General Information
Name: GRR Test Geothermal Area
County: AnyCounty, NV
Technology: Geothermal
Federal Funding: Yes (Exploration)
Project Status
Current Project Phase: Well Field Development
Estimated Gross Production: 25 MW
Estimated Net Output to Grid: 20 MW
Ownership Information
Surface Owner: Federal
Manager: U.S. Forest Service
Mineral Owner: Federal
Manager: Bureau of Land Management
Edit
Edit
Edit
ContinueBack
PROJECT INFO
Home
Project Info
Leasing
Exploration
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
General Information
Name:
Location:
Technology:
This project has received federal funding: Yes No
Select all project phases that have received federal funding:
Exploration
Well Field
Power Plant
Transmission
ContinueBack
GRR Test Geothermal Area
Geothermal
AnyCounty, NV
PROJECT INFO
?
?
Home
Project Info
Leasing
Exploration
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Project Status
Current Project Phase:
Estimated Gross Production: MW
Estimated Net Output to Grid: MW (after any losses, such as due to well field
pumping)
ContinueBack
30
Well Field Development
25
PROJECT INFO
?
?
Home
Project Info
Leasing
Exploration
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Surface Ownership Information
Which best describes the surface location of this project?
Project is entirely on private land
Project is entirely on federal land
Project is entirely on state land
Project is entirely on tribal land
The land ownership is mixed
Which federal agency manages the land surface?
Bureau of Land Management
U.S. Forest Service
Bureau of Reclamation
Department of Defense
?
?
ContinueBack
PROJECT INFO
Home
Project Info
Leasing
Exploration
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Surface Ownership Information
Which best describes the surface location of this project?
Project is entirely on private land
Project is entirely on federal land
Project is entirely on state land
The land ownership is mixed
For each project phase, select a surface owner
?
?
ContinueBack
Project Phase Surface Owner
Exploration None specified
Well Field None specified
Power Plant None specified
Transmission None specified
Access (e.g. roads) None Specified
Start
Start
Start
Start
Start
PROJECT INFO
Home
Project Info
Leasing
Exploration
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Mineral Ownership Information
Which best describes the mineral ownership of this project area?
The mineral rights are entirely privately owned
The mineral rights are entirely federally owned
The mineral rights are entirely state owned
The mineral ownership is mixed
Which federal agency manages the mineral rights?
Bureau of Land Management
U.S. Forest Service
Bureau of Reclamation
Department of Defense
?
?
ContinueBack
PROJECT INFO
Home
Project Info
Leasing
Exploration
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Ownership
The following describes the land and mineral ownership for the location of the exploration activities to be conducted
Lease
There is a federal lease in placeYes
(only listed if both surface and mineral are federally owned)
Land Use Planning
The proposed exploration activity does not need to be included in a land use plan
ContinueBack
EXPLORATION
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
?
?
?
Update
Update
Update
Activities
Construction
Search Document Center Permit List Bookmarks Help Save & Exit
Project Phase Surface Owner Mineral Owner
Exploration Federal (USFS) Federal (BLM)
Activities
One or more of the proposed exploration activities will be invasiveYes
The developer plans to complete the Exploration Pre-Application Process Yes
The project will use ground water for exploration activitiesYes
The exploration well will be cased longer than 60 daysYes
The exploration permit requires a modificationYes
The initial survey indicates a potential geothermal well fieldYes
ContinueBack
EXPLORATION
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
?
Update
Activities
Construction
Search Document Center Permit List Bookmarks Help Save & Exit
?
?
?
?
?
?
ContinueBack
EXPLORATION
Search Document Center Permit List Bookmarks Help Save & Exit
UpdateConstruction for Well Field Activities
The following questions must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
The exploration activity requires transporting construction Yes
equipment or materials on state roads
The exploration activity will encroach on a state or local right of wayYes
The exploration activity will cause storm water to disturb soilYes
The exploration activity requires demolishing an existing structureYes
The exploration activity requires an exception from local zoning regulationsYes
?
?
?
?
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
Environmental Evaluation
The activity includes a major federal action Yes
ContinueBack
EXPLORATION
?
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
Search Document Center Permit List Bookmarks Help Save & Exit
Update
Federal Nexus
Surface Ownership Federal (USFS)
Mineral Ownership Federal (BLM)
Federal Funding for Exploration: Yes
Resources
Tribes and cultural resources Flora and fauna
Previous land uses
Water resources
Air quality
Geological resources
Aesthetic resources
Waste and/or hazardous waste
ContinueBack
EXPLORATION
? Start
? Start
? Start
? Start
? Start
? Start
? Start
? Start
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
Update
Search Document Center Permit List Bookmarks Help Save & Exit
Tribal and Cultural Resources
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Is there potential for the activities to cause effects on historic properties? (Sec 106 subsection?)
