Doosan Heavy Industries & Construction Co., Ltd.www.doosanheavy.com
Seoul office1303-22, Seocho-Dong, Seocho-Gu. Seoul 137-920, Korea(C.P.O Box 1826, Seoul Korea)Tel. 82-2-2-513-6114, Fax. 82-2-513-6200Head office and Changwon plant 555, Guigok-dong, Changwon, Gyeongsangnam-do, 641-792, Korea Tel. 82-55-278-6114, 7114 Fax. 82-55-264-5551,5552
GLOBAL NETWORK
Doosan Heavy Industries America Corp.400 Kelby Street, Parker Plaza, 10th fl. Fort Lee, NJ 07024, USAPhone : 1 201 944 4554 Fax : 1 201 944 5022/ 5053
Doosan Heavy Industries Japan Corp.Room2410,Mita Kokusai BLD.1-4-28,Mita Minato-ku, Tokyo, Japan 108-0073Phone : 81 3 3452 5451~3 Fax : 81 3 3452 5624
Windsor OfficeWestinghouse Electric, 20 International Drive, Windsor, CT 06095, USA (Windsor, Schenectady)Phone : 1 860 731 6479 Fax : 1 860 731 6478
Schenectady OfficeRoom 33-202A, General Electric Bldg, One River Road, Schenectady, NY 12345,USA (Windsor, Schenectady)Phone : 1 518 385 5218 Fax : 1 518 385 4984
Beijing Office19F, Tower B Gateway Plaza, No. 18 Xiaguangli,North Road, East Third Ring, Chaoyang District, Beijing 100027Phone : 86 10 8454 7131~33 Fax : 86 10 8484 7139
Shanghai OfficeRoom 2802. City Center of Shanghai Bldg.,100 Zunyi Rd, Changning District Shanghai 200051, ChinaPhone : 86 21 6237 2485/2486 Fax : 86 21 6237 2487
Taipei OfficeRoom 704, No.51, Keelung Road Section 2,Taipei 110, TaiwanPhone : 886 2 2739 2255(ARS) Fax : 886 2 2739 2266
Hanoi Office#1101, Daeha Business Center, 360 Kim Ma,Ba Dinh District, Hanoi, VietnamPhone : 84 4 273 0545~8 Fax : 84 4 273 0550
Bangkok Office10th Floor, M-thai Tower, Wireless Road, Bangkok, ThailandPhone : 66 2 654 0690~2 Fax : 66 2 654 0693
New Delhi Office2A, 2nd Floor, Lotus Towers, Community Centre, New Friends Colony, New Delhi-110 065, IndiaPhone : 91 11 4132 8031 Fax : 91 11 4132 8039
Mumbai Office1109&1110, 11th Floor, Maker Chambers-V,Nariman Point, Mumbai 400021, IndiaPhone : 91 22 2202 6504 Fax : 91 22 2202 6557
Dubai OfficeOffice No. 308, Al Serkal Building, Airport Road PO Box 11859, Dubai, UAE (Dubai, Abu Dhabi)Phone : 971 4 294 4699 Fax : 971 4 294 9930
Abu Dhabi OfficeAl Ghaith Tower 5th Floor, Room 508, Hamdan Street, P.O. Box 27767, Abu Dhabi, UAE (Dubai, Abu Dhabi)Phone : 971 2 627 6273 Fax : 971 2 627 6274
Riyadh OfficeP.O.Box 9656, Riyadh 11423, Saudi ArabiaPhone : 966 1 419 1920/1696 Fax : 966 1 419 1995
Kuwait OfficeVilla 15, Street 24, Block 4, Sabah Al-Salem Area, KuwaitPhone : 965 551 8452/8436 Fax : 965 551 8453
Frankfurt OfficeFrankfurt Office 9th Floor, Arabella Center, Lyoner Strasse 44-48, 60528 Frankfurtam Main, GermanyPhone : 49 69 69 5004 0 Fax : 49 69 69 5004 10
