Migration Plans & Procedures for Transportation Management Systems Contract No. DTFH61-01-C-00181

Post on 19-Mar-2016

33 views 0 download

description

Migration Plans & Procedures for Transportation Management Systems Contract No. DTFH61-01-C-00181. Kick Off Meeting December 12, 2003. PB Farradyne. Presentation Overview. Project Team Project Background Project Purpose and Objectives Work Plan & Approach Key Issues Project Tasks - PowerPoint PPT Presentation

Transcript of Migration Plans & Procedures for Transportation Management Systems Contract No. DTFH61-01-C-00181

Migration Plans & Procedures for Transportation Management Systems

Contract No. DTFH61-01-C-00181

Kick Off MeetingDecember 12, 2003

PB Farradyne

PB Farradyne2

Presentation Overview• Project Team• Project Background• Project Purpose and Objectives• Work Plan & Approach• Key Issues• Project Tasks• Action Items and Next Steps• Project Contacts

PB Farradyne3

Project Team• FHWA

– Jon Obenberger, COTM

• Cambridge Systematics, Inc.– William Perez, Project Manager

• PB Farradyne– Erin Ehlinger, Task Lead– Les Jacobson, Technical Expert– Larry Graves, Technical Expert– David Kingery, Technical Expert

– Nu Rosenbaum, Technical Expert – Tim Sapp, Technical Expert– Jason Stribiak, Writing Team– Lisa Nelson, Writing Team

PB Farradyne4

Project Background• TMC Pooled Fund Study Project• Guidance for TMC migration activities

– Not yet available– Must address!

• Previously completed work available – Will draw upon

PB Farradyne5

Project Purpose• Develop guidance to address TMC-related migration

activities• Provide outreach to end users

– TMC staff (supervisors, managers, maintenance)– Consultants and contractors– Colleges and universities– Transportation planners and engineers

PB Farradyne6

Project Objectives• Describe migration strategies & techniques• Describe how to use strategies & techniques throughout

TMC life cycle• Provide lessons learned & case studies• Identify subject material that needs additional research

and training

PB Farradyne7

Work Plan & Approach• Project to focus on issues listed in the TOPR• Will work closely with COTM on key aspects of project• Will deliver chapters of the handbook incrementally

– Allows adequate time for COTM review

• Outreach to ensure target audience acceptance

PB Farradyne8

Key Issues• Migration strategies and techniques for:

– TMC devices and software applications– New or revised system components– Communication devices, protocol, standards, and other items

• Migration process, procedures, and protocol• Migration planning and coordination• Migration plans• System operating requirements and considerations• Migration considerations throughout TMC life cycle• Continuity of operations plans, provisions, and considerations

PB Farradyne9

Project Tasks• Task A: Annotated Outline, References, and Work Plan• Task B: Technical Document• Task C: Outreach, Primer, and Distribution Plan• Task D: Research, Technology Transfer & Training

Recommendations

PB Farradyne10

Task ADeliverable DueA.1 Kickoff Meeting Complete

• Draft Project Fact Sheet Complete• Project Presentation Complete

A.2 List of References & Work Plan• List of References Complete• Work Plan Complete

A.3 Annotated Outline• Initial Annotated Outline 01/22/04• Draft Annotated Outline 02/24/04• Final Annotated Outline 04/05/04

PB Farradyne11

Task BDeliverable DueB.1 Technical Document Mockups 06/18/04B.2 Draft Technical Document

• Initial Draft Document 08/17/04• Revised Draft Document 11/15/04

B.3 Final Draft Technical Document• Final Draft Document 01/31/05• Final Document for Printing 03/25/05

PB Farradyne12

Task CDeliverable DueC.1 Project Fact Sheet (Draft/Final) 01/31/05 / 03/25/05

Project Presentation (Draft/Final) 01/31/05 / 03/25/05Subject Presentation (Draft/Final) 01/31/05 / 03/25/05

C.2 Primer (Annotated Outline/Draft/Final) 01/31/05 / 03/25/05C.3 Questions & Answers (Draft/Final) 01/31/05 / 03/25/05C.4 Distribution Plan, Letter & Notice

(Draft/Final)01/31/05 / 03/25/05

PB Farradyne13

Task DDeliverable DueD.1 Draft White Paper 11/30/04D.2 Final White Paper 01/31/05

PB Farradyne14

Action Items and Next Steps• Incorporate fact sheet, references, and work plan

comments (if any)• Begin initial annotated outline (submit 01/22/04)

PB Farradyne15

Project ContactsJon ObenbergerContract Office Task ManagerFHWA, Office of Travel ManagementPhone: 202-366-2221Fax: 202-366-8712Jon.Obenberger@fhwa.dot.gov

Erin EhlingerTask Order ManagerPB FarradynePhone: 206-382-5250Fax: 206-382-5222Ehlinger@pbworld.com

William PerezProject Manager/ OversightCambridge SystematicsPhone: 301-347-0100Fax: 301-347-0101wperez@camsys.com