DESIGNThe pre-breaker is designed for breaking up EPS and EPP waste material.

A solid welded construction in conjunction with good soundabsortion assures stable and quiet opera-tion.

The granulate is transportet to an outlet at the bottom off the pre-breaker by an auger, from here transport are done by a SM51/52 mills, who breaks the material to smaller beads, and transports it to storage silos.

Options

• Inlet hoppers• Sorting Tables• Metal detectors• Mills with interchangeable sieves 5-30mm

The customer at the center of attention The Pre-breakers are designed according to custo-mer specifications, and is adaptable to most waste sizes. At CK Teknik we draw and possibly animate all products in 3D, which will cause unforeseen mecha-nical problems already to be identified and corrected