Yes No
Is there concern about impacts to Native American or Native Hawaiian Interests?
Yes No
ContinueBack
EXPLORATION
?
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
?
Search Document Center Permit List Bookmarks Help Save & Exit
Flora and Fauna Resources
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Are protected species present at the activity location? (If no – ends here)Yes No
Is there potential for the activity to take migratory birds or eggs?Yes
No
Are nesting or wintering bald or golden eagles present at the activity location?
YesNo
Is there potential to impact marine mammals or their habitats?Yes
No
ContinueBack
EXPLORATION
?
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
?
Search Document Center Permit List Bookmarks Help Save & Exit
?
?
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Will the activity affect farmland or livestock? Yes No
Will the activity affect military lands?Yes No
Will the activity affect navigable waters?Yes No
Will the activity affect airports?Yes No
Will the activity involve contaminated lands?Yes No
ContinueBack
EXPLORATION
?
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
?
Search Document Center Permit List Bookmarks Help Save & Exit
?
?
Previous Land Uses
?
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Will the activity affect waters of the United States? Yes No
Will the activity require a point source discharge of a pollutant?Yes No
Will the activity require the dredge and fill of wetlands?Yes No
Will the activity impact a source water protection zone?Yes No
Will the activity discharge to the groundwater?Yes No
Is the Discharge regulated under the state groundwater protection program or underground injection control (UIC) program?
Ground Water ProtectionUIC
ContinueBack
EXPLORATION
?
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
?
Search Document Center Permit List Bookmarks Help Save & Exit
?
?
Water Resources
?
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Are there paleontological resources on the site?Yes No
Will there be impacts to significant geological resources?Yes No
EXPLORATION
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
Search Document Center Permit List Bookmarks Help Save & Exit
Geologic Resources
?
?
ContinueBack
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Will the activity require use of an underground storage tank?Yes No
Will the activity require use of an aboveground storage tank?Yes No
Is a non-excluded hazardous waste discovered at the activity site?Yes No
Will the activity generate a non-excluded hazardous waste?Yes No
Will the activity dispose of solid waste?Yes No
EXPLORATION
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
Search Document Center Permit List Bookmarks Help Save & Exit
Waste and/or Hazardous Waste
?
?
?
?
?
ContinueBack
Water Supply
State level questions here
Edit
ContinueBack
EXPLORATION
?
?
?
Home
Exploration
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Land
Environmental
Resources
Water Supply
Activities
Construction
Search Document Center Permit List Bookmarks Help Save & Exit
?
?
ContinueBack
WELL FIELD
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
Ownership
The following describes the land and mineral ownership for the location of the exploration activities to be conducted
Lease
There is a federal lease in placeYes
(only listed if both surface and mineral are federally owned)
Land Use Planning
The proposed exploration activity does not need to be included in a land use plan
Update
Update
Update?
Activities
The developer plans to complete the Well Field Drilling Pre-Application Process Yes
The project will use the well for production; and re-inject all of the produced fluidYes
The existing drilling permit requires a minor changeYes
?
WELL FIELD
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
Update
?
?
ContinueBack
?
WELL FIELD
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
UpdateConstruction for Well Field Activities
The following questions must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned well field activities.
The drilling activity requires transporting construction Yesequipment or materials on state roads
The drilling activity will encroach on a state or local right of wayYes
The drilling activity will cause storm water to disturb soilYes
The drilling activity requires demolishing an existing structureYes
The drilling activity requires an exception from local zoning regulations Yes
?
?
?
?
ContinueBack
ContinueBack
WELL FIELD
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
UpdateEnvironmental Evaluation
The activity includes a major federal action Yes
?
ContinueBack
WELL FIELD
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
Update
Federal Nexus
Surface Ownership Federal (USFS)
Mineral Ownership Federal (BLM)
Federal Funding for Exploration: Yes
Resources
Tribes and cultural resources Flora and fauna
Previous land uses
Water resources
Air quality
Geological resources
Aesthetic resources
Waste and/or hazardous waste
Start
? Start
?
?
?
?
?
?
?
Start
Start
Start
Start
Start
Start
ContinueBack
WELL FIELD
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
Update
Tribal and Cultural Resources
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned well field development activities.
Is there potential for the activities to cause effects on historic properties? (Sec 106 sub-section?)
Yes No
Is there concern about impacts to Native American or Native Hawaiian Interests?
Yes No
?
?
