Minera Candelaria
Tailings Storage Facilities
Transition ExperienceApril 2019
TSX: LUN Nasdaq Stockholm: LUMI
Candelaria, Atacama Region, Chile
3
AGENDA
Lundin Mining, Candelaria District
TSF Candelaria description and capacity
TSF distribution System - Water recovery – Monitoring
Natural events
TSF Los Diques – construction/transition
TSF Summary/Inspections and review
Conclusions/Learnings
4
Lundin Mining – Diversified Global Portfolio
1. Lundin Mining holds an indirect 24% equity stake in the Freeport Cobalt Oy business which includes a cobalt refinery located in Kokkola, Finland.
2. Lundin Mining holds an 80% interest in Candelaria.
Eagle
Níquel-Cobre-PGMs
(USA)
Candelaria2
Cobre-Oro-Plata
(Chile)
Neves-Corvo
Cobre-Zinc
(Portugal)
Zinkgruvan
Zinc-Plomo-Cobre
(Suecia)
Freeport Cobalt1
Refinería de Cobalto
(Finlandia)
Lundin Mining
Casa Matriz
(Toronto, Canadá)
5
Candelaria District
The district is formed by Candelaria Open Pit,
Candelaria Norte, Santos and Alcaparrosa ore
deposits.
The ore extracted from these deposits is processed in the
Candelaria and Pedro Aguirre Cerda (PAC) concentrator Plants.
The copper concentrate produced is shipped at the Punta
Padrones Mechanized Clean Port in Caldera.
The Desalination Plant provides 100% of water
process demand. Is located In the same industrial
complex as the Port.
6
Candelaria 2030: Operacional continuity
STATUS: EIA approved (July 2015)
Main
FEATURES
MINE
Expansion of the pit to exploit new mineral reserves
WASTE FACILITIESIncrease in the storage volume of waste
TSF Los DiquesConstruction of a new tailing facility
MINE LIFE Extension of the mine life operation from 2018 to 2030
7
Crushing
Stockpile
MINEBOTADERO
NORTE
Capacity
BOTADERO
NORTEEl Buitre area
BOTADERO
NANTOCO
Capacity
STOCK PILE
BAJA LEY
Concentrator
Plant
Tailings Thickener
Concentrate
Thickener
Concentrator Storage Punta Padrones Port
Candelaria Tailings
Storage Facility
301.9 Mm3
Sterile
Sterile
Stock baja ley
Tailings
Copper
Concentrate
MINERAL
Remanejo
To other
destinations
Los Diques Tailings
Storage Facility
600 Mton
Hydraulic
Connection
Desalination Plant
SAG MLL
Harnero
vibratorio
Magnetita
StockpilePebbles
Crusher
Conveyor belt
CV 02
Recirculated water
South
Botadero
Aux 1
South
Botadero
Aux 2 Magnetita
Stock
Flowsheet
8
AGENDA
Lundin Mining, Candelaria District
TSF Candelaria description and capacity
TSF distribution System - Water recovery – Monitoring
Natural events
TSF Los Diques – construction/transition
TSF Summary/Inspections and review
Conclusions/Learnings
9
NORTH
DAM
MAIN
DAM
SOUTH
DAM
TSF Candelaria
CONCENTRATOR
PLANT
ENLACE
HIDRAULICO
10
TSF Candelaria and TSF Los Diques
SOUTH
DAM
NORTH
DAM
MAIN DUM
DR Los
Diques
11
TSF Candelaria – main information
Actual deposit in operation from 1994
Volume authorized : 318.4 Mm3
Volume accumulated: 309.0 Mm3
Total tonnage accumulated: 541 Mt
Actual deposit level: 795.9 masl
Crest Elevation : 800.0 masl
Authorized level: 798.5 masl
Freeboard : 1.5 m
12
TSF Candelaria – accumulated tailing 1
,4 6,9 12
,6
19
,0 31
,3 42
,3 55
,3 68
,9 83
,1 96
,3 11
0,2
12
4,0
13
7,3
15
2,7
