IEEE 802.20IEEE 802.20 Technology Selection ProcessTechnology Selection Process
Presentation of Contribution C802.20-04-72
Dan Gal
Berlin, September 14, 2004
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 2
Introduction Introduction
This is the presentation version of contribution C802.20-04-xx, a proposal for IEEE 802.20 technology selection process (TSP)
Purpose: Start a working group discussion and trigger follow-up contributions for an agreed-upon technology selection procedure
Goal: Adopt a TSP in the November 2004 plenary meeting.
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 3
OutlineOutline
This TSP proposal includes:
– Suggested process ground rules– Selection process stages– Form templates – A list of open issues that require
additional contributions and working group resolutions.
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 4
TSP ElementsTSP Elements
Define Technology Proposal submission rules Define a scoring system Define selection rules Identify decision criteria issues that require
working group resolution
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 5
Section 1 - IntroductionSection 1 - Introduction
This proposal is not a complete procedure It is recommended that an agreed upon TSP be
adopted before the call for 802.20 proposals
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 6
Section 2.1 – Document PrecedenceSection 2.1 – Document Precedence
In case of a conflict with the rules, the applicable IEEE SA rules, as well as the 802.20 rules, shall have higher precedence [than the TSP]
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 7
Section 2.3.1 – Proposal Submission RulesSection 2.3.1 – Proposal Submission Rules
Technology proposals shall include five parts:– Part I: Technical Specifications Summary (section 2.3.2). – Part II: Technology Description (section 2.3.3).– Part III: PHY/MAC specifications (section 2.3.4).– Part IV: Evaluation Criteria simulations results
(section 2.3.5).– Part V: Compliance statement (section 2.3.6).
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 8
Section 2.3.1 – Proposal Submission RulesSection 2.3.1 – Proposal Submission Rules
Proposals need not be fully compliant with the 802.20 SRD in order to be considered for the technology selection process
Proposals shall comply with the IEEE 802 SA patent policies
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 9
Section 2.3.2 – Tech Proposal Section 2.3.2 – Tech Proposal Part IPart ITechnical Specifications SummaryTechnical Specifications Summary
Use SRD as a reference, specify values and indicate ranking
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 10
Section 2.3.3 – Tech Proposal Section 2.3.3 – Tech Proposal Part IIPart IITechnology DescriptionTechnology Description
Detailed technical description of the technology
Use engineering white paper style
Show how the proposal meets or exceeds the SRD requirements
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 11
Section 2.3.4 – Tech Proposal Section 2.3.4 – Tech Proposal Part IIIPart IIIPHY, MAC SpecificationsPHY, MAC Specifications
Style and level of detail -- similar to IEEE 802 standards
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 12
Section 2.3.5 – Tech Proposal Section 2.3.5 – Tech Proposal Part IVPart IVPerformance Evaluation ResultsPerformance Evaluation Results
Evaluation Criteria test results
Use a uniform tech report template (TBD)
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 13
Section 2.3.6 – Tech Proposal Section 2.3.6 – Tech Proposal Part VPart VSRD Compliance StatementSRD Compliance Statement
A fully compliant proposal has no entries in the “P” column
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 14
Section 2.3.7 – Tech ProposalsSection 2.3.7 – Tech ProposalsSubmissionSubmission
Comply with the call for proposals requirements
Post on the 802.20 website, at least 30 calendar days before a working group interim or plenary meeting.
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 15
Section 2.3.7 – Tech ProposalsSection 2.3.7 – Tech ProposalsPresentationPresentation
Presentation material shall be fully consistent with the text of the formal proposal.
In case of inconsistencies, the formal proposal shall prevail and a corrected presentation shall be submitted ASAP
Presentations shall be treated like WG contribution and shall be allowed adequate time slots on the meeting agenda
Generate meeting minutes of all presentations and associated Q&A
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 16
Section 2.3.8 – Tech ProposalsSection 2.3.8 – Tech ProposalsAmendment & ConsolidationAmendment & Consolidation
Amended proposals shall not include significant changes (that affect performance)
Submit and post amended proposals at least 14 days prior to the next WG session
Consolidated proposals shall be considered new proposal
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 17
Section 2.3.9 – Tech ProposalsSection 2.3.9 – Tech ProposalsScoring System (slide 1)Scoring System (slide 1)
The scoring system shall consist of a list of the most essential (quantitative and qualitative) performance attributes required of a winning proposal
A weighted average scoring system shall be
Collect individual member scores and calculate the group average scores (tables 3 and 4)
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 18
Section 2.3.9 – Tech ProposalsSection 2.3.9 – Tech ProposalsScoring System (slide 2)Scoring System (slide 2)
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 19
Section 2.3.9 – Tech ProposalsSection 2.3.9 – Tech ProposalsScoring System (slide 3)Scoring System (slide 3)
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 20
Section 2.3.9 – Tech ProposalsSection 2.3.9 – Tech ProposalsScoring System (slide 4)Scoring System (slide 4)
Issues the WG needs to resolve:
– Establish the most essential requirements – try to keep the list short (< 20 items)
– Assign averaging weights
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 21
Section 2.3.9 – Tech ProposalsSection 2.3.9 – Tech ProposalsScoring System (slide 5)Scoring System (slide 5)
The scoring process shall be conducted in a plenary session
Final scores shall be posted on the WG website prior to the next step – the voting rounds
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 22
Section 2.3.10 – Tech ProposalsSection 2.3.10 – Tech ProposalsSelection RoundsSelection Rounds
The selection of the winning proposal shall assure that the most meritorious proposal is chosen.
The scoring process shall be conducted in a plenary session
Elimination rounds; followed by selection among the two finalists
Voting of the winning proposal must be consistent with the scoring results, evaluation results and compliance tables.
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 23
Section 2.4 – Tech ProposalsSection 2.4 – Tech ProposalsSelection StagesSelection Stages
Phase 1:
Stage 1: Proposal submissions. Stage 2: Working-group Presentations Stage 3: Review proposal compliance tables and evaluation results Stage 4: Poll and document the member-scores Stage 5: Proposal elimination (round 1) – select the top-two proposals Stage 6: If proposal consolidation is requested, skip to “Phase 2” below, otherwise, move to
round 2 and select the winning proposal. Stage 7: Finalize the technology selection process.
Phase 2: (optional, follow from stage 6 of “Phase 1” above)
Stage 1: Consolidated proposals submission Stage 2: Working-group Presentations Stage 3: Review proposal compliance tables and evaluation results Stage 4: Poll and document new member-scores Stage 5: Present the proposal-scores and vote the top-two proposals. Stage 6: Select the winning-proposal. Stage 7: Finalize the technology selection process.
At any TSP stage, the working group may decide (by simple majority) to abort it and cycle back to the previous stage.
September 2004 IEEE 802.20 Contribution C802.20-04-72 Slide 24
SummarySummary
This TSP proposal is designed to assure a balanced and fair selection process
Additional work is needed to bring this proposal to an agreed upon, complete TSP state (see TBD indications and the five annexes of contribution C802.20-04-72)