Flora and Fauna Resources
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Are protected species present at the activity location? (If no – ends here)Yes No
Is there potential for the activity to take migratory birds or eggs?Yes
No
Are nesting or wintering bald or golden eagles present at the activity location?
YesNo
Is there potential to impact marine mammals or their habitats?Yes
No
ContinueBack
?
?
Search Document Center Permit List Bookmarks Help Save & Exit
?
?
WELL FIELD
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Will the activity affect farmland or livestock? Yes No
Will the activity affect military lands?Yes No
Will the activity affect navigable waters?Yes No
Will the activity affect airports?Yes No
Will the activity involve contaminated lands?Yes No
ContinueBack
WELL FIELD
?
?
Search Document Center Permit List Bookmarks Help Save & Exit
?
?
Previous Land Uses
?
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Will the activity affect waters of the United States? Yes No
Will the activity require a point source discharge of a pollutant?Yes No
Will the activity require the dredge and fill of wetlands?Yes No
Will the activity impact a source water protection zone?Yes No
Will the activity discharge to the groundwater?Yes No
Is the Discharge regulated under the state groundwater protection program or underground injection control (UIC) program?
Ground Water ProtectionUIC
ContinueBack
WELL FIELD
?
?
Search Document Center Permit List Bookmarks Help Save & Exit
?
?
Water Resources
?
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Are there paleontological resources on the site?Yes No
Will there be impacts to significant geological resources?Yes No
WELL FIELD
Search Document Center Permit List Bookmarks Help Save & Exit
Geologic Resources
?
?
ContinueBack
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
The following resources must be evaluated multiple times in the development of a geothermal project. Be sure to answer the questions in this section as they pertain to the planned exploration activities.
Will the activity require use of an underground storage tank?Yes No
Will the activity require use of an aboveground storage tank?Yes No
Is a non-excluded hazardous waste discovered at the activity site?Yes No
Will the activity generate a non-excluded hazardous waste?Yes No
Will the activity dispose of solid waste?Yes No
WELL FIELD
Search Document Center Permit List Bookmarks Help Save & Exit
Waste and/or Hazardous Waste
?
?
?
?
?
ContinueBack
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
Water Supply
State level questions here
Edit
ContinueBack
WELL FIELD
?
?
?
Search Document Center Permit List Bookmarks Help Save & Exit
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Well Field
Project Info
Power Plant
Land
Activities
Construction
Environmental
Resources
Water Supply
POWER PLANT
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Project Info
Land
Activities
Construction
Environmental
Resources
Water Supply
Update
?
?
?Power Plant
Activities
The Facility is a cogeneration facility
No
The facility is an independent power producer that exclusively sells to wholesale customersYes
The facility will require a CPCN from a state public utility regulatory authorityYes
ContinueBack
POWER PLANT
Home
Leasing
Exploration
Well Field
Transmission
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Project Info
Land
Activities
Construction
Environmental
Resources
Water Supply
Update
?
?
?Power Plant
Construction for Power Plant Activities
The power plant construction requires transporting construction Yes
equipment or materials on state roads
The power plant construction will encroach on a state or local right of wayYes
The power plant construction will cause storm water to disturb soil
Yes
The power plant construction requires demolishing an existing structureYes
The power plant construction requires an exception from local zoning regulationsYes
The facility involves construction of a power plant
Yes
The power plant requires a county use permitYes
The power plant will provide non-municipal drinking waterYes
The power plant construction will require building a new structure, Yes
grading land or plumbing
?
?
?
?
?
?
ContinueBack
TRANSMISSION
Home
Leasing
Exploration
Well Field
Geothermal Regulatory Roadmap
Operation
Search Document Center Permit List Bookmarks Help Save & Exit
Project Info
Land
Activities
Construction
Environmental
Resources
Water Supply
Update
Transmission
?
?
Power Plant
Activities
The facility will negotiate an interconnection agreementYes
The transmission will be located within the NIETC
Yes
The transmission line is over 200 kV, outside an incorporated city, Yesand not required to be underground.
?
ContinueBack
DRAFT: 6/26/2013
PERMIT LIST
Home
Leasing
Well Field
Power Plant
Transmission
Geothermal Regulatory Roadmap
Operation
Project Info
Search Document Center Permit List Bookmarks Help Save & Exit
Section Permit Agency Contact Status
Exploration
4-FD-a Notice of Intent to Conduct Geophysical Exploration
BLM Nevada Winnemucca District Office5100 E. Winnemucca Blvd.Winnemucca, NV 89445
John D’AmoDistrict Geothermal Lead(715) 623-1500jdamo@blm.gov
Triggers
4-NV-a
Exploration
Show: All | Triggered | Not Triggered