An overview of G+ incident data during the constructionof offshore wind farms and their current work programme

to improve safety performance

Andrew Sykes

Technical Manager – Offshore Wind

Energy Institute

23 March 2017

gplusoffshorewind.com

The G+ journey

2012 2017

gplusoffshorewind.com

When things go wrong

gplusoffshorewind.com

Who are the G+?

The G+ and its members are committed to promoting and maintaining the highest possible standards of health and safety throughout the life cycle of offshore wind farms

gplusoffshorewind.com

Who are the G+?

gplusoffshorewind.com

Who are the G+?

StephenRose

PaulCowling

AnneMarit Hansen

AnthonyWort

JonathanCole

(Chairman)

TonyLyon

BenjSykes

JillLees

Bjørn Mo

Østgren

Mark Vvyan-

Robinson

Board of Directors

GlynnFereday

DarrenTape

Nachaat Tahmaz

Chris Bartliff

Frank Monaghan

MikeBean

Martin Kjær Mogensen

Marcus Peters

Aud Jorunn Skjørestad

Garry Bradford

HSE Focal Group

Secretariat:

Secretariat:

General Manager - Kate Harvey

François Bathellier(ENGIE)

gplusoffshorewind.com

Industry hazards

gplusoffshorewind.com

Evolution of G+ data reporting

2012

11 Hazard / Risk Areas

8 Consequence classifications

2013

32 Incident areas

25 Work processes

7 Consequence classifications

2014HiPo incident

Y/N

Medivac incident Y/N

Dropped object incident Y/N

Hours worked

TCE – UK R3 reporting

2015

Comparison with some

other industry sectors

Transfer work process –

further breakdown

2016

Vessel incident area – further

breakdown

gplusoffshorewind.com

Annual reports

2013 20152014 2016

To bePublishedQ2 2017

gplusoffshorewind.com

In house reporting

• Quarterly reports (summary information, RIDDOR reportable, LTIF / TRIR, etc)

• Lessons learned reporting (monthly)

gplusoffshorewind.com

Future reporting - 2017

• Leading indicators• Direct cause analysis (LTIs):

– Cause of incident / event category list (Slip/Trip/Fall, hit by, struck by, etc)

– Causal factors (lack of attention, not following procedures, etc)

• Comparison with other industry sectors (networks / distribution, thermal generation, onshore wind, others?)

• Integration with ORE Catapult SPARTA database (UK O&M sites)

• Comparison with NWA safety forum statistics

gplusoffshorewind.com

What is the 2016 data showing?

gplusoffshorewind.com

What is the 2016 data showing?

gplusoffshorewind.com

What is the 2016 data showing?

gplusoffshorewind.com

What is the 2016 data showing?

gplusoffshorewind.com

What is the 2016 data showing?

gplusoffshorewind.com

gplusoffshorewind.com

What is the 2016 data showing?

gplusoffshorewind.com

What is the 2016 data showing?

gplusoffshorewind.com

The challenge going forward

gplusoffshorewind.com

G+ response to Bootle workshop

1. Consider how to improve engagement through the supply chain to ensure it is fully involved

• Further engage tier 1 supply chain companies through the FG

• Develop Safe by Design workshop programme beyond 2016

• Continue to promote and hold the annual G+ Stakeholder Forum

2. Recognise need to create a common, risk-based agenda for the sector

• Advance the G+ risk based agenda through improved incident data

• Supplement the risk based agenda with additional information e.g. from workshops, other organisations, etc.

• Develop the G+ operating plan (and share at the next Stakeholder Forum)

gplusoffshorewind.com

G+ response to Bootle workshop

3. Actively engage with all relevant stakeholders including trade associations and others

• Prepare a G+ engagement plan covering strategic, structural and topic based engagement activity

• Undertake bilateral and multilateral engagement (specific subject agreements)

4. Drive the development and proper and consistent implementation of good practice

• Update our existing good practice guidelines based on user feedback

• Initiate peer review process of G+ sites to support cross learning and improvements

gplusoffshorewind.com

G+ response to Bootle workshop

5. Identify quick wins to provide momentum for further change

• To investigate quick wins in:

– equipment

– training

– operating practices

– medical and physical fitness requirements

• Formation of a new industry steering committee (comprising representation from: G+, GWO, IMCA, RUK) – chaired by G+

• Agree additional resourcing through a permanent secondee placement

• Rebranding to ensure that the G+ better reflects their international and inclusive remit

• Information and knowledge sharing through e.g. Project Director’s forum (behavioural safety campaign material) – “Safety champions in offshore wind”

gplusoffshorewind.com

Thank You