FM 2499 From: Spinks Road To: FM 1171. PUBLIC HEARING November 16, 2004. FM 2499 Study Area. N. End Project. Tonight’s Public Hearing Covers- FM 2499 from Spinks Road to FM 1171. Begin Project. Tonight’s Hearing . Public Hearing Process Project Design and Environmental Presentations - PowerPoint PPT Presentation

Transcript of FM 2499 From: Spinks Road To: FM 1171

1

FM 2499FM 2499From: Spinks RoadFrom: Spinks Road

To: FM 1171To: FM 1171

PUBLIC HEARINGPUBLIC HEARING

November 16, 2004November 16, 2004

2

FM 2499 Study AreaFM 2499 Study Area

Tonight’s Public Hearing Covers-FM 2499 from Spinks Road

to FM 1171

N

Begin Project

End Project

3

Tonight’sTonight’s HearingHearing......

Public Hearing Process

Project Design and

Environmental

Presentations

Right of Way Acquisition

Process Recess Comments

4

Tonight’sTonight’s HearingHearing......

Public Hearing Process

Project Design and

Environmental

Presentations

Right of Way Acquisition

Process Recess Comments

5

FM 2499 FM 2499 Project DescriptionProject Description

Widen Existing Facility from 4 lanes to 6 lanes Lengthen left-turn bays to allow main-lane traffic to flow

freely Construct noise walls at two locations Upgrade Intersections at:

FM 3040 FM 1171

Modify median openings just north and south of FM 3040

6

TYPICAL SECTIONSFM 2499FM 2499

Existing

Proposed

7

FM 2499 Project CostFM 2499 Project Cost

Construction: $3.5MDesign: $ 0.5MTOTAL: $4.0M

8

FM 2499 FM 2499 Purpose and Need of ProjectPurpose and Need of Project

Population Increases Traffic Volume Increases Traffic Congestion Increases Noise Levels Increase Air Quality Decreases Mobility Suffers

9

FM 2499FM 2499Environmental EvaluationEnvironmental Evaluation

• Regional And Community Growth• Economic Impacts• Land Use• Public Facilities And Services• Community Cohesion And Environmental Justice• Displacements And Relocations• Parkland And 4(f) Properties• Jurisdictional Waters And Wetlands• Water Quality• Flood Plain• Threatened/Endangered Species• Historical And Archaeological Sites• Aesthetic Considerations• Prime, Unique And Special Farmland Impacts• Air Quality Assessment• Noise Assessment• Hazardous Waste/Substance• Construction

10

FM 2499 Public HearingFM 2499 Public Hearing

Public Hearing Process

Project Design and

Environmental

Presentations

Right of Way Acquisition

Process Recess Comments

11

Tonight’sTonight’s HearingHearing......

Public Hearing Process

Project Design and

Environmental

Presentations

Right of Way Acquisition

Process Recess Comments

12

Right-of-Way Acquisition Right-of-Way Acquisition ProcessProcess

• Environmental Clearance• Local Agency Agreements• Approved Right of Way Map• Funding• Release from TxDOT Austin to Begin

Acquisition Process

1. TxDOT Obtains:

13

Right-of-Way Acquisition Right-of-Way Acquisition ProcessProcess

• Property Title Information• Five Year Sales Data• Preliminary Title Commitment

…Agency then makes pre-appraisal contacts with property owners.

2. Agency Orders:

14

Right-of-Way Acquisition Right-of-Way Acquisition ProcessProcess

• Appraisers Contacts Owner• Appraisers Submit Appraisals• TxDOT Reviews Appraisals for Approval

3. Acquiring Agency Assigns Independent Appraisers:

15

Right-of-Way Acquisition Right-of-Way Acquisition ProcessProcess

• Appraised Value of Property• Compensable Damages to Remaining

Real Property • Relocation Assistance

4. Agency’s Acquisition Agent Presents Offer to Property Owner, Including:

16

Right-of-Way Acquisition Right-of-Way Acquisition ProcessProcess

a. Donate Land,

b. Accept Offer,

c. Submit Counter Offer,

if Appropriate.

d. Begin Eminent Domain Proceedings, if

Agreement on Value is not Reached.

5. Property Owner may then:

17

Right-of-Way Acquisition Right-of-Way Acquisition ProcessProcess

• Owner Signs Deed & Memorandum of

Agreement• Agency Issues Warrant to Owner & Title

Company• Owner Closes at Title Company and is

Compensated for New Right-of-Way

5b. When Owner Accepts:

18

Right-of-Way Acquisition Right-of-Way Acquisition ProcessProcess

• Owner May Submit Counter Offer if Owner

Believes it does not Represent Fair Market

Value• Agency Reviews Counter Offer and Either

Accepts or Rejects It• If Rejected, Owner may Accept Original Offer

or Proceed to Eminent Domain

5c. Owner Counter Offers:

19

Right-of-Way Acquisition Right-of-Way Acquisition ProcessProcess

• Court Appoints 3 Commissioners to Hear Owner & Agency

• Commissioners Decide Award• Agency Deposits Award in Registry of Court

& Takes Possession• Either Owner or Acquiring Agency Shall Have

the Right to Appeal to Jury Trial

5d. Eminent Domain:

20

Tonight’sTonight’s HearingHearing......

Public Hearing Process

Project Design and

Environmental

Presentations

Right of Way Acquisition

Process Recess Comments

21

Write us:Write us:

Fax us:Fax us:

Craig Hancock, P.E., TxDOT,Craig Hancock, P.E., TxDOT,PO Box 133067, Dallas, TX 75313-3067PO Box 133067, Dallas, TX 75313-3067 ororCraig Hancock, P.E., TxDOT,Craig Hancock, P.E., TxDOT,4777 East Hwy 80, Mesquite, TX 75150-66434777 East Hwy 80, Mesquite, TX 75150-6643

(214) 320-4470(214) 320-4470

Speak Here Tonight,Speak Here Tonight,Submit Written Comments Here Tonight,Submit Written Comments Here Tonight,

-or--or-

Written Comments Must Be Postmarked by November 26, 2004

Comments / InputComments / Input