RETROFIT OF HISTORIC WAREHOUSE TO NEWMEDICAL CLINIC IN TULSA, OK
MECHANICALTEAM 2010 5
MECHANICALTEAM 2010-5
J CQ BJACQUELINE BAYER
JEFFREY DOWGALA
LIAM HENDRICKEN
LAUREN MCNALLY
A 10 2010APRIL 10, 2010
INTRODUCTION
(CIRCA 1927)
PROPOSED NEW DESIGN
INTRODUCTIONASCE CHARLES PANKOW FOUNDATION ANNUAL
ARCHITECTURAL ENGINEERING STUDENT COMPETITION
GOALSINNOVATION
SUSTAINABILITYSUSTAINABILITY
DESIGN FOCUSEXISTING STRUCTUREEXISTING STRUCTURE
MEDICAL CLINIC NEEDS
TORNADO SHELTERTORNADO SHELTER
TRIAGE CENTER
PROJECT REQUIREMENTS DISCIPLINARY COORDINATION ARCHITECTURAL ARCHITECTURAL CIVIL STRUCTURALSTRUCTURAL MECHANICAL
HISTORIC PRESERVATION HISTORIC PRESERVATION DEVELOP SAFE DESIGN DERIVED FROM CODES AND GUIDELINES TORNADO SHELTER
T C TRIAGE CENTER
CODES & STANDARDS MULTI-DISCIPLINARY
IBC 2006 IBC, 2006 IEBC, 2006
TORNADO SHELTER REQUIREMENTS FEMA 361
SUSTAINABILITY LEED V3 2009LEED V3 2009
CODES & STANDARDS HVAC DESIGN GUIDELINES 2009 ASHRAE HANDBOOK - FUNDAMENTALS 2007 ASHRAE HANDBOOK – HVAC APPLICATIONS IMC
HVAC STANDARDS HVAC STANDARDS ASHRAE 90.1 – 2007 ASHRAE 62.1 – 2007ASHRAE 62.1 2007
PLUMBING IPC
FIRE PROTECTION NFPA 13: INSTALLATION OF SPRINKLER SYSTEMS, 2007 NFPA 101: LIFE SAFETY CODE 2009 NFPA 101: LIFE SAFETY CODE, 2009
PROJECT MANAGEMENT: DESIGN PROCESS
Architectural DesigngSite DesignStructural DesignMechanical DesignTornado Shelter DesigngBuilding Integration
PROJECT MANAGEMENT: DESIGN PROCESS
Concept Design
Analytical Model
Proposed Design
Final Design
Architectural
Site
Architectural
SiteSite
Structural
Site
Structural
Mechanical
Tornado Shelter
Mechanical
Tornado Shelter
SITE LOCATION TULSA, OKTULSA, OK BRADY ARTS DISTRICT
SIZE OF SITE ~1 ACRE
SITE USE OBJECTIVESSITE USE OBJECTIVES PARKING
SMALL PARK SMALL PARK
SITE
Medical ClinickPark
EXISTING FIRST FLOOR
EXISTING SECOND FLOOR
COMPETITION PROPOSED FIRST FLOOR
FINALIZED FIRST FLOOR
Lobby Enhancement
Tornado Shelter
Fire StairTower
FINALIZED SECOND FLOORCommunity Space
Fitness
Mechanical
Childcare
Alternative M di i
Mechanical Room
Medicine
Staff Room
Fire StairTower
HVAC GOALS CLIENT GOALS ROOM PRESSURIZATION ROOM PRESSURIZATION
MEET OR EXCEED FEMA VENTILATIONREQUIREMENTSREQUIREMENTS
INNOVATION AND SUSTAINABILITY
TEAM GOALS TEAM GOALS LOW LIFE-CYCLE COSTS
REDUCE ENERGY CONSUMPTION AT LEAST 10% PRECISE TEMPERATURE AND HUMIDITY CONTROL
