Inspection Response and Fix-up Report

Owners:ChineshGandhiandParindaChineshGandhi

3500ELakeSammamishPkwySE,Unit2-103,Sammamish,WA98075Fairahadathirdpartyconductinspectionforthehousebeforeitwaslisted.ThereportisverythoroughandlistedonFairawebsite.Asthehomeowners,weareveryproudoftheconditionofthehouse.Thereportidentifiedonekeyissueandsomeminorissues.Inthisreport,wehaveprovideddetailsforallthefixupswehavedone.Basedonthereportandthefixup,wecanconfidentlysaythatthemajorissuesarefixed.

Interior report, item no. 4.2

Image from inspection report

Image during the re-modeling to get brand new flooring and installation of brand new toilet.

Imageofanewbathroomwithbrandnewflooringandbrandnewtoilet.

As this was related to leak, we addressed this issue right away. We used licensed technicians to get this issue addressed.

Other Minor Issues reported and now Fixed:

4.5 Linen Closet Door adjustment Fixed! 6.0 Hall bath sink leak Fixed! 7.2 Loose outlet Fixed! 10.4 Food waste disposer Fixed!