Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Development of a Novel Integrated Inspection System for

the Accurate Evaluation of the Structural Integrity of Rail

Tracks

SCP8 – GA-2009-234040

WorkshopWorkshopWorkshopWorkshop

Integrated highIntegrated highIntegrated highIntegrated high----speed system speed system speed system speed system –––– UT UT UT UT

modulemodulemodulemodule

Channa Nageswaran and Nikolaos TsopelasChanna Nageswaran and Nikolaos TsopelasChanna Nageswaran and Nikolaos TsopelasChanna Nageswaran and Nikolaos Tsopelas

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Aims• Ultrasonic inspection of the full rail:

– Foot– Web– Head

• Inspection at high speed • Robust mechanical solution

– Data integrity– Operational conditions– Survivability– Simplicity

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

The Options• Sled design - rejected

– Mechanically complex to maintain contact at high speed, coupling issues and protection of sensitive components

• The wheel design – chosen– Inherent suspension without loss of contact– Simple, yet robust– Maintenance and replacement– Protection of active components: transducers

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

The Concept & the Prototype

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Development

• Tested through laboratory tests:– Static tests on representative flaws

– Dynamic test to prove capability for all flaw types at 75kph

• Field tests:– Focussed on mechanical robustness

– Ultrasonic data integrity

– High speeds > 80kph

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

The Tyre

• Strong, flexible polyurethane

• At pressure gives natural damping/suspension

• Protects the active probes from environment

• Commercial availability

• Potential to improve

• Survivability

• Mass production

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

The Probes

• Three probes:– 0deg for the foot

– 35deg for the web

– 70deg for the head

• Frequency: 3.5MHz

• Standard probes:– 2 x standard immersion Panametrics

V382-SU (3.5MHz, 13mm)– 1 x Accuscan Paintbrush Panametrics A331S-SU (3.5MHz,

38mmx6mm)

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Optimisation through Simulation

• CIVA platform (validated by TWI)

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Probe Assembly

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Coupling Liquid in Wheel

• Mix of water and propylene glycol (40%)

• Reasons:– Sound velocity really close to membrane material

(~1722m/s)

– Temperature usage (down to -40 C and up to >100 C)

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Effect of Temperature

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Laboratory Testing

• Static tests on rail samples

• Dynamic tests – At TWI on spinning wheels installed

on a lathe (speed up to 75kph)• Side drilled holes

• Slots

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Laboratory Testing Results: 75kph

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Field Trials: REFER Test Train

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Integration of UT module

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Testing of UT module with the deployment system

• Calibration with reference rail piece

• Inner pressure of the tyre

• Position of the wheel on the track

• Pneumatics

• Irrigation

• Communication with system developed by MISTRAS

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Testing of UT module with the deployment system

UT acquisition module by MISTRAS used for field trials(courtesy of MISTRAS)

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

• Results generated from UT wheel with UT system developed by MISTRAS

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

• Example of a good A-scan from channel 1 (00 probe)

Interface Echo

Irrelevant Indication from rail head

2nd Interface Echo

Back Wall Echo

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

• Transverse crack verification in a thermic weld by the 700

probe of the UT module

00 probe 700 probe

Progress meeting #4

REFER, Lisbon, 29th-30th September 2011@Copyright INTERAIL Consortium 2011

Workshop 2013Copyright INTERAIL Consortium 2013

Future

• Further field trials on test trains:– Establish working ranges of wheel system

– Establish survival capabilities

– Establish environmental influences on data & system

• Automated flaw assessment system:– Distances involved not suitable for manual

assessment

– Neural network methods may be better suited

Progress meeting #4