarantee, the same may be recovered if necessary by due legal process.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

25

14.6 Limitation of Liability

a) The liability of Bidder/Agency (whether in contract, tort, negligence, strict liability in tort, by statute or otherwise) for any claim in any manner related to this Agreement, including the work, deliverables or Services covered by this Agreement, shall be the payment of direct damages only which shall in no event in the aggregate exceed the Total Value of Project.

b) The liability of NMRCL (whether in contract, tort, negligence, strict liability in tort, by statute or otherwise) for any claim in any manner related to this Agreement shall be limited to the amount of fees remaining to be paid to the Bidder/Agency under this Agreement.

c) Except as otherwise provided herein, in no event shall either party be liable for any consequential, incidental, indirect, special or punitive damage, loss or expenses (including but not limited to business interruption, lost business, lost profits, or lost savings) nor for any third party claims even if it has been advised of their possible existence.

d) Notwithstanding anything contained in the foregoing, the liability cap and exclusion for the Bidder/Agency given under this Clause 14 shall not be applicable to the indemnification obligations set out in Clause 14 and breach of Clause 11.3 and 16.

14.7 The allocations of liability in clause 14 represent the agreed and bargained-for understanding of the parties and compensation for the Services/ Deliverables/Goods reflects such allocations. Each Party has a duty to mitigate the damages and any amounts payable under an indemnity that would otherwise be recoverable from the other Party pursuant to this Agreement by taking appropriate and commercially reasonable actions to reduce or limit the amount of such damages or amounts.

15 FORCE MAJEURE

15.1 Definition of Force Majeure

The Bidder/Agency or NMRCL as the case may be, shall be entitled to suspend or excuse performance of its respective obligations under this Agreement to the extent that such performance is impeded by an event of force majeure (‘Force Majeure’).

15.2 Force Majeure events

A Force Majeure event means any event or circumstance or a combination of events and circumstances referred to in this Clause, which:

a) is beyond the reasonable control of the affected Party; b) such Party could not have prevented or reasonably overcome with the exercise of reasonable

skill and care; c) does not result from the negligence of such Party or the failure of such Party to perform its

obligations under this Agreement; d) is of an incapacitating nature and prevents or causes a delay or impediment in performance;

and e) may be classified as all or any of the following events: Such

events include:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

26

(i) act of God, including earthquake, flood, inundation, landslide, exceptionally adverse weather conditions, storm, tempest, hurricane, cyclone, lightning, thunder, volcanic eruption, fire or other extreme atmospheric conditions;

(ii) radioactive contamination or ionizing radiation or biological contamination except as may be attributable to the Bidder/Agency’s use of radiation or radioactivity or biologically contaminating material;

(iii) industry wide strikes, lockouts, boycotts, labor disruptions or any other industrial disturbances as the case may be not arising on account of the acts or omissions of the

Bidder/Agency and which affect the timely implementation and continued operation of the Project; or

(iv) an act of war (whether declared or undeclared), hostilities, invasion, armed conflict or act of foreign enemy, blockade, embargo, prolonged riot, insurrection, terrorist or military action, civil commotion or politically motivated sabotage, for a continuous period exceeding seven (7) days. For the avoidance of doubt, it is expressly clarified that the failure on the part of the Bidder/Agency under this Agreement or the SLA to implement any disaster contingency planning and back-up and other data safeguards in accordance with the terms of this Agreement or the SLA against natural disaster, fire, sabotage or other similar occurrence shall not be deemed to be a Force Majeure event. For the avoidance of doubt, it is further clarified that any negligence in performance of Services which directly causes any breach of security like hacking aren’t the forces of nature and hence wouldn’t be qualified under the definition of “Force Majeure”. In so far as applicable to the performance of Services, the Bidder/Agency will be solely responsible to complete the risk assessment and ensure implementation of adequate security hygiene, best practices, processes and technology to prevent any breach of security and any resulting liability therefrom (wherever applicable).

15.3 Notification procedure for Force Majeure

a) The affected Party shall notify the other Party of a Force Majeure event within seven (7) days of

occurrence of such event. If the other Party disputes the claim for relief under Force Majeure it shall give the claiming Party written notice of such dispute within thirty (30) days of such notice. Such dispute shall be dealt with in accordance with the dispute resolution mechanism in accordance with Clause

b) Upon cessation of the situation which led the Party claiming Force Majeure, the claiming Party shall within seven (7) days thereof notify the other Party in writing of the cessation and the Parties shall as soon as practicable thereafter continue performance of all obligations under this Agreement.

15.4 All ocation of costs arising out of Force Majeure

a) Upon the occurrence of any Force Majeure Event prior to the Effective Date, the Parties shall

bear their respective costs and no Party shall be required to pay to the other Party any costs thereof.

b) Upon occurrence of a Force Majeure Event after the Effective Date, the costs incurred and attributable to such event and directly relating to the Project (‘Force Majeure Costs’) shall be allocated and paid as follows:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

27

upon occurrence of a events mentioned in Clause 15.2 (i), (ii) (iii) and (iv) the Parties shall bear their respective Force Majeure Costs and neither Party shall be required to pay to the other Party any costs thereof.

Save and except as expressly provided in this Clause, neither Party shall be liable in any manner whatsoever to the other Party in respect of any loss, damage, costs, expense, claims, demands and proceedings relating to or arising out of occurrence or existence of any Force Majeure Event or exercise of any right pursuant hereof.