16
7,5
18
2,0
19
5,7
20
8,8
22
2,7
23
6,2
24
9,6
26
5,4
28
2,2
29
8,0
30
5,0
30
8,8
318,4
0,0
50,0
100,0
150,0
200,0
250,0
300,0
350,0
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
Mm
³
Volume of accumulated tailings2
,6 12
,1
22
,4
33
,7 55
,3 74
,9 97
,9 12
1,9
14
7,1
17
0,4
19
5,0
21
9,5
24
3,0
27
0,3
29
6,4
32
2,2
34
6,3
36
9,6
39
4,3
41
8,1
44
1,9
46
9,8
49
9,5
52
6,6
53
8,9
54
1,2
564
0
100
200
300
400
500
600
19
94
19
95
19
96
19
97
19
98
19
99
20
00
20
01
20
02
20
03
20
04
20
05
20
06
20
07
20
08
20
09
20
10
20
11
20
12
20
13
20
14
20
15
20
16
20
17
20
18
20
19
TMS
Mill
on
es
Accumulated tonnage Tailings
13
AGENDA
Lundin Mining, Candelaria District
TSF Candelaria description and capacity
TSF distribution System - Water recovery – Monitoring
Natural events
TSF Los Diques – construction/transition
TSF Summary/Inspections and review
Conclusions/Learnings
14
Tailings
management
system
Safe work
procedures
Owner policies,
regulatory
requirements, and
commitments
Internal and External
Audits
Control
· Bathymetric
· Infiltrations
· Stability of the walls
· Water phreatic level
Inspection of lines and
slopes, vortices,
maintenance of roads
Daily and weekly meetings with
maintenance staff, coordination and work
planning
Evaluate and
periodically execute
new projects, in
conjunction with
Engineering and
Management
Deposit control program
TSF distribution System - Water recovery – Monitoring
15
Tailing Distribution system
TAIL
ING
S D
EPO
SITI
ON
SYST
EM
HYDR
AULI
C PU
MPS
ST
ATIO
NTA
ILIN
GS P
UMPS
THIC
KENE
RSTA
ILIN
GS
DUM
PS
THICKENERS
2; 400 ft diameter
PUMPS STATION
Gravimetric tailing3 pumping groups
3 pumps each
PUMPS
3 pumping group 5 pumps each
3 Discharge line
TAILINGS DUMP
Main DAMSouth DAMNorth DAM
16
Water recovery system
WAT
ER R
ECO
VER
Y
RWS
Reco
very
Wat
er S
yste
m
RWS
Reco
very
Wat
er S
yste
mW
ater
Sys
tem
SCS
Seep
age
Colle
ctio
n sy
stem
Fresh Water
Pumping System
5 Pumps first Group6 pumps second group
(New System)
Barges
2 pumping groups2 pumps each
Tailings Thickeners
2 OVERFLOW4 Vertical pumps each
Process Water • Make up: 0.34 m3/ton
• Water recovery: 85%
17
Monitoring - PI System
18
AGENDA
Lundin Mining, Candelaria District
TSF Candelaria description and capacity
TSF distribution System - Water recovery – Monitoring
Natural events
TSF Los Diques – construction/transition
TSF Summary/Inspections and review
Conclusions/Learnings
19
1997
157,5 mm
2015 2017
65,3 mm 45,5 mm
RAINFALL EVENTS
2002
5,8º
2006 2013
6,3º 6,8º
EARTHQUAKES
Natural events- Without impacts in tailing facilities
20
AGENDA
Lundin Mining, Candelaria District
TSF Candelaria description and capacity
TSF distribution System - Water recovery – Monitoring
Natural events
TSF Los Diques – construction/transition
TSF Summary/Inspections and review
Conclusions/Learnings
21
Para esto sugiero mencionar con un slide por tema:- Down stream construction- Espesor de capas- Granulometrías y tamaños máximos- Estudio de deformaciones coef sísmico- Análisis químico
TSF Los Diques
22
• Retaining wall constructed by high strength casting, composed of
fresh rock.
