Presented By:Mr. Ponnuraj, IAS,
Deputy Commissioner,Shimoga Dist.
District Administration, Shimoga
Presentation Before The Hon. Lok Adalath
STRUCTURE OF PRESENTATION
Municipal Solid Waste Management
Bio Medical Waste Management
Tank & Water Table – Management & Restoration
Watershed Management
Industrial Pollution
Forest – Plantation
Eviction Clearance
Village Forest Committee
INF0RMATION ABOUT DISTRICT
INF0RMATION ABOUT DISTRICT
1. Population: 16.42 Lakhs
2. Area: 8,477 Sq. Km
3. Taluks: 07
4. ULB’s: 09
5. GP’s: 260
6. Urban Population: 10.71 Lakhs
7. Rural Population: 5.71 Lakhs
8. Annual Rain Fall: 1800 to 2000 mm
9. No. of Rainy Days: 87
1. MUNICIPAL SOILD WASTE MANAGEMENT1. MUNICIPAL SOILD WASTE MANAGEMENT
MSW - AT A GLANCEMSW - AT A GLANCE
Name of ULB No. of Wards
Population(2011)
Solid Waste Gen. (TPD)
Primary Collection
Segregation Sec. Collection & Transportation
MSW Treatment
Disposal Facility
CMC - Shimoga 35 3,22,505 166.06 28 Wards 1 Ward Yes Yes IMSWTLFF
CMC - Bhadravathi 35 150540 51.68 6 Wards - Yes - ELFF
CMC - Sagara 31 53,660 22.00 26 Wards 3 Ward Yes Yes ELFF
TMC - Shikaripura 23 36,024 16.50 6 Wards - Yes - ELFF
TP – Thirthahalli 15 14,537 5.00 15 Wards - Yes Yes IMSWTLFF
TP - Soraba, 11 11,027 5.00 8 Wards - Yes - ELFF
TP – Shiralkoppa 15 16,872 5.00 3 Wards - Yes - ELFF
TP – Hosanagara 11 5,533 1.80 2 Wards - Yes - LF
TP - Jog-Kargal 13 10,840 3.65 3 Wards - Yes - LF
189 6,21,538 276.69 97 4 9 ULBs 3 ULB 9 ULB
NOTE:IMSWTLFF : Integrated MSW Treatment & Sanitary Landfill Facility - 2 ULBELFF: Engineering Land Fill Facility- 5 ULBLF: Land Filling - 2 ULB
SWM ACHIVEMENTS - SHIMOGASWM ACHIVEMENTS - SHIMOGA
SWM ACHIVEMENTS - SAGARASWM ACHIVEMENTS - SAGARA
SEWERAGE SYSTEMSEWERAGE SYSTEM
Name of ULB Population(2011)
UGD Network Facility STP Facility Remarks
CMC - Shimoga 3,22,505 Old network revamping and additional coverage being tackled
Renovation and fresh STP being constructed
Slow progress, contract terminated, matter before HC
CMC - Bhadravathi 150540 UGD Network Work being established
Renovation being done and additional coverage
Slow progress, Fresh tender called
CMC - Sagara 53,660 Tender Called Tender Called work will begin in 2- 3 months
TMC - Shikaripura 36,024 UGD Network Work is Completed STP Work is Under Progress
Site dispute resolved, work under progress
TP – Thirthahalli 14,537 No UGD SystemNo STP System -
TP - Soraba, 11,027 No UGD SystemNo STP System -
TP – Shiralkoppa 16,872 No UGD SystemNo STP System -
TP – Hosanagara 5,533 No UGD SystemNo STP System -
TP - Jog-Kargal 10,840 No UGD SystemNo STP System -
SLAUGHTER HOUSESLAUGHTER HOUSE
Slaughter House
Exists
Thirthahalli
DPR Preparation
Shimoga,
Bhadravathi,
Shikaripura
Land Identification
Shimoga, Sagara
In all other ULBs DPR & Land Identification to be
done
2. BIO MEDICAL WASTE MANAGEMENT2. BIO MEDICAL WASTE MANAGEMENT
MEDICAL INSTITUTIONS (MI) - SHIMOGA DIST.MEDICAL INSTITUTIONS (MI) - SHIMOGA DIST.
Particulars of HCF’s No. of HCFs
Health and Family Welfare 112
Medical Education 01
Govt. AYUSH 35
Veterinary and Animal Husbandry 162
Private 669
Total 979
BIO MEDICAL WASTE MANAGEMENT – Govt. MIBIO MEDICAL WASTE MANAGEMENT – Govt. MISl.
No.Levels of Hospitals No. of
Health Care Facilities
Progress on Bio Medical Waste Handling Rules
No. of HCF Tied up with
CTF
Deep Burial & Sharp Pit Completed
Liquid Waste Disinfection
Unit Completed
1 District Level Hospital (Shikaripura)
1 1 - 1
Medical Education (SIMS) 1 1 - 1
Taluk Level Hospital 5 5 - 5
Community Health Center 7 5 2 7
Primary Health Center & Urban Health Centre
99 7 72 78
2 District Level Ayush Hospital
01 01 Tied up with MeG..H. 01
Taluk Level Hospital 34 34 All Ayush dispensaries are tied up with near
by PHCS
34
Time required for implementation: Remaining 20 Deep burial, Sharp Pits & 21 Liquid Waste
Disinfection Units will be completed by 31-12-2011
BIO MEDICAL WASTE MANAGEMENT – Animal Hus. & Pvt. Inst.BIO MEDICAL WASTE MANAGEMENT – Animal Hus. & Pvt. Inst.
Type of HCE No. of HCE’s
Solid BMW
Handing over to CBMWTF
Installed Captive facility
Captive facility under Construction
Veterinary Hospital 17 - 13 -
Veterinary dispensary 72 - 17 -
Primary veterinary centre and Artificial Insemination Centre
73 - 14 -
Total 162 44
Time required for implementation: Remaining units will be completed by 31-03-2012
No.s of HCE Solid BMW
Tie up with CBMWTF Installed Captive facility
Yet to Comply
669 444 06 219
Animal Husbandry:
Private HCE’s:
ACTION TAKENACTION TAKEN
Description No.s
Closed Establishments 28
Closer Order Issued 49
Notice Issued for Non-Compliance 301
Soraba & Hosanagara Taluk HCE’s are covered under Common Bio Medical Waste
Treatment Facility
BIO MEDICAL WASTE – COLLECTION & SEGREGATION SYSTEMBIO MEDICAL WASTE – COLLECTION & SEGREGATION SYSTEM
Human anatomical waste into yellow Bins
Infected waste into Red Bins
Sharps into White Bins
BIO MEDICAL WASTE – TRANSPORTATIONBIO MEDICAL WASTE – TRANSPORTATION
Door step Collection
Transportation by BMW Authorized
Vehicle
COMMON BMW TREATEMNT FACILITY - SHIMOGACOMMON BMW TREATEMNT FACILITY - SHIMOGA
Plant Capacity: 1000 Kg/ Day
Effluents Handling Capacity: 3000 Lt/d
Plant Area: 1 Acr.
Established: 2004
Shushurutha Bio Medical Waste Treatment Facility, Machenahalli
COMMON BMW TREATEMNT FACILITY - SHIMOGACOMMON BMW TREATEMNT FACILITY - SHIMOGA
Facilities Available at CBWTF
Incinerator Scrubber
Autoclave
Sharp & Ash Pit
ETP
IN-SITU BIO MEDICAL WASTE TREATMENT UNITSIN-SITU BIO MEDICAL WASTE TREATMENT UNITS
ETP LWTP
LWTP
LWTP
Sharp Pit