IW Overlay of Services For All Phases · 2020. 9. 7. · 3m 6.91 ht05 ht05 ht03 ht03 ht03 ht02 ht02...

Post on 07-Feb-2021

1 views 0 download

Transcript of IW Overlay of Services For All Phases · 2020. 9. 7. · 3m 6.91 ht05 ht05 ht03 ht03 ht03 ht02 ht02...

  • 3m

    6.91

    HT05 HT05 HT03

    HT03

    HT03HT02 HT02

    HT05

    HT05

    HT05

    HT05

    HT05

    HT05

    HT04HT04

    HT03

    HT0

    3

    HT0

    2HT0

    2H

    T05

    HT0

    5

    HT03 H

    T02HT0

    2

    HT0

    1

    HT01

    HT04

    HT04

    HT09H

    T04H

    T04

    HT04HT04

    HT0

    5H

    T04

    HT0

    5H

    T04

    HT0

    4H

    T04

    HT03HT04 HT04

    HT09

    HT07

    HT04

    HT04

    HT05 HT05

    HT04

    HT04

    HT04

    HT04

    HT01 HT02 HT02

    HT03

    HT05HT05

    HT03

    HT0

    1H

    T04

    HT0

    4

    HT07

    HT03

    HT05

    HT05

    HT03

    HT02H

    T02H

    T05H

    T05

    HT11

    HT10

    HT05

    HT05

    HT11

    HT01

    HT03

    HT03

    HT02H

    T02

    HT03

    HT02H

    T02

    HT05

    3m

    HT05

    HT0

    4H

    T04

    HT0

    4H

    T04

    HT05

    HT05

    HT08

    HT08

    HT08

    HT08

    HT08

    HT08

    HT12

    HT12

    HT08

    HT08

    HT03

    HT04HT04

    HT03

    HT02

    HT03

    HT12

    HT12

    HT12

    6261

    60

    59

    58

    57

    56

    55

    54

    696867

    66

    53

    52

    51

    50

    49

    48

    2 3

    4

    10

    11

    12

    5

    6

    7

    8

    9

    14

    13

    34

    35

    36

    37

    38

    1-3

    4

    56

    78

    31

    32

    33

    1516

    17

    18

    19

    20

    21

    22

    23

    2425

    2627 28

    29 30

    10

    9

    30

    31

    32-34

    11

    12

    13

    14

    39

    40

    41

    42

    43

    44

    45

    46

    47

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    1 2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24-26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    39