15.5 Consultation and duty to mitigate

a) Except as otherwise provided in this Clause, the affected Party shall, at its own cost, take all

steps reasonably required to remedy and mitigate the effects of the Force Majeure event and restore its ability to perform its obligations under this Agreement as soon as reasonably practicable. The Parties shall consult with each other to determine the reasonable measures to be implemented to minimize the losses of each Party resulting from the Force Majeure event. The affected Party shall keep the other Party informed of its efforts to remedy the effect of the Force Majeure event and shall make reasonable efforts to mitigate such event on a continuous basis and shall provide written notice of the resumption of performance hereunder.

16 CONFIDENTIALITY

16.1 NMRCL may allow the Bidder/Agency to utilize highly Confidential Information including confidential public records and the Bidder/Agency shall maintain the highest level of secrecy, confidentiality and privacy with regard to such Confidential Information. The Bidder/Agency shall use its best efforts to protect the confidentiality and proprietary of Confidential Information.

16.2 Additionally, the Bidder/Agency shall keep confidential all the details and information with regard to the Project, including systems, facilities, operations, management and maintenance of the systems/facilities. The Bidder/Agency shall use the information only to execute the Project.

16. NMRCL shall retain all rights to prevent, stop and if required take the necessary punitive action against the Bidder/Agency regarding any forbidden disclosure.

16.4The Bidder/Agency may share the confidential information with its employees, agents and subcontractors but only strictly on a need to know basis. The Bidder/Agency shall execute a corporate non-disclosure agreement with NMRCL in the format provided by NMRCL and shall ensure that all its employees, agents and sub-contractors execute individual non-disclosure agreements, which have been duly approved by NMRCL with respect to this Project.

16.5 To the extent the Bidder/Agency shares its confidential or proprietary information with NMRCL for effective performance of the Services, the provisions of the Clause 16.1 to 16.3 shall apply mutatis mutandis on NMRCL.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

28

17 AUDIT, ACCESS AND REPORTING The Bidder/Agency shall allow access to NMRCL or its nominated agencies to all information which is in the possession or control of the Bidder/Agency or its subcontractors, agents, suppliers etc. and which relates to the provision of the Services/Deliverables as set out in the Audit, Access and Reporting Schedule and which is reasonably required by NMRCL to comply with the terms of the Audit, Access and Reporting Schedule set out as Schedule II of this Agreement.

18 OWNERSHIP AND INTELLECTUAL PROPERTY RIGHTS

18.1 Products and fixes:

All COTS products and related solutions and fixes provided pursuant to this Agreement shall be licensed according to the terms of the license agreement packaged with or otherwise applicable to such product. Such licenses shall be brought on behalf of and in the name of NMRCL or mentioning NMRCL as the end user of such licenses. The Bidder/Agency would be responsible for arranging any licenses associated with products. “Product” means any computer code, web-based services, or materials comprising commercially released, pre-release or beta products (whether licensed for a fee or no charge) and any derivatives of the foregoing which are made available to NMRCL for license which is published by product owner or its affiliates, or a third party. “Fixes” means product fixes that are either released generally (such as commercial product service packs) or that are provided to you when performing services (such as workarounds, patches, bug fixes, beta fixes and beta builds) and any derivatives of the foregoing. All intellectual property rights in any development/enhancement/customization etc. done on the COTS products pursuant to this Agreement shall be owned by NMRCL.

18.2 Bespoke development:

Upon acceptance of any bespoke development as per this Agreement or RFP, the ownership of all IPR rights in any and all bespoke development done during the Term for implementation of the Project under this Agreement will lie with NMRCL. The Bidder/Agency shall provide source code, object code and all other relevant materials, artefacts etc. of all bespoke development to NMRCL and NMRCL shall own all IPRs in them. All material related to such bespoke development shall be treated as confidential information by the Bidder/Agency. This will also include any developments on COTS.

18.3 Training and other material:

The ownership of all IPR rights in any and all documents, artefacts, etc. (including all training material) made during the Term for implementation of the Project under this Agreement will lie with NMRCL.

18.4 Pre-existing work of the Bidder/Agency:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

29

For the purpose of this Agreement, ‘pre-existing work of the Bidder/Agency’ shall mean such pre-existing work of Bidder/Agency and that of its subcontractors, agents, representatives (i) that were identified by the Bidder/Agency in its Proposal, (ii) for which Bidder/Agency had provided sufficient documentary proof to establish that such work belongs solely to Bidder/Agency (or its subcontractors, agents, representatives) and (iii) which were accepted by NMRCL (based on the documentary proof) as pre-existing work of Bidder/Agency. To the extent Bidder/Agency uses any of pre-existing work of the Bidder/Agency (or its subcontractors, agents, representatives) in provision of services/Deliverables under this Agreement, the Bidder/Agency hereby transfers (for itself and on behalf of its subcontractors etc.) all rights, title and interest (excluding intellectual property rights) in such pre-existing work of the Bidder/Agency to NMRCL. Bidder/Agency shall provide to NMRCL (to the satisfaction of NMRCL) all documentation including, without limitation, source code, object code, SRS, FRS, operational documents etc. of such pre-existing work of the Bidder/Agency before using such pre-existing work of the Bidder/Agency in provision of services/Deliverables under this Agreement.

18.5 Third Party Products:

If license agreements are necessary or appropriate between the Bidder/Agency and third parties for purposes of enabling/enforcing/implementing the provisions hereinabove, the Bidder/Agency shall enter into such agreements at its own sole cost, expense and risk.