Tripoli OfficePhone : 971 50 459 2759 / 218 91 380 8021
MAJOR SUBSIDIARIES
Doosan Babcock Energy Limited11 The Boulevard, Crawley West Sussex, United Kingdom RH10 1UXPhone : 44 1293 584 990 Fax :44 1293 584 918
Doosan Heavy Industries Vietnam Co., Ltd.[Doosan Vina]No.1 An Duong Vuong Street, Quangngai City, Quangngai Province, VietnamPhone : 84 55 713 001~7 Fax : 84 55 713 008
Doosan IMGB104 Berceni Road, Bucharest 4, RomaniaPhone : 40 21 301 2602 Fax : 40 21 301 2502
Doosan Engineering & Services India Pvt. Ltd.3rd Floor DLF Building No. 8, DLF Cyber City Phase , Gurgaon Haryana (122-002), India Phone : 91 124 439 8200 Fax : 91 124 414 7006
Doosan Hydro Technology, Inc.9001 Brittany Way Tampa, Florida 33619Phone : 1 813 549 0182 Fax : 1 813 471 0713
Doosan HF Controls Corp.16650 Westgrove Drive, Suite 500 Addison, Texas 75001, USAPhone :1 972 367 4657 Fax : 1 972 367 4699
Ceylon Heavy Industries & Construction Co., Ltd. [CHICO]Oruwala Athurugiriya Sri LankaPhone : 94 114 440031 2 Fax : 94 114 440030
Hanjung Power Ltd.P.O.Box 2803, Boroko, NCD Papua New GuineaPhone : 675 320 0529 Fax : 675 321 2984
Han-Viet Heavy Industry & Construction Corp. [HANVICO]933 Ton Duc Thang Street, Hong Bang District, HaiPhong, VietnamPhone : 84 31 371 2710 Fax : 84 31 712 714/715
D o o s a n
P o w e r
S e r v i c eP RO G R E S S T H RO U G H C H A N G E
Talk with DOOSAN
DOOSAN Heavy Industries & Construction
superior technical skills/proven success/
experienced engineers
rapid repair/perfect solution/
high quality guarantee
client
steady equipment management/low-priced maintenance
increase availability/reduce down time/
improve performance/extend plant life/lower expenses
Regardless of the original equipment manufacturer, Doosan hasdeveloped retrofit technologies not only to improve unitperformance and reliability but also to eliminate maintenanceproblems in steam turbine, generator, boiler and environmentfacilities.
To Order a Customized Retrofit
DOOSAN Heavy Industries & Construction Global Network
A regular, precise diagnosis on high temperature components ofolder power generation equipment and an early diagnosis ofweakened or damaged parts determines the right time and the rightequipment for Retrofit & Replacement.
02 |03
DOOSAN RetrofitBusinessAs a total solution provider for power plants, regardless of originalequipment manufacture, Doosan covers a wide range of retrofittechnologies for steam turbine, generator, boiler and environmentfacilities and offers optimized retrofit solutions with a throughinvestigation of the retrofit environment such as customerdemands, engineering constrains and existing conditions.
