Municipal Solid Waste Power Plant Project 2014. 4. DL ENT Co., Ltd.

Post on 17-Jan-2016

215 views 0 download

Tags:

Transcript of Municipal Solid Waste Power Plant Project 2014. 4. DL ENT Co., Ltd.

1

Municipal Solid Waste

Power Plant Project

2014. 4.

DL ENT Co., Ltd.

- 2 -

01

02 Construction Plan

03 Government’s Scope

Project Overview

04 Master Plan

- 3 -

01 Project Overview

- 4 -

Project Project • MSW (Municipal Solid Waste) Power Plant Project (BOT)

Construction

Terms

Construction

Terms• 14 months after start up • BOT (Build – Operation – Transfer) : 20 years

Target of

the Project

Target of

the Project

1.Hygienic and economical processing of waste disposal facility for the installation of public

2. Using waste heat to ensure the development of renewable energy, such as crude oil expected

substitution effect

 3.On fossil fuels, the substitution effect of CDM projects to reduce greenhouse gas emissions,

such as the UN Framework Convention on Climate Change active coping

 4.Load reduction in eco-friendly to the environment and the installation of local residents improve

health care plan

CapacityCapacity

• MSW Capacity: 300 ton/day (1st stage)

• Incinerator : 150 ton/day (× 2 Facilities), STG 7.0MWh (× 1 Facility)

* 2nd stage (700 ton/day) will be discussed later on

AreaArea • 10,000 ㎡

1. Project Overview

- 5 -

2. Project Structure

DL ENT Co., ltd.

1. PPA : Power Purchase Agreement

Government

ProjectFinancing

1) EPC(Engineering, Procurement & Construction)

FinancialShareholder

KothaiTechnology

EPC 1)

Turn-key

* Scope of Government

1. MSW Supplying Contract

2. Related Certificates / Public Complaints

3. MSW : 300 ton/day (more than 52% of Combustibles)

4. Free treatment for Waste Water / Ash (Incombustibles)

5. Free usage of Running water

6. MSW price : 350 THB/ton(1st year),

450 THB/ton(from 2nd year)

PEA

- 6 -

02 Construction Plan

- 7 -

Incineration

Type

Incineration

Type Stoker (with Heat Recovery Boiler)

Operating

hours

Operating

hours

Steam

Production

Steam

Production

Incineration

Capacity

Incineration

Capacity 300 ton/day (150 ton/day * 2 Facilities)

24 hr/day (Continuous)Annual

Operating hours

Annual

Operating hours 7,680 hr/year (320 days)

47.0 Steam Ton/hr Electricity

Production

Electricity

Production 7.0 MWh

Type of Waste

Quantity(kg/hr)

Ratio(%)

Com-bustibles

(%)

Water(%)

Ash(%)

MSW

(Incoming)13,750 100 41.3 49.3 9.4

Low Quality : 2,677 kcal/kg

2. Waste Characteristics and Design Crite-ria

1. EquipmentTo be fixed after

Basis Design

- 8 -

Steam turbine gen-set

Induced draft fan

Ash bunker

Bag filerBoilerIncinerator

Refuse hopper

Electric crane

Refuse bunker

Ash discharger

Acid gas treatment sys.

Reception hall

3. Equipment Model (Concep-tual)

- 9 -

Consump-tion

Quantity PressureSteam Temp.

Equipment 45 ton/hr39 –

40kg/㎠ 350℃

350

4. Heat Recovery system To be fixed after Basis Design

- 10 -

5. Layout (Main Process - Conceptual)

To be fixed after Basis Design

- 11 -

공 종

Construction Schedule

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1. Detail Engineering

2. Fabrication (M)

3. Civil Work

4. Installation (M)

5. Architecture

6. Piping

7. Electricity Incoming

8. Insulation

9. Start up – Test run

10. Inspection(Environ)

12. Commercial Run & Generation of Elec-tricity

Total duration 14 Months

6. Master Schedule (Esti-mated)

(Unit : Month)To be fixed after Basis Design

- 12 -

5. Financing Summary (Unit : 100M Kwon)

Description Cost Note  

Direct Cost

1. Incinerator with Heat Recovery Boiler sys-tem

25,500  

2. Turbine Generator 4,500  

3. Civil Work 8,200  

4. Design 800  

Summary 39,000 -

Indirect Cost(Administrative)

1. Insurance for EPC 1,700  

2. 사전개발비 1,750  

3. Feasibility Study 500  

4. Cost for Law Firm 300  

5. Cost for Financing 200   6. Supervision Management for the Con-struction

150  

7. Administrative Cost 800  

8. Contingency 2,100  

Summary 7,500  

Total Summary 46,500 -

- 13 -

03 Scope of Government’s

- 14 -

Scope of

Rayong

Government

Scope of

Rayong

Government

1. MSW Supplying Contract

2. Related Certificates / Public Complaints

3. MSW : 300 ton/day (more than 52% of Combustibles)

4. Free treatment for Waste Water / Ash (Incombustibles)

5. Free usage of Running water

6. MSW price limitation : 350 THB/ton(1st year),

450 THB/ton(from 2nd year and further)

- 15 -

04 Master Plan

- 16 -

Description Main Subject Dead line Note

1st Proposal(Brief)

Project Inquiry Finished

Site Survey Finished

Project Proposal ~ `14. 4.10

MOU Agree-ment

MOU check / Agreement ~ 4.30

Project Financing Financing Agency Contract ~ 5.10

Feasibility Study Financial/Legal Consultant / Reports ~ 8.30

Certificates

Supplying of MSW ~7.30

BOI Certificates / PPA Agree-ment

~ 8.30

Project Financing Financial Shareholders ~ 9.20

Construction

Bidding for Construction Com-pany

~ 9.30

Start up of the Construction ~ 10.1

1. Master Schedule (Esti-mated)

- 17 -

- 18 -

THANK YOU