19 Transfer of risk and ownership in Goods

a) Subject to the terms of this Agreement, Bidder/Agency shall sell, assign, convey, transfer and deliver to NMRCL, and NMRCL shall purchase, receive and accept from the Bidder/Agency, all right, title and interest in and to the Goods required to be provided by the Bidder/Agency as per the RFP. The Bidder/Agency shall not make any substitute for the Goods of any other model, capacity, or manufacturer without the prior written consent of NMRCL which consent shall not be unreasonably delayed or withheld.

b) The Bidder/Agency shall arrange for delivery of the Goods to the delivery site identified by NMRCL (the “Delivery Site”) as per the Timelines provided in the RFP unless otherwise notified by NMRCL. In addition to paying all transportation charges for the Goods, the Bidder/Agency shall insure, and pay all insurance charges for the Goods.

c) Title to and ownership of the Goods designated as being purchased by NMRCL hereunder shall remain vested in the Bidder/Agency until written Acceptance and Go Live by NMRCL under the terms hereof, at which time title to and ownership of such Goods shall transfer to the NMRCL. Upon transfer of ownership of the Goods to NMRCL, the Bidder/Agency shall treat such Goods as Assets as detailed above in this Agreement.

d) Notwithstanding the transfer of ownership of the Goods to NMRCL, the risk of loss in Goods shall remain with the Bidder/Agency during the Term of the Agreement or till effective date of earlier termination of this Agreement.

20 WARRANTY

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

30

20.1 General:

The warranties and remedies provided in this clause 20 are in addition to, and not in derogation of, the warranties provided in Volume II of the RFP and the two are to be read harmoniously. The Bidder/Agency represents, warrants and covenants that: (a) the Bidder/Agency is the lawful owner of the Goods (including those Goods and Deliverables that are to be transferred to NMRCL as per the RFP) and the lawful owner or licensee of the materials used in the performance of the Services and delivery of Deliverables, (b) the bespoke development and such materials have been lawfully developed or acquired by the Bidder/Agency, and (c) the Bidder/Agency has the right to sell the Goods to NMRCL and to grant NMRCL the rights to the bespoke development and such materials, including the rights of access to and use of the bespoke development, which it grants under this Agreement, without the consent of any other person or entity. The Bidder/Agency represents, warrants and covenants that during the Warranty Period it will promptly provide NMRCL with any and all Maintenance Modifications, Enhancements, and related Documentation which the Bidder/Agency or its OEM makes available to any other person or entity.

20.2 Warranty for Goods

a) The Bidder/Agency represents, warrants and covenants each of the following: (i) That NMRCL shall acquire good and clear title on the Goods, free and clear of any and

all charges and encumbrances and shall have right to uninterrupted use of such Goods; (ii) That the Goods and all of its parts and components are new and unused; (iii) That the Goods are free from defects in material and workmanship under normal use and

that the Goods shall remain in good working order during the Warranty Period. (iv) That the Goods are and shall remain throughout the Warranty Period eligible for

maintenance under the OEM’s standard maintenance agreement. (v) That the Goods are fit for the purpose of successfully implementing the Project. (vi) That the Goods shall not become end of support during the Warranty Period and at least 6

months thereafter.

b) NMRCL shall be entitled to install an attachment, feature or device to the Goods, or make modifications, changes, enhancements, upgrades, or additions to the Software, without affecting the Bidder/Agency’s representations and warranties hereunder, unless the Bidder/Agency, within a reasonable time not to exceed five (5) days after receipt from NMRCL of written notice of its intention to do so, provides written notice to NMRCL stating grounds which, in NMRCL’s sole determination are reasonable, upon which the Bidder/Agency concludes such attachment, feature, device, modification, change, enhancement, upgrade or addition shall materially or adversely affect the System, thereby materially increasing Bidder/Agency’s burden of compliance with certain identified sections of this Agreement (the “Affected Obligations”). If the grounds set forth in the notice are determined by NMRCL to be reasonable and NMRCL employs such feature, device, modification, change, enhancement, upgrade or addition, the Bidder/Agency shall not be liable for the resulting adverse effect on the Affected Obligations to the extent attributable to such action by NMRCL. If the grounds set forth in the notice are determined by NMRCL to not be reasonable and NMRCL employs such feature, device, modification, change, enhancement, upgrade or addition, the Bidder/Agency

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

31

shall be liable for the resulting adverse effect on the Affected Obligations.

20.3 Warranty for Software

(a) The Bidder/Agency represents, warrants and covenants that on the Acceptance Date and for the Warranty Period, the Software will be free of material programming errors and will operate and conform to the respective Software’s Documentation including, inter alia, FRS (Functional Requirement Specification) and SRS (System Requirement Specification) and other manuals. The Bidder/Agency also represents, warrants and covenants that the medium on which the Software is contained when delivered to NMRCL will be free from defects in material or workmanship and shall be free from any viruses, bugs etc.

(b) The Bidder/Agency represents, warrants and covenants that the technical Documentation delivered to NMRCL for the System will be sufficient to allow a reasonably knowledgeable information technology professional to maintain and support such Software. The Bidder/Agency represents, warrants and covenants that the user Documentation for the System will accurately describe in terms understandable by a typical end user the functions and features of the System and the procedures for exercising such functions and features.

20.4 Warranty for Services

The Bidder/Agency represents, warrants and covenants that all services under this Agreement will be performed with promptness and diligence and will be executed in a workmanlike and professional manner, in accordance with the practices and high professional standards used in well-managed operations performing services similar to the services under this Agreement. The Bidder/Agency represents, warrants and covenants that it shall use adequate numbers of qualified individuals with suitable training, education, experience and skill to perform the services hereunder.

20.5 Warranty for System

The Bidder/Agency represents, warrants and covenants that for the Warranty Period and for as long as there is a maintenance agreement in effect between the Parties, the System shall at all times perform in accordance with the specifications in the Project Documents and meet the performance requirements set out in RFP. The Bidder/Agency represents, warrants and covenants (a) that it shall ensure that no computer viruses or similar items are coded or introduced into the System or any systems used to perform the Services, and (b) that it shall not insert into any System any code which would have the effect of disabling or otherwise shutting down all or a portion of the System or damaging any information or functionality.

