Interconnection Processes and Procedures - Solar Plus NW · Interconnection Commissioning Operation...

Post on 02-Apr-2018

223 views 2 download

Transcript of Interconnection Processes and Procedures - Solar Plus NW · Interconnection Commissioning Operation...

Interconnection Processes and Procedures

Michael CoddingtonNREL

2

3

Sale of PV / Financing

System Design

Permitting & Interconnection

Commissioning

Operation of System

System Retirement

Interconnection

4

Identified Issues Relative Priority Identified Issues Relative Priority

Voltage Control High Equipment Specs High

System Protection HighInterconnection Handbook

Medium

System Operations High State Rule Medium

Power Quality High IEEE 1547/ UL 1741 Medium

Monitoring and Control

Medium Application Review High

Feeder Loading Criteria

HighClarification of Responsibilities

High

Transmission Impact

MediumIntegration with Tariffs

Medium

Feeder Design MediumCoordination with Other Initiatives

Medium

Planning Models Medium

Utility Concerns for Distributed Generation

Source: Southern California Edison

4

5

• Size of each PV system

• Location of each PV system

• Impedance of feeder

• Voltage level of the distribution feeder

• Size & impedance of substation transformer

• Location of any capacitor banks

• Line regulation configuration (LTC, Vregs)

• Presence of other types of DG, Loads

• “Advanced” inverter deployment (PF, VAr)

6

7

10 MVA Substation Bank 50 MVA Substation Bank

9

Document current practices

Determine the range of feeders in CA

Collect high-res PV data

Analyze high-pen PV feeder

Develop/validate alternate screening methods

Step 1: Current Screening Practices

Task Purpose

> Investigate and document current practices for screening PV interconnection requests among California utilities and from other sources outside California

Approach

> Consider federal, state, and local interconnection procedures pertaining to CA (Rule 21, WDAT, SGIP)

> Consider non-CA utility screening practices as well

10

Documenting Current Practices

Document current practices

Determine the range of feeders

in CA

Collect high-res PV data for

model development &

screening validation

Analyze high-pen PV feeder

Develop/validate alternate screening methods

11

21 Utilities, Four Regions

PG&ESCESDG&ESMUD

NSPCom EdDetroit EdisonNashville Electric

PSCOPNMAPSTri County Electric CoopAustin PowerSPS

NSTARNational GridCon EdO&RCentral HudsonLIPAPEPCO

12

ApplicationScreens Applied

Supplemental

Study

Impact Studies / Modeling

Mitigate Concerns

Approve Installation

13

Questionnaire Areas of Focus

• Application Process

• Screening procedures

• Supplemental screening procedures

• Utility concerns related to interconnection

• Impact study approach & software used

• Mitigation strategies

14

Application Processes

• Most have time limits to respond to applications

• Many utilities followed state rules for applications

• Many utilities have multiple tiers

• Many utilities have inverter-based DG applications

• Many interconnection applications are posted online

• Some utilities allowed online submittal, tracking

• Some utilities are not allowed to charge a fee for certain applications

15

Screening Procedures

• Most utilities follow a version of FERC screens

• Some used a minimum daytime load for penetration screen (prior to FERC SGIP 2013 order)

• One utility didn’t use any screens at all

1. Aggregated DG <15% of peak load on line section

2. For connection to a spot network: DG is inverter-based, aggregated DG capacity is <5% of peak load & <50 kW

3. Aggregated DG contribution to maximum short circuit current is <10%

4. Aggregated DG does not cause protective device to exceed 87.5% of short circuit interrupting capability

5. DG interface is compatible with type of primary distribution line (wye/Delta)

6. For a single-phase shared secondary, Aggregated DG capacity <20kW

7. Resulting imbalance <20% of service transformer rating of 240 V service

8. Aggregated transmission connected DG capacity <10 MW for stability-limited area

9. Construction not required for interconnection

16

Universal Interconnection Process

There are significant differences amongst U.S. Electric utilities in practices, processes, tools & models and mitigation strategies

Complete Application

Fast-Track Screens

Supplemental

Review Screens

Impact

StudiesModel Mitigate

Approval

Expedited Review Process (Preferred)

$ Supplemental study Process (Better)

$$$ Detailed Study Process

(Slower, Expensive, Time-Consuming)

Fail Fail

17

Supplemental Screening

• Used to pass some interconnection applications when fast-track screens are failed

• Often quick, inexpensive solutions rather than moving to detailed impact studies

• Implemented only by some utilities

• Now part of the FERC SGIP

18

Major Utility Concerns

• Voltage Regulation 16

• Protection system coordination 10

• Reverse power flow 11

• Increased duty of line regulation equipment 8

• Unintentional islanding 8

• Secondary network protection 6

• Variability due to clouds 5

• Increased switching of capacitors 4

19

Minor Utility Concerns

• Flicker 4

• Reactive power control 3

• Balancing resources and demand response 3

• Overvoltage due to faults 2

• Multiple inverter stability 1

• Harmonics 1

• Relay desensitization 1

• Exporting power through network protectors 1

20

Detailed Impact Studies

Most utilities employ one or more of the following study types

• Feasibility

• Facility

• Power Flow (common)

• Short Circuit (common)

• Voltage (common)

• Quasi-Static Time Series

• Flicker

• Power Quality

• Dynamic/Transient Stability

• Electromagnetic Transient

Common software

• SynerGEE• CymDist• Milsoft Windmil• DEW• ASPEN• OpenDSS

21

Common Mitigation Strategies

Type SW (5) Central (3) California (4) NE (7)

Voltage Regulation devices (13) 4 1 3 5

Upgraded line sections (16) 4 2 4 6

Modify protection (16) 4 3 3 6

Power factor controls (8) 4 1 x 3

Direct Transfer Trip (12) 2 3 1 6

Static VAR Compensator (SVC) (1) 1 x x x

Communication/Control Technology (11) 4 1 2 4

Grounding transformers (8) 2 2 2 2

Advanced inverters (11) 3 2 3 3

Capacitor control modifications (1) x x x 1

Reclosers (3) x 1 x 2

Volt/VAR Controls (1) x x x 1

22

Common Amongst Experienced Utilities

• Open communication between utility & developer• Online interconnection applications• Ease of tracking project status• Rational screening approach• Supplemental screening options• “Safety Valve” approach to solve simple problems

and avoid impact studies• Standard impact study approach, software• Cost-effective mitigation strategies• Supportive regulatory organizations• Uniform state rules/processes for all utilities • Overall streamlined, transparent processes