Optimized Retrofit Solution
Scope of ServiceRetrofit / UpgradeReplacement / Repair Diagnosis & Evaluation
Objective of BusinessLife ExtensionElimination of Maintenance ProblemsImprovement of Capacity, Efficiency and Reliability
Retrofit of Power Generation Equipment Improvement of Operating Efficiency
Manufacturing & Installation of Equipment
Provision of Components Spare Parts
Life Extension
Maintenance of Power Generation EquipmentBoiler / Turbine / Generator /
Environment & BOP/
NSSS / MSR / I & C Diagnosis & EvaluationPerformance Test & Analysis
Inspection & Lifetime Assessment
Technical Supervision
THE FIELD OF OUR SERVICES
Maximum Performance/EfficiencyShort Delivery & Low Cost
Plant Heat BalanceDesign Margin
Life ExtensionEquipment Interface
Cost Effective Solution
Experience History
Honam Unit 1,2 Fuel Conversion ( Thermal P/S, Korea, 1984 )
Incheon Unit 1~4 Turbine & Generator Life time Extension ( Thermal P/S, Korea, 1996~1998 )
Pyeongtaek Unit 1~4 Turbine & Generator DSS Rehabilitation ( Thermal P/S, Korea, 1997~2002 )
Malraya Unit 1 Turbine & Generator Retrofit ( Thermal P/S, Philippine, 1998 )
Samchonpo Unit 1,2 EP Replacement ( Thermal P/S, Korea, 1998 )
Kori Unit 1~4 LP Turbine Replacement & Generator Rewinding ( Nuclear P/S, Korea, 1998 & 2002 )
Malraya Unit 1 Boiler Water Wall Tube Replacement ( Thermal P/S, Philippine, 2000 )
Incheon Unit 2 Boiler Tube Replacement ( Thermal P/S, Korea, 2001 )
Sequoyah Unit 1 Replacement Steam Generator ( Nuclear P/S, US, 2002 )
Ulchin Unit 1,2 MSR Tube Bundle Rehabilitation ( Nuclear P/S, Korea, 2002 )
MDA Unit 1~4 Generator Rewinding ( Thermal P/S, Israel, 2002~2006 )
Ulchin Unit 1,2 Generator Rewinding ( Nuclear P/S, Korea, 2003 )
Huvis Fuel Conversion ( Thermal P/S, Korea, 2003 )
Pyeongtaek Unit 1~4 Air Pre-Heater Element Replacement ( Thermal P/S, Korea, 2004 )
Sancheong Unit 1,2 Water Pumping Repair works ( Water P/S, Korea, 2005 )
Kori Unit 1 Exciter Replacement ( Nuclear P/S, Korea, 2005 )
Eraring Unit 1 Generator Rewinding ( Thermal P/S, Australia, 2005 )
Watts Bar Unit 1 Replacement Steam Generator ( Nuclear P/S, US, 2005 )
Ulsan Unit 4,5,6 Generator Replacement ( Thermal P/S, Korea, 2005~2006 )
Yonggwang Unit 1,2 HP Turbine & Generator Retrofit ( Nuclear P/S, Korea, 2007 )
Boryeong Unit 1,2 Turbine & Generator Upgrade ( Thermal P/S, Korea, 2007~ )
Boryeong Unit 1,2 Boiler Upgrade ( Thermal P/S, Korea, 2007~ )
Kori Unit 2,3,4 Generator Replacement ( Nuclear P/S, Korea, 2007~ )
Eraring Unit 1~4 Turbine & Generator Upgrade ( Thermal P/S, Australia, 2007~ )
Ulchin Unit 1,2 LP Turbine Upgrade ( Nuclear P/S, Korea, 2008~ )
04 |05
Turbine RetrofitTurbine Blade ReplacementTurbine Rotor Bore InspectionTurbine Inner Casing RepairManufacture of Turbine Casing Bolts,Nuts, Washers, etcTurbine Rotor Journal RepairManufacture of Forced Cooling Devices
Turbine Rotor Blade Root NDETurbine Throttle Valve ReplacementManufacture of Turbine Blade CarrierTurbine Auxiliary Control SystemReplacementHigh Speed BalancingTurbine Control System Replacement
Steam Turbine
The world s highest level of engineering technology and ourextensive & modernized production facilities allow Doosan to carryout a series of turbine manufacturing processes including rawmaterial production, machining, fabrication and high speedbalancing.