20.6 Modifications

The representations, warranties and covenants provided by the Bidder/Agency under this Agreement will not be affected by NMRCL’s modification of any portion of the System so long as the Bidder/Agency can discharge its obligations despite such modifications, or following their removal by NMRCL.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

32

21 INSURANCE COVER

21.1 Obligation to maintain insurance

In connection with the provision of the Services, the Bidder/Agency must have and maintain:

a) for the Term, valid and enforceable insurance coverage for: i. public liability;

ii. professional indemnity; iii. product liability;

b) The above insurance policies shall be for appropriate values so as to cover risks of Bidder/Agency under this Agreement.

c) Insurance of Goods: The Bidder/Agency shall take insurance for the Goods and System for the Term at its own cost and expense for appropriate value in consultation with NMRCL and shall apprise NMRCL of the premium paid and claims made under the insurances on every 6 monthly basis. In the event of any failure by the Bidder/Agency to comply with the insurance requirements set out in this Agreement, NMRCL may, without in any way compromising or waiving any right or remedy, at law or in equity, upon five (5) days’ written notice to the Bidder/Agency, purchase such insurance, at the Bidder/Agency’s expense, provided that NMRCL shall have no obligation to do so and if NMRCL shall do so, the Bidder/Agency shall not be relieved of or excused from the obligation to obtain and maintain such insurance amounts and coverages. All such reasonable costs incurred by NMRCL shall be promptly reimbursed by the Bidder/Agency and/or may be withheld from any payment due to Bidder/Agency. None of the requirements contained herein as to types, limits or NMRCL’s approval of insurance coverage to be maintained by the Bidder/Agency are intended to and shall not in any manner limit, qualify or quantify the liabilities and obligations assumed by the Bidder/Agency under this Agreement, or otherwise provided by law.

21.2 Certificates of currency

The Bidder/Agency must, on request by the NMRCL, provide current relevant confirmation of insurance documentation from its insurance brokers certifying that it has insurance as required by this Clause 21. The Bidder/Agency agrees to replace any coverage prior to the date of expiry/cancellation.

21.3 Non-compliance

NMRCL or its nominated agencies may, at its election, terminate this Agreement upon the failure of the Bidder/Agency, or notification of such failure, to maintain the required insurance coverage. Inadequate insurance coverage for any reason shall not relieve the Bidder/Agency of its obligations under this Agreement.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

33

22 MISCELLANEOUS

22.1 Personnel

a) The personnel assigned by the Bidder/Agency to perform the Services shall be employees of the

Bidder/Agency or its subcontractor(s), and under no circumstances shall such personnel be considered employees of NMRCL or its nominated agencies. The Bidder/Agency shall have the sole responsibility for the supervision and control of the personnel deployed in the Project and for payment of such personnel’s compensation, including salary, withholding of income taxes and social security taxes, worker’s compensation, employee and disability benefits and the like and shall be responsible for all obligations of an employer subject to Applicable Law.

b) The Bidder/Agency shall use its best efforts to ensure that sufficient of its personnel (but in no timely perform the obligations under this Agreement and that such personnel have appropriate qualifications to perform the obligations. After discussion with Bidder/Agency, NMRCL or its nominated agencies shall have the right to require the removal or replacement of any such personnel performing work under this Agreement based on bona-fide reasons. In the event NMRCL or its nominated agencies requests that any of its personnel be replaced, the substitution of such personnel shall be accomplished pursuant to a mutually agreed upon schedule.

c) For the personnel of the Bidder/Agency identified as “Key Personnel”, the Bidder/Agency shall not remove such personnel from the Project without the prior written consent of NMRCL unless such removal is the result of resignation, termination of services, severe medical condition or death.

d) Except as stated in this Clause, nothing in this Agreement or the SLA will limit the ability of the Bidder/Agency to freely assign or reassign its employees; provided that Bidder/Agency shall be responsible, at its expense, for transferring all appropriate knowledge from personnel being replaced to their replacements. NMRCL or its nominated agencies shall have the right to review and approve the Bidder/Agency’s plan for any such knowledge transfer. The Bidder/Agency shall maintain the same or higher standards for skills and professionalism among replacement personnel as in personnel being replaced.

e) Each Party shall be responsible for the performance of all its obligations under this Agreement or the SLA as the case may be and shall be liable for the acts and omissions of its employees and agents in connection therewith.

f) During the Term and 12 months thereafter, neither Party will solicit for employment or knowingly hire an employee of the other Party with whom such Party has contact pursuant to project engagements under this Agreement. This restriction shall not apply to employees of either Party responding to advertisements in job fairs or news media circulated to the general public.

22.2 Independent Contractor

Nothing in this Agreement or the SLA shall be construed as establishing or implying any Bidder/Agencyship or joint venture between the Parties to this Agreement or the SLA and, except as expressly stated in this Agreement or the SLA, nothing in this Agreement or the SLA shall be deemed to constitute any Parties as the agent of any other Party or authorizes either Party to:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

34

a) incur any expenses on behalf of the other Party; or b) enter into any engagement or make any representation or warranty on behalf of the other

Party; or c) pledge the credit of or otherwise bind or oblige the other Party; or d) commit the other Party in any way whatsoever without in each case obtaining

the other Party’s prior written consent.