HVAC DESIGN CHALLENGES TORNADO SHELTER - SELF-CONTAINED
SYSTEMSYSTEM
LIMITED INTERSTITIAL SPACE
COLLABORATING WITH STRUCTURALENGINEERSMINIMIZE HVAC AND FIRE PROTECTION
PENETRATIONS IN TORNADO SHELTER
EQUIPMENT PLACEMENT
SUSTAINABLE PLUMBING SYSTEMS
HVAC INNOVATIONGEOTHERMAL HEAT PUMP
S SOY-BASED SPRAY INSULATION FOAM
ENERGY SAVING STRATEGIESENERGY SAVING STRATEGIES
RAINWATER HARVESTING
LOW-FLOW FIXTURES
OUTDOOR DESIGN CONDITIONS
ASHRAE ZONE 3A
(www1.eere.energy.gov)
OUTDOOR DESIGN CONDITIONS
REQUIRES HEATING COOLING AND HUMIDITY REQUIRES HEATING, COOLING, AND HUMIDITYCONTROL
Table D‐1: Table Summarizing Tulsa Outdoor Design Conditions (Reference: ASHRAE 90.1, Table D‐1)
Latitude Longitude Elev ft Heat DD Cool DD Heating Dry Cooling Dry Cooling WetLatitude Longitude Elev., ft Heat DD Cool DD Heating Dry Cooling Dry Cooling Wet
36.18 °N 95.90 °W 668 3691 5150 9 °F 97 °F 76 °F
INDOOR DESIGN CONDITIONS
ASHRAE STANDARD 62 1 2007 ASHRAE STANDARD 62.1, 2007
Room Cl ifi ti
Dry B lb
Relative H idit
Sensible G i
Latent Gain(W)
Lighting Gain(W/SF)Classification Bulb
(°F)Humidity (%)
Gain (W)
(W) (W/SF)
Patient Relations
70‐75 30‐60 75‐4500 55‐3300 0.8‐1.5Relations, Orthography , ENT, Staff Areas
Surgery, Procedure
62‐80 30‐80 600‐3300 440‐2420 2.2
X‐Ray 78‐80 40‐50 75 55 0.4
BUILDING ENVELOPE CURRENTLY DOUBLE-WYTHE MASONRY NO MOISTURE PROTECTION NO MOISTURE PROTECTION
LIMITED THERMAL RESISTANCE
S B S I F SOY-BASED SPRAY INSULATION FOAM WALLS AND ROOF
IMPERMEABLE
EFFECTIVE R-VALUE:12 HR-FT2-°F/BTU TRIPLE PANE GLASS R-VALUE: 12 HR-FT2-°F/BTU/
HVAC LOAD CALCULATIONSApplication Baseline R‐Value ASHRAE R‐value Actual R‐valueRoof 6 25 20 83 27 03Roof 6.25 20.83 27.03Wall 4.15 11.9 17.86Glazing 1.67 ‐ 11.76
BASELINE - 115 TONS COOLING
ACTUAL – 95 TONS COOLING
690 KBTU/HR HEATING
60,000 CFM
400 KBTU/HRHEATING
50,000 CFM
16% REDUCTION
PRIMARY SYSTEMGEOTHERMAL
H C M HEAT PUMP – CLIMATEMASTEROUTSIDE AIR REQUIREMENTS
REDUNDANCY
WELLS (36) 500’ VERTICAL WELLS
15’ SPACING - COVERS 6,000 SF
NO TEAR OUT – LIFE-CYCLE COST
ZONING
1ST FLOOR 2ND FLOOR
SECONDARY SYSTEMCONSTANT AIR VOLUME TEMPERATURE AND HUMIDITY CONTROLSURGERY AND PROCEDURE ROOMSSURGERY AND PROCEDURE ROOMS
ROOM PRESSURIZATION
DUCTED RETURNENHANCED INDOOR AIR QUALITY
TORNADO SHELTER 2 REDUNDANT AHUS
INDEPENDENT SYSTEM INDEPENDENT SYSTEM
ONLY 2 MECHANICAL PENETRATIONS TORNADO RATED LOUVERS TORNADO RATED LOUVERS