Conceptual Retrofit Solution
What We DoExperience History
Incheon Unit 1~4 Turbine Lifetime Extensionin Korea (OEM : Toshiba/Alstom, 250MW x 4 - 60Hz, 1995~1996)
Honam Unit 1,2 HP Turbine Rotor & BladeReplacement in Korea (OEM : Alstom, 280MW x 2 - 60Hz, 1996)
Doosan C.C.P.P Turbine Control SystemReplacement in Korea (OEM : MHI, 50MW - 60Hz, 2003)
Ulsan Unit 5 HP & IP Rotor High SpeedBalancing Test in Korea (OEM : BBC, 180MW - 60Hz, 2005)
Ulsan Unit 1 Control Valve Replacement in Korea(OEM : Simens, 200MW - 60Hz, 2005)
Yonggwang Unit 1,2 HP Turbine Retrofit in Korea(OEM : Siemens, 1000MW- 60Hz, 2007)
Boryeong Unit 1,2 HIP & LP Turbine Up-rating in Korea(OEM : Toshiba, 500MW - 60Hz, 2007~)
Eraring Unit 1~4 Turbine & GeneratorUpgrade in Australia (OEM : Toshiba, 750MW - 50Hz, 2007~)
Ulchin Unit 1,2 LP Turbine Upgrade in Korea(OEM : Alstom, 1000MW - 60Hz, 2008~)Integral Covered
Bucket DesignBrush Seal Advanced
Tip Seal
Typical HIP & LP Turbine
Advanced ReactionTechnology Blade
Entropy / VelocityDistribution
Generator
Doosan provided a wide range of generators to customers and hasmanufactured 50Hz and 60Hz generators ranging from 30MW to1,400MW. Presently Doosan is applying advanced state-of-the arttechnology that integrates all factors of design, manufacturing andquality control to supply customers not only with hardware but alsowith total satisfaction. Doosan is a full service provider in generatorretrofit, replacement and repair including associated auxiliaries andexcitation systems.
Generator Rotor & Stator Rewind Generator ReplacementGenerator Repair- Stator Wedge Replacement - High Voltage Bushing Replacement - Rotor Retaining Ring Replacement - High Speed BalancingGenerator Overhaul Inspection and Lifetime EvaluationGenerator Excitation System Replacement with DS-DEX TMR Controller
Experience History
Ulsan Unit 4~6 GEN Replacement in Korea(OEM : BBC, 400MW x 3 - 60Hz)
MDA Unit 1~4 GEN Stator Rewind in Israel(OEM : GE-350MW x 4 - 50Hz)
Ulchin Unit 1~2 GEN Stator Rewind in Korea(OEM : Alstom, 1000MW x 2 - 60Hz)
Hagit Unit 6 GEN Rotor Rewind in Israel(OEM : GE, 130MW - 50Hz)
Eraring Unit 3 GEN Rotor Rewind in Australia(OEM : Toshiba, 660MW - 50Hz)
Kori Unit 1 NPP in Korea (650 MW, Rotating / Static)
Honam Unit 1~2 TPP in Korea (250MW, Rotating / Static)
Yonggwang Unit 1,2 Generator Retrofit
in Korea(OEM : Siemens, 1000MW - 60Hz, 2007)
Boryeong Unit 1,2 Generator Rotor & StatorRewind in Korea (OEM : Toshiba, 500MW - 60Hz, 2007~)
Kori Unit 2,3,4 Generator Replacement in Korea(OEM : GEC, 950MW - 60Hz, 2007~)
Conceptual Retrofit Solution
What We Do
I T E M 06 |07
F-ClassInsulation MaterialsMICAPAL ll
Coil DesignOptimization
Qualified BrazingMaterials/ Induction Brazing
GasCooling
Field Rewind
Increased Crpavility with Field Rewind
KW
Original RatedPower Factor Capatility
New Pated Power Pactor
Increased Capability With Stator Rewind
KW
KVAR
KVAR
Stator Rewind
Replacement
Repair and Replacement of Boiler Pressure VesselBoiler Low NOx Emission & Fuel Conversion RetrofitLow NOx Burner / Windbox & OFAPulverizer Dynamic Classifier, BMS, Fan, etc. Modernization of Boiler Control SystemsSoot Blower Optimization SystemsBoiler Monitoring Systems, Thermal Stress, Combustion Systems, Performance Precise Diagnosis & Lifetime AssessmentInspection/Technical Consulting & Supervision
Boiler
Since our first utility boiler of 560MW class in 1978, We have designedand manufactured a full range of subcritical and supercritical boilers ofDrum, Once-through and CFB units that are designed to burn coal, oil,or gas efficiently, as well as Heat Recovery Steam Generators(HRSG).We offer a comprehensive range of advanced technical support,performance testing, life cycle evaluation, and repair and retrofitservices for both Doosan and non Doosan equipment.
