Post on 06-Apr-2017
INSERT CTO HERE
Brief History of the Future
“ The future is already here --
it's just not evenly
distributed. ”
– William Gibson
Traffic signal
prioritization
5,700 public buses
2.5 million passengers
every weekday
12,860 signaled
intersections – all
connected wirelessly
20% reduction in bus
transit delays
Wireless meter
readings
817,000 meters across
the five boroughs
$3 million in annual
savings by eliminating
manual readings
56% reduction in billing
disputes
Residents have saved
$73 million thanks to
new leak alerts
Real time gunshot detection
Only 1-in-5 gunshots are estimated to be reported nationwide
Triangulation enables shots to be traced within 25 meters
Validation provided within a 1 minute timeframe
Integrates with dozens of unique data feeds to assist police in the field
Project 2: Urban Tech NYCTargeting growth-stage hardware and software companies working towards smart and sustainable cities.
Hub @ New Lab
• Growth-stage hardware companies
• Building 128, Brooklyn Navy Yard
• 84,000 sf
• Prototyping and testing for rapid product iteration
• Private studios, co-working desks
• Summer 2016
Hub @ Grand Central Tech
• Growth-stage software companies
• 335 Madison Ave
• 50,000 sf
• Multi-purpose innovation center
• Private office suites, co-working desks
• Late Summer 2016
COMPUTER SCIENCE FOR ALL
Hire NYC Youth for the summer:
Ladders for Leaders
nyc.gov/cye
Support Computer Science for All
bit.ly/joincsforall
Join the Tech Talent Pipeline
techtalentpipeline.nyc
Support Women Entrepreneurs
nyc.gov/wenyc
nyc.gov/forward @MinervaTweet @NYCForward