K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 11
Move to FNL Move to FNL
ECAL/HCAL-Movable Table Setup ECAL/HCAL-Movable Table Setup test beam integration test beam integration to Fermilab MT6-B3to Fermilab MT6-B3//B4B4
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 22
ECAL/HCAL Movable Table Setup ECAL/HCAL Movable Table Setup no change in basic dimension no change in basic dimension
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 33
Setup in test beam areaSetup in test beam area update beam area ground dimension update beam area ground dimension
HCAL Movable Tableplaced in MTB6-B3 ?
ECAL/HCAL Movable TableControl room ?
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 44
Setup in test beam areaSetup in test beam area inner height ? other equipment ? inner height ? other equipment ?
shielding concrete
roof support
dump
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 55
Setup in test beam areaSetup in test beam areaone escape route is sufficient ?one escape route is sufficient ?
Escape rote from B4
blocked
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 66
Setup in test beam areaSetup in test beam areacrane height and crane load criticalcrane height and crane load critical
needed hook height
over roof 4 m
transport weight 15 tons
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 77
Setup in test beam areaSetup in test beam area total height ~ 4 meter total height ~ 4 meter
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 88
Setup in test beam areaSetup in test beam areapermanent closed roof (except openings) permanent closed roof (except openings)
•installation of Movable Table HCAL and ECAL with “tricks” only
•installation of HCAL modules in position B3 criticalcrane needed !
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 99
Infrastructure at FermilabInfrastructure at Fermilab(Joe Howell)(Joe Howell)
Power ConversionPower Conversion– Experiment 2 x 50 Hz 400 VLL 25-32 AExperiment 2 x 50 Hz 400 VLL 25-32 A– Standard Fermilab 60 HZ, 208v/120v or 480vStandard Fermilab 60 HZ, 208v/120v or 480v– Initial checks indicate there is no existing on-Initial checks indicate there is no existing on-
site conversion equipmentsite conversion equipment– Continue checking optionsContinue checking options
Data TransferData Transfer– Desire at least 1 Gbit/s Eathernet LinkDesire at least 1 Gbit/s Eathernet Link– Erik Ramberg is checking current capacityErik Ramberg is checking current capacity
K.Gadow 19.04.2007K.Gadow 19.04.2007 CALICE technical reviewCALICE technical review 1010
Operations Readiness ClearanceOperations Readiness Clearance(Joe Howell)(Joe Howell)
Approval given by the Fermilab Partical Physics Approval given by the Fermilab Partical Physics Division Head indicating that the experiment is Division Head indicating that the experiment is safe to operatesafe to operate
Safety Review CommitteesSafety Review Committees– Mechanical and Conventional SafetyMechanical and Conventional Safety– ElectricalElectrical– Fire (and flammable gas)Fire (and flammable gas)
Documentation Review and Equipment Documentation Review and Equipment InspectionInspection
Help provided to guide through the processHelp provided to guide through the process