22.3 Sub-contractors

The Bidder/Agency shall not subcontract any core work (as such term is defined in the RFP) without NMRCL’s prior written consent which may be withheld or denied by NMRCL without assigning any reason. However the Bidder/Agency may subcontract any non-core work to a sub-contractor with NMRCL’s prior written consent. It is clarified that the Bidder/Agency shall be the principal employer for all claims arising from the liabilities statutory or otherwise, concerning the sub-contractors. The Bidder/Agency undertakes to indemnify NMRCL and/or its nominated agencies from any claims on the grounds stated hereinabove. Notwithstanding the sub-contracting, the Bidder/Agency shall remain solely responsible for and liable for successful delivery of Deliverables and accomplishment of the Project.

22.4 Assignment

a) All terms and provisions of this Agreement shall be binding on and shall inure to the benefit

of NMRCL and the Bidder/Agency and their respective successors and permitted assigns. b) Except as otherwise expressly provided in this Agreement, the Bidder/Agency shall not be

permitted to assign its rights and obligations under this Agreement to any third party. c) NMRCL may assign or novate all or any part of this Agreement and Schedules/ Annexures,

and the Bidder/Agency shall be a party to such novation, to any third party contracted to provide outsourced services to NMRCL or any of its nominees.

22.5 Trademarks, Publicity

Neither Party may use the trademarks of the other Party without the prior written consent of the other Party except that the Bidder/Agency may, upon completion, use the Project as a reference for credential purpose. Except as required by law or the rules and regulations of each stock exchange upon which the securities of one of the Parties is listed, neither Party shall publish or permit to be published either along or in conjunction with any other person any press release, information, article, photograph, illustration or any other material of whatever kind relating to this Agreement, the SLA or the business of the Parties without prior reference to and approval in writing from the other Party, such approval not to be unreasonably withheld or delayed provided however that the Bidder/Agency may include NMRCL or its client lists for reference to third parties subject to the prior written consent of NMRCL not to be unreasonably withheld or delayed. Such approval shall apply to each specific case and relate only to that case.

22.6 Notices

a) Any notice or other document which may be given by either Party under this Agreement or

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

35

under the SLA shall be given in writing in person or by pre-paid recorded delivery post and email.

b) In relation to a notice given under this Agreement, any such notice or other document shall be addressed to the other Party’s principal or registered office address as set out below:

<Insert Address> Tel: Email: Contact:

With a copy to Bidder/Agency:

Tel: Email: Contact:

c) In relation to a notice given under this Agreement, a Party shall specify the Parties’ address for

service of notices, any such notice to be copied to the Parties at the addresses set out in this Clause.

d) Any such notice or other document shall be deemed to have been given to the other Party (or, if relevant, its relevant associated company) when delivered (if delivered in person) between 9.00 AM and 5.00 PM on the working day at the address of the other Party set forth above or if sent on email.

e) Either Party to this Agreement or to the SLA may change its address, telephone number, and nominated contact for notification purposes by giving the other reasonable prior written notice of the new information and its effective date.

22.7 Variations and Further Assurance

a) No amendment, variation or other change to this Agreement shall be valid unless authorized

in accordance with the change control procedure as set out in the Change Management and Control set out in Section 7 of Volume II of the RFP. Such amendment shall be made in writing and signed by the duly authorized representatives of the Parties to this Agreement.

b) Each Party to this Agreement agrees to enter into or execute, without limitation, whatever other agreement, document, consent and waiver and to do all other things which shall or may be reasonably required to complete and deliver the obligations set out in this Agreement.

22.8 Severability and Waiver

a) If any provision of this Agreement, or any part thereof, shall be found by any court or

administrative body of competent jurisdiction to be illegal, invalid or unenforceable the illegality, invalidity or unenforceability of such provision or part provision shall not affect the other provisions of this Agreement or the remainder of the provisions in question which shall remain in full force and effect. The relevant Parties shall negotiate in good faith in order to agree to substitute for any illegal, invalid or unenforceable provision by a valid and enforceable provision which achieves to the greatest extent possible the economic, legal and

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

36

commercial objectives of the illegal, invalid or unenforceable provision or part provision. b) No failure to exercise or enforce and no delay in exercising or enforcing on the part of either

Party to this Agreement of any right, remedy or provision of this Agreement shall operate as a waiver of such right, remedy or provision in any future application nor shall any single or partial exercise or enforcement of any right, remedy or provision preclude any other or further exercise or enforcement of such right, remedy or provision or the exercise or enforcement of any other right, remedy or provision.

22.9 Compliance with Applicable Law

The Bidder/Agency accepts that its individual conduct shall (to the extent applicable to its business like an information technology service provider) and at all times it shall comply with all laws, rules and regulations of government and other bodies having jurisdiction over the area in which the Services are undertaken provided that changes in such laws, rules and regulations which result in a change to the Services shall be dealt with in accordance with the Change Management and Control set out in Section 7 of Volume II of the RFP.

22.10 Professional Fees

All expenses incurred by or on behalf of each Party to this Agreement, including all fees of agents, legal advisors, accountants and actuaries employed by either of the Parties in connection with the negotiation, preparation and execution of this Agreement shall be borne solely by the Party which incurred them.

22.11 Ethics

The Bidder/Agency represents, warrants and covenants that it has given no commitments, payments, gifts, kickbacks, lavish or expensive entertainment, or other things of value to any employee or agent of NMRCL or its nominated agencies in connection with this Agreement and acknowledges that the giving of any such payment, gifts, entertainment, or other things of value is strictly in violation of NMRCL standard policies and may result in cancellation of this Agreement.

22.12 Entire Agreement

This Agreement with all schedules & annexures appended thereto and the contents and specifications of the RFP constitute the entire agreement between the Parties with respect to their subject matter, and as to all other representations, understandings or agreements which are not fully expressed herein, provided that nothing in this Clause shall be interpreted so as to exclude any liability in respect of fraud, misrepresentation and corrupt practice.

