GCTC is an integrated construction company that offers a wide range of services to meet the clients’ needs and requirements.
Gulf Corners for Trading & General Contracting (GCTC) for Industrial Construction is specialized in all types of EPC, Civil, Electrical, Mechanical Projects. GCTC Offers its clients a wide range of diversified high-quality services. Its present area of expertise includes the following;
CIVIL WORKS: • Buildings Construction & Renovation • Road Construction Works• Steel Structure Erection• Earth Works Activates• Concrete Tank Repair • Infrastructure Construction • Scaffolding Erection • Dewatering and Shoring
ELECTRICAL & INSTRUMENTATION WORKS:• Supply and Installation of Electrical Equipment• Installation of Power Transformers, Power Cables• Lighting Systems • Cathodic Protection for Wellhead & Pipelines• Overhead Power lines• Testing & Commissioning for Power Transformers• Fire Alarm Control Systems• Supply & Installation of CCTV system• Control panel & Control Cables
MECHANICAL WORKS:• Specialized in T&I Shutdown Activities• Repair & Maintenance of Valves• Hydrotesting• Protective Coating for Steel, Concrete, Pipes and Storage Tanks• Torqueing & Tensioning• Hydro Jetting• Sand Blasting & Grit blasting• Coating & Painting• Pipeline Construction • Maintenance of Water Sewage Tanks• Supply & Installation of HVAC System
Scope of Business
2
1- Company Name: Gulf Corners for Trading & General Contracting
2- Name of Owners: Dr. Ali AbdullahEng. Salem Saeed Salem
3- Head Office Address: Kingdom of Saudi ArabiaDammam 32252Prince Mohamed Bin Fahd Rd.P.O. Box 6767TEL: +966 138 351 657FAX: +966 138 327 501
4- Web Site: www.gcec.com.sa5- E-Mail: info@gcec.com.sa
6- GOVERNMENT CERTIFICATIONCR.: 2050086821ZAKAT CERTIFICATE: 3008191762CHAMBER OF COMMERCE: 69649
7- REGISTERED CONTRACTOR FOR:SAUDI ARAMCO: 10051508SCECO: 5008340 SABIC: 507233
GENERAL INFORMATION
GENERAL INFORMATION
3
GCTC Completed the Shutdown Activities at GOSP 2 &3 in Shaybah safely. It was the biggest T&I shutdown project in Shaybah so far. Scope of Work includes Torqueing & Tensioning, Nitrogen Purging, Scaffolding, steaming, Hydro jetting, Vacuum Cleaning, Sand blasting, Painting, Inspection, Box up and lining up the system etc.Client: Saudi AramcoContract No. 6510922880Year of Completion: 2019Discipline: T&I Shutdown Activities
T & I SHUTDOWN Location: GOSP 2 & GOSP 3, SHAYBAH
GCTC Completed the Shutdown Activities at GOSP 4 in Shaybah safely and a week before of due date. Scope of Work includes Torqueing & Tensioning, Nitrogen Purging, Scaffolding, steaming, Hydro jetting, Vacuum Cleaning, Sand blasting, Painting, Inspection, Box up and lining up the system etc.Client: Saudi AramcoContract No. 6510911105Year of Completion: 2019Discipline: T&I Shutdown Activities
T & I SHUTDOWN Location: GOSP 4, SHAYBAH
STP-Piping and T&I ActivitiesLocation: SHAYBAHThe scope of work comprised with supply and Installation of 8” & 6” PVC S40 pipeline with Valves, flanges and fittings. Supply, fabrication, welding and installation of stainless steel 3”pipeline with fittings.Client: Saudi AramcoYear of Completion: 2020Discipline: Mechanical Activities
4
The scope of work, it includes the upgradation of three instrument control panels and its sequencer panel for Shaybah Gosp-2 B09 Plant and connecting the new control panels with existing DCS.Client: Saudi AramcoContract No. 6510689770Year of Completion: In Progress / 2020Discipline: E & I Works
UPGRADATION OF THREE INSTRUMENT AIR COM-PRESSOR CONTROL SYSTEM IN GOSP 2Location: GOSP 2, SHAYBAH
The Project comprised procurement, installation, testing and commissioning of a complete working CCTV system which includes, CCTV camera, fiber optic cable, converters, transceivers, equipment cabinets, camera pole, fiber patch panel, Ethernet data switch, equipment cabinet, video recorders, servers and associated VMS software/licensesClient: Saudi AramcoContract No. 6510913390 Year of Completion: In Progress / 2020Discipline: Civil, E & I Works
INSTALLATION OF CCTV SYSTEM Location: SHAYBAH GOSP-2 & GOSP-3
In Scope of work for this project it includes complete supply and construction of Operation Support Buildings including Civil works, E & I works, Fire fighting, HVAC System etc.Client: Tekfen / Saudi AramcoYear of Completion: In Progress / 2020Discipline: Civil, E & I Activities
Construction of Operation and Security Building location: Ghazal R/H & UNYZ GGM
5
This Scope of Work includes Complete Supply and Construction of New RTU Shelter including Installation of Plumbing and Drains, Supply and installation of Fire Protection System, Supply and Installation of complete HVAC System, Supply & Installation of Complete Lighting System of New RTU Shelter.Client: SNC Lavalin /Saudi AramcoContract No. KHRS-SC-671-00075Year of Completion: In Progress / 2020Discipline: Civil, E & I Works
CONSTRUCTION OF RTU SHELTER Location: NORTH HARADH GGM & GHAZAL RH-A&B GGM
The project comprised building structure for three chemical stores, concrete foundations, Acid drain system to chemical storage tank, installation of 250 CMU walls etc.Client: Saudi AramcoContract No. 6510780711Year of Completion: 2016Discipline: Civil & Structural Works