Experience History
Seoul Unit 4,5 Fuel Conversion(OEM : FWC/MHI, 138/250 MW, Coal/Oil LNG/Oil)
Honam Unit 1,2 Fuel Conversion(OEM : Babcock/BHK, 280 MW x 2, Oil Coal)
Yongnam Unit 1,2 Pressure Part Lifetime Assessment(OEM : Alstom/IHT, 200MWx2)
Pyeongtaek Unit 1,2 Performance Test (OEM : Babcock HTC, 350MW x 2)
Ulsan Unit 4~6 S/H, R/H Tube & W.W Panel Replacement(OEM : Stein Muller, 400MW x 3)
Boryong Unit 1,2 S/H, R/H, Eco Tube & W.W Panel Replacement (OEM : B&W, 500MW x 2)
Ulsan Unit 1~3 Boiler Sling Rod Adjusting (OEM : Babcock Atlantigue, 200MW x 3)
Samchonpo Unit 3,4 Pulverizer Classifier Modification(OEM : Doosan, 560 MW x 2, Static Dynamic)
Boryong Unit 1,2 Superheater & Replacementin Korea (OEM : B&W, 500MW, 2007~)
Boryong Unit 1,2 Low-NOx Burner Retrofit (OEM : B&W, 500MW, 2007~)
Conceptual Retrofit Solution
What We Do
Typical Drum-type Boiler
Aged Pressure Part Replace
Low-NOx Firing System
DCS Modernization
Environment & BOP
We provide environmental pollution control and auxiliary balance ofplant (BOP) for the efficient, safe and clean operation of thermalpower plant. We continue to expand our capabilities for the best andprompt service of our customer’s requests with a vast background ofknowledge and practical experience in combustion andenvironmental engineering fields.
Technical Consulting and Supervision of Replacementand Repair for Performance Enhancement of Environmental Facilities
Air preheater & Gas Gas HeaterElectrostatic PrecipitatorFGD (Flue Gas Desulfurization) System SCR (Selective Catalytic Reduction) System Auxiliary BoilerPressure Retaining Component & Tank
Boiler feed-water Heater and De-aeratorCondenser & CTCS (Condenser Tube Cleaning System)Intake Facilities & Debris filterWaste-Water Treatment EquipmentOther plant facilities
Experience History
Kori NPP Unit 1,2 Intake Facility Modification (OEM : Doosan, 587/650MW)
Honam Unit 1,2 Electrostatic PrecipitatorInternal Replacement (OEM : Alstom, 200MW x 2)
Yongdong Unit 1,2 Air Pre-heater HeatingElement Replacement (OEM : Babcock HTC, 125/200MW )
Samchonpo Unit 1,2 Condenser Tube Replacement(OEM : Doosan, 560 MW x 2)
Tangjin Unit 4 GGH Element Replacement (OEM : Doosan, 500 MW)
Taean Unit 6 GAH & FDF Retrofit (OEM : Doosan, 500 MW)
Conceptual Retrofit Solution
What We Do
I T E M 08 |09
FFGGDDSSCCRR
Flue Gas
Flue Gas
noxAnalyzer
Catalyst Unit
Gas Air
GAS IN
GAS OUT
EEPP
Nuclear Steam SupplySystemWith experts and advanced equipment, Nuclear Service Businessoffers the most reliable and perfect repair & retrofit services forReactor Vessel, Steam Generator, Pressurizer, Heat Exchanger,Pumps and Valves for Nuclear Power Plants.
