by performing major improvements in the present network:by performing major improvements in the present network:•- introduce significant enhancements in the remote stations•- adopt (near) real-time transmission of signals•- real-time processing capability
Supported bySupported by•- Portuguese National Science Foundation, FCT (20 new stations + 6 upgrades)•- Private Donation (GALP – oil company) (2 new stations)•- Instituto de Meteorologia, I.P.
Solve some constrains:Solve some constrains:• - frequency band (SP stations …)•- dynamic range•- non real time (digital)
Modernization of the Modernization of the IM (now IPMA) Seismic NetworkIM (now IPMA) Seismic Network
These improvements allowed: These improvements allowed: •- quality data acquisition in highly sensitive stations which are also equipped with strong-motion sensors•- higher quality digital transmission•- real time monitoring at the Operational Center•- automatic signal detection•- automatic association of detections, event location and magnitude evaluation•- development of a rapid earthquake information system for Civilian Protection authorities •- automatic archive of recorded data•- development of high-level products (bulletins, shakemaps, etc.)•- contribute to international monitoring efforts (FDSN, ORFEUS, tsunami projects [NEAREST, IOC])•- data for scientific research purposes
Modernization of the Modernization of the IM (now IPMA) Seismic NetworkIM (now IPMA) Seismic Network
New and Upgraded Seismic NetworkNew and Upgraded Seismic Network
Seismometer CMG-3T & 3ESP compactAccelerometer CMG-5TDigitiser DM24 (6 components)Seiscomp unit (seiscomp software)
21 stations
Data Center (Lisbon)(SEISCOMP)
Seismometer STS-2Accelerometer EpisensorDigitiser Q330 (6 components)Seiscomp unit (seiscomp software)
1 station
Quality Control
(Seiscomp+ContQual+Soh) Near RT
processing(Seiscomp)
Manual revision(Seisan)
Archieve(Storage Area
Network)Check&Register(Data_Extract)
Seismometer LE3DAccelerometer CMG-5TDigitiser+logger EAM (6 components) or DM24 + seiscomp (seedlink server)
7 stations
VSAT / Internet(seedlink)
new new upgraded
New Seismic StationsNew Seismic Stations
PVAQ PVAQ (Vaqueiros)(Vaqueiros)
Broadband sensoraccelerometer
IPMA Accelerometer Station ListIPMA Accelerometer Station List
IPMA Strong-Motion NetworkIPMA Strong-Motion Network
Satellite [VSAT]Internet (public & VPN)Local
Real-Time (latency <10s)
2012-09-24 21:52 UTC 3.6MLSW Ourique, Portugal mainland
ExampleExample
56 km
62 km
65 km
163 km
170 km
220 km
224 kmMacroseismic observations (DYFI)
2012-09-24 21:52 UTC 3.6MLSW Ourique, Portugal mainland
ExampleExample
ShakeMap
Macroseismic observations (DYFI)