Proiect - Qua Progress Report

CIVIL ENGINEERING PVT. LTD.,

(4,

Promoter's Name Mls. CASA GRANDE CIVIL ENGINEER!NG PVT. LTD.,and M/s. CASA GRAND BUTLDER PVT. LTD.,

Project Name CASAGRAND SAVOYE

Project Registration No TN/OUBui ld ing/O t2/ 2OL9 dated 25 loLlzOLeQuarter Ending 31't December 2OL9

S.No Description Nos. Total Area

(sq.m)1 Flats Booked size wise (As

given in Carpet Area Statementwhile registering)

zBHK -

2BHK + 2T

3BHK + 2T

3BHK + 3T

38

50

3

9835.28

2000.37

8641.30

2 Parking Lots

3 UDS Registered in Sq.m

S.No Description Block/TowerNo.

Status

1 Stage of construction ofeach Block ff ower, Floorwise

Authori

ILDER PVT. LTD.,

Area

BLOCK3

F Fourth Floor roofslab

BLOCK2

E

Second Floor roof slab

K First Floor roof slab

L Foundation

FoundationD

BLOCKI

M Foundation

FoundationC

FoundationA

B Foundation

C. Details of Clearances

L. Completion Certificate No. - Enclosed

2. Annual Audit Report of Special Account in Form 7 Already Submitted

D. Latest Photo with Date (At least from 2 angles)- Enclosed

For M/s.

And M/s.

NGINEERING PVT. LTD.,

R PVT. LTD.,

UAuthorized

Core J –Pour 2 -4th Floor Roof slab Electrical conduit laying work in progress

G core –-4th Floor Roof Slab work in progress

Core K – 4th Floor Roof Slab concrete completed

Core L –2nd floor Roof slab ready for concreting

Core D –2nd Floor Roof slab shuttering work in progress

Core C –1st Floor column work in progress

Core M –Stilt Roof slab Shuttering work in progress

Core B –Pile cap & Stilt column work in progress