Repair & Retrofit Service for NuclearPower Plant High Density Spent FuelStorages Racks- Reactor Stud & Hole Repair- Steam Generator Tube Repair- Pressurizer Heater Repair- Refueling Service- I & C Service- Waste Disposal System Service
NSSS Equipment Replacement Service- Steam Generator Replacement- Reactor Head Replacement- Reactor Vessel Head Replacement- Pressurizer Replacement- ASEM , Heat ExchangerReplacement
Others- Supply of NSSS Spare Parts- Warranty Service- Technical Supervision on NPPInstallation & Start Up Operation
- Modernization- New Technology Development forNuclear Service
What We Do
Experience History
Sequoya Unit 1 Steam GeneratorReplacement in U.S
(OEM : TVA/WEC - 1,200MW, 60Hz )
Watts Bar Unit 1 Steam GeneratorReplacement in U.S
(OEM : TVA/WEC - 1,200MW, 60Hz )
ANO Unit 2 RPZR Pressuizer Replacement inU.S( OEM : Entergy/WEC - 900MW, 60Hz)
Yonggwang Unit 1,2 TPO D/F Replacement
in Korea
( OEM : WEC - 950MW, 60Hz)
Yonggwang Unit 5,6 C.W Debris FilterReplacement in Korea
(OEM : DOOSAN - 1,000MW, 60Hz)
Ulchin Unit 1,2 Steam GeneratorReplacement in Korea
(OEM : Framatome - 1,000MW, 60Hz)
Moisture SeparatorReheaterThe function of the Moisture Separator Reheater(MSR) is to improvethe quality of the high-pressure turbine exhaust steam before itenters the low pressure turbine. The operation mechanicallyremoves the moisture from the high-pressure turbine exhauststeam, then reheats the dry steam almost to its initial live steamtemperature by passing it though a hot tube bundle. Depending onexisting turbine conditions, we can replace the internal tube bundleon site or replace the tube bundle and shell on site
MSR Up-Grade - Bunddle Replacement- Complete ReplacementMSR Performance GuaranteeOn-site Installation
What We Do
The main characteristic of a Doosan MSR
Compact, High Efficiency & High Quality
Optimum Design
- Chevron Vane Sizing & Arrangement
- Installation of by-pass restrictor
- Flexible tube support plate to protect against
tube failure caused by thermal stress
- Control of excess steam
- Installation of test gauge for performance
tests
- All types of bundle designs available
(Horizontal, Vertical, 2 pass & 4 pass)
Experience History
Younggwang Unit 1,2/1000MW/1981
Ulchin Unit 1,2/950MW/1983
Younggwang Unit 3,4/1000MW/1993
Wolsong Unit 2,3,4/700MW/1996
Ulchin Unit 3,4/1000MW/1996
Younggwang Unit 5,6/1000MW/2000
Wolsong Unit 1/700MW/1999
Ulchin Unit 5/1000MW/2001
Ulchin Unit 1/950MW/2001
Ulchin Unit 6/1000MW/2002
Ulchin Unit 2/950MW/2002
I T E M 10 |11
2 PASS Design
1st PASS
DRAIN
1 1
3
4
2 2
2nd PASS2nd PASS
4rd PASS
3rd PASS
1st PASS
4 PASS Design
2nd STAGEREHEATER
1st STAGEREHEATER
MOSTURESEPARATOR
IMPINGEMENTPLATE
InspectionConventional NDE(MT, UT, PT)W/W Tube Crack DetectionBorescopeBoresonicSurface ReplicationOxide Scale MeasurementTube SamplingHigh Speed Balancing Small Specimen Creep TestingHardness MeasurementT/G Rotor I.S.I SystemsGenerator Core Test
Lifetime AssessmentFinite Element AnalysisCreep/Fatigue Crack Growth AnalysisCreep/Fatigue Damage EvaluationHigh Temperature Tube Life AssessmentCreep Cavitation EvaluationMaterial Degradation EvaluationNondestructive Fatigue Evaluation
Inspection & LifetimeAssessmentInspection and lifetime assessment on high temperature parts of long-term serviced power plants provides the optimal time and the methodfor retrofit & replacement.
