iPresas Risk Analysis - Education.gouv.frcache.media.education.gouv.fr/file/2016/96/9/8... ·...

Post on 21-Jul-2020

2 views 0 download

Transcript of iPresas Risk Analysis - Education.gouv.frcache.media.education.gouv.fr/file/2016/96/9/8... ·...

iPresas Risk Analysis

Adrián Morales Torres

CTO Projects & Development

adrian.morales@ipresas.com

www.ipresas.com

Bilbao, Spain

March 8, 2016

• iPresas is a technology-based spin-off company (SME) of the Polytechnic University of Valencia (Spain).

• The main objective of iPresas is to support integrated safety and security management in dams and other critical infrastructures of the water sector.

• This support is based on the development of risk models and the application of Risk Analysis techniques.

• The main asset of iPresas is our know-how in dam safety and risk analysis and tools for risk-informed decision-making.

• iPresas' team, with an experience of more than 15 years in dam safety, has developed an innovative methodology for the calculation and modeling of risks in dam-reservoir systems.

IPRESAS RISK ANALYSIS

2

iPresas develops software for risk-informed management of critical infrastructure portfolios

IPRESAS SOFTWARE

3

iPresas Calc

iPresas Manager

PREVIOUS PROJECTS: DUERO RIVER AUTHORITY

4

• 27 dams and 88 proposed measures (2008-2012):

PREVIOUS PROJECTS: OTHER PROJECTS IN SPAIN

5

• Urrúnaga Dam - IBERDROLA (2009 - 2010)

• Sant Ponç Dam – ACA (2009 - 2010) • Membrío and Hervás dams –

Gobierno de Extremadura (2013 - 2015) • Bolarque dam (Gas Natural) (2014 - 2015) • El Vado Dam (Canal de Isabel II) (2014 - 2015)

PREVIOUS PROJECTS: HALLBY DAM (SWEDEN)

6

• ELFORSK (2011-2012)

PREVIOUS PROJECTS: DRIN RIVER DAMS (ALBANIA)

7

• 3 dams: Fierze, Koman and Vau I Dejes - KESH (2014 - 2015)

iPresas Risk Analysis

Adrián Morales Torres

CTO Projects & Development

adrian.morales@ipresas.com

www.ipresas.com

Bilbao, Spain

March 8, 2016