22.13 Amendment

Any amendment to this Agreement shall be made by mutual written consent of the Parties.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

37

23 Performance Bank Guarantee

23.1 The Bidder/Agency shall, within 15 days after the receipt of Letter of Award from NMRCL, furnish an unconditional, irrevocable and continuing Performance Security/Guarantee to NMRCL for an amount equal to 10% of the Total Value of the Project from any Commercial bank in the format acceptable to NMRCL. The Performance Security shall be valid for entire Term and six months thereafter. If the Performance Security is liquidated /encashed, in whole or in part, during the currency of the Performance Security, the Bidder/Agency shall top up the Performance Security with the same amount as has been encashed within 15 days of such encashment without demur.

23.2 In the event of the Bidder/Agency opting for advance payment as per the RFP, it shall also

furnish an unconditional, irrevocable and continuing Advance Payment Security/ Guarantee to NMRCL for an amount equal to 110% of the value of advance payment from any Commercial bank in the format acceptable to NMRCL. The advance payment guarantee shall be returned to the Payment once the advance payment is completely set off against due and payable payments to it by NMRCL.

24 GOVERNING LAW AND DISPUTE RESOLUTION

24.1 This Agreement shall be governed by and construed in accordance with the laws of India, without giving effect to conflict of laws / rules. The parties expressly agree to exclude the application of the U.N. Convention on Contracts for the International Sale of Goods (1980) to this Agreement and the performance of the parties contemplated under this Agreement, to the extent that such convention might otherwise be applicable.

24.2 Any dispute, in the event escalations do not help in resolution of the issue / problem arising out of or in connection with this Agreement, shall in the first instance, be dealt with in accordance with the conciliation procedure as set out in the Project Management and Governance provisions set out in Section 6 of Volume II of RFP.

24.3 In case the problem is not solved within 3 weeks of conciliation, both the parties shall agree on a mediator for communication between the two parties. The process of the mediation shall be as follows:

Aggrieved party should refer the dispute to the identified mediator in writing, with a copy to the other party. Such a reference should contain a description of the nature of the dispute, the quantum in dispute (if any) and the relief or remedy sought suitable.

The mediator shall use its best endeavors to conclude the mediation within a certain number of days of his appointment.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

38

24.4 If no resolution can be reached by way of mediation within 30 days, a neutral panel of 3 experts agreeable to both parties should be constituted. The process of the expert advisory would be as follows:

Aggrieved party should write to the other party on the failure of previous alternate dispute resolution processes within the timeframe and requesting for expert advisory. This is to be sent with a copy to the mediator.

Both parties should thereafter agree on the panel of experts who are well conversant with the issue under dispute for providing a neutral position on the issue.

If no resolution can be reached through the above means within 30 days from the date of referring the matter to the panel of experts then the matter should be referred to Arbitration.

24.5 Any dispute or difference whatsoever arising between the parties to this Agreement

out of or relating to the construction, meaning, scope, operation or effect of this Agreement shall be referred to a Sole Arbitrator to be appointed by mutual consent of both the parties herein. The arbitration proceedings shall be governed by the provisions of the Arbitration and Conciliation Act, 1996 . The Arbitration proceedings will be held at Nagpur, India. All disputes shall be subject to the exclusive jurisdiction of courts at Nagpur.

IN WITNESS WHEREOF the Parties have by duly authorized Representatives set their respective hands and seal on the date first above Written in the presence of:

WITNESSES: Signed

by:

(Name and designation)

For and on behalf of NMRCL (FIRST PARTY) Signed

by:

(Name and designation) Bidder/Agency (SECOND PARTY) (Name and designation) For and on behalf of Bidder/Agency Signed by:

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

42

Section :2

SCHEDULES

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

40

SCHEDULE – I – DEFINITIONS

1. Agreement means this Master Services Agreement together with all Annexures, Schedules, referenced documents and all amendments, corrigendum /corrigenda, changes thereto;

2. Applicable Law(s) means any statute, law, ordinance, notification, rule, regulation, judgment,

order, decree, bye-law, approval, directive, guideline, policy, requirement or other governmental restriction or any similar form of decision applicable to the relevant party and as may be in effect on the date of the execution of this Agreement and during the subsistence thereof, applicable to the Project;

3. Assets shall have the same meaning ascribed to it in Clause 9.1 (a);

4. Software means the software procured, designed, developed / customized, tested and deployed

by the Bidder/Agency for the purposes of the Project and includes the source code (in case of Bespoke development) along with associated documentation, which is the work product of the development efforts involved in the Project and the improvements and enhancements effected during the term of the Project, but does not include the third party software products (including the COTS products used for the Project), proprietary software components and tools deployed by the Bidder/Agency;

5. Confidential Information means all information including NMRCL Data (whether in written,

oral, electronic or other format) which relates to the technical, financial and business affairs, dealers, suppliers, products, developments, operations, processes, data, trade secrets, design rights, know-how, plans, budgets and personnel of each Party and its affiliates which is disclosed to or otherwise learned by the other Party in the course of or in connection with this Agreement (including without limitation such information received during negotiations, location visits and meetings in connection with this Agreement);

6. Control means, in relation to any business entity, the power of a person to secure:

(i) by means of the holding of shares or the possession of voting power in or in relation to that or any other business entity, or

(ii) by virtue of any powers conferred by the articles of association or other document regulating

that or any other business entity, that the affairs of the first mentioned business entity are conducted in accordance with that person’s wishes and in relation to a Bidder/Agencyship, means the right to a share of more than one half of the assets, or of more than one half of the income, of the Bidder/Agencyship;