What We Do
Experience History
Power Plant Boiler Condition Assessment- Busan CCPP Unit 1~4 (OEM : Doosan, 150MW)
- Seoul Unit 4,5 (OEM : FWC, 250MW)
- Ulsan Unit 4~6 (OEM : Steinmuller, 400MW)
- Samchonpo Unit 1,2 (OEM : Doosan & C.E, 560MW)
- Incheon Unit 4 (OEM : Stein Industry, 325MW)Turbine Rotor Bore-hole Inspection andLifetime Assessment- Incheon Unit 1 LP-A,B Rotor (OEM : Toshiba, 250MW)
- Taean Unit 1 HIP & LP-A,B Rotor (OEM : Doosan, 500MW)
- Yonggwang Unit 3,4 HP Rotor (OEM : W.H, 950MW)Steam Turbine Performance Evaluation - Boryong Unit 1,2 (OEM : Doosan, 500MW)
- Pyeongtaek Unit 1 (OEM : Hitachi, 350MW)
- Seochun Unit 1,2 (OEM : Doosan & G.E, 200MW)
Performance Analysis &Performance TestingPerformance Analysis provides the quantitative evaluation ofperformance deterioration in the turbine cycle through steam pathaudits during overhaul. Performance testing provides turbineperformance assurance through precision testing after repair orretrofit work for long-term service power plants and performanceassurance for new power plants. Our business is also developingmore precise performance testing technologies through majorinvestments and accumulation of reliable data.
Performance AnalysisSteam path auditPerformance degradation evaluationEconomic evaluationFeasibility study for plant upgrade
Performance TestAcceptance testing program designand executionInstrumentation and isolation planreview and designTesting uncertainty analysisDetection of performance degradationPower plant cycle diagnostic services
What We Do
12 |13
Experience History
Bukjaeju Unit 3 Plant Uprate
Younghung Unit 1,2 Boiler
Dangjin Unit 5,6 Boiler
Las Raffan HRSG
PALOS Unit 10~Unit 30 HRSG
IRAN Fars HRSG
AL-JUBAIL HRSG
Panglima HRSG
Phumy III HRSG
Sandhill HRSG
Gibraltar HRSG
Ma j o r C e r t i f i c a t i o n sOverall Operations
Nuclear Equipment
Boiler Equipment
Pressure Vessels
Castings & Forgings
: 9001:2000/ISO 14001
: ASME N,NPT,NA,NS,N3/KEPIC MN,SN,EN,DN
: ASME A,PP,S,H/CE(PEDmodules H,H1)
/Safety Quality License
: ASME U,U2/CE (PED modules H,H1)
/Safety Quality License
: KR/LR/DNV/NK/CCS/GL/RINA/KS
The Korea NationalQuality Award Trophy
Quality Assurance
At Doosan, we recognize that innovations in technology must beaccompanied by innovations in quality. Guided by an organization-wide commitment toward achieving excellence and total customersatisfaction, we aim for the highest standards for quality, technology,and competitiveness in every phase of our operations.
As the global standards rise, so do ours. In addition to certificationsfrom ASME, KEPIC, LR, DNV, TÜV, AQSIA and others, our operationsmeet the latest ISO 9001:2000 quality and ISO 14001 environmentalstandards. Doosan products are also in full compliance with modulesH and H1 of the European Pressure Equipment Directive(97/23/EC)covering heat recovery steam generators and other pressureequipment.
Today, our QA personnel work closely with talented engineers ofbroad and diverse disciplines to identify and address unique qualitychallenges on each project. This synergistic partnership for qualityas well as our active, ongoing acquisition of internationalcertifications, development and implementation of quality initiatives,and utilization of information technology to improve how we managequality is laying the foundation for a higher level of customersatisfaction.
PowerP l a n tService