• Growth method type downstream.
• Construction of the wall using compacted layers of controlled
thickness.
• Developments for the control of infiltrations: curtain wall and curtain
of injections.
• Geotechnical instrumentation to monitor the behavior of the retaining
wall.
• Strong basal drainage system.
• Quality control and monitoring for the generation of acid drainage
TSF Los Diques – Relevants aspects of the design
23
Main wall section
TSF Los Diques – Drainage system
24
TSF Los Diques – Main dam
MuroPrincipal Fase 0&1Muro
Principal Fase 2&3
Filters
Noviembre 2017
Elev 764
Elev 773
Elev 747
Elev 796Muro Sur
25
- Fiber optic and Casagrande-type
piezometers: monitor the phreatic
level within the wall
- Accelerometers: determine the
response of the wall against seismic
events
- Inclinometers and topographic
monoliths: allow the monitoring of
displacement patterns of the wall
- Aforador: allows for the evaluation of
quantity and characteristics of
drainage flow
TSF Los Diques: Geotechnical Instrumentation
Allows for timely evaluation of the variables which control the behavior of
the wall..
26
TSF Los Diques – Operational chronology 2018
January February April June October
Tailing system Hydraulic testTailing delivery by Cajón Poniente (50
% of tailing)Barges water recovery 100% tailing delivery to TSF Los Diques
Return to TSF Candelaria. Business decision
27
TSF Los Diques – accumulated tailing and water recovery 2018
0,621,26
2,59
4,19
6,11
8,19
10,49
12,73
14,52
0,0
2,0
4,0
6,0
8,0
10,0
12,0
14,0
16,0
Jan Feb Mar Apr May Jun Jul Ago Sep Oct
TMS
Mill
on
es
Accumulated Tonnage Tailings
28
Water recovery – Sequence
0.020.04
0.12
0.20
0.270.28
0.00
0.05
0.10
0.15
0.20
0.25
0.30
Jan Feb Mar Apr May Jun Jul Ago Sep Oct
m³
Mil
lio
ns
Volume water system Parshall
29
AGENDA
Lundin Mining, Candelaria District
TSF Candelaria description and capacity
TSF distribution System - Water recovery – Monitoring
Natural events
TSF Los Diques – construction/transition
TSF Summary/Inspections and review
Conclusions/Learnings
30
Candelaria Tailings Facilities Summary
Active Facilities
Los Diques TSF• Thickened technical disposal (55% solids) from Candelaria Plant
• Tailing stored 15 Mm3
• One main dam and another perimeter dam
• Dam design = downstream construction
• Nearby population = highway C-397 and Candelaria operations
• Emergency plan review annually
• Quality control and monitoring for the generation of acid drainage
Candelaria TSF
• Slurry tailings (35% solids) from PAC Plant and thickened tailing (55% solids)
from Candelaria Plant
• Tailing storage 305 Mm3
• One main dam and three perimeter dams
• Max main dam height = 170 m
• Dam design = downstream construction
• Emergency plan review annually
• Quality control and monitoring for the generation of acid drainage
31
Candelaria Tailings Dam Inspections and Reviews
32
AGENDA
Lundin Mining, Candelaria District
TSF Candelaria description and capacity
TSF distribution System - Water recovery – Monitoring
Natural events
TSF Los Diques – construction/transition
TSF Summary/Inspections and review
Conclusions/Learnings
33
Conclusions/Learnings
External support
Expedite water recovery
Early involved of Candelaria team in
design and construction stages
Planning (Tailing deposit plan)
Strong water balance
Operational manual/Procedures
Availability of water production (Desal
Plant)
Training
34