7. Deliverables means the Goods, Services, Software, applications and all other products,

infrastructure and services etc. to be delivered by the Bidder/Agency in pursuance of the Agreement as defined more elaborately in the RFP and includes all Service Deliverables, documents including the user manual, technical manual, design, process

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

41

and operating manuals, service mechanisms, SRS, FRS, policies and guidelines (such as security related, data migration related), inter alia payment and/or process related etc., source code and all its modifications;

8. Effective Date shall have the same meaning ascribed to it in Clause 3;

9. Go-Live shall have the meaning ascribed to such term in Volume II of RFP.

10. Force Majeure shall have the same meaning ascribed to it in Clause 15.1;

11. Force Majeure Costs shall have the same meaning ascribed to it in Clause 15.4 (b);

12. Indemnifying Party shall have the same meaning ascribed to it in Clause 14.1;

13. Indemnified Party shall have the same meaning ascribed to it in Clause 14.1;

14. Intellectual Property Rights means all rights in written designs and copyrights, moral

rights, rights in databases and Bespoke Software / Pre-existing work including its up-gradation systems and compilation rights (whether or not any of these are registered and including application for registration);

15. Parties means NMRCL and the Bidder/Agency for the purposes of this Agreement and “Party” shall be interpreted accordingly;

16. Performance Guarantee means the guarantee provided by any Commercial Bank in favor of

the Bidder/Agency.

17. Timelines means the timelines for performance of scope of work as described in Volume II of the RFP;

18. Services means the services delivered or to be delivered by the Bidder/Agency under this

Agreement using the tangible and intangible assets created, procured, installed, managed and operated by the Bidder/Agency including the tools of information and communications technology and includes but is not limited to the list of services specified in Volume II of the RFP;

19. Service Deliverables means the deliverables to be provided by the Bidder/Agency to NMRCL

as part of the Services under this Agreement;

20.Service Level means the level of service and other performance criteria which will apply to the Services delivered by the Bidder/Agency and as described in Volume II of the RFP;

21. SLA means the Performance and Maintenance SLA mentioned in Volume II of RFP;

22. System means the 5D BIM & ERP System as described in the RFP.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

42

23. Term shall have the same meaning ascribed to it in Clause 3;

24. Warranty Period shall mean the period starting from the date of successful completion /Go-live and extending till the expiry of the Term.

25. Goods means to include all hardware, equipment, instruments, machinery, material,

electronic items, networking equipment, switches, routers, cables and other tangible goods/items etc., and includes their user manuals, technical manuals, operating manuals, service mechanisms, policies and guidelines (such as security related, data migration related) and all its modifications, provided or to be provided by Bidder/Agency to NMRCL under this Agreement;

26. Original Equipment Manufacturer (OEM) means the manufacturers of Goods;

27. Data Centre (DC), Data Recovery (DR), Near Data Centre (NDC) and Near Data

Recovery (NDR) shall have the respective meaning assigned to them in the RFP; 28. COTS means Commercial off-the-shelf product(s) which has been implemented for at least 5

organizations worldwide. 29. Total Value of Project/Total Project Value means [ ] i.e. the amount quoted

by the Bidder/Agency (inclusive of taxes) in its commercial bid. If the Total Value of the Project is increased due to change request, increase in tax rates/tax laws etc. in accordance with the terms of this Agreement, then NMRCL shall have the right to seek additional Performance Guarantee to such increased extent of Total Value of the Project and the penalties/liquidated damages etc. getting affected by such increase would be calculated based on such increase from the effective date of such increase in the Total Value of the Project.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

43

SCHEDULE- II - AUDIT, ACCESS AND REPORTING

1. PURPOSE

This Schedule details the audit, access and reporting rights and obligations of NMRCL and/or its nominated agency and the Bidder/Agency and its subcontractors, agents, supplier etc. This Schedule is in addition to, and in derogation of, the audit rights and process provided in the RFP.

2. AUDIT NOTICE AND TIMING

2.1 As soon as reasonably practicable after the Effective Date, the Parties shall use their best endeavors to agree to a timetable for routine audits (Other than those mentioned as part of the mandatory requirements for successful delivery and acceptance of the System) during the Project Implementation Phase and the Operation and Maintenance Phase. Such timetable during the Implementation Phase, and thereafter during the operation Phase, NMRCL shall conduct routine audits in accordance with such agreed timetable and shall not be required to give the Bidder/Agency any further notice of carrying out such audits.

2.2 NMRCL may conduct non-timetabled audits at his/ her own discretion if it reasonably believes that such non-timetabled audits are necessary as a result of an act of fraud by the Bidder/Agency, a security violation, or breach of confidentiality obligations by the Bidder/Agency, provided that the requirement for such an audit is notified in writing to the Bidder/Agency a reasonable period time prior to the audit (taking into account the circumstances giving rise to the reasonable belief) stating in a reasonable level of detail the reasons for the requirement and the alleged facts on which the requirement is based. If the Bidder/Agency considers that the non-timetabled audit was not appropriate, the matter shall be referred to the escalation procedure as set out in the Project Governance and Management section of RFP.

2.3 Except as provided in 2.2 above, audits shall be conducted by with adequate notice of 2 weeks to the Bidder/Agency.

3. ACCESS

The Bidder/Agency shall provide to NMRCL and/or its nominated agency reasonable access to employees, subcontractors, suppliers, agents and third party facilities as detailed in the RFP, documents, records and systems reasonably required for audit and shall provide all such persons with routine assistance in connection with the audits and inspections. NMRCL or its nominated agency shall have the right to copy and retain copies of any relevant records. The Bidder/Agency shall make every reasonable effort to co-operate with them.

