Lean Six Sigma (LSS)
2he Pareto Chart a(ove tells us that High *ressure is the highest
contri(utor to the total 'efects%
&e0t the Labelsare not in the ri.ht place%
An' r' are the ,ents
Since this covers 8$9 of the 'efects , 6an ol( shoul' concentrate on these
'efects:
High *ressure
Labels
,ents
8/14/2019 LSS Assignment.doc
4/16
Lean Six Sigma (LSS)
As seen from the information a(ove, since 'ents can (e a safet* ha3ar', the
two main 'efects that 6an ol( shoul' concentrate on shoul' (e High
*ressure in the cans and ,ents% 2he /a(els not in the ri.ht place an' can
(e tacle' as less priorit* 'efect%
Question &
-ap the Greasex production process% tracing !arious processing
stages in!ol!ed Where should Han loo for the root causes
of the can pressure problem" What might be the root causes
of the high pressures in cans"
#ns$er
;n the or.ani3ation lac of
8/14/2019 LSS Assignment.doc
5/16
Lean Six Sigma (LSS)
A(ove is the parameter 'ia.ram showin. various parameters lea'in. to
8/14/2019 LSS Assignment.doc
6/16
Lean Six Sigma (LSS)
.efer belo$ production process/
4ith the .iven information it loos lie followin. two potential reasons for
hi.h pressure
1+ Pressure is .enerate' 'ue to mar(les insertion in to the cancorrect
8/14/2019 LSS Assignment.doc
7/16
Lean Six Sigma (LSS)
Question 0
ased on the data pro!ided ho$ $ell is the process meeting gi!en
can pressure specifications of '2 to 32 *si" What can you say
about pressure !ariation in the can produced by the process"
#ns$er
rom Samples:
Mean thicness of output, 8%?B
Dpper St' /imit 85
Stan'ar' 'eviation of output, ?%1B7
/ower St' /imit 75
+alculations
4e will use E test for Proportion within specifications%
0 F G # 3% H
3 F )0 ! G+"H F )85 - 8%?B+"?%1B7 F $%B1 3 F )0 ! G+"H F )8%?B ! 75+"?%1B7 F
!1%7I 3)$%B1+ F $%7I
3)!1%7I+ F $%$7
2otal area un'er the curve F $%7I - $%$7 F $%BI F BI%9
Process capa(ilit*:
Cp F )DS/ ! /S/+"BH F )85 !75+"BJ?%1B7 F $%?
rom Minita(:
Varia(le & Mean SK Mean St=ev Variance Minimum
4ei.ht 1$$ 8%?B$ $%?17 ?%1B7 17%B 7%$$$
Varia(le Ma0imum Lan.e
4ei.ht I%$$$ $%$$$
7
8/14/2019 LSS Assignment.doc
8/16
Lean Six Sigma (LSS)
Proportion of cans with wei.hts within 75 to 85 F BI%9
Proportion of cans with wei.hts (e*on' 75 to 85 F $%89
Kstimation of process Mean wei.ht:
4ith I59 C; the limits for mean wei.ht are: 81%?B to 8%77
2hus we can sa* that currentl* the pressure variation is too hi.h (ecause:
1% Process capa(ilit* Cp of $%? is ver* low%
% 4ith current amount of varia(ilit* $%89 parts will (e reecte'%
% 7%19 reections will (e 'ue to overwei.ht cans%
Process mean is towar's the hi.her en' of the ran.e of 75 to 85%
Lefer (elow ta(le in'icatin. stan'ar' 'eviations, P Values, mean num(ers for
all can measurements%
4t clearly sho$s that process mean has been shifted for all cans
*ressure !ariation does not meet Six Sigma le!el
5ariation is due to random noises no special causes% especially since
* !alue is 6772 Stan'ar' 'eviation is also more%
8
8/14/2019 LSS Assignment.doc
9/16
Lean Six Sigma (LSS)
I
8/14/2019 LSS Assignment.doc
10/16
Lean Six Sigma (LSS)
+an818Mean has (een shifte' an' out of control
+an8&8*rocess shifted% but less !ariation as per mo!ing a!erage
1$
8/14/2019 LSS Assignment.doc
11/16
Lean Six Sigma (LSS)
+an808*rocess shifted $ith huge !ariations
+an898 *rocess shifted $ith huge !ariations
11
8/14/2019 LSS Assignment.doc
12/16
Lean Six Sigma (LSS)
+an828 *rocess shifted $ith huge !ariations
Question 9
1
8/14/2019 LSS Assignment.doc
13/16
Lean Six Sigma (LSS)
What should Han do to impro!e the process performance% both in
short term and in long run" :o$ards ambitious goal of producing Six
sigma quality% suppose Han $ould lie to start by meeting the
customer specifications at least ;2< of the time What le!el of
process capability or precision he $ould be needed"
#ns$er
Short :erm -easures
1% 2he* coul' perform a mae"(u* anal*sis to 'etermine if the* shoul' off!loa' the pro'uction to another compan*%
& Con'uct formal e0tensive trainin. of the operator who runs themachine%
0 Accor'in. to the process flow charts, ensure that Manufacturin. an'ualit* (oth are a'herin. to the chec points an' eliminatin. the reect cans
at appropriate sta.es%
9 4or with Maintenance to come up with a Preventive maintenancesche'ule for the ol' )wron.+
2Shift the process to the of the ran.e which is 8$ Psi
=2here is lot of variation with in a can an' across the cans, hence this henee' to control variation (* improvin. processes% 2his variation is ma* (e(ecause of various reasons, some of the reasons in'icate' (elow%
;mprove process for plastic valve assem(l* which is shorin. (urr'urin. assem(l* an' re
8/14/2019 LSS Assignment.doc
14/16
Lean Six Sigma (LSS)
9 2he* can 'o a cost"(enefit anal*sis to see if the* shoul' invest in (ettermachines% 4or with Manufacturin. an' Maintenance to (u* a (ran' new ora secon' han' machine )su(ect to finance availa(ilit*+ which is 'esi.ne'for the @rease0%
2 4or with Nperators an' ualit* Kn.ineers to trac the Process capa(ilit*,
an' Pareto of 'efects to (rin. it un'er control over perio'%
= 2he* coul' start with senior mana.ement to mana.e the compan* (* avisi(le
8/14/2019 LSS Assignment.doc
15/16
Lean Six Sigma (LSS)
Question 2
#lthough the process does not seem to be meeting customer
requirements !ery $ell% does it at least appear to be stable in terms
of
a) 5ariation in cans produced bet$een day>s
b) 5ariation in cans produced $ith in a day"
#ns$er
Lefer (elow ta(le is clearl* (ase' on mean an' stan'ar' 'eviation it is clearthat process has hu.e variations within a 'a* an' across various for 'ifferentcans%
15
8/14/2019 LSS Assignment.doc
16/16
Lean Six Sigma (LSS)
88?@,88
1B
5aria
$ith
day
5ariation across cans at
different day>s