GANTRY COVERED WITH NOISE / DUST BARRIER

Post on 20-Nov-2021

4 views 0 download

Transcript of GANTRY COVERED WITH NOISE / DUST BARRIER

MTR Corporation LimitedKwun Tong Line Extension Contract No. NEX/2207 Environmental Impact Assessment

TYPICAL LAYOUT OF ENCLOSURE FOR MUCKOUT POINTS

Figure:

Scale:

7.22

NTS

Rev:

GANTRY COVERED WITH

NOISE / DUST BARRIER