Mariposa Grove Restoration - National Park Service · Mariposa Grove Rd, 3 Picnic 1 Vault 1000'...

Post on 17-Aug-2020

1 views 0 download

Transcript of Mariposa Grove Restoration - National Park Service · Mariposa Grove Rd, 3 Picnic 1 Vault 1000'...

Mariposa Grove Restoration Choosing By Advantages Workshop | June 5-6, 2012

Design Charette #2 Review Concept Evaluation Exercise

CONCEPT EVALUATION RESULTS:

Red = lowest value per category Green = highest value The general scoring pattern indicated a relatively strong preference for Preliminary Draft Concept B: South Entrance Hub. This result is consistent with previous and subsequent exercises.

Design Charette #2 Review Results of Evaluation Exercise

221

2 Write-in comments

Write-in comments

Mariposa Grove Restoration

DRAFT ALTERNATIVES

Pacific Fisher Photo © Art Wolfe

RESTORATION is paramount Guided by the best available science and information Toward the development of a plan that is feasible

59

294

201

172

279

221

Photograph by Josh Helling

DRAFT COST ESTIMATING for Value Analysis

• Class C Cost Comparison • Layered Contingency Factors • Life Cycle Costs for Visitor Transportation

Systems

We are here

CBA/Value Analysis