… More Than 100 years Of Water Turbines Manufacturing
HISTO RY
www.ckdsh.cz
ČKD Blansko is ranked among most traditional Czech engineering companies.
� 1698 – Origins of engineering manufacture
� 1870 – Origins of water turbines manufacture
� 1985 – New Hydraulic Laboratory has been put into operation
� 2007 – ČKD Blansko Small Hydro foundation
� 2010 – Integration to the JSC Tyazhmash Group
COMPANY ORGANIZATION CHART
www.ckdsh.cz
CEO
Sales & Project Management Department
Sales & Project Management
Site Management
Design Department
Basic Design
Technical Department
Detail Design
Production Engineering Department
Production Technology
Cooperation
Purchasing
Tool Store
Production Department
Stock
Machine Shop
Welding Shop
Assembly & Erection
Dispatch
Quality Control Department
Technical Inspection
Back OfficeRepresentative for
Quality Management System
BASIC INFO RMATION
www.ckdsh.cz
Number of Employees by 2015
Technical and Administrative Staff 38
Basic Design Dpt. 6
Detail Design Dpt. 8
Sales & Project Management Dpt. 6
Hand Workers 49
Total 87
DESIGN AND TECHNICAL DEPARTMENT
www.ckdsh.cz
STRUCTURE OF DESIGN AND TECHNICAL DPT.• Managing and Administration• Development and Design of Water Turbines • Development and Design of Closing Valves• Development and Design of Governors• FEM Computation• Production Technology• Special Technology• Jigs Design Department
INTERNAL SUPPORT• Basic Design Department • Research and Development of Water Turbines• Hydraulic Laboratory
SOFTWARE - SolidWorks• 3D Design SolidWorks Professional
SolidWorks PremiumSolidWorks DWGeditor
• FEM Computation SolidWorks Simulation • CNC Machinery SolidCAM• Data management SolidWorks Enterprise PDM
DEPARTMENT OF APPLIED MECHANICS
www.ckdsh.cz
� Strength, stiffness and fatigue structuralcalculations (water turbines, valves, hydromechanical structures).
� Finite Element Method (SolidWorks SimulationPremium) is used to determine structuralstress and strain.
� Methods of fracture mechanics are used for evaluation of strength and fatigue life.
WATER MACHINERY RESEARCH INSTITUT
www.ckdsh.cz
� Development of turbine hydraulic profiles
� Hydraulic testing laboratory
� Calibration of flow meters
KAPLAN TU RBINES
www.ckdsh.cz
Head: 2 – 40 [m]
Output: 200 – 10 000+ [kW]
Diameter: 500 – 3 000+ [mm]
FRANCIS TU RBINES
www.ckdsh.cz
Head: 10 – 300 [m]
Output: 200 – 40 000+ [kW]
Diameter: 400 – 1 700+ [mm]
PELTO N TU RBINES
www.ckdsh.cz
Head: 70 – 800 [m]
Output: 300 – 40 000+ [kW]
Diameter: 500 – 1 500+ [mm]
HYDRO-MECHANICAL EQUIPMENT
www.ckdsh.cz
� Slide Gates and Stop Logs
� Trash Racks
� Cleaning Machines
www.ckdsh.cz
FRONHAS HEPPCountry: PortugalCommissioned: 2008Type of Turbine: Horizontal FrancisTotal Output: 1 x 750 kW
Country: IndonesiaCommissioned: 2009Type of Turbine: Horizontal FrancisTotal Output: 2 x 1 500 kW
RANTE BALLA HEPP
AMPELGADING HEPPCountry: IndonesiaCommissioned: 2010Type of Turbine: Vertical FrancisTotal Output: 2 x 5 000 kW
www.ckdsh.cz
PATIKARI HEPPCountry: IndiaCommissioned: 2007Type of Turbine: Horizontal PeltonTotal Output: 2 x 9 459 kW
Country: PeruCommissioned: 2009Type of Turbine: Horizontal „S“ KaplanTotal Output: 2 x 5 000 kW
POECHOS 2 HEPP
ČESKÉ ÚDOLÍ HEPPCountry: Czech RepublicCommissioned: 2012Type of Turbine: Horizontal „S“ KaplanTotal Output: 1 x 233 kW
www.ckdsh.cz
LABSKÁ HEPPCountry: Czech RepublicCommissioned: 2009Type of Turbine: Vertical KaplanTotal Output: 1 x 500 kW
Country: ArmeniaCommissioned: 2011Type of Turbine: Horizontal PeltonTotal Output: 2 x 3 082 kW
TRGI 2 HEPP
ARCO IRIS HEPPCountry: MexicoCommissioned: 2013Type of Turbine: Vertical PeltonTotal Output: 2 x 4 700 kW
www.ckdsh.cz
CABULIG HEPPCountry: PhilippinesCommissioned: 2012Type of Turbine: Horizontal FrancisTotal Output: 2 x 4 700 kW
Country: SlovakiaCommissioned: 2013Type of Turbine: Horizontal „PIT“ KaplanTotal Output: 1 x 995 kW
TEKOV HEPP
ORTACAG HEPPCountry: TurkeyCommissioned: 2013Type of Turbine: Vertical PeltonTotal Output: 1 x 13 280 kW
www.ckdsh.cz
TAHTAKORPU HEPPCountry: AzerbaijanCommissioned: (2013)Type of Turbine: Horizontal FrancisTotal Output: 3 x 10 627 kW
Country: TurkeyCommissioned: 2014Type of Turbine: Vertical FrancisTotal Output: 2 x 5 661 kW
KAVSAKBENDI HEPP
KANDIL-1 HEPPCountry: TurkeyCommissioned: 2013Type of Turbine: Horizontal FrancisTotal Output: 1 x 4 719 kW
www.ckdsh.cz
ARAKLI-4 HEPPCountry: TurkeyCommissioned: 2013Type of Turbine: Horizontal PeltonTotal Output: 2 x 4 564 kW
Country: GreeceCommissioned: (2014)Type of Turbine: Horizontal FrancisTotal Output: 1 x 4 200 kW
ILARION HEPP
CUCUMACAYAN HEPPCountry: El SalvadorCommissioned: 2014Type of Turbine: Vertical FrancisTotal Output: 2 x 1 470 kW
MAIN SU B- SUPPLIERS
www.ckdsh.cz
Inlet Equipment – Main Inlet Valves
Hydraulic Governing and Lube-Oil Units
Generators
Ševčík – Vodohospodářská zařízení, Czech Republic Czech Republic
Spain Czech Republic Brazil, India
Czech Republic Czech Republic Czech Republic
Germany Hungary