Go North Schweden und Finnland
30.11.2016, Berlin Eike Gentsch
Country Manager Norway, Faroe Islands & Iceland
ENERCON GmbH
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 2
Agenda
1 Business portrait
2 ENERCON in Sweden
3 Wind Farm Development and Installation in Sweden
4 Wind Farm Operation in Cold Climate
Economical aspects of wind farm developments
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 3
Business portrait: Global activities of ENERCON
In eight countries ENERCON is present with its own production facilities.
Canada
Brazil
Portugal
France
Sweden
Austria
Turkey
Germany
Headquarter: Aurich, Germany
Emplyoees: 15,000 world wide
Sales offices: 32 world wide
Service: >300 stations
Logistics: trucks
cranes (up to
1,600t)
E-ship 1
Railway company
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 4
Business portrait: Market share by installed capacity On- and Offshore 2015
Also on an European level, ENERCON is among the leading manufacturers.
source: BTM Consult 2014
Provisional market shares
Europe 2015
ENERCON
19.2%
Provisional market shares
World Wide 2015
ENERCON
5%
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 5
Business portrait: ENERCON in the Nordics
• ENERCONs has been active in Scandinavia since the
early 2000s
• Installations in Finland, Sweden, Norway and on the Faroe
Islands are currently at:
629 WECs
1,097.9MW (October 2016)
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 6
ENERCON in Sweden
EWP – ENERCON Windtower Production (Landskrona) - Production facilities (steel towers and metal works) Moved from central Malmö to
Landskrona in 2015. - 161 employees
ENERCON Energy Converter AB (Stenåldersgatan 19, Malmö) - Swedish service organisation - 143 employees - ENERCON Training Center is located on Arlövsvägen 9
ENERCON GmbH Germany Filial (Arlövsvägen 9, Malmö) - Swedish branch office (Sales, PM, Site Assesment, Shared Services) - 30 employees
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 7
Business portrait: ENERCON Wind turbine portfolio
7
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 8
Wind Farm Development and Operation in the North
Planning
Site planning
Planning permission process
Grid codes
Grid requirements
(costs, possible income)
Our strengths
Expert consulting and
Customer care
Highly qualified employees
Years of experience
Operational period
O&M in Cold Climate
Full service
Maintenance only
Customized concepts
Grid connection
Availability warranties
Production optimization
Our strengths
Logistics and installation
Long-term partnership
Customer-oriented service
Wind turbine
installation
Project time schedule
Wind
Environment
Weather
Our strengths
High quality
Minimized supplier risk
Engineering and development
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 9
Economical aspects in wind farm development: Planning
Wind farm siting
• Access to site?
• Ports, roads
• Grid availability and grid code
• Local/ transmission grid
• Land leases (site and access to site)
• Special requirements
• Site conditions
• Terrain complexity
• Climatic conditions (e.g. icing)
• Wind conditions
• Site limitations
• Social (e.g. noise, shadow cast, recreational areas,
visibility ….)
• Environmental (protected areas, breeding birds,
reindeer …)
• Other limitations?
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 10
Access to site
Wind farm siting
• Access to site?
• Ports, roads
• Grid availability and grid code
• Local/ transmission
• Land leases (site and access to site)
• Special requirements Source: NVE – Vindkart for Norge Kartbok 1b; 08.2009.
www.nve.no
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 11
Site conditions
• Site conditions
• Terrain complexity
• Climatic conditions (e.g. icing)
• Wind conditions
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 12
Site conditions – Wind Measurement
Middagsberget 3xE-101 3050 kW, 99m, 2012
Skogberget 36xE-92 2350 kW, 138m, 2013-2014
Middagsberget 3xE-101 3050 kW, 99m, 2012 Egby 5xE-70 2,0MW, 64m, 2008 5xE-82 2,0 MW, 78m, 2012
Tubular mast
Lattice masts
Lidar:
Wind Measurements
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 13
CFD (Computational Fluid Dynamics)
applied on complex sites (terrain, forests…)
WAsP (Wind Atlas Analysis and Application Program)
Linear models for lowland sites (e.g. northern Germany, Denmark)
Site conditions – Wind Conditions
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 14
Wind Farm Installation in Cold Climate
Middagsberget 3xE-101 3050 kW, 99m, 2012
To be considered:
Impact of climate and weather
conditons on the construction
phase:
• Ice, frost, snow, darkness
(winter)…
• Implications for the
installation time
• Careful planning is vital!
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 15
Wind Farm Development and Operation in the North
Planning
Site planning
Planning permission process
Grid codes
Grid requirements
(costs, possible income)
Our strengths
Expert consulting and
Customer care
Highly qualified employees
Years of experience
Operational period
O&M in Cold Climate
Full service
Maintenance only
Customized concepts
Grid connection
Availability warranties
Production optimization
Our strengths
Logistics and installation
Long-term partnership
Customer-oriented service
Wind turbine
installation
Project time schedule
Wind
Environment
Weather
Our strengths
High quality
Minimized supplier risk
Engineering and development
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 16
Operational period
sources: WindStats Report 2012 Vol. 25. No. 2,3,4 and 2013 Vol. 26 No.1
Downtime per year (in hours)
Cold Climate sites require
special attention to the
operation:
• Machinery
• Spare parts
• Tools
• Site access
• HSE
• …
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 17
Operational period: Cold Climate and Icing
Andermatt, Switzerland Antarctica
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 18
3.8 Icing classifications from IEA with influence of EC RBHS
*Proved by Meteotest
IEA ice class Meteorological
icing Instrumental icing
Production loss
(WEC without
RBHS)
Production loss
(WEC with RBHS,
consumption incl.) Validation
no. % of year % of year % of AEP % of AEP Site
5 >10 >20 >20 >4 -
4 5-10 10-30 10-25 1,5-5 Krystofovy Hamry (CZ)*
Dragaliden (SE)*
Gabrielsberget (SE)
3 3-5 6-15 3-12 0,5-3 St. Brais (CH)
Nuttby (CA)
2 0,5-3 1-9 0,5-5 0-1,5 Molau (DE)*
1 0-0,5
© Copyright ENERCON GmbH. All rights reserved. Eike Gentsch 19
Summary
• ENERCON has a long track record in Scandinavia
• Good wind farm sites with little to medium complexity, careful planning important
• Climatic conditions have to be considered for planning, installation and operation
• Highly recommended to use Cold Climate packages and Rotor Blade Heating systems espeically from Mid-
to Northern Sweden
• With the Cold Climate Package, the technology of the turbines are adjusted to survive harsher weather.
• ENERCON has the right technology for the Nordic sites!
ENERCON GmbH | Dreekamp 5 | D-26605 Aurich
phone: +49 4941 927-0 | fax: +49 4941 927-109
Contact: eike.gentsch@enercon.de
Thank you for your attention!