CONSTRUCTION OF CHEMICAL STORAGES Bulding UWIP-I - UWIP-III-ADWIP-Ilocation: UTHMANIYA WATER INJECTION PLANT
This scope of work constitutes the basis for the construction of an extension at the North-East corner of the existing building #113. The work involved extension for Conference Conference Room, Restroom, Coffee room and Storage room.Client: Saudi AramcoContract No. 6510842099Year of Completion: 2019Discipline: Civil, E & I
RTPMSD MATERIALS UNIT BUILDING RENOVATIONLocation: RASTANURA
6
This project comprised Demolishing and Replacement of existing deteriorated PV solar system with a new resized PV system, Site access road stabilization, Site preparation, Pre casting concrete works, Shelter preparation, System commissioning, Shelter and PV Max installation, Conduits, Trenching and Cable pulling.Client: Watad/Saudi AramcoContract No. MIS-PPO-0003-2017Year of Completion: 2017Discipline: E & I works, PV System
REPLACE PHOTOVOLTAIC SYSTEM FOR CATHOD-IC PROTECTION SK-65 Location: SAFANIYAH
In scope of work it includes installation of fence & gates. Fabrication, coating, installation crash barriers & guard rails. Hydrotesting for blow down lines. Installation of cable markers, grounding, fabrication and installation of steel covers for LDS.Client: Saudi AramcoContract No. 6510817148Year of Completion: 2018Discipline: Civil, E & I, Mechanical, Structural
REMAINING CONSTRUCTON ACTIVITIESLocation: SHAYBAH NGL PIPELINE
The project comprised installation of solar panels for valves and scrapper trap stations for NGL pipeline Km 0 to Km 633. It includes all types of Civil, Electrical, Mechanical, E & I, Cathodic Protection and Commissioning Activities.Client: Saudi AramcoContract No. 6510689770Year of Completion: 2015Discipline: Civil, Electrical, Mechanical, E& I, CP, Solar System
INSTALLATION OF SOLAR SYSTEM Location: SHAYBAH NGL PIPELINE
7
In this project company removed the existing roof asbestos and replace corrugated roofing sheet sandwich panel for Terminal South Coast Guard Sargent rooms at Ras Taunora terminal.Client: Saudi AramcoContract No. 6510748581Year of Completion: 2016Discipline: Civil & Structural Works
BUILDING UPGRADATION OF COAST GUARDLocation: RAS TANURA
The project comprised removing & installation of 230kv 3-phase air disconnect switches, DC panel installation at control room, AC,DC & control cable laying and termination as per cable routing, repair existing civil foundation.Client: Xervon/Saudi Electricity CompanyContract No. M3051/110Year of Completion: 2017Discipline: Civil, Electrical
INSTALLATION OF 230KV 3-PHASE/DC Location: HOFUF, AL AHSA
Construction of concrete duct bank and base from, construction of 115KV direct burned with PVC sleeves, construction of 115KV duct bank with all support structure, demolishing of existing foundation and replace with the asphalt, relocation of existing foundations. Client: Xervon/Saudi Electricity CompanyContract No. M3064-33 Year of Completion: 2018Discipline: Electrical
SEC-REPL. OF NINE 115 KV BOCBS IN JMBDLocation: Jubail
8
The project comprised well site preparation, well site type-III fence, electrification & lighting, installation of PDHMS surface panel, well site instrumentation, cathode protection, wellhead guardrail and operating platform, mechanical and steel structural works etc.Client: Saudi kad/ Saudi AramcoContract No. 16011001Year of Completion: 2017Discipline: Civil, Electrical, Mechanical, E& I, CP, Solar System
FLOW/TRUNKLINE & SCRAPER AREALocation: ABU HADRIYAH ABHD-135 OBS WELL
The project comprised well site preparation. Company was appointed to do Civil, Structural, Mechanical, Piping, Electrical, Instrumentation, Hydrostatic testing, Well cathodic protection etc. Client: Wasmi/Saudi AramcoContract No. 20/06WH2017-05-00040Year of Completion: 2017Discipline: Civil, E & I,Steel Structure, CP
KHUFF GAS WELL TINT-53,MADRIKA-5Location: HARADH
Scope of work for this project includes Berming & Stabilization of mainline pipe berming Seg. I, II & III. Exposure and safeguarding of CP test cable to above of berm.Client: Saudi AramcoContract No. 6510752382Year of Completion: 2016Discipline: Civil, E & I
SHAYBAH NGL BERMING PROJECTLocation: SHAYBAH NGL PIPE LINE (KM 0 to KM 50)
9
10
11
Classification: Saudi Aramco: Company General Use
Good Afternoon,
I would like to formally inform you that Gulf Corners for Trading and General Trading Company have passed the pre-qualification for Off Grid PV Battery Installation.
Kind Regards
Samreen
Samreen Akhtar
Power Systems, Contracts Unit
Saudi Aramco, LIP Area, Building 3107 Dhahran 31311, KSA
Tel: +966-(0)13-8729181
email: samreen.akhtar@aramco.com
Web: www.saudiaramco.com
Please consider the environment before printing this email.
This email has been classified as Saudi Aramco: Company General Use by Akhtar, Samreen J on Monday, July 23, 2018 4:36:53 PM.
Saudi Arabia, Dammam 32552, Prince Mohamed Bin Fahd Rd. P.O. Box 6767Tel.: +966(013) 835 1657 Fax: +966 (013) 832 7501
info@gcec.com.sa www.gcec.com.sa