Post on 15-Jan-2017
MTI Power provides - shop/field machining; shop/field
orbital welding; shop/field manual welding; preheat,
post-heat, and post weld heat treatment; NDE; leak
detection; erection, disassemble, and maintenance on
machinery; industrial construction/maintenance staff
augmentations; as well as; sales/rentals of MTI Power
designed/manufactured machining/welding equipment.
Making Tough Ingenious
1
George Sandora President
45 Years Experience
Andria Sandora VP Finance and Administration
11 Years Experience
Mike Simundza VP Operations
30 Years Experience
Executive Management
2
Objective Deliver each/every MTI Power product and service
in full/complete compliance with all applicable:
contracts, design drawings, codes, schedules,
standards, statutes, processes, and safety
procedures.
3
Corporate Background Since the founder/owner of MTI Power, Mr. George
Sandora, is focused almost entirely on the needs/well
being of his customers; it is an absolute fact that the
entire MTI Power organization shall be: easy to contact,
quick to respond, and fast to fix … all concerns/problems
that occur.
4
Typical Power Generation
Customers • AMEC Foster Wheeler
• American Electric Power
• Bechtel
• Exelon
• Hayes
• Kiewit
• Power Maintenance
and Constructors
• Siemens
• TEI Construction
• URS Corporation
5
Typical Midstream Pipeline
Customers • US Pipeline
• Michels Corporation
6
• Matrix NAC
• Minnesota Limited LLC
Past Steam Generator
Replacement Work • Almaraz Nuclear
• Braidwood Nuclear
• Byron Nuclear
• Calvert Cliffs Nuclear
• Shearon Harris Nuclear
• Donald C. Cook Nuclear
• Farley Nuclear Plant
• HP Robinson Nuclear
• Indian Point Energy Center
• Kori Nuclear
• North Anna Nuclear
• Point Beach Nuclear
• St. Lucie Nuclear
• Turkey Point Nuclear
7
Previous Retrofit Work • Donald C. Cook Nuclear
• Susquehanna Nuclear
8
Common Forced Outage and
Maintenance Tasks Completed • CO2 piping
• Expansion joints
•Gland steam piping
•High pressure turbine piping
• Hydrogen control system
• Hydrogen filter
• Hydrogen piping
• Installation of dry cask
storage containers
9
Common Forced Outage and
Maintenance Tasks Completed • Installation of Mitsubishi
transformers
• Lift oil pumps
• LP expansion joints
• LP rotor replacement
• Lube oil piping
• Security system installation
• Upgrade 765KV and 354 KV
transmission lines
• Weld overlay
10
Certifications MTI Power holds The National Board of Boiler and
Pressure Vessel Inspectors “NB” mark and
“R” SYMBOL; as well as; MTI Power possesses the
ASME “PP” mark, ASME “S” mark, and ASME “U” mark.
11
Certification MTI Power is currently strengthening our “Quality System
Manual” in preparation for the MTI Power application to
The National Board of Boiler and Pressure Vessel
Inspectors “NR” SYMBOL.
12
Safety MTI Power currently has an Experience Modification
Rating (i.e., EMR or ratio of actual losses to expected losses
over a rolling three year period average) of 0.71 or
“excellent”.
13
Safety However, Workers’ Compensation Claims and
OSHA Recordable are separate subjects. In part, because it
is very possible to have an OSHA Recordable Rate over the
national average and also have an EMR below 1.0;
MTI Power has provided additional safety related
information and statistics.
14
Safety
The North American Industry Classification System
(i.e., NAICS) Lost-Time Injury Rate (i.e., LTIR) for
MTI Power employment size is 1.4.
MTI Power LTIR is 0.0
15
Safety The NAICS Total Recordable Incident Rate (i.e., TRIR) for
MTI Power employment size is 4.1
MTI Power TRIR is 0.0
16
Signatory
MTI Power is a signatory to the:
General Presidents’ Project Maintenance Agreement,
National Maintenance Agreement,
United Association National Specialty Agreement, and
National Construction Agreement.
17
Core Team MTI Power keeps a mainstay workforce of highly skilled
machinists, welders, pipefitters, and millwrights. These
direct labor personnel are supported by very
knowledgeable/very experienced frontline supervision.
Additionally, MTI Power has project managers, field
superintendents, and field coordinators ready to
meet/overcome shop/site challenges. 18
Project Management MTI Power routinely works with our customers; as well as;
the customers Architects and Engineers to reduce required
construction time/job cost using “value engineering”.
19
Facilities MTI Power’s headquarters is near Chicago in Marseilles,
Illinois. This resource includes a 40,000 square foot
manufacturing facility containing over 300 shop/field
milling/welding machines … ready to serve our customers.
MTI Power also has a regional office located in Melbourne,
Florida.
20
Foreign Work Locations MTI Power has successfully served our clients in Germany,
Mexico, Peru, Saint Croix, Saudi Arabia, South Korea,
Thailand, Trinidad, United Arab Emirates, United Kingdom,
and United States.
21
For the MTI Power Team …
Thank You!
Thank You!
22