    40

    41

    42

    43

    44

    45

    46

    47

    76-77

    75

    74

    73

    Donore

    HT05

    HT05

    68

    1.5m

    verge

    C

    reche D

    rop O

    ff

    171

    238

    240

    241

    243

    244

    245

    246-251

    195

    176

    175

    174

    172

    154

    170

    169

    168

    153

    155

    156

    233

    234

    236

    235

    237

    12 1314 15 16

    17

    18

    19

    222324252627

    34

    33

    35

    36

    37 38 39

    28

    29

    31

    32

    3

    2

    1

    4

    5

    6

    7

    8

    9

    10

    11

    21

    20

    52

    53

    54

    55

    56

    57

    58

    59

    60

    113-120

    239

    242

    OPEN SPACE

    30

    177

    178

    179

    181

    180

    Creche

    B

    in S

    tore

    Bike

    Store

    105-112

    97-104

    89-96

    121-134

    158

    159

    160

    161

    162

    163

    164

    165

    166

    167

    173

    184

    183

    182

    188

    189

    190

    191

    192

    193

    194

    196

    197

    217

    218

    219

    220

    221

    222

    232

    231

    230

    229

    228

    226

    OPEN SPACE

    157

    185

    186

    187

    198

    199

    200

    201

    202

    203

    204

    40

    41

    42

    43

    4445

    46

    47

    48 49

    50

    6162

    63

    64

    65

    66

    67

    152

    151

    206

    205

    HT1

    HT4

    HT2

    HT1

    HT2

    HT4

    HT4

    HT3

    HT4

    HT3

    HT2aHT2

    HT2a

    HT4

    HT2a HT2

    HT2a

    HT2a HT2 HT2a

    HT3

    HT2

    HT1b

    HT1b

    HT2b

    HT2b

    HT6

    HT3

    HT1a

    HT5

    TB2

    HT4

    HT2

    HT6

    HT6

    HT1a

    HT1a

    HT6

    HT6

    HT6

    HT5

    HT1a

    HT1a

    HT4

    TB6

    AP1

    AP2

    HT2a

    HT2B

    HT6

    HT1A

    TB3

    HT1a

    HT4

    HT4

    HT1a

    HT1a

    HT3

    TB1

    TB1

    HT1a

    HT1a

    HT2

    HT1a

    HT1a

    HT2

    HT1a

    HT1a

    HT2

    TB1

    HT6

    HT6

    TB2

    HT6

    HT1A

    HT2B

    TB2

    HT1

    HT1

    HT2

    HT1a

    HT1a

    TB1

    HT2

    HT2a

    77-88

    143-150

    135-142

    69-76

    62

    ANM

    63

    ANM

    64

    ANM

    65

    ANM

    77

    ANM

    78

    ANM

    79

    ANM

    ANM

    61

    ANM

    32

    ANM

    31

    ANM

    Pump House

    208

    207

    211

    210

    209

    213

    212

    216

    215

    214

    223

    224

    225

    227

    1.5m

    verge

    HT4

    HT2B

    HT1A

    HT6

    HT2B

    HT1A

    HT6

    TB4

    + 6.87

    R

    132

    R

    132

    E

    xis

    tin

    g B

    us S

    top

    8.47

    8.47

    GROVEVIEW

    G

    G

    G

    G

    G

    S45.B

    CL 4.90

    IL 3.26

    S45.C

    CL 4.87

    il 3.405

    il 3.275

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    S57.C

    CL 7.93

    IL 3.76

    S72.D

    CL 5.18

    IL 3.65

    IL 3.50

    S72.G

    CL 5.36

    IL 3.89

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    G

    S45.D

    CL 4.75

    il 3.45

    S46.L

    CL 4.90

    IL 3.50

    2

    2

    5

    m

    P

    I

    P

    E

    @

    1

    i

    n

    1

    5

    0

    S57.B

    CL 7.49

    IL 3.63

    G

    G

    G

    G

    G

    G

    G

    G

    il 3.66

    il 3.88

    225m

    m

    P

    IP

    E @

    1in

    150

    S15

    CL 8.38

    6

    0

    0

    m

    m

    P

    I

    P

    E

    @

    1

    i

    n

    5

    9

    7

    G

    G

    G

    G

    Ex. F16.A

    CL - 8.44

    IL - 6.66

    IL - 3.89

    3

    7

    5

    m

    m

    P

    IP

    E

    @

    1

    in

    3

    7

    5

    24000

    14000

    150mm Access Lines

    S47B

    CL 7

    .39

    IL 2.9

    A

    co

    g

    u

    lle

    y ke

    rb

    to

    b

    e

    la

    id

    EX. F57.A

    CL - 6.9

    IL - 4.2

    252-257

    GFM

    Manholes are to be constructed of the following materials:

    Precast concrete manholes shall only be provided where the water table is low. The

    precast wall units shall be provided with rubber sealing ring gaskets between units,

    specific approval of Irish Water, complete with a 150mm minimum thickness cast in

    situ concrete surround, C16/20, in accordance with IS EN 206, 20mm aggregate

    size, in accordance with IS EN 12620. The precast concrete manhole shall have

    either pre-cast or cast in-situ concrete base (225mm minimum thickness beneath

    channel) and pre-cast or cast in-situ concrete roof slab (225mm minimum

    thickness), both constructed of C30/37 concrete, in accordance with IS EN 206,

    20mm aggregate size, in accordance with IS EN 12620, reinforced with high tensile

    steel bar reinforcement, with a minimum 40mm concrete cover. The concrete

    surround to the precast concrete wall units shall only be omitted if the manhole ring

    has a wall thickness of 125mm or more and where a proprietary watertight sealing

    system is provided as an integral part of the manhole wall system.

    Manhole Bases should be constructed of cast in situ C30/37 concrete, in accordance

    with IS EN 206, 20mm aggregate size, in accordance with IS EN 12620, with a

    minimum thickness of 225mm. Thicker manhole bases are required for Sewers in

    excess of 3m deep or where the manhole size is greater than the standard minimum

    size outlined above. Alternatively, approved precast concrete bases may be used,

    incorporating channels, benching, etc. subject to Irish Water approval and compliance

    with BS 5911, Part 4. Where precast concrete rings are used with cast-in-situ concrete

    bases, the bottom ring unit shall be cast into the base slab to ensure adequate sealing

    of the wall/base junction

    Manhole Covers and Frames shall comply with IS EN 124 and BS 7903 and be of

    suitable load grade, Class D400 (or E600 for heavy trafficked roads, as required on a

    case by case assessment basis). Covers shall be selected and designed to prevent the

    cover unit(s) falling into the chamber. Covers and frames shall be designed to be safely

    lifted with minimal risk of manual handling injury, suitable for use with lifting equipment

    and arranged to ensure rescue procedures are not impeded. Frames should be square

    or circular with a square or circular insert with a minimum clear diameter/dimension of

    600mm. Class D400 shall either have a 100mm or a 150mm deep frame and Class

    E600 covers on heavily trafficked roads shall have a 150mm deep frame. All covers

    shall be of non-rock design and two closed keyways shall be provided in each cover.

    Manhole covers may be single units or double triangular. Third Party Certification shall

    be provided for all cast iron manhole covers and frames.

    Thermoplastic Structured Wall Pipes; Thermoplastic structured wall pipes shall

    comply with the provisions of IS EN 13476 (2007/2009). Pipes to be of Stiffness

    Class 8kN/m2 and to be capable of demonstrating a jetting

    resistance of 2,600 psi (180 Bar) without damage when tested in accordance with

    Section 3.3 of WIS 4-35-01 (2008). (Sewer diameters 150mm up to 450mm,

    Service Connections of 100mm diameter);

    Unplasticised PVC; Unplasticised PVC pipes and fittings shall comply with the

    Stiffness Class 8kN/m2. Provision for jetting shall be based on the WRc

    Sewer Jetting Code of Practice, June 1997. Pipes to be capable of resisting a

    maximum jetting pump pressure of 2,600psi (180 Bar) without damage.

    (Sewer diameters 150mm up to 450mm, Service Connections of 100mm

    diameter);

    Other; The use of alternative pipe types and materials will require the prior written

    agreement of Irish Water

    WORKS TO BE UNDERTAKEN IN ACCORDANCE WITH:

    WASTE WATER INFRASTRUCTURE STANDARD DETAILS, CONNECTIONS AND DEVELOPER

    SERVICES, CONSTRUCTION REQUIREMENTS FOR SELF LAY DEVELOPMENTS

    DECEMBER 2017 (REVISION 03) AND

    CODE OF PRACTICE FOR WASTE WATER INFRASTRUCTURE, CONNECTIONS AND DEVELOPER

    SERVICES, DESIGN AND CONSTRUCTION REQUIREMENTS FOR SELF LAY DEVELOPMENTS

    DECEMBER 2017 (REVISION 1)

    G