Post on 04-Jun-2015
description
Practice Quiz Title:Hibbing High School Reading
Questions
Answers
If you are using this document over the internet, please be patient. Sometimes, the graphics can take time to load as you move from page to page.
Automated Quiz
Question 01During which year was there a fire in Hibbing High School?A) 1948B) 1965C) 1996D) 1978
Answer 01During which year was there a fire in Hibbing High School?A) 1948B) 1965C) 1996D) 1978
Question 02In 1968, Hibbing High School won the ___________ Award.A) TrumanB) EisenhowerC) ReaganD) Bellamy
Answer 02In 1968, Hibbing High School won the ___________ Award.A) TrumanB) EisenhowerC) ReaganD) Bellamy
Question 03
True or FalseThe High School Auditorium can hold up to 1400 people.
Answer 03True or FalseThe High School Auditorium can hold up to 1400 people.
FALSEIt can hold up to 1800 people.
Question 04
True or FalseThe Hibbing High School is built in the shape of the letter “E”.
Answer 04True or FalseThe Hibbing High School is built in the shape of the letter “E”.
TRUE
Question 05
True or FalseHibbing’s largest graduating classes had around 440 students.
Answer 05
True or FalseHibbing’s largest graduating classes had around 440 students.
TRUE
Question 06The first class to graduate for the current Hibbing High
School was the class ofA) 1925B) 1938C) 1924D) 1931
Answer 06The first class to graduate for the current
Hibbing High School was the class ofA) 1925B) 1938C) 1924D) 1931
Question 07The seats in the High School auditorium have only been replacedA) 3 timesB) 2 timesC) Once a decadeD) once
Answer 07The seats in the High School auditorium have only been replacedA) 3 timesB) 2 timesC) Once a decadeD) once
Question 08The large mining mural in the library was painted in A) 1943B) 1913C) 1923D) 1963
Answer 08The large mining mural in the library was painted in A) 1943B) 1913C) 1923D) 1963
Question 09True or FalseThe Barton Pipe Organ in the auditorum has over 1900 pipes.
Answer 09True or FalseThe Barton Pipe Organ in the auditorum has over 1900 pipes.
TRUE
Question 10
The current High School was completed in A) 1919B) 1920C) 1922D) 1923
Answer 10The current High School was completed in A) 1919B) 1920C) 1922D) 1923