PROVIDE CONDITIONED AIRAFTER A TORNADO EVENTAFTER A TORNADO EVENT EXCEEDS FEMA VENTILATION
REQUIREMENTS
ENERGY RECOVERY CLIMATEMASTER DESICCANT WHEEL (LATENT AND
SENSIBLE)SENSIBLE) HEAT RECOVERY
VENTILATOR (SENSIBLE)( ) EXHAUST FANS
PLUMBING APPLICATIONS
PLUMBING DESIGN CHALLENGESMEET IPC, 2006 REQUIREMENTS 10 WATER CLOSETS 10 WATER CLOSETS
8 LAVATORIES
3 DRINKING FOUNTAINS 3 DRINKING FOUNTAINS
REDUCE WASTE WATER BY 50% GREY WATER
RAINWATER
LOW-FLOW FIXTURES
PLUMBING DESIGNBASELINE LAVATORIES IN BATHROOMS AND EXAM
ROOMS 47 LAVATORIES
350 COLD/350 HOT GALLONS DAILY
WATER CLOSETS IN BATHROOMS 20 WATER CLOSETS20 WATER CLOSETS
1760 COLD GALLONS DAILY
PLUMBING DESIGNPLUMBING EFFICIENCY STRATEGIES GREY WATERGREY WATER USE LAVATORY WATER IN WATER CLOSETS 28% WATER REDUCTION%
RAINWATER 42” RAINWATER ANNUALLY / 20,000 SF
ROOF 41% WATER REDUCTION
LOW-FLOW FIXTURES SENSOR / DUAL-FLUSH TOILETS
37% W R 37% WATER REDUCTION
FIRE PROTECTION GOALS PROTECTION OF
LIFE
PROPERTY
BUILDING OPERATION
NFPA 13 AND 101 NFPA 13 AND 101
FIRE PROTECTION DESIGNLIGHT HAZARD FACILITY WET PIPE SYSTEM WITH 200 SF COVERAGE PER
SPRINKLER HEAD
PIPE SIZING
NFPA 13, 2007 0.07GPM/SF
100 GPM FOR INDOOR/OUTDOOR HOSE
DURATION OF 30 MINS
5,100 GALLONS (TORNADO SHELTER)( ) 85,000 GALLONS (REST OF BUILDING)
FIRE PROTECTION DESIGNHVAC AND ADDITIONAL REQUIREMENTS
D DEDICATED SMOKE EXHAUST SYSTEM
FIRE SMOKE DAMPERS
FIRE EXTINGUISHERS
HORN AND STROBE NOTIFICATIONHORN AND STROBE NOTIFICATION
ALARM PULL STATIONS
SUSTAINABILITY LEED 2009 NEW CONSTRUCTION AND
MAJOR RENOVATIONSMAJOR RENOVATIONS SILVER CERTIFICATION (55 POINTS)
MECHANICAL ACHIEVEMENTS WATER EFFICIENCY
RAINWATER HARVESTING
ENERGY REDUCTION
INDOOR ENVIRONMENTAL QUALITY
CLIENT BUDGET
BUDGET COSTBUDGET COST
CONSTRUCTION $3,227,825
FURNISHINGS $775 000FURNISHINGS $775,000
DESIGN $330,000
PERMITTING FEES $10 000PERMITTING FEES $10,000
LAWYER & BOND COSTS $50,000
S A $0SITE ACQUISITION $0
TOTAL: ≈ $4,400,000
INTEGRATION AND COLLABORATION
COORDINATION ARCHITECTURAL, STRUCTURAL, MECHANICAL, ETC.
TORNADO SHELTER
NEW BACKUP WALL CONSTRUCTION
BUILDING INFORMATION MODELING: REVIT 2010BUILDING INFORMATION MODELING: REVIT 2010
RETROFIT OF HISTORIC WAREHOUSE TO NEWMEDICAL CLINIC IN TULSA, OK
MECHANICALTEAM 2010-5
MECHANICALTEAM 2010 5
JACQUELINE BAYERJACQUELINE BAYER
JEFFREY DOWGALA
LIAM HENDRICKEN
LAUREN MCNALLY