4. AUDIT RIGHTS

NMRCL and/or its nominated agency shall have the right to audit and inspect suppliers, agents, subcontractors and third party facilities (as detailed in the RFP),

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

44

data center, documents, records, procedures and systems relating to the provision of the services, but only to the extent that they relate to the provision of the services, as shall be reasonably necessary to verify:

a) The security, integrity and availability of all data processed, held or conveyed by the Bidder/Agency on behalf of NMRCL and documentation related thereto;

b) That the actual level of performance of the services is the same as specified in the SLA;

c) That the Bidder/Agency has complied with the relevant technical standards, and has adequate internal controls in place; and

d) The compliance of the Bidder/Agency with any other obligation under the Agreement. e) Unless otherwise provided in the RFP, Security audit and implementation audit of the system

shall be done once each year, the cost of which shall be borne by NMRCL.

For the avoidance of doubt the audit rights under this Schedule shall not include access to the Bidder/Agency's profit margins or overheads, any confidential information relating to the Bidder/Agency’ employees, or (iii) minutes of its internal Board or Board committee meetings including internal audit, or (iv) such other information of commercial-in-confidence nature which are not relevant to the Services associated with any obligation under the AGREEMENT. 5. AUDIT RIGHTS OF SUBCONTRACTORS, SUPPLIERS AND AGENTS 5.1 The Bidder/Agency shall use reasonable endeavors to achieve the same audit and access

provisions as defined in this Schedule with subcontractors, suppliers and agents who supply labor, services, equipment or materials related to performance of obligations by Bidder/Agency under this Agreement. The Bidder/Agency shall inform NMRCL and/or its nominated agency prior to concluding supply/subcontract agreements of any failure to achieve the same rights of audit or access.

5.2 REPORTING: The Bidder/Agency will provide quarterly reports to NMRCL and/or its nominated agency regarding any specific aspects of the Project and in context of the audit and access information as required by NMRCL or its nominated agency.

6. ACTION AND REVIEW 6.1 Any change or amendment to the systems and procedures of the Bidder/Agency, where

applicable arising from the audit report shall be agreed within thirty (30) calendar days from the submission of the said report.

6.2 Any discrepancies identified by any audit pursuant to this Schedule shall be immediately notified to NMRCL or its nominated agency and the Bidder/Agency Project Manager who shall determine what action should be taken in respect of such discrepancies in accordance with the terms of this Agreement.

7. TERMS OF PAYMENT

Except as otherwise provided in RFP, NMRCL shall bear the cost of any audits and inspections. The Bidder/Agency shall bear all costs for all reasonable assistance and

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

45

information provided under this Agreement, the Project Implementation, Operation and Maintenance SLA by the Bidder/Agency pursuant to this Schedule.

8. RECORDS AND INFORMATION

For the purposes of audit in accordance with this Schedule, the Bidder/Agency shall maintain true and accurate records in connection with the provision of the services and the Bidder/Agency shall handover all the relevant records and documents upon the termination or expiry of this Agreement.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

46

SCHEDULE – III - PROJECT DELIVERABLES & PAYMENT

SCHEDULE

1. As per RFP 2. Terms of Payment

[TO BE INSERTED]

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

47

SCHEDULE – IV – Transition and Exit Management

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

49

Section: 3

Annexure

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

49

ANNEXURE – A - FORMAT FOR CHANGE COTROL NOTICE

CCN Number: <<Number>>

Change of Control Details:

Before Change of Control After Change of Control (Surviving Legal Name of Entity: Legal Name of Entity:

Registered Office Address: Registered Office Address:

Date of Incorporation (as per Companies Act, 1956):

Date of Incorporation of Surviving Entity (as per Companies Act, 1956):

Annual Turnover (in INR) during last three Financial Years

Annual Turnover (in INR) during last three Financial Years

Entity Financial Net worth (measured as paid-up capital plus free reserves) (total assets minus total liabilities)

Entity Financial Net worth (measured as paid-up capital plus free reserves) (total assets minus total liabilities)

Name & Designation:

Signature

Name:

Designation:

Date:

Note: All the information provided above should be supported by documentary evidences signed by concerned authorized signatories and the client may ask for any additional information as desired in case of occurrence of a Change of Control event.

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

50

ANNEXURE – B – FORMAT FOR CHANGE REQUEST NOTICE (if applicable under the RFP)

PART A: INITIATION

CRN Number: Date:

Title:

Initiator: Brief Description of Proposed Change: (To include reason for change and appropriate details/specifications. Identify any attachments as A1, A2, and A3 etc.) Name & Designation: (On behalf of Initiator)

Part B : EVALUATION

CRN Number: <<Number1>>/B Date:

Detailed Description of Change: (To include Changes to Deliverables, Cost/ Charging Structure, Payment Details, Documentation, Training, Service Levels, Working Arrangements and any other contractual issue or change. Identify any attachments as B1, B2, and B3 etc.)

Impact:

Deliverables Involved:

Detailed Timelines:

Cost/ Charges for Proposed Change: (including detailed costing to arrive at such cost structure and schedule of payments, if change is approved) Any Other Relevant Information:

1 CRN Number will be same for both Parts, but demarcated with “/ <Part Name>”

NMRCL RFP for Selection of Agency for OSO, 5D-BIM and ERP

51

Name & Designation (on behalf of Initiator)

Signature: Date:

Authority to Proceed: Implementation of this CRN as submitted in Part A, in accordance with Part B is: (tick as appropriate)

Approved Comments:

Rejected Comments:

For NMRCL For Bidder/Agency

Signature

Signature

Name: Name:

Designation: Designation:

Date: Date: